The ADC Readiness Area at Travis Air Force Base (AFB) offers an extremely coherent cluster of buildings and structures. It occupies a segregated site on the base and is easily recognized as a readiness area supportive of a Fighter Interceptor Squadron (FIS) alert hangar. The cluster possesses a strong quality of time and place, with few exterior modifications to its buildings and no site infill post-1960. Of the installations surveyed for Air Materiel Command (AMC) by Geo-Marine during only this readiness area maintains its historic coherence. The ADC readiness area is physically, and in terms of its Cold War mission, complementary to the presence of the Strategic Air Command (SAC) bomber and tanker compounds (Buildings 810 and of the same period at Travis AFB.
The readiness area, including Building is interpreted as potentially eligible under Criterion C, as an excellent example of the programmatic ADC readiness area, built in a standardized configuration throughout the United States and at selected installations, of a highly tactical role in U.S. Air Force air defense during the The ADC readiness area is also interpreted as eligible under Criteria Consideration G for demonstration of exceptional significance for properties less than 50 years of age (Geo- Marine, The readiness/maintenance hangar serviced and maintained FIS aircraft not on alert. Description: This 33,873-square-foot, steel-framed, concrete block building measures x 8", with two major offsets of x along the side elevations. Thus, it is roughly "Z"-shaped in plan.
It has a metal-clad, front-gabled roof and is supported by a steel-gable truss. The corrugated metal-sided primary elevation (southeast) faces the runway and is dominated by a full-height sliding industrial door. A 11 recess is centered below the gable, and above the doors. Shed-roofed additions are to either side of the fa,;:ade. The south (side) fa,;:ade is dominated by a shed-roofed wing, with a fenestration pattern com,isting of two paired persomtel doors with recessed bottom panels and glazing in the upper one half of each unit; a similar single personnel door, and a small industrial sash. The north side fa,;:ade is dominated by a sir:.gle-story, shed-roofed, wrap-around addition, with a full-fayade-width corrugated translucent plastic panel below the eave of the main structure.
A central steel industrial string/ribbon window extending the length of the fayade defines the single-story wing. Interspersed among the string/ribbon are two sets of paired doors with recessed panels below, and glazing in the upper one half of each unit. An overhead industrial door has been added to the west of the window. Four paired 4-light casement windows are at the eastern comer, followed by the paired doors, then by Travis Air Force Base Readiness Maintenance Hangar (Building No. HABS No. CA-2669-0 (page 2) 12 identical casements, then by a pair of doors, then by 5 identical casements, then by the overhead door, and then by a string of 3 4-light industrial sashes.
The rear fa<;ade consists of a 20-unit, 9-light, steel, industrial, string/ribbon sash centered immediately below the gable. A single-story, shed-roofed addition ( is below, and extends 5/6 the width of the fa<;ade. It is dominated by a string of 4-light industrial sash windows with personnel doors with recessed panel below and 6-light glazing in the upper half of each unit and a transom above. The fenestration pattern consists of 9 sashes, followed by a single personnel door, followed by 5 sashes, paired doors, 3 sashes, a single door, 4 sashes, a single door, and 13 sashes. At the terminus of this wing, the original hangar fa<;ade is revealed, exposing another single personnel door, followed by an overhead industrial door.
The interior consists of a large, open shop, roughly "L"-shaped in plan, with an exposed truss ceiling, surrounded by offices, holding rooms, supply areas and various shops.
Historical Context: This hangar was based on the original June design by Strobel & Saltzman (shop drawings dated April Modifications were introduced by Falk & Booth (December and the structure was completed in Earl & Wright, Consulting Engineers, prepared designs in for electrical upgrades, which were completed in Minor modifications were noted to the building's interior: a women's restroom was added in and square feet of the interior was remodeled into warehouse space in Major alterations designed by ADDCO/DEED were made in to the facility designated "CEMIRT," including new interior partitions; moving an overhead door; new suspended ceilings in perimeter rooms; and mechanical, electrical, and plumbing modifications.
Radiant heaters were installed in In further modifications by Guyer Santin, Inc., were made to the mechanical systems, and the building was insulated. This building has sustained minimal exterior modifications.