Building 932 is significant as a contributor to the AFSWP "Q" Area, also referred to as "Fairfield Air Force Station (AFS)," the "Air Materiel Command (AMC) West River Depot," and the 11 Air Defense Command (ADC)/Air Defense Group (ADG)." It is interpreted as a rare and distinguishable entity, three components of which are distinctive: the "A" structure, the "C" structure, and the interconnected weapons assembly structures.
This district was designed as four concentrations of buildings and structures within high-security fencing: administrative buildings, communications- intelligence center, power plant, and base spares warehousing (Geo-Marine, Description: This 4,780-square-foot x with a x wing at the northeast comer), "L"-shaped, reinforced concrete masonry building sits perpendicular to "W" Street, with the primary fa9ades facing south and north. It is one of five interconnected, tunnel-vaulted, bunker buildings protected by earthen embankments. A 7' 8"-wide concrete tunnel extends along the south fa9ade, connecting it to the units to its west. A smaller tunnel vault creates an "L" shape to the northeast of the building.
The south fa9ade consists of a clipped concrete gable projecting past the earthen berm, with a shed-roofed entry vestibule extending to its south. This wing is defined by a large, steel, overhead door with horizontal grooves centered on its south fa9ade, and a steel personnel door at its east fa9ade. Attached to the east of this wing is a flat-roofed toilet facility, with single, small, rectangular windows in the upper quarter of both the east and south facades. To the west of the entry vestibule is a flat-roofed concrete wall of the interconnecting tunnel. The east fa9ade consists of the earthen berm with a steel access stair leading to the roof at the south comer and two ventilation chimneys at the north.
The north fa9ade is defined by a large, clipped gable with two Type A blast protection doors below. The door to the east is the smaller of the two, measuring in height, and provides access to the equipment room; while the door to the west, leading into the main space, measures A canopy is above each entrance. Historical Context: Building 932 was designed by Black & Veatch, Kansas City, Missouri, in and revised in Construction was complete in February It consisted of an equipment room that formed an "L" wing to the main space that incorporated three spaces: two outer vestibules and a large, open, central area bisected by a monorail. This facility was fully air-conditioned and was provided with a security alarm and sprinkler system in No major remodelings were recorded.