BlockBefore

Lawrence Livermore National Laboratory, Site 300, High Explosives Process Area, Building 825, North of Corral Hollow Road, Tracy

Lawrence Livermore National Laboratory, Site 300, High Explosives Process Area, Building 825, North of Corral Hollow Road, Tracy, San Joaquin County, CA. Surveyed as HAER CA-2353-E, with a 3,051-word written history.

From the record

“In Lawrence Livermore National Laboratory acquired the land for Site 300 which contains Building 825 as a high explosive (HE) process area for the production of HE prototypes for their burgeoning weapons program.”

Written record, HAER CA-2353-E survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2353-E · the record runs 3051 words · one of 104 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

52 words

Source document Quoted word for word from HAER CA-2353-E. Not written, edited or summarised by this site.

West of the North Outer Loop in the northwestern portion of Lawrence Livermore National Laboratory north of Corral Hollow Road, Tracy, San Joaquin County, California. Building 825 is located at latitude: longitude: These points were obtained on July 18, using Google Earth There is no restriction on its release to the public.

Significance

195 words

Source document Quoted word for word from HAER CA-2353-E. Not written, edited or summarised by this site.

In Lawrence Livermore National Laboratory acquired the land for Site 300 which contains Building 825 as a high explosive (HE) process area for the production of HE prototypes for their burgeoning weapons program. The High Explosive Process Area (Process Area) was built to formulate, mix, cast, press, mechanize and assemble conventional HE for use in the physics package of nuclear weaponry. Built from to the core of s Process Area consists of twenty-six buildings compartmentalized into four main buildings and five building complexes.

Billets, a processed or formed piece of HE used for testing, for all LLNL-designed nuclear weapons were developed and facilitated by scientists and technicians at the Process Area at Site Subsequently, was one of two American laboratories that devised and developed nuclear weapons for the U.S. stockpile. Building 825 was built as a chemistry research building as part of the Chemistry Process Facility, created to test and develop new HE. The manufacturing processes that occurred at Building 825 were one component of the larger operation to develop and fabricate HE for s nuclear weapons designs. The building currently houses mechanical presses. Historian Preparer: Alison Garcia Kellar, Senior Architectural Historian, Garavaglia Architecture, Inc.,

Written history

2719 words

Source document Quoted word for word from HAER CA-2353-E. Not written, edited or summarised by this site.

This HAER documentation has been prepared for the US Department of Energy, Livermore Site Office with supervision from the California State Historic Preservation Office. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 2) In April the National Nuclear Security Administration (NNSA) Livermore Field Office in consultation with the California State Historic Preservation Officer (SHPO) determined Buildings 806A, 817A, 827A, and to be contributors to a Site 300 Process Area Historic District. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 3) Part I. Historical Information A. Physical History 1. Date of erection: Designed: completed: 2.

Architect: Rogers Engineering (consulting engineers) and Starks, Jozens & Nacht (consulting architects) of San Francisco, CA 3. Original and subsequent owners, occupants, uses: The building has always been owned by the U.S. Government, as part of one of the laboratories of the Atomic Energy Commission (AEC) and its successor agencies (currently the Department of Energy/National Nuclear Security Administration [DOE/NNSA]). Building 825 was constructed for the formulation and testing of new HE in The building currently houses mechanical presses. 1 4.Original plans and construction: Rogers Engineering designed Building 825 in and construction was complete by This structure consisted of a control room with two test cells (Cell 1 and Cell 2) separated by a mechanical equipment room.

The control room sits to the northeast of the two test cells, forming a T with the rest of the building. A corridor runs horizontally along the width of the building separating the Control Room from the test cells. Each of the rooms in the building have direct access outside. 2 5. Alterations and Additions: An accidental explosion in the prompted the rebuilding of the frangible walls. B. Historical Context Cold War Context The following context related to the development of and the Hydrodynamic Test Facilities was created in as part of the Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment: The primary historic context for assessing the significance of buildings is the Cold War.

The Cold War, although still a fairly recent event in US history, has been universally recognized as an event of exceptional significance within the nation s history. The Cold War spanned the forty-six years from to and encompassed a series of events, policy decisions, and conflicts between the United States and Soviet Union over the economic and political orientation of various countries in Europe, Asia, and the Middle East. In essence, the United States and the Soviet Union had incompatible and conflicting visions for the fate of the post-war world. The US was wedded to a world that 1 Michael A. Sullivan and Rebecca A. Ulrich. Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment. Livermore: Lawrence Livermore National Laboratory, Pp.

