The ADC Readiness Area at Travis Air Force Base (AFB) offers an extremely coherent cluster of buildings and structures. It occupies a segregated site on the base and is easily recognized as a readiness area supportive of a Fighter Interceptor Squadron (FIS) alert hangar. The cluster possesses a strong quality of time and place, with few exterior modifications to its buildings and no site infill post-1960. Of the installations surveyed for Air Materiel Command (AMC) by Geo-Marine during only this readiness area maintains its historic coherence. The ADC readiness area is physically, and in terms of its Cold War mission, complementary to the presence of the Strategic Air Command (SAC) bomber and tanker compounds (Buildings 810 and of the same period at Travis AFB.
The readiness area, including Building is interpreted as potentially eligible under Criterion C, as an excellent example of the programmatic ADC readiness area, built in a standardized configuration throughout the United States and at selected installations, of highly tactical role in U.S. Air Force air defense during the The ADC readiness area is also interpreted as eligible under Criteria Consideration G, for demonstration of exceptional significance for properties less than 50 years in age (Geo- Marine, Description: This reinforced concrete building with a flat, built-up roof consists of two discernibly separate wings of one and two stories in height. The "L" -shaped facility measures at the single-storied squadron operations wing, and at the two-story readiness crew wing.
The roof is flat, yet has slightly overhanging eaves. The primary fa9ade (southwest) is defined by seven 16-light metal casement windows followed by 2 8-light casements at the second story. The first story incorporates a 3-panel door with a transom and a small awning, followed by 3 8-light casements, a 3-panel door with a transom and like awning, 2 16-light casements, a double 3-panel door and transom within a small porch supported by 2 posts, and an 8-light casement, followed by 4 narrow 12-light casements. The northwest (side) fa9ade is defined by a central personnel door with a small glazing panel, accessed at the second story by a single-run external. stair, flanked by 2 16-light casements. A flat-roofed (slightly, sloped) addition is visible at the south comer of the first story.
The southeast fa9ade (side) consists of a central 8-light casement window, followed by a 20-light fixed sash at the north comer of the second story. Below, is a single-story, flat- roofed (slightly sloped) addition defined by a 24-light casement window, followed by a double door with 3 glazing panels, a 4-light transom and 3-light sidelights, followed by 2 24-light casements (the second of which is topped by an awning). Travis Air Force Base Squadron Operations and Readiness Crew Facility (Building No. HABS No. CA-2669-N (page 2) The northeast (rear) faryade is defined by a single-story, shed-roofed addition connected at the east comer to the main two-story building. It consists of a three-panel door with transom, flanked by two eight-light casement windows.
The second story of the main building is defined by ten 16-light casement windows. The first story incorporates a 3-panel double door with transom and canopy; followed by 3 16-light casements; a small shed-roofed addition with a pair of flush wood doors with integral, metal-louvered panels; a pair of 3-panel doors with sidelights and protected by a canopy; a single 16-light casement window; and a 24-light casement window. This building incorporated both dormitory and operations facilities, including training, flight simulation, control, radio, and weather offices.
Historical Context: The squadron operations wing (for training information and command and control functions) was designed by Barnett, Haynes, Barnett in January and completed in March and the readiness crew wing (for housing the crew that serviced and maintained aircraft not on alert) was designed by Franceschi, Dreyfus & Mullen and Rickey & Brooks in November and completed in December It is similar in program to the standardized design for the ADC readiness crew facility developed in by the Washington, DC, firm of Charles M. Goodman Associates. By the mid- most as-built readiness crew facilities, no longer exacting copies of the standardized design, were the products of local architectural-engineering firms, as was the case for that erected here.
At Travis AFB, ADC built the readiness crew building (Building as a free-standing structure, following it 2 years later with the readiness crew wing to complete the standardized design program Typically, ADC removed its squadron operations from the double-purpose readiness crew building in the first phase of expansion. At this stage, the entire structure became officer and airmen dormitory space, and squadron operations acquired its own building. At Travis AFB, ADC erected a modest squadron operations building (Building even before its squadron operations wing of the standardized readiness crew facility was completed, and well before construction of the readiness crew wing.
It is assumed that ADC immediately moved its squadron operations unit into the free-standing structure, using the squadron operations wing during its first months as dormitory space while the readiness crew wing was under construction, and finally employed the finished two-wing readiness crew building as combined operations- dormitory space, sharing the former activity with Building An air-conditioning system and oxygen shelter were installed in Alterations were made to the readiness crew building in including a Command Post room; a new window was introduced and two windows were blocked off. The architect for these modifications was Charles Dougherty, Architect, and Ike B. Bond was the engineer.
The electrical system was upgraded in In modifications were made to the interior of the training rooms. The roofs were repaired in Few changes have been noted to the exterior of this building.