BlockBefore

Ponderosa Way Bridge, Spanning the North Fork of the American River at Ponderosa Way, Applegate

Ponderosa Way Bridge, Spanning the North Fork of the American River at Ponderosa Way, Applegate, Placer County, CA. Surveyed as HAER CA-2380, with a 4,209-word written history.

From the record

“As a component of the greater Ponderosa Way project, the Ponderosa Way Bridge is associated with events that have made a significant contribution to the broad patterns of history both nationally and statewide (National Register of Historic Places Criterion A).”

Written record, HAER CA-2380 survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2380 · the record runs 4209 words · one of 28 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

111 words

Source document Quoted word for word from HAER CA-2380. Not written, edited or summarised by this site.

Spanning the North Fork of the American River, approximately 2.5 miles east of Applegate, within the Auburn State Recreation Area, Placer County, California The Ponderosa Way Bridge over the North Fork of the American River is located at latitude: , longitude: . The coordinates were taken from the northeast corner of the bridge and were obtained in March through Google Earth using the World Geodetic System geographic coordinate system (datum), which is accurate to approximately +/- 3 meters. U.S. Geological Survey (USGS) Quads: Colfax, California and Greenwood, California. The location of the Ponderosa Way Bridge has no restriction on its release to the public. Present Owner/ Occupant: U.S. Bureau of Reclamation

Significance

219 words

Source document Quoted word for word from HAER CA-2380. Not written, edited or summarised by this site.

As a component of the greater Ponderosa Way project, the Ponderosa Way Bridge is associated with events that have made a significant contribution to the broad patterns of history both nationally and statewide (National Register of Historic Places Criterion A). The Civilian Conservation Corps and U.S. Forest Service completed the Ponderosa Way Firebreak Project between and The massive project cleared 800 miles for fire protection along the western slope of the Sierra Nevada region. The project was designed to separate ponderosa pine forests from the foothills on the eastern edge of the Central Valley. Ponderosa Way was the largest CCC project completed in California, using approximately CCC workers.

The subject Ponderosa Way Bridge is one of over bridges constructed in California by the CCC and one of many that were completed to support Ponderosa Way Road and the greater Ponderosa Way Firebreak. The design employed a Parker pony truss. The Parker truss was considered an advancement in bridge engineering as an evolution of the Pratt truss, and was commonly utilized during the late nineteenth and early twentieth centuries. Historian(s): Leesa Gratreak, architectural historian Engineering, Inc.), completed the initial survey and evaluation of the Ponderosa PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 2) Way Bridge in August Jessica M. Forbes, architectural historian Engineering, Inc.), completed this HAER report in April

Written history

2736 words

Source document Quoted word for word from HAER CA-2380. Not written, edited or summarised by this site.

The Federal Highway Administration Central Federal Lands Highway Division (FHWA-CFLHD) sponsored the completion of this HAER documentation to satisfy mitigation requirements for adverse effects associated with the replacement of the Ponderosa Way Bridge spanning the North Fork of the American River, in accordance with Section 106 of the National Historic Preservation Act of as amended. Bill Dewey (Bill Dewey Photography) completed the large format photographs, and Jessica M. Forbes prepared the historical report. Leesa Gratreak and Nancy Jepsen, technical editor Engineering, Inc.), edited and assisted in formatting the document. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 3) Part I. Historical Information A. Physical History: 1. Date(s) of Construction: 2. Architect/Engineer: U.S.

Forest Service 3. Builder/Contractor/Supplier: Max Sidler of Redlands, and Halsey Machine & Manufacturing Company 4. Original plans and construction: The as-built drawings for the bridge indicate the design was based on a standard design that the U.S. Forest Service employed in both local and regional projects in the The drawing for the pony truss was originally prepared in September and the bridge plan, profile, substructure, and approaches were designed and approved in February The bridge design drawings were completed by the U.S. Forest Service, under direction of the regional engineer E. W. Kramer. Two additional designers are noted on the plans as and ; however, it is unclear who those individuals are.

