This HAER documentation has been prepared for the U.S. Department of Energy, Livermore Site Office, with supervision from the California State Historic Preservation Office by Alison Garcia Kellar, Senior Architectural Historian, Garavaglia Architecture, Inc. in consultation with Rinaldo Veseliza of Alisto Engineering. In April NNSA Livermore Field Office in consultation with the California State Historic Preservation Officer (SHPO) determined that Buildings 850 and 851A, as contributors to a Hydrodynamic Test Facilities District (District) for their association with a historic pattern of events in nuclear weapons design and testing, met the requirements of the Criteria Consideration G under Criteria A (District) and C.
The district was determined to be eligible for the National Register of Historic Places under Criterion A; Building 851A was also determined to be individually eligible under Criteria A and C. The period of significance for the Site 300 Hydrodynamic Test Facilities was Continuous facility and equipment upgrades to ensure workplace safety and environmental compliance have diminished the property s historic integrity. As such, the Hydrodynamic Test Facility is no longer a potentially eligible historic district.3 3 Ibid. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 3) Part I. Historical Information A. Physical History 1.
Date of erection: Building 850 was designed in and construction was completed in Building 851A was designed in and construction was completed in 2. Architect: Indenco Engineers, Inc., of San Leandro, California, designed and built Buildings 850 and 851A. Indenco was incorporated in California on April 1, Its founder, Joe Salley, had worked for the Manhattan Engineer District during World War II. Indenco specialized in military and industrial facilities, but also served as general contractor on various other projects, working with different architects on school projects, for example. The firm was dissolved in Original and subsequent owners, occupants, uses: The test facilities have always been owned by the U.S.
Government, as part of one of the laboratories of the Atomic Energy Commission (AEC) and its successor agencies (currently the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)). Building 850 was designed and built as a Diagnostics Bunker housing cameras and related diagnostic equipment to photograph detonations of explosive devices on the firing table on top of and extending to the west of the building. It retained that mission until it was taken out of operation in It later served as a camera repair and storage facility. It is no longer in use. Building 851A was also designed and built as an explosives testing facility.
Housing a Linear Accelerator (LINAC) to generate gamma rays in support of X- ray photography of explosives tests, it was the largest of the first five firing facilities built for hydrodynamic testing at Site Although used primarily for conventional explosives testing in recent years, it retains its core purpose as a test facility and remains in use. 3. Builder, contractor, suppliers: Indenco Engineers served as architect/engineer and construction manager for the initial construction of the buildings.
Holmes & Narver, Inc., undertook the addition to Building 851A in 4 Sullivan and Ullrich, Historic Context and Building Assessments, 5 Ibid, The following drawings were used in determining the dates of the physical history of Buildings 850 and 851A: Site 300 General Plans, Civil, Site Location Plan & Vicinity Map, Plant Engineering Library (PEL); Site Diagnostics Bunker Civil, Site and Grading Plan, PSZ1958-0850-0004JA, PEL; Site Diagnostics Bunker Architectural, Floor Plan, PSZ1958-0850-0006JA, PEL; Site HELAC Building No. Title Sheet, Architectural, Index & Notes, PSZ1958-0851-0101JA, PEL; Site HELAC Building No. 851 and Shop, Civil, Site Plan, PSZ1958-0851-0202JA, PEL; Site HELAC Building No. Architectural, Main Floor Plan, PEL; and Site HELAC Building No.
Architectural, Exterior Elevations and Roof Plan, PSZ1958-0851-0110JA. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 4) s Plant Engineering organization oversaw all design and construction. It was also responsible for the minor modifications to both buildings. 4. Original plans and constructions: Indenco Engineers, Inc., of San Leandro was involved in the design and construction of several facilities for particularly at Site It provided the original designs for Building 850 in May and for Building 851A a year later. The designs were based on specifications for its hydrodynamic testing needs.
Indenco also undertook the original construction, completing Building 850 in December and Building 851A in November Both buildings are reinforced concrete floors, ceilings, and walls. The back portion of each is built into the hillside and essentially buried in earth and gravel. Each is topped with a firing table that extends beyond the building s exterior walls. Building 850 is one story, Building 851A is one story with a high-bay extending two stories to house the LINAC. Both were designed to house diagnostic equipment and cameras, as well as the related controls; Building 851A also housed controls for the LINAC. 5. Alterations and additions: Building 850 Building 850 underwent very little change in the years it was in use.
A changing room (Room was added on the north end of the south side in Some activities were relocated within the interior rooms. Room originally the control room, became a camera repair room when the control room activities moved to Room Raised cable-access flooring was installed in Room when the control room moved. The room had housed Z raster oscilloscopes for test diagnosis. No longer in use, those were removed when the control room was relocated. The building otherwise remains as originally designed and built. The building was decommissioned as a hydrodynamic test facility in and eight years later was placed back into use as a camera maintenance repair facility for the firing areas. It is no longer in use.
Building 851A Building 851A experienced more significant and numerous changes over its history, although it, too, remains largely intact in purpose and basic design. In the years immediately after the building opened, a few minor improvements were undertaken. In additional stand-by power for the LINAC injector was added via a new generator in the electrical equipment room (Room and new electrical switches and panels in the electrical and mechanical equipment rooms (Rooms 119 and In a new 12 x 12 generator cover was installed. In a change room was added (Room It was a small room formed by partitioning the existing 6 Site Building 851A, HELAC Bunker, Floor Plan, Stand-by Power for Injector, PSE1961-0851-0106CA, PEL.
LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 5) storage and ready room (Room and giving the existing room a new doorway.7 In the entire built environment underwent a renumbering effort to more clearly align building numbers with locations. Site 300 s facility numbers were changed from 300-series to 800-series. Building 350 became 850 and Building 351 became 851 and was later renumbered again to Building 851A. Their current numbers are used throughout this report. In the two camera ports emerging from the west side of the camera room (Room were replaced on the Firing Table. The existing cast steel cubicles were removed, as were the caulking, waterproofing, and port liner itself.
New 26 long pipes in diameter were installed and epoxy grout used to seal them. 26 in. diameter steel plate covers were installed.8 Also in an overhead bridge crane and 1-ton capacity hoist was installed in the LINAC room.9 In the original detector room located north of the camera room (Room was removed.10 Building 851A gained additional diagnostic capacity in when Holmes & Narver, Inc. completed a significant modification to the west side. The addition included a diagnostics corridor supporting additional cameras, an extension to the existing camera room, and a room to house a Fabry-Perot interferometer.