2 Ibid, LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 4) closely mirrored its capitalist and democratic economic and political structure, while the Soviet Union hoped for a world that resembled its communist political and economic structure. The Cold War dominated almost every aspect of American life-diplomatic, military, social, economic, scientific, and political. Nevertheless, only two aspects of Cold War history are relevant to the history of the arms race and the more general history of nuclear science. 3 Early History: The was the brainchild of E. O. Lawrence and Edward Teller, physicists affiliated with the Manhattan Engineering District.

Lawrence and Teller believed that the existing Los Alamos National Laboratory (LANL) was not working aggressively enough to achieve the goal of accelerating advancements in nuclear weaponry. The two physicists advocated for the founding of a second laboratory, determined that the design and production of a thermonuclear weapon in a new facility would be the next advancement in nuclear weaponry. Lawrence and Teller's argument was well received within the AEC, as the Soviet Union had just detonated its first atomic weapon in American nuclear policymakers felt an urgency to stay ahead of the Soviet Union both technologically and militarily, fearing the potential actions of an enemy armed with nuclear weapons.

To deter the use of such weapons by the opposition, policymakers were determined to significantly increase the U.S. stockpile. Convinced that a second laboratory would accelerate the process of building up a nuclear arsenal, the AEC established the in Livermore, California, in September of as a second nuclear weapons design facility. 4 Herbert York, the first director of articulated four missions for the new laboratory; including designing thermonuclear weapons, providing diagnostic measurements for weapons tests for LANL and developing a controlled thermonuclear reaction for power sources, and basic physics research.

York was in strong pursuit of both weapons and non-weapons related research, as he felt that a diversified research program at would attract the country s brightest young scientists. 5 Establishment of the HE Process Area: administrators noted the need for a remote site to conduct HE tests for the weapons program in administrators decided that the LANL in New Mexico was too distant to be reliable for the fabrication and test firing of various devices.

Considering that obtaining land for a self-sufficient high explosives test site was crucial for the long-term success of the weapons design program, purchased acres of ranch land east of Livermore, California in The first two buildings of s Process Area were Building 805 and Building both built in The Process Area would continue to expand to twenty-six buildings with construction being complete in The HE Process program remained dedicated to the creation and progression of HE for through the end of the Cold War in 6 3 Sullivan and Ullrich, Historic Context and Building Assessments, 4 Ibid. 5 Herbert York, Making Weapons, Talking Peace, Physics Today (April 6 Sullivan and Ulrich, p. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No.

CA-2353-E (Page 5) Part II. Structural/ Design/ Equipment Information A. General Statement 1. Architectural character: Process Area Most of the buildings in the Process Area were constructed of poured concrete, concrete block or cement-asbestos panels with frangible walls to direct blasts in the event of an accidental explosion. Few structures are made of corrugated metal. The buildings at Site 300 were generally constructed with inexpensive and sometimes less durable materials than at the main Livermore site. Building 825 Building 825 looks like the other buildings in the Site 300 Complex, as they share a similar visual language of non-ornamented, industrial construction, made to serve utilitarian purposes. Completed in Building 825 was constructed to develop and test HE components.

Building 825 has cast-in-place concrete walls and a flat roof surmounted by wooden shrapnel baffles that run above the building to the nearby hillside. Highly utilitarian in character, the building is a monolithic volume, void of ornamental features or decorative finish treatments. 2. Condition of fabric: The fabric of the building remains in good condition and is structurally intact. B. Description of Exterior 1. Overall dimensions: The one story gross square foot industrial building is like a T in footprint. The structure is 10 tall 2. Foundations: A 4 concrete slab comprises the foundation of this building. 3. Walls: Building 825 is constructed of pre-cast, and cast-in-place reinforced concrete.