The as-built drawings show the bridge with wood railings, which were later replaced, as detailed in the following section. 5. Alterations and additions: The bridge deck currently has three layers of wood decking material, indicating that one additional full layer of decking and one layer of stripped plank decking (which covers only the vehicular tire tread path), have been added on top of the original wood surface decking over time. The original decking layer, secondary transverse layer, and tertiary perpendicular planking appear to have utilized 2 x 8 timbers and all three are visually similar. The additional decking material was not a substantial alteration as the original decking appears to remain underneath.

The original wood railings were replaced with steel pipe and steel cable barriers at an unknown date. Based on material deterioration and visible rust, the pipe and cables were likely added to the bridge over forty-five years ago. Vertical steel pipe posts attach to the steel crossbeams below the bridge deck, between which the steel cables are strung and attached. Within the Parker truss span, the steel cable railing attaches directly to the truss, requiring small triangular steel welds to stabilize the cable, as well as small holes drilled in truss members to attach the cable. The two wing walls, though visually similar in their splayed, cast-in-place concrete design, appear to have been constructed separately.

The south wing wall, as seen at close visual inspection, was formed contemporaneously with the south concrete abutment and has a seamless transition between the concrete components; however, the north wing wall shows a joint between the abutment and the wing wall, indicating it was attached with a separate PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 4) board-formed pour. Based on the age of the concrete, deterioration, and similar granular content, the north wing wall was likely added shortly after the bridge was completed. As the two wing walls are visually similar, the addition on the north wing wall does not detract from the bridge s significance. Lastly, concrete reinforcement has been added to the pier within the channel of the river. The repair was made to damaged and eroded areas.

The visual prominence of the concrete reinforcement varies depending on the fluctuating depth of the river. B. Historical Context Construction of the Ponderosa Way Firebreak, also known formally as the Ponderosa Way Project and simply as Ponderosa Way, was undertaken by the CCC between the fall of and December Ponderosa Way was the largest project undertaken by the CCC in California and included the creation of both a physical firebreak through the clearing of forested land as well as a truck route for emergency vehicles in the case of a forest fire (Ponderosa Way Road). Ponderosa Way Road extends nearly 800 miles along the western slope of the Sierra Nevada Mountains, from its northern terminus at the Shasta Bear Lookout to its southern terminus at the Kern County border.

Ponderosa Way Road is located roughly parallel to the firebreak along its length, skirting the edge of the cleared timber path, which also continues on the down-slope side of the road in some sections. 1 There was great need for the project as the portion of the Sierra Nevada foothills where the project was being erected had been the greatest fire hazard in the state for over eighty years, and growing populations continued to stretch further east from the Central Valley floor towards the forest. 2 As described by State Forester M. B. Pratt during the project s construction: Studies have shown that repeated fires have caused the timber to be pushed back from 10 to 20 miles along the entire front of the Sierra range.

Ponderosa Way should provide of tremendous value as a front line firebreak where the protection forces of the state and United States forestry service will make a stand to prevent further recession of the timber line. 3 In addition to firefighting access, Ponderosa Way Road was also expected to provide unprecedented recreation access to the forest lands of the Sierra Nevada and provide a new scenic drive unlike any that had been developed in the state prior, based on its location and size. 4 As 1 Alison T. Otis, William D. Honey, Thomas C. Hogg, and Kimberly K. Lakin, The Forest Service and The Civilian Conservation Corps: (U.S. Department of Agriculture, 42; Ponderosa Way, San Anselmo Herald. September 21, 1. 2 Ponderosa Way, 1.

3 Efforts to Finish Fire Break Made, Healdsburg Tribune, March 30, 4. 4 Ponderosa Way, 3. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 5) stated in a news article, It [Ponderosa Way] will open up an immense new recreational area for citizens of California and tourists. 5 Initial survey for the project occurred in the fall of under the direction of Associate Regional Forester Clarence E. Dunstand and Associate Silviculturist A. Everett Wieslander. J. E. Elliott, supervisor of the San Bernardino National Forest, was placed in charge of the project, including supervision of the extensive CCC staff and crew totaling by the road s completion.