In raised computer (cable access) flooring was installed in the control room (Room and camera rooms (Rooms 105 and In the earth-filled space between the Fabry-Perot Room and the Control Room was opened up and turned into Room a diagnostics room. A double door frame was cut in the south wall and double leaf doors hung, a new cable trench (12 wide x 12 deep) was dug in the floor along the north and east walls, and a McMaster-Carr capacity jib crane was mounted on the north end of the west wall. The floor slab was sealed, the membrane waterproofing was removed from the walls and they were painted, and a new concrete roof was built.12 The activities housed in the building have moved around and the equipment upgraded over the years.
The control room equipment, in particular, has been 7 Site Building Change Room Addition, Architectural, Plumbing, Ventilation, and Electrical Plans, PSA1968-0851-0601D, PEL. 8 Site Building 851A, Room Camera Port Modification, PEL. 9 Site Building Bridge Crane Installation, PEL. 10 Site Building Detector Room, Detector Room Removal and Camera Stand Installation, PEL. 11 Site Building 851A, Computer Floor, Plan, PSA1989-0851-0102DA, PEL. 12 Site Building 851A, Room Addition, Floor Plan and Notes, PSA1996-0851-0001DA; and Site Building 851A, Room Addition, Partial Floor Plan and Partial Roof Plan and Structural General Notes, 0001DA. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No.
CA-2352 (Page 6) upgraded to accommodate processing and electronic improvements (Figures 11 and The LINAC was completely removed in B. Historical Context: Buildings 850 and 851A are part of s West Firing Area at Site The buildings were added to the site s suite of explosive test facilities as the lab expanded its testing capabilities in the late Both were built to support hydrodynamic testing of nuclear physics package designs.13 Hydrodynamic testing, as its name implies, is the observation of liquids in motion. Nuclear physics packages for nuclear weapons do not contain liquids, but the materials of which they are made, when under extreme pressure, behave like liquids. They are also moving at extremely fast speeds, but not necessarily at a consistent velocity.
The goal in the testing is to determine in detail how the materials behave during and immediately after detonation. Cold War Context The following context related to the development of and the Hydrodynamic Test Facilities was created in as part of the Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment: The primary historic context for assessing the significance of buildings is the Cold War. The Cold War, although still a fairly recent event in US history, has been universally recognized as an event of exceptional significance within the nation s history.
The Cold War spanned the forty-six years from to and encompassed a series of events, policy decisions, and conflicts between the United States and Soviet Union over the economic and political orientation of various countries in Europe, Asia, and the Middle East. In essence, the United States and the Soviet Union had incompatible and conflicting visions for the fate of the post-war world. The US was wedded to a world that closely mirrored its capitalist and democratic economic and political structure, while the Soviet Union hoped for a world that resembled its communist political and economic structure. The Cold War dominated almost every aspect of American life-diplomatic, military, social, economic, scientific, and political.
Nevertheless, only two aspects of Cold War history are relevant to the history of the arms race and the more general history of nuclear science.14 Origins In September the AEC established as a second nuclear weapons design facility as part of the overall build-up in the U.S. nuclear weapons complex at the time. Physicists Ernest O. Lawrence of the University of California Radiation Laboratory and Edward Teller of the University of Chicago advocated the founding of a second physics 13 The items being tested were not full-up physics cores for the nuclear weapons, but designs containing little or no radioactive material. None of the tests at Site 300 involve radioactive materials achieving criticality. Full-scale nuclear testing was conducted at U.S.
test sites in the Pacific or at the Nevada Test Site. 14 Sullivan and Ullrich, Historic Context and Building Assessments, LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 7) laboratory to accelerate the design and production of a thermonuclear weapon, arguing that these were the next advance in atomic weaponry. Neither Lawrence nor Teller felt that Los Alamos National Laboratory (LANL)15 was working aggressively enough to achieve this goal. Their argument was well-received within the AEC, as the Soviet Union had detonated its first atomic weapon in adding a nuclear arms race element to the early Cold War.
American policymakers, fearing the potential actions of an enemy armed with nuclear weapons, determined to deter their use by significantly increasing the U.S. stockpile s size and capability. Although the primary goal of was to design and develop a thermonuclear weapon, Herbert York, the laboratory s first director, insisted on including non-weapons research in the mission of the laboratory. The four missions he articulated for were designing thermonuclear weapons, providing diagnostic measurements for weapons tests for Los Alamos and Livermore, developing a controlled thermonuclear reaction for power sources, and basic physics research.
He hoped to attract the brightest young scientists in the country and felt that there should be breadth and depth of research options beyond nuclear weapons investigations to attract them.16 The lab was initially established as another site of Lawrence s University of California Radiation Laboratory, from which it would ultimately separate. Although it pursued non- weapons research, its early growth and focus were predominantly on nuclear weapons. Specifically, the physics package or core design, including the high explosives used to compress the radioactive material to criticality. There were a variety of new nuclear weapon designs proceeding through the nuclear weapons complex in the second half of the supporting the U.S. policy of deterrence.
s designs were part of that and the design effort including testing. As early as administrators noted the need for a remote site to conduct high explosive tests for the weapons program. Obtaining land for a self-sufficient test site was deemed critical to the long-term success of s weapons design program. Without one would be reliant on LANL to provide both fabrication and test firing of new device designs. began the search for suitable land. It needed to be remote, with sufficient space (at least one mile in radius) for a lb.
detonation, as near as possible to Livermore (less than a one-hour drive and accessible in all weather conditions), and reasonably free of cover to avoid fire hazards.17 The site selected was named Site Site 300 s Site 300 occupies approximately acres in the rolling hills of the Diablo Range. It is approximately 17 miles southeast of Livermore and 12 miles southwest of Tracy, by road. It houses s explosives and developmental testing facilities. Site 300 provides the facilities that allow the multiple, simultaneous diagnostics capability 15 The current names of the national laboratories are used throughout this report to avoid repeated explication of titles.
