Lawrence Livermore National Laboratory, Site 300, High Explosives Process Area, Building 805, North of Corral Hollow Road, Tracy

Lawrence Livermore National Laboratory, Site 300, High Explosives Process Area, Building 805, North of Corral Hollow Road, Tracy, San Joaquin County, CA. Surveyed as HAER CA-2353-A, with a 3,207-word written history.

From the record

“In Lawrence Livermore National Laboratory acquired the land for Site 300 which contains Building 805 as a high explosive (HE) process area for the production of HE prototypes for their burgeoning weapons program.”

Written record, HAER CA-2353-A survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2353-A · the record runs 3207 words · one of 104 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

52 words

Source document Quoted word for word from HAER CA-2353-A. Not written, edited or summarised by this site.

West of the North Outer Loop in the northwestern portion of Lawrence Livermore National Laboratory north of Corral Hollow Road, Tracy, San Joaquin County, California. Building 805 is located at latitude: longitude: This point was obtained on July 18, using Google Earth There is no restriction on its release to the public.

Significance

202 words

Source document Quoted word for word from HAER CA-2353-A. Not written, edited or summarised by this site.

In Lawrence Livermore National Laboratory acquired the land for Site 300 which contains Building 805 as a high explosive (HE) process area for the production of HE prototypes for their burgeoning weapons program. The High Explosive Process Area (Process Area) was built to formulate, mix, cast, press, mechanize and assemble conventional HE for use in the physics package of nuclear weaponry. Built from to the core of s Process Area consists of twenty-six buildings compartmentalized into four main buildings and five building complexes.

Billets, a processed or formed piece of HE used for testing, for all LLNL-designed nuclear weapons were developed and facilitated by scientists and technicians at the Process Area at Site Subsequently, was one of two American laboratories that devised and developed nuclear weapons for the U.S. stockpile. Building 805 was the first of two Process Area structures built at Site and contains nine shops, one mechanical room, five offices and three service shops. Built specifically for the trimming and assembly of HE components, the manufacturing processes that occurred at Building 805 were one component of the larger mission to develop and fabricate HE for s nuclear weapons designs. Historian Preparer: Alison Garcia Kellar, Senior Architectural Historian, Garavaglia Architecture, Inc.,

Written history

2867 words

Source document Quoted word for word from HAER CA-2353-A. Not written, edited or summarised by this site.

This HAER documentation has been prepared for the US Department of Energy, Livermore Site Office, with supervision from the California State Historic Preservation Office. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 2) In April the National Nuclear Security Administration (NNSA) Livermore Field Office in consultation with the California State Historic Preservation Officer (SHPO) determined Buildings 806A, 817A, 827A, and to be contributors to a Site 300 Process Area Historic District. LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 3) Part I. Historical Information A. Physical History 1. Date of Erection: 2.

Architect: Increment 1 of Building 805 was designed in by Plant Engineering and constructed in Increment 2 was designed in by Indenco Engineers of San Leandro and completed in The third and final increment was designed in by Garretson, Elmendorf, Zinov and Reibin Architects and Engineers of San Francisco and completed in 3. Original and subsequent owners, occupants, uses: The building has always been owned by the U.S. Government, as part of the Atomic Energy Commission (AEC) and its successor agencies (currently the Department of Energy/National Nuclear Security Administration [DOE/NNSA]).2 The original user was the Lawrence Radiation Laboratory, which evolved into Lawrence Livermore National Laboratory.

The occupants had continuously been Lawrence Livermore National Laboratory employees, and the building was continuously used for nuclear research, supporting the weapons program, in addition to chemistry, physics, and biomedical research programs at the and Lawrence Berkeley National Laboratory 5. Original plans and construction: The original rectangular square foot structure, Increment 1, sits within the eastern portion of Building measuring 55 feet long and 20 feet wide. Increment 1 has 6-inch-thick poured concrete exterior walls on all elevations with a concrete masonry unit wall on the southern elevation, enclosing the tool room. As noted in early construction photographs and Building 805 is of steel frame construction.3 6.

Alterations and additions: Constructed in 59, Increment 2 is similar in configuration and style to Increment 1 but nearly double in size, measuring square feet.4 The construction of Increment 3 in enclosed the existing two increments within pre-cast and cast-in-place concrete walls. Extending the entire length of the 1 Michael Anne Sullivan and Rebecca Ann Ullrich. Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment, UCRL-TR-234717 (Livermore: Lawrence Livermore National Laboratory, 259 2 Lawrence Livermore National Laboratory, High Energy Laser Facility, Written Historical and Descriptive Data, Historic American Engineering Record, National Park Service, U.S. Department of the Interior, page 2.