6 Elliott took leave from his Forest Service duties and relocated his wife and daughter to supervise the project, which appears to have been one of, if not the, greatest achievements of his career with the Forest Service. 7 Supplies for the completion of Ponderosa Way came from a variety of contractors, including metal chains from Max Sidler of Redlands, and steel from the Halsey Machine & Manufacturing Company of San Bernardino. 8 In March the CCC program in California was under threat of being dismantled unless managers could demonstrate a strong purpose and need, and could show that plans were underway to ensure men were kept busy. This led to a conference between the California Chamber of Commerce and President Franklin D.

Roosevelt to discuss plans developed between state and federal forestry officials. The conference was intended to persuade Roosevelt to extend the program for another year. At that meeting, the chamber introduced the 800-mile-long Ponderosa Way firebreak and access road project to the president, and organizers were able to guarantee that the CCC could continue to work in California through March of Thus, the project can be credited for both extending the CCC program and providing it with its single biggest contribution to the state of California. 9 Immediately following the conference with President Roosevelt, steps were underway to corral the workforce needed to complete the extensive task of finishing Ponderosa Way. This included state emergency response administrator R. C.

Blanton announcing accelerated construction plans that would concentrate thousands of otherwise idle Californians from multiple existing CCC camps. 10 The men known to have worked on the project originated from at least twenty-eight separate CCC camps throughout the state, most from within Shasta, Yuba, and Tuolumne Counties. At least 5 CCC Camp Jobs Good for a Year, The Sotoyome Scimitar, March 1, 2. 6 Otis et al., The Forest Service and The Civilian Conservation Corps: 42; 7 Elliott Leaves for New Duties, San Bernardino Sun, October 13, 13; Builds Firebreak, San Bernardino Sun, April 12, 5. 8 Contracts for Materials Set, San Bernardino Sun, February 15, 5. 9 Camps to Be Continued for One Year, Mill Valley Record, March 2, 1; CCC Camp Jobs Good for a Year, 2.

10 Firebreak 800 Miles Long is Being Rushed, The Oakland Tribune, April 2, 16. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 6) 100 came from a CCC camp located 7 miles east of Coulterville and several came from a CCC camp at Applegate. 11 During initial planning, the project was considered the greatest single fire prevention project ever undertaken in the world, and by the time it was nearing completion in the project was still considered and touted as such. 12 By October Ponderosa Way was 75 percent complete, and sections of the roadway were operational. Work began to slow at that time due to winter snowfall. Also in October, a second 200-mile-long firebreak was being planned, Ponderosa No. 2.

That firebreak would extend from Shasta County 200 miles down the coast range into Trinity County. Though mentioned in news articles in no additional information was located regarding Ponderosa No. 2, and it is unclear if it was ever constructed. 13 By February the benefits of the project had already been noticed and realized. The partially completed project had stopped nine out of eleven large fires from spreading into heavy timber stands during the previous dry season. Only two fires were able to sweep past the firebreak, and in both circumstances exceptionally high winds were blamed for the breach. 14 In December the Ponderosa Way firebreak and access road project was deemed complete by Arno B. Cammerer, director of the National Park Service.

The National Park Service also reported that as a result of completing the project, approximately 250 miles of high mountain trails created by the young men during construction would also become available for recreational use. 15 Upon completion, the Healdsburg Enterprise identified the road segment located in the Sequoia National Park as one of the most important and difficult parts of the project: One of the most important units of the entire break is the west boundary truck trail in the Sequoia national park. This trail, which has just been completed after a year and a half of work, extends for a distance of nearly 8 miles.