16 University of California, Lawrence Livermore National Laboratory, 30 Years of Technical Excellence (Livermore: Lawrence Livermore National Laboratory, 4; and Herbert York, Making Weapons, Talking Peace, Physics Today (April 44 45. 17 Preliminary Proposal for Site 1 July Ernest Orlando Berkeley National Laboratory Declassified Records, 43 95, Box 4, File 19 10 Archives; and Herbert York to General Kenneth E. Fields, UCRL High Explosive Test Requirements, Ernest Orlando Lawrence Berkeley National Laboratory Declassified Records, Box 1, File 13, Archives. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 8) that has become the single most outstanding feature of the approach to hydrodynamic testing.
18 As other non-nuclear weapons mission areas have expanded, diagnostic facilities at Site 300 used in support of them, as well. In the University of California Regents authorized the University to negotiate a ten- year land lease near Tracy for a research facility.19 Rather than lease, in the AEC acquired acres of ranch land from William J. Kelley, F. B. Kelley, and Bert Banta to conduct high explosives (HE) experiments.20 In purchased additional acres to the west of the existing Site This area, identified as the West Firing Area, was acquired to host additional and larger hydrodynamic testing as program needs expanded in response to the demands for a growing U.S. nuclear stockpile. Buildings 850 and 851A were built in the West Firing Area. Facilities at Site 300 are grouped by function.
Support activities are primarily located in the General Services Area in the southeastern tip of the site, near the entrance. The Physical Environment and Dynamic Test Areas are just north of the General Services Area. The Process and Chemistry areas are in the southeast portion of the site, just west of the General Services and Environmental Test areas. The East and West Firing Areas take up the northern portion of Site occupying most of the site, with and acres respectively. 21 They require a great deal of space, not just for the test activities they house, but also for the buffer zones around the facilities.
The East Firing Area was established first, with the decision to expand the number of facilities as well as the size of the shots fired pushing the acquisition of additional land for the West Firing Area. The key facilities forming the West Firing Area were Buildings 850 and 851A. These facilities could handle larger high explosive shots than the East Firing Area. Once completed, they became s primary hydrodynamic test facilities and 851A remained a key part of hydrodynamic testing until completion of the renovation of Building 801 into a Confined Firing Facility in Completed first, Building 850 opened in as a diagnostics bunker. It housed multiple diagnostic features that could be deployed to capture data from explosives tests on its firing table.
These included high-speed cameras and pin systems to capture images and track velocity of the materials in the test devices as detonation occurred. 18 Ruth and Going, Inc., Development Plan: Site Box Folder Site Development Plan, Archives, 9. 19 Copy of page from October 22, UC Regents Minutes, in Summary of the Attached Correspondence, Subject: LLL/UC Regents/ERDA-San Agreements for Safety of Site 300 Operations, Box Folder Site 300 Safety, Archives. 20 Proposed Weapons Research Remote Site, Site 300 Memorandum, 18 October Administrative Files Donald Cooksey, Lawrence Berkeley Laboratory, Folder Reactors, Plant, Livermore Site Archives. 21 Ruth and Going, 22. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No.
CA-2352 (Page 9) Building 851A, housing a linear accelerator, was originally identified as the high explosive linear accelerator (HELAC) Building. The term HELAC was later dropped and replaced with the more generic and widely used LINAC. Like Building 851A had cameras and pin diagnostics capabilities. In addition, it was designed specifically to house the linear accelerator. In a slightly unusual deployment of an accelerator at the time, the 851A LINAC was used to produce gamma rays for taking high-speed photographs of test items during an explosion. Based on an design, the LINAC was built by ARCO.22 Approximately 35 long, 6 high, and 3 wide, the machine could pulse electrons to 35 million electron volts (MeV).
It produces long (up to 30 microseconds) pulses of electrons, which ride a radiofrequency envelope down the length of the accelerator. The beam pulses continuously into a heavy metal target and generates gamma rays. The gamma rays are directed at the firing table and generate images of the test objects. The LINAC is on the mezzanine level in the LINAC high bay of Building 851A. The rest of the building is single story. A capacitor bank sits on the main level below the LINAC, sending power to it. Radiofrequency modulators generate the pulse, which is then injected into the LINAC. Winding coils and steering magnets keep the beam straight as it moves along the accelerator to the tungsten target, which is inside a heavily reinforced concrete bullnose between the mezzanine and the firing table.
The machine has been modified over the years. The injector was replaced in the early the modulators were moved from the building s main level to the mezzanine and various components have been replaced. Its basic operation and purpose remained intact over time, however. High-speed cameras also capture the shot in detail. Using cameras to capture high explosive detonations was not a new development when Site 300 opened, but s decision to place cameras in a bunkered building under the firing table and point them upward to film the tests was unusual. Part of the overall effort to get in closer to the explosive shot without destroying the equipment and emphasizing stability and repeatability in test set-ups, the design was remarkably effective.
also pursued improved camera designs, by the working with industry to produce a high-speed image converter camera system that allowed dynamic spatial resolution, provided multiple optical paths with different magnifications and could operate at a high-ambient- light level. In an addition was put on the north end of Building 851A. This included a diagnostics corridor that extended under the firing table, a Fabry-Perot room, and an extension to the existing camera room. This added 14 camera ports to the firing table (6 in the diagnostics corridor, 7 in the extension of the camera room, and 1 in the new Fabry-Perot Room).23 22 J. S. Norton to D. A. Bruce, memorandum, 8 January Administrative Files Donald Cooksey, Lawrence Berkeley Laboratory, Archives.
23 Site Bunker 851A, Modifications, Legend and Site Plan, PSE1986-0851-0101D, PEL; Site Bunker 851A, Modifications, Lighting Plan, PSE1986-0851-0103D, PEL; Site Bunker 851A, Modifications, Floor Plan LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 10) The new Fabry-Perot room housed a Fabry-Perot interferometer, which measures the Doppler shift of light as an object moves. This gives velocity, not as the overall distance over time, but as it changes as the object moves. It offers a more granular understanding of how the materials in a test item are moving during detonation and how the blast wave and its forces move.
New image converter cameras, powered by a ruby laser, were added to Building 851A in the As described in cameras and mirrors on the firing table were set up around a test object. Data from all sources is captured within Building 851A. 70 mm camera film captures 26 separate sets of images of each shot. The film is loaded and hand-processed within the building. Over time, the numbers of new weapons entering the stockpile declined and, by the Building 850 was used for a variety of conventional high explosives tests. Building 851A also had conventional high explosive testing added to its mission in later years. In Building 850 was decommissioned as a hydrodynamic test facility. In the facility was converted to a camera maintenance repair facility for the firing area.