From Prints and Photographs Division, Library of Congress (HAER No. CA-232; 3 This assumption is based on construction photographs of Building 805 Increment 1 in and of Increment 2 in which depicts Increment 1 still under construction (UCRL Livermore Photograph Numbers and 4 Drawing PSZ55-805-005JA. Plans, Elevations and Details Trim and Assembly Building: Building Number Phase II Construction (Livermore: U.S. Atomic Energy Commission University of California Radiation Lab, revised LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 4) building s west side, Increment 3 added gross square feet to the facility.5 These modifications transformed the entire structure to house an HE lens facility.6 B.

Historical Context Cold War Context The following context related to the development of and the Hydrodynamic Test Facilities was created in as part of the Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment: The primary historic context for assessing the significance of buildings is the Cold War. The Cold War, although still a fairly recent event in US history, has been universally recognized as an event of exceptional significance within the nation s history. The Cold War spanned the forty-six years from to and encompassed a series of events, policy decisions, and conflicts between the United States and Soviet Union over the economic and political orientation of various countries in Europe, Asia, and the Middle East.

In essence, the United States and the Soviet Union had incompatible and conflicting visions for the fate of the post-war world. The US was wedded to a world that closely mirrored its capitalist and democratic economic and political structure, while the Soviet Union hoped for a world that resembled its communist political and economic structure. The Cold War dominated almost every aspect of American life-diplomatic, military, social, economic, scientific, and political. Nevertheless, only two aspects of Cold War history are relevant to the history of the arms race and the more general history of nuclear science.7 Early History The was the brainchild of E. O. Lawrence and Edward Teller, physicists affiliated with the Manhattan Engineering District.

Lawrence and Teller believed that the existing Los Alamos National Laboratory (LANL) was not working aggressively enough to achieve the goal of accelerating advancements in nuclear weaponry. The two physicists advocated for the founding of a second laboratory, determined that the design and production of a thermonuclear weapon in a new facility would be the next advancement in nuclear weaponry. Lawrence and Teller's argument was well received within the AEC, as the Soviet Union had just detonated its first atomic weapon in American nuclear policymakers felt an urgency to stay ahead of the Soviet Union both technologically and militarily, fearing the potential actions of an enemy armed with nuclear weapons.

To deter the use of such weapons by the opposition, policymakers were determined to significantly increase the U.S. stockpile. Convinced that a second laboratory would accelerate the process of building up a nuclear arsenal, the AEC established the in 5 Plot Plan for the H.E. Lens Facility Building 805 Site 300 (San Francisco: Gattetson, Elmendorf, Zinov, Reibin Architects and Engineers, revised 6 Sullivan and Ullrich, Historic Context and Building Assessments, 7 Sullivan and Ullrich, Historic Context and Building Assessments, LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No.

CA-2353-A (Page 5) Livermore, California, in September of as a second nuclear weapons design facility.8 Herbert York, the first director of articulated four missions for the new laboratory; including designing thermonuclear weapons, providing diagnostic measurements for weapons tests for LANL and developing a controlled thermonuclear reaction for power sources, and basic physics research.

York was in strong pursuit of both weapons and non-weapons related research, as he felt that a diversified research program at would attract the country s brightest young scientists.9 Establishment of the HE Process Area administrators noted the need for a remote site to conduct HE tests for the weapons program in administrators decided that the LANL in New Mexico was too distant to be reliable for the fabrication and test firing of various devices.

Considering that obtaining land for a self-sufficient high explosives test site was crucial for the long-term success of the weapons design program, purchased acres of ranch land east of Livermore, California in The first two buildings of s Process Area were Building 805 and the Building 806 Complex, both built in The Process Area would continue to expand to twenty-six buildings with construction being complete in The HE Process program remained dedicated to the creation and progression of HE for through the end of the Cold War in 8 Ibid., 247 9 Herbert York, Making Weapons, Talking Peace, Physics Today (April 10 Sullivan and Ulrich, Historic Context and Building Assessments, 252 LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No.

CA-2353-A (Page 6) Part II. Structural/ Design/ Equipment Information A. General Statement 1. Architectural character: Building 805 looks like the other buildings in the Site 300 Complex, as they share a similar visual language of non-ornamented, industrial construction, made to serve utilitarian purposes. Highly utilitarian in character, Building 805 is comprised of a long, monolithic volume, void of ornamental features or decorative finish treatments. 2. Condition of fabric: Good. B. Description of Exterior 1. Overall dimensions: The building is approximately 380 -0 by 560 -0 at the main rectangular volume, and 180 -0 by 180 -0 at the square addition at the northwest corner. The one story, 6,802-gross-square-foot industrial building is rectangular in footprint 2.