Because of the great 11 Ponderosa Way, 800-Mile Firebreak Three-Quarters Finished, Forester Says, Calexico Chronicle, October 9, 2; Tuolumne County to Get 2 Winter Camps, Oakland Tribune, November 26, 18; Rodi Lee and Michael G. American River Canyon (Charleston, SC: Arcadia Publishing, 29. Though the most- commonly cited number for the use of CCC labor estimates CCC laborers worked on Ponderosa Way, one article in Popular Science stated that members of the CCC were involved. This number is not cited in any local news sources, which all indicate approximately were involved ( Biggest Fire Break 800 Miles Long, Popular Science, May It is assumed that closer to men were involved. 12 World Record Firebreak is 630 Miles Long, The Healdsburg Enterprise, December 5, 9; Ponderosa Way, 1.

13 Ponderosa Way, 800-Mile Firebreak Three-Quarters Finished, 2. 14 800 Mile Firebreak in Sierras is Built, Santa Cruz Evening News, February 7, 1. 15 World Record Firebreak is 630 Miles Long, 9; Ponderosa Way Nearly Finished. San Bernardino Sun, December 6, 11; Firebreak is 856 Miles Long! Santa Cruz Sentinel, December 6, 8. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 7) amount of natural obstacles that had to be overcome, it ranks as a remarkable engineering feat. 16 Segments of Ponderosa Way Road have been altered and modernized over time, with segments of roadway being paved and reused for residential and commercial purposes or removed/realigned for new roadways. In addition, multiple segments have been left abandoned and subsequently lost.

However, extant components of the project continue to serve an important role in the fighting and suppression of fire within California s Central Valley. During the Telegraph Fire of Ponderosa Way was an instrumental resource for battling the blaze in Mariposa, indicating that the resource continues to provide great value to the residents of California. 17 Intact sections of the roadway and firebreak that have original construction features in place provide an opportunity to interact with the resource, which is largely accessible to the public, and witness original CCC design and construction techniques. As segments of the resource have been lost, remaining segments with high integrity could be considered rare surviving examples.

The Ponderosa Way Bridge was completed in by the in conjunction with the U.S. Forest Service, to support the Ponderosa Way firebreak and truck access route. 18 Due to the hasty construction of the structure, as well as the pace of CCC development in California during the historical documentation of this specific bridge is minimal, and most of the available information has been derived from the as-built drawings and contemporaneous news articles. The subject Ponderosa Way Bridge is one of over bridges constructed in California by the CCC and one of many that were completed to support the 800-mile-long Ponderosa Way Road. 16 World Record Firebreak is 630 Miles Long, 9.

17 California: Ponderosa Way CA, The Living New Deal [website], University of California, Department of Geography, accessed June 18 Lee and American River Canyon, 29 PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 8) Part II. Structural/Design Information A. General Statement: 1. Character: The bridge employs a Parker pony truss. Parker trusses were commonly utilized in bridge construction in the late nineteenth and early twentieth century. Similar to the Pratt style pony truss, which utilizes diagonal members in tension and vertical members in compression, the Parker truss added a polygonal top chord to the original Pratt design, creating a stronger structure. The Parker truss was considered an advancement in bridge engineering as an evolution of the Pratt truss.

This truss type was developed by C. H. Parker in the mid-nineteenth century and due to its arched top chord, the Parker truss irregularly sized pieces sometimes made it more expensive to construct. 19 Parker trusses became commonly used by highway departments across the country in the early twentieth century for pony trusses between approximately 30 and 60 long. 20 2. Condition of fabric: At the time of this report s completion, the Ponderosa Way Bridge was closed to vehicular traffic due to structural deficiencies. Corrosion was present across the steel Parker pony truss and metal post-and-cable railing system, which replaced the original wood railings. The southwest wing wall was damaged.