The building was fully decommissioned in and remains inactive. Building 851A did all of the hydrodynamic shots needed prior to full-scale nuclear testing at the Nevada Test Site until the mid-1980s when Building 801 came online. At this point, it does mostly conventional HE shots. In proposed removing the LINAC from Building 851A and pursuing other modifications to the facility. In the remaining equipment of the original LINAC was removed. and Section, PEL; Site Bunker 851A, Modifications, Roof Plan and Details, PEL; and Site Bunker 851A, Modifications, Retaining Walls, PEL. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 11) Part II. Structural/ Design/ Equipment Information A. General Statement: 1.
Architectural character: Both facilities have an industrial look and feel. Building 850 is a heavily reinforced concrete bunker built into the hillside and topped with a firing table that extends to the northwest. The thick concrete walls and roof, as well as the camera ports extending from the camera room up to the firing table, reflect its purpose as a diagnostic facility for high explosive testing. The camera room (Room and control room (Room reinforce the impression in their combinations of rugged concrete construction with technologically sophisticated (for their era) camera mounts, ports, and equipment racks. Rooms referenced in this description and in the following text are identified in the building s key plan (Figure 1).
Building 851A is a heavily reinforced concrete building housing a LINAC in the mezzanine of a high bay on its north side. The building sits under a firing table that extends to the west and south. The building s design, particularly the reinforced concrete walls and ceiling and the blast doors reflect its purpose as a high explosive test facility. Rooms referenced in the following descriptions are identified in the building s key plans (Figures 2 and 3). 2. Condition of fabric: Building 850 is in fair condition. The building is inactive and the cameras, related diagnostic equipment, and controls have been removed. Building 851A is in good condition. The building is in active use and is maintained by s plant engineering organization. B. Description of Exterior: 1.
Overall dimensions: Building 850 The main section of Building 850 is a rectangle with the northwest corner cut off (the north and west walls do not meet at a right angle, but are connected by a northwest wall). The loading dock area is also a rectangle aligned with the main building on their south sides, but extending past the main building on the north side. The sub-station attached to the building extends from the loading dock s south side (Figure 1). The main building s east wall is 61 , south wall 59 , west wall 47 , northwest wall 19 8 , and north wall 45 . The loading dock is 29 wide x 73 4 long with the substation 10 8 x 14 8 . The resulting building footprint is approximately 88 8 wide x 90 2 long. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No.
CA-2352 (Page 12) Building 851A The main floor of Building 851A is basically a rectangle with an L-shaped extension off of its west end (Figure 2). The front (east) side is 86 3 wide, including the exterior loading docks/walkways that extend around the north, east, and south sides. The south wall extends 107 6 from the east end to the end of the original building s west wall. The addition begins 19 11 north of the south exterior edge. The south wall of the addition is 36 2 1/8 , extending from the west wall of the original building to the east wall of the tall leg of the L-shaped addition. The east wall of the addition then extends 28 8 to the south. A 15 6 wall forms the top of the L. The west wall of the addition is 119 .
The north wall of the addition is 53 8 1/8 and meets the north end of the LINAC high bay. The west wall of the high bay is 27 and the building s north wall is 105 6 . The LINAC mezzanine of the high bay is a rectangle with the bullnose extending from its west end (Figure 3). The east and west sides are 26 and the north and south are 54 6 . The bullnose extends another 19 to the west. It is 9 wide at the nose (the west end). The resulting building footprint is approximately 146 wide x 143 8 1/8 long. 2. Foundations: Building 850 has a reinforced concrete foundation. Building 851A has a reinforced concrete foundation on a 6 rock fill base course. The LINAC high bay has 2 of filter material fill at its base. Above that is a 6 rock fill followed by a vibration insulator.
A poured concrete foundation rests on that and extends to the floor of the mezzanine level, where the LINAC sits. The bullnose sits on a 3 steel-reinforced concrete foundation, with draining channels. 3. Walls: Building 850 s south and east exterior walls are 1 thick reinforced concrete; the west, north, and northwest walls are 2 thick concrete. The south, west, northwest and north walls have membrane waterproofing on their outer layer, where the gravel buildup to the firing table meets the building. Building 851A s east and south exterior walls are 1 thick reinforced concrete; the west walls are 2 thick reinforced concrete.
The east portion of the north wall is 1 thick reinforced concrete but the west portion of that wall (the exterior of the LINAC high bay area) is 3 thick reinforced concrete. The walls are 15 high on all sides except the LINAC high bay, which rises to 26 4 above the loading dock level. 4. Structural system, framing: These are both steel-framed concrete buildings with extensive steel reinforcing in the poured walls. The LINAC foundation LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 13) includes a vibration insulator that separates the LINAC and its beam from the rest of the building s activities. The bullnose has steel reinforcement closely spaced throughout its design. In addition, steel mesh is placed in the concrete of its outer edges. 5.
Porches and loading docks: Both buildings have loading docks on their front entrance sides. 6. Chimneys: There are no chimneys in either building. 7. Openings: a. Doorways and doors: Building 850 This building has two doors on the east side. The main entrance is a large steel blast door in a 4 thick frame. It opens to an inner two-leaf metal swinging door with a window in each side. The building also has a metal naval hatch-type door just to the north of the main door. This leads into the shower/change room addition. Building 851A Building 851A has several exterior doors. The front (east) side is the primary building entrance, with two large steel blast doors providing access to Corridor 2 and Room 122 (Figure 2). The entrance to Room 121 is open.
Room 119 has two openings on its east side. The north doorway is open with no door and the larger, south doorway has a chain link fence and gates (Figure 2). There are two pedestrian blast doors on the building s north side. One is near the west end of the wall and leads from the firing table, just behind the bullnose, into the mezzanine. The other is slightly further west, on the north side of the bullnose (Figure 3). There are two pedestrian doors in the diagnostics corridor addition. A single-leaf door opens from the south side of the equipment room (Room and a double pedestrian door opens from the south half of the east side of Room 27. b. Windows and shutters: Building 850 has no exterior windows. The double swinging doors inside the main entrance have a window in each leaf.
