This HAER documentation has been prepared for the US Department of Energy, Livermore Site Office, with supervision from the California State Historic Preservation Office. In April the National Nuclear Security Administration (NNSA) Livermore Field Office in consultation with the California State Historic Preservation Officer (SHPO) determined Buildings 806A, 817A, 827A, and to be contributors to a Site 300 Process Area Historic District. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 3) Part I. Historical Information A. Physical History 1. Date of Erection: Buildings 806A and were both constructed in 2. Architect: Buildings 806A and were both designed by Rogers Engineering.1 3.
Original and subsequent owners, occupants, uses: The building complex has always been owned by the U.S. Government, as part of the Atomic Energy Commission (AEC) and its successor agencies (currently the Department of Energy/National Nuclear Security Administration [DOE/NNSA]).2 The original user was the Lawrence Radiation Laboratory, which evolved into Lawrence Livermore National Laboratory. The occupants had continuously been Lawrence Livermore National Laboratory employees, and the complex was continuously used for nuclear research, supporting the weapons program, in addition to chemistry, physics, and biomedical research programs at the and Lawrence Berkeley National Laboratory 5.
Original plans and construction: Rogers Engineering designed Buildings 806A and in and and construction was complete by Building 806A was comprised of two large machining rooms separated by a utility room and a control room. Identical yet slightly larger in construction, Building had an office and control room, inert storage room, remote control machining room, utility room, machining room and an inspection room. A wooden barricade blast wall additionally separates Building 806A from 6. Alterations and additions: Two small, metal Butler buildings Buildings and were constructed in for additional 806 Complex storage.
Building was used specifically for inert storage and drum fixture storage and Building was used as a washroom to clean fixtures contaminated with HE compounds.3 An office was added to 806A in and a lunchroom was added in 1 Michael Anne Sullivan and Rebecca Ann Ullrich. Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment, UCRL-TR-234717 (Livermore: Lawrence Livermore National Laboratory, 2 Lawrence Livermore National Laboratory, High Energy Laser Facility, Written Historical and Descriptive Data, Historic American Engineering Record, National Park Service, U.S. Department of the Interior, page 2. From Prints and Photographs Division, Library of Congress (HAER No. CA-232; 3 Webster-Scholten, C. P., Ed.
Table Source screening information in the HE Process Area study area: Final Site-Wide Remedial Investigation Report, Lawrence Livermore National Laboratory Site 300.,UCRL-AR-108131 (Livermore: Lawrence Livermore National Laboratory, 4 Michael A. Sullivan and Rebecca A. Ulrich, Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment (Livermore: Lawrence Livermore National Laboratory, LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 4) B.
Historical Context Cold War Context The following context related to the development of and the Hydrodynamic Test Facilities was created in as part of the Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment: The primary historic context for assessing the significance of buildings is the Cold War. The Cold War, although still a fairly recent event in US history, has been universally recognized as an event of exceptional significance within the nation s history. The Cold War spanned the forty-six years from to and encompassed a series of events, policy decisions, and conflicts between the United States and Soviet Union over the economic and political orientation of various countries in Europe, Asia, and the Middle East.
In essence, the United States and the Soviet Union had incompatible and conflicting visions for the fate of the post-war world. The US was wedded to a world that closely mirrored its capitalist and democratic economic and political structure, while the Soviet Union hoped for a world that resembled its communist political and economic structure. The Cold War dominated almost every aspect of American life-diplomatic, military, social, economic, scientific, and political. Nevertheless, only two aspects of Cold War history are relevant to the history of the arms race and the more general history of nuclear science.5 Early History The was the brainchild of E. O. Lawrence and Edward Teller, physicists affiliated with the Manhattan Engineering District.
Lawrence and Teller believed that the existing Los Alamos National Laboratory (LANL) was not working aggressively enough to achieve the goal of accelerating advancements in nuclear weaponry. The two physicists advocated for the founding of a second laboratory, determined that the design and production of a thermonuclear weapon in a new facility would be the next advancement in nuclear weaponry. Lawrence and Teller's argument was well received within the AEC, as the Soviet Union had just detonated its first atomic weapon in American nuclear policymakers felt an urgency to stay ahead of the Soviet Union both technologically and militarily, fearing the potential actions of an enemy armed with nuclear weapons.