Visible evidence of concrete repairs was present on all concrete components of the bridge, namely the other wing wall and the structural piers. B. Description: The Ponderosa Way Bridge is a one-lane, steel-truss and wood-deck bridge that spans 222 -0 across the North Fork of the American River. The bridge has a 12 -0 clear travel way between timber curbs. The four-span structure is supported by three concrete piers and abutments on spread footings. Starting at the north end of the bridge, the first two spans are steel I-beam girders on a curved alignment (20 -0 and 40 -0 -long, respectively). The third span is a steel 129 -6 Parker pony truss main span across the river. The fourth span is a 30 -0 -long single I-beam girder span.

The bridge deck is timber with steel post-and-cable barrier railings. Concrete wing walls flank both abutments. The truss structure is secured with bolted and riveted steel joints, as well as via pin connectors located at either end of the main truss span where it rests on the concrete piers. No notable alterations of the steel truss are visible. There are no stamps or plaques located on or adjacent to the bridge with any identifying information 19 Caltrans, Caltrans Historic Bridges Inventory Update: Metal Truss, Moveable, and Steel Arch Bridges Historical Consulting, 30. 20 Parsons Brinkerhoff and Engineering and Industrial Heritage, A Context for Common Historic Bridge Types (Parsons Brinkerhoff, PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 9) Part III. Sources of Information A. Primary

Sources

1063 words

Source document Quoted word for word from HAER CA-2380. Not written, edited or summarised by this site.

Blue Lake Advocate, The. Work by CCC Increased in Second Year. March 9, Page 6. Calexico Chronicle. Ponderosa Way, 800-Mile Firebreak Three-Quarters Finished, Forester Says. October 9, Page 2. Healdsburg Enterprise, The. Efforts to Finish Firebreak Made. April 5, Page 4. World Record Firebreak is 630 Miles Long. December 5, Page 9. Mill Valley Record. Camps to Be Continued for One Year. March 2, Page 1. Oakland Tribune, The. Firebreak 800 Miles Long is Being Rushed. April 2, Page 16. Tuolumne County to Get 2 Winter Camps. November 26, Page 18. Popular Science. Biggest Fire Break 800 Miles Long. May 34. Available online at (accessed June San Anselmo Herald. Ponderosa Way. September 21, Pages 1 and 3. San Bernardino Sun. Builds Firebreak. April 12, Page 5. Contracts for Materials Set.

February 15, Page 5. Elliott Leaves for New Duties. October 13, Page 13. Ponderosa Way Nearly Finished. December 6, Page 11. Santa Cruz Evening News. 800 Mile Firebreak in Sierras is Built. February 7, Page 1. Santa Cruz Sentinel. Firebreak is 856 Miles Long! December 6, Page 8. Sotoyome Scimitar, The. CCC Boys Praised by the California Chamber of Commerce. March 7, Page 4. CCC Camp Jobs Good for a Year. March 1, Page 2. United States Geological Survey (USGS). Colfax, CA [map] 7.5 Minute Series. Washington, United States Department of the Interior, USGS, Greenwood, CA [map] 7.5 Minute Series. Washington, United States Department of the Interior, USGS, PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 10) B. Secondary Caltrans.

Caltrans Historic Bridges Inventory Update: Metal Truss, Moveable, and Steel Arch Bridges. Prepared for State of California, Department of Transportation Environmental Program. JRP Historical Consulting, Lee, Rodi, and Michael G. American River Canyon. Charleston, SC: Arcadia Publishing, Myron, Angel. History of Placer County, California. Oakland, CA: Thompson & West, Otis, Alison T., William D. Honey, Thomas C. Hogg, and Kimberly K. Lakin. The Forest Service and The Civilian Conservation Corps: U.S. Department of Agriculture, Parsons Brinkerhoff and Engineering and Industrial Heritage. A Context for Common Historic Bridge Types, Project Task 15. Prepared for The National Cooperative Highway Research Program, the Transportation Research Council, and the National Research Council.