The west wall is frangible and made of wood with exposed metal strips to help form a Faraday Cage. The north and south walls are clad in cement-asbestos panels. 7 A safety-wall/windbreak constructed of pressed board and piping projects from the east elevation. 4. Structural system and framing: As noted in early construction photographs (ca. Building 825 is of reinforced concrete construction.8 5. Porches, stoops, balconies, and bulkheads: There are no porches, stoops, balconies or bulkheads present at this building. There is a concrete entrance overhang above the single door in the Control Room s eastern facade. An overhead wooden open slat shade system (shrapnel baffle) projects from the south, west and north roof edges and extends to the surrounding hills. 6. Openings 7 Ibid.

8 This assumption is based on construction photographs of Building 825 still under construction (UCRL Livermore Photograph numbers and LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 6) a. Doorways and doors: There are three pairs of metal double doors on the northern elevation which lead to the Equipment Room/corridor, to Cell 2 and to the additional Equipment Room. The southern elevation has two pairs of metal double doors, one of which leads to the Equipment Room and the other to Cell 1. The eastern elevation has one single metal door leading to the Control Room and Office. The western elevation features two single metal doors which lead to Cell 1 and 2, respectively. b.

Windows and shutters: There are no exterior windows present at this building. 7. Roof a. Shape and covering: The roof of this building is flat, covered with tar and gravel. C. Description of Interior 9 1. Floor plans: Each of the five main rooms of Building 825 are accessible directly from the exterior. Internally, two test cells (Rooms 102 and flank the mechanical equipment area (Room Room 104 is comprised of a rectangular room and north-south running hallway. Projecting east of Room is the Control Room, Room This rectangular room completes the T -formation of the building and is accessible from the exterior at the eastern elevation. Room used for mechanical equipment, sits to the northeast of the Control Room, and is accessed from the north elevation. 2.

Flooring: 6 vinyl flooring is present in the remote control room. Painted concrete comprises the flooring of both test cells. The flooring of other rooms is unpainted concrete. 3. Wall and ceiling finish: The concrete interior walls are finished with white paint. Vinyl baseboards line each room. The ceilings are painted white with exposed structural framing, mechanical piping and corrugated metal roofing. 4. Openings a. Doorways and doors Building 825 is built with five sets of double doors and with four single doors. Double doors open to both equipment rooms, with Room 104 having a set of double doors at both the north and south entrances, and Room 107 having a set of double doors at the north entrance.

Each explosives test cell has a single door leading into it from the west and a double door leading into it from the south for Room 102 and the north for Room The Control Room has a single door leading into it from the east. There is only one interior door, and that is for the restroom which is located inside the Control Room. There is a single metal interior door that leads to the control room, Room b. Windows and shutters Behind the control panel in the Control Room, there are two deep, rounded viewports, which face west looking into the equipment room (Room Further, equipment room 104 has two identical viewports on the west wall of the corridor which look into each of the explosives test cells. This building has no other windows and no shutters. 9 Figure 1.

Lab Building Facility Key plan, Lawrence Livermore National Laboratory Archives. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 7) 5. Hardware: The hardware in this building is most likely of commercial grade, intended for utilitarian purposes. 6. Mechanical equipment: a. Heating, air conditioning, and ventilation An air-conditioning system is located on the eastern exterior wall. b. Lighting Ceiling mounted T8 fluorescent fixtures line the ceiling of the control room. Explosive- rated industrial lighting is located in each test cell. c. Plumbing The sewer system for this building runs to a septic tank. D. Machines: A control panel lines the west wall of the Control Room.

Cell 1 contains a remote control press and small oven. Cell 2 contains a calorimeter within a 5 deep pit, a two-inch diameter ram press, and a 250-pound crane. E. Site Layout: The building is located in the southern portion of the Site 300 Complex. Building 825 was built adjacent to a surrounding hillside, a feature that serves as extra site protection in the event of an accidental explosion within the building. An auxiliary metal Butler-type structure sits to the south of the control room. The structure is used for storing supplies and equipment, and has a slightly pitched roof and a rounded roof vent. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 8) Part III. Operations and Process A.

Operations: Building 825 was constructed as the Chemistry Research Building (Chemistry Process Facility) for the Site 300 Process Area. The building housed initial chemical formulation activities, and was operated largely by chemists. Here, new HE recipes were tested in small quantities before being scaled up. 10 B. Technology: Building 825 had manufacturing technology for developing and testing new HE. It originally housed small ovens and a one-inch and a four-inch press. The ram presses could press billets from to 4- long at pressures up to psi from ambient to 120 degrees Celsius. The press could be operated either locally or remotely. 11 By Building 825 housed a 4-foot in diameter Monel sphere which allowed for sampling gaseous detonation products.