Building 851A has no windows. 8. Roof: a. Shape, covering: Building 850 s roof is flat. It is 1 thick reinforced concrete covered with a light concrete fill, a waterproofing membrane, grout, and then gravel fill to LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 14) the firing table above. An 8 wide concrete curb extends 2 above the roof to hold the gravel fill below the surface of the firing table. Steel plates are in place on part of the firing table surface. Building 851A s roof is flat. It is constructed of 1 thick square poured concrete slabs with steel reinforcing running both north-south and east- west through them. A 1 wide concrete curb extends 2 above the roof along the east wall, forming the edge of the firing table.
The roof is topped with #8 x 5/8 graded gravel cover 2 deep, forming the firing table. The roof of the LINAC high bay is also 1 thick reinforced poured concrete topped with a 5 deep gravel cover C. Description of Interior: 1. Floor plans: Building 850 The current floor plan is shown in Figure 1. Personnel access the building via the loading dock area on the building s east side. An east-west corridor (Corridor 1 on the floor plan) leads into the building and intersects with an east-west corridor. All rooms are accessed off of these corridors, except Room 1010A, which is accessible through Room and two exterior rooms, Room and which sit on the front of the building in the loading dock area. Rooms and their purpose prior to the building s shutdown are described below.
They are listed in counterclockwise order beginning with at the building s entrance. Room is the shower/change room. It is not accessed from the building s interior, but via the steel naval hatch on the loading dock. Room is an office. Room originally housed a bank of capacitors; it was converted to office space. Room is the camera room. Room is an office. Room was originally the control room. When the control room moved to Room this space was converted to camera repair. Room originally housed the Z raster oscilloscopes. It then became the control room. Room 1010A is an electronics shop. Room formerly a lab, is empty. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 15) Room is a restroom.
Room originally was the machine shop, housing a lathe, drill press, and mill. That activity was moved to the Arco building north of Building Room is on the south end of the loading dock/parking area. It is accessed via steps from the parking area. Building 851A Current floor plans are shown in Figures 2 and 3. The primary personnel entrance to the building is via the door into Corridor 2 on the loading dock on the east side. The corridor proceeds westward, passing offices and laboratories on the south side and the large control room (Room to the north. The corridor extends past Rooms 131 and 129 before reaching the diagnostic room (Room at the far west end of the building.
The rooms along the building s north side are accessed via the control room (Room the diagnostics room (Room or the mechanical room space (Room A stairway to the LINAC high bay mezzanine is located in Room The extant rooms and their purposes are listed below. They are listed as encountered when entering the building at the east end of Corridor 2 and moving roughly clockwise. Room 124 is a storage and ready room. Room 120 is a restroom. Room 118 is a restroom. Room 118A is a janitor s closet. Room 117 was built as the electronic rack room, which over time was referred to as the control room. It houses controls for both the firing table and the LINAC (Figures 11 and Room 116 is a dark room. The facility has always processed its own film. Room 114 is an electronics maintenance area.
Room 112 is an office. Room 110 is currently an office space. Room 108 housed the flash x-ray and its capacitors. It is now referred to as the FXR Darkroom. Room 131 is a diagnostic room. It was added in After the addition, it was an earth-filled void area between the control room (Room and the Fabry-Perot room (Room LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 16) Room 129 was created as part of the addition. It was built to house the Fabry-Perot interferometer and was designated the Fabry-Perot room. It is now known as the laser room. Until recently, it housed a laser to support the interferometer, as well as a ruby laser illuminator for the image converter cameras.
The lasers were brought from another facility and installed here in the Room 127 was built as part of the addition. It is the diagnostics corridor and has additional hardening, as it sits under the firing table. Room 128 is the extension of the original camera room (Room It was created as part of the addition. Room 105 is the original camera room. Room 107 is an office. Room 113 was originally the modulator room for the LINAC (Figure When the modulators were upgraded and moved to the mezzanine, pulsed regulators were installed in Room Room 115 is a work area. The capacitors for the LINAC are housed near the stairs to the mezzanine. Room 119 is an electrical equipment room. Room 121 is a mechanical area housing gas bottle racks. Room 122 is the building s mechanical room.
The second floor is the mezzanine of the LINAC high bay. 2. Stairways: There are no interior stairways in Building In Building 851A, A straight flight of stairs leads up from the north side of Room 115 on the building s main floor into the east end of the mezzanine in the LINAC high bay area. There is a short flight of concrete steps down from the entrance into the mechanical room (Room 3. Flooring: Building 850 This building has poured concrete floors in all rooms and corridors. Corridors and laboratory spaces (including the camera room) have 12 wide cable trenching with steel covers along the edges or across workspaces (Figures 8 and 9. Trenches extend between each of the camera mounts and the northwest wall in Room (Figure 6).
LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 17) There is raised access flooring above the concrete floor in the control room (Room The corridor rises in a ramp at the connection to Room Building 851A Building 851A has poured concrete floors throughout; some are covered in other flooring materials. The camera rooms (Rooms 105 and control room (Room and laser room (Room have 2 x2 raised access floor tiles above their concrete floor, allowing access to cable configurations. There is 12 x12 vinyl floor tile in the FXR dark room (Room the modulator room (Room and the offices. 4. Wall and ceiling finish: a. Wall finish: Building 850 has concrete exterior walls and a concrete roof. As a result, the exterior walls of the interior are concrete.
Although they are painted, they are not covered in other materials. The interior south wall of the camera room (Room is metal. All other interior walls are gypsum board, painted. Building 851A has concrete exterior walls and a concrete roof. The interior rooms are often concrete, painted but otherwise uncovered. The camera rooms (Rooms 105 and have concrete walls painted white. In Room 108 the west and south walls are concrete and the east and north are painted gypsum board. Room 113 has metal walls. The control room (Room has gypsum board walls, although the racks of control equipment effectively form their own walls. The walls at Room 127 are painted concrete. Room 129 has concrete walls; sound deadening panels were installed on the walls to reduce disturbances to the laser beams.