Parsons Brinkerhoff, University of California. California: Ponderosa Way CA. The Living New Deal [website]. A program of the University of California, Department of Geography. Available online at (accessed June United States Department of Agriculture (USDA). The Civilian Conservation Corps in the California Region. Cleveland National Forest. Available online at (accessed June C. Likely Sources Not Yet Investigated: National Archives in San Bruno, California. Located at Commodore Drive, San Bruno, California. National Archives in Perris, California. Located at Cajalco Road, Perris, California. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 11) Supplemental Materials: Location Map Figure 1. Location of HAER No. CA-2380. 1 1 Figure prepared by HDR Engineering, Inc.

using USGS Colfax and Greenwood Quadrangle Maps PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 12) Color Photographs Figure 2. HAER No. CA-2380, wing walls at north end of bridge, looking southeast (March 1 1 Color photographs by HDR Engineering, Inc. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 13) Figure 3. HAER No. CA-2380, northeast wing wall, looking southwest (March 2 2 Color photographs by HDR Engineering, Inc. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 14) Figure 4. HAER No. CA-2380, railings along northern I-beam span, looking southwest (March 3 3 Color photographs by HDR Engineering, Inc. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 15) Figure 5. HAER No. CA-2380, deck at south end of bridge, looking northwest (March 4 4 Color photographs by HDR Engineering, Inc.

PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 16) Figure 6. HAER No. CA-2380, railings on southern I-beam span and truss details, looking northwest (March 5 5 Color photographs by HDR Engineering, Inc. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 17) Figure 7. HAER No. CA-2380, wing walls at south end of the bridge, looking northwest (March 6 6 Color photographs by HDR Engineering, Inc. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 18) Figure 8. HAER No. CA-2380, southwest wing wall, looking northeast (March 7 7 Color photographs by HDR Engineering, Inc. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 19) Historic Drawings Figure 9. Plan for 129 -6 Truss, 8 8 129 -6 St d Thru Truss. U.S. Department of Agriculture, Forest Service, Region 5. September 11, (Source: Bureau of Reclamation).

PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 20) Figure 9a. Plan for 129 -6 Truss, Detail, 1 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 21) Figure 9b. Plan for 129 -6 Truss, Detail, 2 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 22) Figure 10. Plot Plan and Profile, 9 9 N. Fork American River Bridge, U.S. Department of Agriculture, Forest Service, Region 5, February 8, (Source: Bureau of Reclamation). PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 23) Figure 10a. Plot Plan and Profile, Detail, 1 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 24) Figure Plot Plan and Profile, Detail, 2 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 25) Figure 11. Superstructure Designs, 10 10 N. Fork American River Bridge, U.S.

Department of Agriculture, Forest Service, Region 5, February 8, (Source: Bureau of Reclamation). PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 26) Figure 11a. Superstructure Designs, Detail, 1 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 27) Figure Superstructure Designs, Detail, 2 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 28) Figure 12. Plan for Concrete Details, 11 11 N. Fork American River Bridge, U.S. Department of Agriculture, Forest Service, Region 5, February 8, (Source: Bureau of Reclamation). PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 29) Figure 12a. Plan for Concrete Details, Detail, 1 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 30) Figure Plan for Concrete Details, Detail, 2 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 31) Figure 13.

Plan for Approach Beam Spans, 12 12 N. Fork American River Bridge, U.S. Department of Agriculture, Forest Service, Region 5, February 8, (Source: Bureau of Reclamation). PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 32) Figure 13a. Plan for Approach Beam Spans, Detail, 1 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 33) Figure Plan for Approach Beam Spans, Detail, 1 of 2. PONDEROSA WAY BRIDGE HAER No. CA-2380 (Page 34) Sketch Plan Figure 14. Sketch plan of HAER No. CA-2380 (March 13 13 Sketch plan by HDR Engineering, Inc.

In context

Applegate, California The place record: every map, photograph and survey of this town.
Placer County, California 357 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Applegate

8 records

The federal surveyors worked through Applegate building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,7-1,483 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,4-1,349 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,6-1,315 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,2-1,300 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,5-1,245 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,3-1,204 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,8-1,196 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,1-1,112 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2380. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.