Building 942 is significant as a contributor to the AFSWP "Q" Area, also referred to as "Fairfield Air Force Station (AFS)," the "Air Materiel Command (AMC) West River Depot," and the 11 Air Defense Command (ADC)/Air Defense Group (ADG)." It is interpreted as a rare and distinguishable entity, three components of which are distinctive: the "A" structure, the "C" structure, and the interconnected weapons assembly structures.
This district was designed as four concentrations of buildings and structures within high-security fencing: administrative buildings, communications- intelligence center, power plant, and base spares warehousing (Geo-Marine, Description: This 4,780-square-foot x with a x wing at the northeast comer), "L"-shaped, reinforced concrete masonry, earth-benned, bunker-type building, sits perpendicular to "W" Street, with the primary fayades facing south and north. It is approximately one block from the five-building plan. The north fayade is a large, clipped-concrete gable with fenestration consisting of two large Type A blast protective doors, followed by a steel personnel door and a smaller Type A blast protective door.
The side facades are covered by earthen embanlanents at roughly 45-degree angles, with a steel access ladder at the northwest corner. The south fayade, originally similar to the north, now is dominated by a single-story, flat-roofed, reinforced concrete addition with a small, front-gabled portico. To its east is a side- gabled picnic area surrounded by wood fencing. Ventilation stacks are visible from all facades. Historical Context: Building 942 was designed by Black & Veatch, Kansas City, Missouri, in and revised in Construction was complete in February. The original interior consisted of a large open space, roughly occupying two-thirds of the building's area. Movable partitions and roll-up curtains bisected the space and were flanked by eight benches and eight rubber mats.
A toilet was in the building's southwest comer, followed by three rooms of varying sizes along the western perimeter. The electrical system was upgraded in In the Precision Measurement Equipment Laboratory was added to the southeastern corner of the building, and the mechanical system was replaced in No other major remodelings were recorded.