Foundations: Building 805 has a poured concrete slab foundation. 3. Walls: The walls are a mixture of poured, precast, and cast-in-place concrete. 4. Structural system, framing: Building 805 is of steel frame construction. 5. Porches and loading docks: Concrete walkways surround the perimeter of the building. A slight roof overhang projects from the concrete eastern fa ade to shelter the main walkway. 7. Openings: a. Doorways and doors: Three metal double doors line the eastern fa ade. Three double doors and three single doors are present at the western elevation. b. Windows and shutters: A single casement window, possibly of acrylic glazing, sits in the east fa ade adjacent to the southernmost pair of doors. 8. Roof: a.

Shape, covering: The pitched roof connecting Increments 1 and 2 was originally clad in corrugated cement-asbestos material. Increment 3 of Building 805 features a flat roof with piping and building utilities/mechanical equipment atop. C. Description of Interior 1. Floor plans: The building is presently square feet. The Increment 1 floor plan was originally rectangular, and after the construction of Increments 2 and 3, the building is presently still rectangular. There are 21 rooms in Building Rooms 144 and The three Increments are internally joined by a long central hallway that runs lengthwise through LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 7) the building.

The orientation of the individual rooms to the interior hallways is not regular, and about half of the rooms have direct access to the exterior.11 Increment 1 consisted of two large rooms for trim and assembly processes, separated by a central utility room. Larger in its overall footprint, Increment 2 to the north followed an identical floor plan with two large machine rooms, a central utility and control room, and a tool room. This eastern collective portion of the structure was renovated in to house a press room, HE storage vault, X-ray room, environmental test chamber, support room, firing tank, camera room, and a dark room. To the west, Increment 3 housed an explosives preparation room, utility room, machine room and technical area, storage room, date reduction room, and office. 3.

Flooring: Vinyl flooring is present in the control rooms, Room 138 (dedicated to the explosives press), and office spaces. Finished concrete comprises the flooring of the radiography room, machine shop, and other laboratory spaces. 4. Wall and ceiling finish: a. Wall finish: The concrete interior walls are finished in plaster and painted white. Vinyl baseboards line the perimeter of each room. b. Ceiling finish: The office spaces have acoustical tile ceilings, while the exposed ceilings of laboratory spaces include white painted structural framing and corrugated metal roofing. 6. Openings: a. Doorways and doors: Nine of the building s 21 rooms have doors that allow for both interior hallway and exterior access.

11 rooms can be accessed solely from within the interior of the building, while one room is accessed directly from the exterior. There are approximately 23 interior doors within the building. 7. Hardware: The hardware present in this building includes several electrically powered tracks with hoists at the ceiling, warning lights, fume hoods, PA alarm horns, cable trays, and secrecy lights in conference rooms. 8. Mechanical equipment: a. Heating, air conditioning, ventilation: The heating, air conditioning, and ventilation equipment of this building is unknown. It appears that much of the mechanics for these systems sits on top of the flat, concrete roof. b.

Lighting: Recessed fluorescent fixtures embedded within acoustic tiles comprise the lighting in control rooms and office areas of Building while suspended fluorescent fixtures are present in laboratory and shop areas. c. Plumbing: There is an interior drain trench in the floor of the original HE trim room.12 11 Figure A-1, Facility Floor Plan Building 805 in Appendix A: Facility Plot Plans and Floor Plans (Lawrence Livermore National Laboratory, LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 8) D. Machines: Building 805 contains remote machining equipment, radiography equipment, a lathe, and an explosives press. E. Site Layout: The building is located in the southeastern portion of the Site 300 Complex.

Cement trenches, unlined disposal lagoons (removed from service in and a septic tank with two cesspools are auxiliary landscape features that contributed to the functions of Building A 300-gallon underground carbon steel diesel fuel tank is located to the west side of the building. Several small portable storage buildings surround the perimeter of Building This includes two 60 square foot storage structures to the north of the building and two flammable-liquid storage buildings to the east and south, respectively. Additionally, there are several smaller auxiliary structures that service Building including two air conditioners, a cooling tower, and a portable storage magazine.

12 Drawing PSZ58-805-008JA, Site Building Floor Plan, Sections, Finish Schedule (San Leandro: Indenco Engineers, Inc., LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 9) Part III. Operations and Process A. Operations: Building 805 housed facilities to trim and assemble HE billets (which were manufactured in nearby Building into device designs for hydrodynamic test shots from to When the building was first constructed, it had one room for HE trim, one room for HE assembly, and a utility room. When Increment 2 was completed in it doubled the assembly capabilities of Building 805 by creating additional space for HE trim and assembly. In the construction of Increment 3 was completed, and Building 805 became an HE Lens facility.