Due to the confidential nature of the work performed at Building specific information about the technology and machines used in the building is limited. D. End Product: The HE developed and tested at Building 825 included billets of various densities and lengths. 12 Small experimental recipes were created and tested here and then scaled up, mixed, and pressed at neighboring Building From there, the HE was machined and assembled at other buildings in the Site 300 Process Area. 10 Sullivan and Ullrich, p. 11 John S. Hallam, Energetic Materials Facility: Operated by the Chemistry and Materials Science Department. Livermore: Lawrence Livermore National Laboratory, University of California, Pp. 15. 12 Ibid.

LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 9) Part IV. Sources of Information A. Primary sources: Figure A-3, Facility Floor Plan Building 825 in Appendix A Facility Plot Plans and Floor Plans. Livermore: 15 June Hallam, John S. Energetic Materials Facility: Operated by the Chemistry and Materials Science Department. Livermore: Lawrence Livermore National Laboratory, University of California. Lab Building Facility Key plan, Scott, John E., Site 300 Manager, and Dawn Chase, Special Projects Manager. Site Personal interview. 16 Sept. B. Secondary sources: Sullivan, Michael A., and Heidecker.

Five-Year Re-Evaluation of Historic Building Assessment: Main Site and Site Livermore: Lawrence Livermore National Laboratory, Sullivan, Michael A., and Rebecca A. Ulrich. Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment. Livermore: Lawrence Livermore National Laboratory, UCRL-TR-234717 Webster-Scholten, C. P., Ed. Final Site-Wide Remedial Investigation Report, Lawrence Livermore National Laboratory Site Livermore: Lawrence Livermore National Laboratory, UCRL-AR- York, Herbert. Making Weapons, Talking Peace, Physics Today (April C.

Likely sources not yet investigated: There is tremendous related research material from the Energy Research and Development Administration (ERDA) and material in the Office of Fusion Energy/Office of Energy Research records. The DOE Headquarters and the National Archives would additionally yield information pertinent to this report. The Lawrence Livermore National Laboratory Archives located in Livermore, California have extensive building and equipment documentation, photographs, plans and related reports. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 10) Figure 1. Lab Building Facility Key plan, Lawrence Livermore National Laboratory Archives.

LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 11) Figure 2. Hillside view of Building 825 under construction, looking northeast, ca. Lawrence Livermore National Laboratory Archives. Figure 3. View of Building 825 under construction, looking northwest, ca. Lawrence Livermore National Laboratory Archives. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 12) Figure 4. View of Building 825 under construction looking northeast as shrapnel baffles are installed, ca. Lawrence Livermore National Laboratory Archives. Figure 5. View of Building 825 looking southwest just after construction, note the shrapnel baffles extending to the hillside, ca.

Lawrence Livermore National Laboratory Archives. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 825 HAER No. CA-2353-E (Page 13) Figure 6. View of Building 825 looking northwest just after construction, note the shrapnel baffles extending to the hillside, ca. Lawrence Livermore National Laboratory Archives.

In context

Tracy, California The place record: every map, photograph and survey of this town.
San Joaquin County, California 232 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Tracy

12 records

The federal surveyors worked through Tracy building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Lawrence Livermore National LaboratoryHAER CA-235211,240 words
Lawrence Livermore National LaboratoryHAER CA-23195,624 words
Lawrence Livermore National LaboratoryHAER CA-2353-A3,207 words
Lawrence Livermore National LaboratoryHAER CA-2353-D2,920 words
Lawrence Livermore National LaboratoryHAER CA-2353-B2,905 words
Lawrence Livermore National LaboratoryHAER CA-2353-G2,736 words
Lawrence Livermore National LaboratoryHAER CA-2353-F2,586 words
Lawrence Livermore National LaboratoryHAER CA-2353-C2,442 words
Lawrence Livermore National LaboratoryHAER CA-23532,260 words
Mountain HouseHABS CAL,1-TRAC.V,1-34 words
OutbuildingHABS CAL,39-COHO,1-A-32 words
Frame HouseHABS CAL,39-COHO,1-26 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2353-E. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.