In Room 131 the east and north walls are concrete and the west and south walls are painted gypsum wall board. b. Ceiling finish: The ceiling at Building 850 is concrete. With few exceptions, the ceilings in Building 851A are concrete. Room 113 has a metal ceiling. Room 117 has a suspended ceiling of ceiling tile panels. The ceiling in Room 131 is 2 x2 suspended ceiling tiles. 6. Openings: a. Doorways and doors: There are both wood and metal doors providing pedestrian access to offices and labs throughout these buildings. Building 850 This building has two sets of swinging two-leaf doors. One set is immediately inside the main entrance (just inside the steel vault-type exterior door); the doors are metal with windows for pedestrian views of oncoming traffic.
The other is at the entrance to the control room (Room This set is wood, also with windows in each leaf. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 18) The office doors are single-leaf wood doors. The door between Rooms and is a single-leaf pedestrian door. It is wood (Figure 9). Building 851A Building 851A has wood office doors and predominantly metal doors for laboratories and technical areas. The access between Rooms 108 and 110 is provided via a metal-and-cloth revolving door. Room 115 has a sliding lead door for shielding. Room 129 has a metal door. Room 131 is a metal double door. b. Windows: At Building there are windows in each of the double doors just inside of the steel door at the main entrance.
A second set of double doors at the entrance to the control room also has a window in each swinging door. Building 851A has no internal windows. In Building 851A, the LINAC beam runs through an opening in the west end of the bullnose to reach the firing table. 8. Mechanical Equipment: a. Heating, air conditioning, ventilation: Building 850 has a substation on the east end of its south side, a colling tower on the south end of its east side, and a mechanical room (Room supplying heating, ventilation, and air conditioning to the building. Ductwork is apparent in the ceilings of the building s rooms (Figures 8 and 9). Building 851A s electrical and mechanical rooms (Rooms 119 and bring heating, air conditioning, and ventilation into the building. It is routed via ductwork in the ceiling. b.
Lighting: There are no historically significant light fixtures in either building. Building 850 has dropped fluorescent lights suspended throughout the corridors, control room and camera room. Building 851A has fluorescent lighting throughout. There are dropped fluorescent light panels suspended from the ceiling in Rooms 127 and In the camera room (Rooms 105 and the lights are mounted at an angle at the top of the walls. In the rest of the building, fluorescent lights are mounted at the ceiling level. c. Plumbing: There are no historically significant plumbing fixtures in either building. Water is supplied via s infrastructure. d. Cranes: LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No.
CA-2352 (Page 19) Building 850 has a crane rail (no crane) running east-west in the loading dock ceiling. There is a small crane rail lb. capacity) in the ceiling of the camera room (Room (Figure 7). Building 851A has a McMaster-Carr capacity jib crane is mounted on the north end of the west wall of Room There is an overhead bridge crane and 1-ton capacity hoist in the LINAC high bay. There is also a crane and hoist in the bullnose. D. Machines: 1. Camera and equipment ports Building 850 has four camera ports extend from Room up through the roof and to the firing table. They are in cast steel cubicles at the top. They are arranged in a northwest line; their centers sit 6 8 from the outer edge of the building s northwest wall.
Building 851A has 8 camera ports extending up from the original camera room (Room and 7 from its extension (Room In addition, there are 6 ports in the diagnostic corridor (Room and one near the north wall of the Fabry-Perot room (Room They rise as steel tubes and have steel covers at the firing table level. 2. Firing Tables Building 850 s roof is covered in 2 of gravel, which forms the top of the firing table. The firing table extends beyond the edge of the building 40 to the north, 55 to the northwest, and 68 to the west. Beyond the building s roof, the firing table is covered in a 4 gravel fill. There are two poles on the firing table for suspension shots with conventional high explosives. There is also a 155 mm Howitzer on the table (in a tented space). This is Gun No.
made by the Vermont Arsenal in it was used previously at the drop tower and at Building 812 at Site Building 851A s roof is also covered in 2 of gravel, which forms the firing table. Beyond the building s edge the firing table is 4 thick. 3. Bullnose Building 851A s LINAC beam extends out to the firing table through a heavily reinforced concrete structure referred to as the bullnose. The bullnose meets the building at the west end of the LINAC high-bay mezzanine. It is a protective shield for the vacuum tube and target of the LINAC, allowing the beamline to reach the test object. It effectively separates the LINAC from the explosives testing.
Named for its shape, the bullnose is a heavily reinforced concrete structure extending 19 6 from the outer wall of the west end of the LINAC high bay and standing 17 2 . The bottom of the west edge of the bullnose flares out slightly so the top of the structure is 19 from the LINAC high bay s outer wall. The bullnose s east side is 21 8 wide. The north and south sides of the bullnose extend straight out from the high bay for 8 10 then taper towards the nose, which is 9 wide. Similarly, the top LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No.
CA-2352 (Page 20) extends for 13 6 from the high bay wall and then tapers down towards the nose, the top of which stands 14 2 .24 The bullnose walls are sitting on a 3 thick concrete foundation and have a 2 2 thick concrete floor. The ceiling is 4 2 thick and the front wall is 2 6 thick. It is all formed with reinforced concrete, with a steel mesh in the outer portion of the concrete forming the tapered walls to the nose. The nose is capped with 4 steel plating with an opening for the beamline to exit. The purpose of the reinforcement and steel plating is evident in the scarring on the bullnose s face and sides from the explosives testing that has taken place on the firing table in front of it.
In addition to the front opening allowing the beamline through, the bullnose has two other openings. It has a steel blast door on the north side leading out to the firing table. It also has a 6 x4 steel hatch in the top to access the interior. A jib crane is mounted on the top of the bullnose, just north of the center steel hatch plate. E. Site Layout: Buildings 850 and 851A sit in the West Firing Area of Site among rolling hills in locations chosen for their rising hillsides. The locations thus serve as natural buffers for explosives testing, directing the energy from detonations up instead of out toward other facilities. Building 850 is built into the hillside, with the land contoured and shaped around it to form a road that rises along the south side of the building to the firing table.
The parking area in front of the east side of the building is paved and there is no foliage on or around it or near the building and its firing table, although the hillsides are covered with native plants. The firing table on top of the building extends beyond the building to the north and west. Recent decontamination of the site and erosion control efforts resulted in some re-contouring of the hillsides around the building. Building 851A is built into the hillside. The land around it is contoured and shaped to form the firing table that sits on the building s roof and extends to the west of it.