Increments 1 and 2 were renovated to hold a 100-ton press room, a small press room with an oven, an HE storage vault, an inspection room, an X-ray room, an environmental test chamber, a support machine room, a firing tank, a camera room, and a dark room. Increment 3 housed an explosives preparation room, a utility room, a machine room and technical area, a storage room, a data reduction room, and an office.13 Building 805 manufactured HE lenses from to B. Technology: Building 805 contains remote machining equipment, radiography equipment, a lathe, and an explosives press. Due to the confidential nature of the work performed at Building specific information about the technology and machines used in the building is limited. C.

End Product: From to Building 805 was devoted to the trim and assembly of HE billets that were manufactured in neighboring Building From to Building 805 was devoted to the manufacturing of HE lenses. 13 Sullivan and Ulrich, Historic Context and Building Assessments, 259 14 Ibid., LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 10) Part IV. Sources of Information A. Architectural drawings: Drawing PSZ55-805-005JA. Plans, Elevations and Details Trim and Assembly Building: Building Number Phase II Construction. Livermore: U.S. Atomic Energy Commission University of California Radiation Lab, revised Drawing PSZ58-805-008JA. Site Building Floor Plan, Sections, Finish Schedule.

San Leandro: Indenco Engineers, Inc., Figure A-1, Facility Floor Plan Building 805 in Appendix A Facility Plot Plans and Floor Plans. Lawrence Livermore National Laboratory, Plot Plan for the H.E. Lens Facility Building 805 Site San Francisco: Gattetson, Elmendorf, Zinov, Reibin Architects and Engineers, revised B. Interviews: Scott, John E., Site 300 Manager, and Dawn Chase, Special Projects Manager. Site Personal interview. 16 Sept. C. Secondary sources: Hallam, John S. Energetic Materials Facility: Operated by the Chemistry and Materials Science Department. Livermore: Lawrence Livermore National Laboratory, University of California.

Lawrence Livermore National Laboratory, High Energy Laser Facility, Written Historical and Descriptive Data, Historic American Engineering Record, National Park Service, U.S. Department of the Interior, From Prints and Photographs Division, Library of Congress (HAER No. CA-232; Sullivan, Michael A., and Heidecker. Five-Year Re-Evaluation of Historic Building Assessment: Main Site and Site Livermore: Lawrence Livermore National Laboratory, Sullivan, Michael A., and Rebecca A. Ulrich. Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment. Livermore: Lawrence Livermore National Laboratory, Webster-Scholten, C. P., Ed.

Final Site-Wide Remedial Investigation Report, Lawrence Livermore National Laboratory Site Livermore: Lawrence Livermore National Laboratory, York, Herbert. Making Weapons, Talking Peace, Physics Today (April LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 11) Appendix Figure 1. Building Facility Floor Plan, (Lawrence Livermore National Laboratory Archives) LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 12) Figure 2. Increments 1 and 2 of Building 805 under construction, ca. (Lawrence Livermore National Laboratory Archives) Figure 3. Increments 1 and 2 of Building 805 completed, ca.

(Lawrence Livermore National Laboratory Archives) LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 13) Figure 4. Building 805 facing west, ca. (Lawrence Livermore National Laboratory Archives) Figure 5. Building looking northwest, ca. (Lawrence Livermore National Laboratory Archives) LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No. CA-2353-A (Page 14) Figure 6. Interior view of Control Room in Building (Lawrence Livermore National Laboratory Archives) Figure 7. Interior view of detonator tanks in Building ca. (Lawrence Livermore National Laboratory Archives) LAWRENCE LIVERMORE NATIONAL LABORATORY, SITE HIGH EXPLOSIVES PROCESS AREA, BUILDING 805 HAER No.

CA-2353-A (Page 15) Figure 8. Interior view of Building ca. (Lawrence Livermore National Laboratory Archives)

In context

Tracy, California The place record: every map, photograph and survey of this town.
San Joaquin County, California 232 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Tracy

12 records

The federal surveyors worked through Tracy building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Lawrence Livermore National LaboratoryHAER CA-235211,240 words
Lawrence Livermore National LaboratoryHAER CA-23195,624 words
Lawrence Livermore National LaboratoryHAER CA-2353-E3,051 words
Lawrence Livermore National LaboratoryHAER CA-2353-D2,920 words
Lawrence Livermore National LaboratoryHAER CA-2353-B2,905 words
Lawrence Livermore National LaboratoryHAER CA-2353-G2,736 words
Lawrence Livermore National LaboratoryHAER CA-2353-F2,586 words
Lawrence Livermore National LaboratoryHAER CA-2353-C2,442 words
Lawrence Livermore National LaboratoryHAER CA-23532,260 words
Mountain HouseHABS CAL,1-TRAC.V,1-34 words
OutbuildingHABS CAL,39-COHO,1-A-32 words
Frame HouseHABS CAL,39-COHO,1-26 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2353-A. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.