To deter the use of such weapons by the opposition, policymakers were determined to significantly increase the U.S. stockpile. Convinced that a second laboratory would accelerate the process of building up a nuclear arsenal, the AEC established the in Livermore, California, in September of as a second nuclear weapons design facility.6 Herbert York, the first director of articulated four missions for the new laboratory; including designing thermonuclear weapons, providing diagnostic measurements for weapons tests for LANL and developing a controlled 5 Sullivan and Ullrich, Historic Context and Building Assessments, 6 Ibid., 247 LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No.
CA-2353-B (Page 5) thermonuclear reaction for power sources, and basic physics research. York was in strong pursuit of both weapons and non-weapons related research, as he felt that a diversified research program at would attract the country s brightest young scientists.7 Establishment of the HE Process Area administrators noted the need for a remote site to conduct HE tests for the weapons program in administrators decided that the LANL in New Mexico was too distant to be reliable for the fabrication and test firing of various devices.
Considering that obtaining land for a self-sufficient high explosives test site was crucial for the long-term success of the weapons design program, purchased acres of ranch land east of Livermore, California in The first two buildings of s Process Area were Building 805 and the Building 806 Complex, both built in The Process Area would continue to expand to twenty-six buildings with construction being complete in The HE Process program remained dedicated to the creation and progression of HE for through the end of the Cold War in 7 Herbert York, Making Weapons, Talking Peace, Physics Today (April 8 Sullivan and Ulrich, Historic Context and Building Assessments, 252 LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No.
CA-2353-B (Page 6) Part II. Structural/ Design/ Equipment Information A. General Statement: 1. Architectural character: The buildings in the Building 806 Complex looks like the other buildings in the Site 300 Complex, as they share a similar visual language of non- ornamented, industrial construction, made to serve utilitarian purposes. Highly utilitarian in character, The Building 806 Complex is comprised of a long, monolithic volumes, void of ornamental features or decorative finish treatments. 2. Condition of fabric: The exterior concrete has weathered over time and hairline cracks prevalent throughout the material surface. The fiberglass panels have become brittle over time with sun exposure. B. Description of Exterior: 1.
Overall dimensions: The building is approximately 380 -0 by 560 -0 at the main rectangular volume, and 180 -0 by 180 -0 at the square addition at the northwest corner. Rectangular in footprint, Building 806A is a one-story, 3,408-gross-square-foot industrial building. Similar in configuration, Building is slightly longer, measuring gross square feet. Situated between the two main structures, Building and are rectangular in plan, measuring 640 gross square feet each. The buildings are organized side-by-side lengthwise, forming a long, shallow complex.9 2. Foundations: Poured concrete slab foundations are present at all complex buildings. 3.
Walls: Building 806A has pre-cast and cast-in-place concrete walls on the north, west and east elevations and a concrete masonry wall on the south elevation. Building is constructed of concrete masonry units, pre-cast and cast-in-place concrete. The walls of Buildings and are of corrugated metal. 4. Structural system, framing: Buildings 806A and are of steel frame construction.10 5. Porches and loading docks: Concrete walkways surround the perimeters of the buildings in the complex. A significant eave overhang projects from the main fa ades of Buildings 806A and forming an enclosure with upright fiberglass sightscreen and windscreen panels, which provide the exterior walkway with shelter. 7. Openings: a.
Doorways and doors: Exterior doors in Building 806A are on the east, west, and south walls. Exterior doors in Building sit on the north, east and west walls. 9 Figure A-2, Facility Floor Plan - Building Appendix A - Facility Plot Plans and Floor Plans, Lawrence Livermore National Laboratory, 10 This assumption is based on construction photographs of Building 805 Increment 1 in and of Increment 2 in which depict Increment 1 still under construction (UCRL Livermore Photograph Numbers and Building 805 was built a year earlier than the Building 806 Complex, and are similar in their original floor plan configuration, building materials and roof type. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 7) b.
Windows and shutters: There are no windows present at this building complex. 8. Roof: a. Shape, covering: Buildings 806A and originally featured pitched cement-asbestos paneled roofs. Buildings and have shallow pitched roofs of the same metal material as their siding. Each of the smaller buildings has three prominent vents atop. C. Description of Interior 1. Floor plans: The rooms in buildings 806A and are each accessible directly from the exterior walkway, and are not accessible to one another from the interior. Rooms are organized linearly. Building 806A has five enclosed rooms, Room 113 and with an unattached Mechanical Room and Room 146 across the walkway from Room 113 and Room respectively.