A large earth berm is formed to rise behind the firing table, providing an observation area, on which equipment can be mounted (Figure A road curves from the front (east side) of the building around to the north of the facility to the west side behind the earth berm (Figure 1. Outbuildings: Building 850 This building has a small (14 8 x 10 8 ) sub-station is attached to the east end of the building s south exterior wall. Its south and west walls are 8 thick concrete and its east side is open, with a woven wire fence and gate. 24 Details of the bullnose s construction are taken from a site visit and Site HELAC Building No. 851A, Architectural, Bullnose Details, PSZ1958-0851-0118JA, PEL; Site HELAC Building No.
851A, Structural, Elastic Bullnose Plan and Details, PEL; and Site HELAC Building No. 851A, Structural, Elastic Bullnose Details, PEL. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 21) A small metal bunker sits to the north of Building It is a corrugated steel Arco building with naval hatch doors on its east side. It served as a machine shop supporting Building 850 activities and housed lathes, drill presses, and grinders. Building 851A Building 851A has two outbuildings. Building was built at the same time as Building 851A. It was designed to be a Radio Frequency Development and Repair Shop supporting the LINAC activities in 851A. It is currently used as a machine shop.
It is located to the east of Building 851A, across the road/parking area (Figure 4). The restroom and shower were remodeled in Building an Armco arch building, is connected to the loading dock close to the north end of the east side of Building 851A (Figure 5). It was built in the to house loading of film cassettes. It has since been turned into a machine shop. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 22) Part III. Operations and Process A. Operations: The key facilities forming the West Firing Area of s Site 300 were Buildings 850 and 851A. Buildings 850 and 851A were built to support hydrodynamic testing the observation of liquids in motion of nuclear physics package designs.
Nuclear physics packages for nuclear weapons do not contain liquids, but the materials of which they are made, when under extreme pressure, behave like liquids. The goal in the testing is to determine in detail how the materials behave during and immediately after detonation. Once completed, they became s primary hydrodynamic test facilities and 851A remained a key part of hydrodynamic testing until completion of the renovation of Building 801 into a Confined Firing Facility in B. Technology: Building 850 Completed first, Building 850 opened in as a diagnostics bunker. It housed multiple diagnostic features that could be deployed to capture data from explosives tests on its firing table.
These included high-speed cameras and pin systems to capture images and track velocity of the materials in the test devices as detonation occurred. Building 851A Building 851A, housing a linear accelerator, was originally identified as the HELAC Building. HELAC stood for high explosive linear accelerator; the term was later dropped and replaced with the more generic and widely used LINAC. Like Building 851A had cameras and pin diagnostics capabilities. In addition, it was designed specifically to house the linear accelerator. In a slightly unusual deployment of an accelerator at the time, the 851A LINAC was used to produce gamma rays for taking high-speed photographs of test items during an explosion. Based on an design, the LINAC was built by ARCO.
Approximately 35 long, 6 high, and 3 wide, the machine could pulse electrons to 35 million electron volts (MeV). It produces long (up to 30 microseconds) pulses of electrons, which ride a radiofrequency envelope down the length of the accelerator. The beam pulses continuously into a heavy metal target and generates gamma rays. The gamma rays are directed at the firing table and generate images of the test objects. The LINAC is on the mezzanine level in the LINAC high bay of Building 851A. The rest of the building is single story. A capacitor bank sits on the main level below the LINAC, sending power to it. Radiofrequency modulators generate the pulse, which is then injected into the LINAC.
Winding coils and steering magnets keep the beam straight as it moves along the accelerator to the tungsten target, which is inside a heavily reinforced concrete bullnose between the mezzanine and the firing table. The machine has been modified over the years. The injector was replaced in the early the modulators were moved from the building s main level to the mezzanine and various components have been replaced. Its basic operation and purpose remained intact over time, however. High-speed cameras also capture the shot in detail.
Using cameras to capture high explosive detonations was not a new development when Site 300 opened, but s decision to place cameras in a bunkered building under the firing table and point them upward to film the tests was LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 23) unusual. Part of the overall effort to get in closer to the explosive shot without destroying the equipment and emphasizing stability and repeatability in test set-ups, the design was remarkably effective.
also pursued improved camera designs, by the working with industry to produce a high-speed image converter camera system that allowed dynamic spatial resolution, provided multiple optical paths with different magnifications and could operate at a high- ambient-light level. In an addition was put on the north end of Building 851A that included a diagnostics corridor that extended under the firing table, a Fabry-Perot room, and an extension to the existing camera room. This added 14 camera ports to the firing table (6 in the diagnostics corridor, 7 in the extension of the camera room, and 1 in the new Fabry-Perot Room). The new Fabry-Perot room housed a Fabry-Perot interferometer, which measures the Doppler shift of light as an object moves.
This gives velocity, not as the overall distance over time, but as it changes as the object moves. It offers a more granular understanding of how the materials in a test item are moving during detonation and how the blast wave and its forces move. New image converter cameras, powered by a ruby laser, were added to Building 851A in the As described in cameras and mirrors on the firing table were set up around a test object. Data from all sources is captured within Building 851A. 70 mm camera film captures 26 separate sets of images of each shot. The film is loaded and hand-processed within the building. D. End Product: Buildings 850 and 851A were built for the hydrodynamic testing of nuclear physics packages for nuclear weapons.
As such, the buildings did not produce a physical end product that was shipped elsewhere, but the testing performed at the buildings influenced the design of nuclear weapons. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 24) Part IV. Sources of Information A. Architectural Drawings: Architectural drawings are held in the Lawrence Livermore National Laboratory Plant Engineering Library. Site 300 General Plans, Civil, Site Location Plan & Vicinity Map, Site Diagnostics Bunker Civil, Site and Grading Plan, PSZ1958-0850-0004JA. Site Diagnostics Bunker Architectural, Floor Plan, PSZ1958-0850-0006JA. Site Diagnostics Bunker Architectural, Sections and Details, PSZ1958-0850-0007JA.