The two main large machining rooms in Building 806A are separated by a utility room and control room. Building is comprised of five main spaces, Room 134 and Building has an office and control room, an inert storage room, a remote control machining room, a utility room, a machining room and an inspection room. Buildings and are both comprised of a single room. 3. Flooring: Finished concrete and vinyl flooring comprise the original flooring of the buildings in this complex. 4. Wall and ceiling finish: a. Wall finish: The concrete interior walls are finished with white panels of an unknown material. Vinyl baseboards line each room. b. Ceiling finish: The ceilings of machining areas are painted white with exposed structural framing, mechanical piping and corrugated metal roofing.
Remote control rooms have dropped, acoustical ceilings. 6. Openings: a. Doorways and doors: There are several interior doors in Building 806A leading from Room 101 to Room 101-A and from Room 103 to Room b. Windows: There are no windows present in the interior of this building complex. 8. Mechanical equipment: a. Heating, air conditioning, ventilation: The heating, air conditioning and ventilation equipment of the 806 Building Complex is unknown. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 8) b. Lighting: Suspended fluorescent fixtures are present throughout the interior.
Several types of industrial-grade exterior light fixtures surround the building, suspended from the building s eaves or mounted directly onto the walls. D. Machines: Buildings 806A and B contain a Lathe, milling machine, Bostomatic machine, band saw, and a Moore measuring machine. E. Site Layout: The Building 806 Complex is located in the southeastern portion of the Site 300 Complex. Building 806A has an adjacent septic tank equipped with two cesspools. Soon after building construction, large protective earthen berms were created between Buildings 806 and 807 and the adjacent road. These berms were built to serve as protective building barriers in the event of an explosion.11 11 John E. Scott, Site 300 Manager, and Dawn Chase, Special Projects Manager, Site Personal interview. 16 Sept.
LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 9) Part III. Operations and Process A. Operations: The Building 806 Complex was one of the first two buildings (along with Building to be constructed in the Site 300 Process Area, and provided functions related to the machining, fabrication, disassembly, and inspection of HE and inert components. B. Technology: The Building 806 Complex was devoted to the machining and assembly of HE explosives. The HE-machining tools were controlled remotely from separate control rooms in Buildings 806A and C. End Product: The Building 806 Complex was devoted to the machining and assembly of HE explosives.
HE billets were machined in the Building 806 Complex and then trimmed and assembled for hydrodynamic test shots in nearby Building LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 10) Part IV. Sources of Information A. Architectural drawings: Figure A-2, Facility Floor Plan Building 806 in Appendix A Facility Plot Plans and Floor Plans. Lawrence Livermore National Laboratory, B. Interviews: Scott, John E., Site 300 Manager, and Dawn Chase, Special Projects Manager. Site Personal interview. 16 Sept. C. Secondary sources: Hallam, John S. Energetic Materials Facility: Operated by the Chemistry and Materials Science Department. Livermore: Lawrence Livermore National Laboratory, University of California.
Lawrence Livermore National Laboratory, High Energy Laser Facility, Written Historical and Descriptive Data, Historic American Engineering Record, National Park Service, U.S. Department of the Interior, From Prints and Photographs Division, Library of Congress (HAER No. CA-232; Sullivan, Michael A., and Heidecker. Five-Year Re-Evaluation of Historic Building Assessment: Main Site and Site Livermore: Lawrence Livermore National Laboratory, Sullivan, Michael A., and Rebecca A. Ulrich. Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment. Livermore: Lawrence Livermore National Laboratory, Webster-Scholten, C. P., Ed.
Final Site-Wide Remedial Investigation Report, Lawrence Livermore National Laboratory Site Livermore: Lawrence Livermore National Laboratory, York, Herbert. Making Weapons, Talking Peace, Physics Today (April LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 11) Appendix Figure 1. Building Facility Floor Plan, (Lawrence Livermore National Laboratory Archives) LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 12) Figure 2. Building 806A upon completion of construction, ca. (Lawrence Livermore National Laboratory Archives) LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No.
CA-2353-B (Page 13) Figure 3. Building in the foreground with wooden blast barrier at center and Building 806A in the background, ca. (Lawrence Livermore National Laboratory Archives) Figure 4. Building adjacent to wooden blast barrier, ca. (Lawrence Livermore National Laboratory Archives) LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 806 COMPLEX HAER No. CA-2353-B (Page 14) Figure 5. Technicians machining HE components in Room 134 of Building (Lawrence Livermore National Laboratory Archives) Figure 6. Control panel for remote machining in Building (Lawrence Livermore National Laboratory Archives)