Site Diagnostics Bunker Structural, Foundation Plan, Site Diagnostics Bunker Structural, Roof Plan, PSZ1958-0850-0009JA. Site Diagnostics Bunker Structural, Wall Elevations, Site Diagnostics Bunker Structural, Wall Elevations, Site Diagnostics Bunker Structural, Sections, Site Diagnostics Bunker Structural, Sections, Site Diagnostics Bunker Structural, Sections, PSZ1958-0850-0014JA. Site Diagnostics Bunker Structural, Miscellaneous, PSZ1958-0850-0015JA. Site Diagnostics Bunker Civil, Grading Cross Sections, PSZ1958-0850-0005JA. Site Typical Details, Architectural, Blast Door Details, Site Typical Details, Architectural, Interior Details, Site Typical Details, Architectural, Exterior Details, PSZ1958-0850-0031JA. Site Bunker Bullnose Openings, PSC1958-0851-0101A.
Site Title Sheet, Architectural, Index and Notes, PSZ1958-0851-0101JA. Site General Plans, Civil, Site Location Plan and Vicinity Map, PSZ1958-0851-0102JA. Site HELAC Project, Civil, Site Plan, PSZ1958-0851-0103JA. Site HELAC Building No. 851A and Shop, Civil, Site Plan, PSZ1958-0851-0104JA. Site HELAC Building No. 851A, Civil, Grading Plan, LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 25) Site HELAC Building No. 851A, Architectural, Main Floor Plan, Site HELAC Building No. 851A, Architectural, HELAC Room and Mezzanine Plans, Site HELAC Building No. 851A, Architectural, Exterior Elevations and Roof Plan, PSZ1958-0851-0110JA. Site HELAC Building No. 851A, Architectural, Cross Sections, PSZ1958-0851-0111JA. Site HELAC Building No.
851A, Architectural, Blast Door Details, 0116JA. Site HELAC Building No. 851A, Architectural, Bullnose Details, PSZ1958-0851-0118JA. Site HELAC Building No. 851A, Architectural, Miscellaneous Details, 0119JA. Site HELAC Building No. 851A, Structural, Foundation Plan, Site HELAC Building No. 851A, Structural, Roof Plan and HELAC Foundation Plan, Site HELAC Building No. 851A, Structural, HELAC Roof Plan and Wall Elevations, Site HELAC Building No. 851A, Structural, Elastic Bullnose Plan and Details, Site HELAC Building No. 851A, Structural, Elastic Bullnose Details, Site HELAC Building No. 851A, Structural, Revised Bullnose Details, 0131JA.
Site Water Tank and Well, Civil, Site and Grading Plans, Site Water Tank, Civil, Plan, Elevation, Sections and Details, Site HELAC Road, Civil, Plan and Profile, PSZ1958-0851-0151JA. Site Roads and Parking, Civil, Paving and Road, Typical Details, PSZ1958-0851-0153JA. Site Title Sheet, Architectural, Index and Notes, PSZ1958-0851-0201JA. Site HELAC Building No. 851A and Shop, PSZ1958-0851-0202JA. Site HELAC Building No. 851A, Structural, Roof Plan and HELAC Foundation Plan, LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 26) Site R. F. Development and Repair Shop, Architectural, Plan, Elevations, Schedules and Details, PSZ1958-0851-0210JA. Site HELAC Bunker, Building 851A, Stand-by Power for Injector, Floor Plan, PSE1961- 0851-0106CA.
Site Building 851A, Generator Cover, PSC1962-0851-0101CA. Site Cooling Towers at Building 851A, Shrapnel Shelter for Cooling Towers, Floor Plan, Roof Plan, and Elevations, PSS1962-0851-0201DA. Site Building Development and Repair Shop, Shrapnel Shelter for Cooling Towers, Details and Sections, PSS1962-0851-0202DA. Site Building Change Room Addition, Architectural, Plumbing, Ventilating, and Electrical Plans, PSA1963-0851-0001D. Site Building 851A, Check In Station, PSE1966-0851-0101
Complex, Key Plan, PSE1968-0851-0101B. Site Building Tube House Relocation, Section View, Site Building Rain Shelter, Site Building 851A, Room Camera Port Modification, Site Building Firing Table Road, Plan, Site Building Bridge Crane Installation, Site Building 851A, Steel Washer Bullnose, PSM1976-0851-0106A. Site Building 851A, Proposed Building Additions, Floor Plan and Sections, PSA1977- Site Building Detector Room Removal and Camera Stand Installation, Plans, Sections, Details, Site Building HELAC Complex, Ready Room Addition, Floor Plan, Details, Foundation Plan, PSA1978-0851-0101DA. Site Building HELAC Complex, Ready Room Addition, Sections, Elevations, Details, PSA1978-0851-0102D. Site Building Building Modification for VISAR Installation, PSA1978-0851-0105C.
Site Building Room PAKO Dark Room, Architectural, PSA1979-0851-0101C. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 27) Site Building Room and Hallway Modification, Floor Plan, Elevation, and Details, PSA1981-0851-0102D. Site Building Bullnose Roof Shield, Site Building Survey Monument, Monument Modification, Site Building Camera Room Hoist and Assembly, Plans and Details, Site Bunker 851 Modifications, Project Location, Site Bunker 851 Modifications, Sections and Details, Site Bunker 851 Modifications, Legend and Site Plan, PSE1986-0851-0101D. Site Bunker 851 Modifications, Bill of Materials and Removal Plan, PSE1986-0851- Site Bunker 851 Modifications, Lighting Plan, PSE1986-0851-0103D.
Site Bunker 851 Modifications, Floor Plan and Section, Site Bunker 851 Modifications, Roof Plan and Details, Site Bunker 851 Modifications, Retaining Walls, Site Building 851A, Computer Floor, Title Sheet, Location, and Vicinity Map, PSA1989- 0851-0101DA. Site Building 851A, Computer Floor, Plan, PSA1989-0851-0102DA. Site Building Room Addition, Floor Plan and Notes, PSA1996-0851-0001DA. Site Building Room Addition, Partial Floor Plan and Partial Roof Plan, and Structural General Notes, PSS1996-0851-0001DA. Site Building Restroom, Floor Plan, Sections and Scope of Work. PSA1998-0851- Site Building 851A, Restroom Remodel, Demolition and New Floor Plans, Specifications and Scope of Work, PSA2003-0851A-0002D. B.
Early Views: Historic photographs of the Site 300 facilities reside in the Lawrence Livermore National Laboratory Archives. C. Interviews: No oral history interviews were conducted. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HYDRODYNAMIC TEST FACILITIES HAER No. CA-2352 (Page 28) D. Secondary