Lake Okeechobee vicinity, Martin and Glades Counties, Florida Date of Construction: Engineers: Hamilton Disston State Drainage Commission U.S. War Department and the U.S. Army Corps of Engineers to present) Fabricator: Furst-Clark Construction Company of Baltimore, Maryland, and Galveston, Texas, constructed the St. Lucie Canal from to St. Lucie Lock No.land No.2 from to the North New River Lock No.l; and the North and South New River, Miami, Hillsboro, and West Palm Beach canals. Macwilliams Construction Company was awarded the contract to dredge the Okeechobee Waterway in Spadaro Construction Company and Architect Edgar H. Latham Company of Miami, Florida, supervised the construction of Ortona and Moore Haven locks and dams.
Latham is also credited for the design and construction of the Hurricane Gates Nos. 2, 3, 4, 5, and 6 that constitute sections of the Herbert Hoover Dike. Moore Haven Lock and Dam is technically known as Hurricane Gate No. 1. Cleary Brothers Construction Company supervised the renovation and modernization of East St. Lucie No. 2 from to
Significance
44755 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER FL-21.
Not written, edited or summarised by this site.
The construction of the Cross-State Canal was a milestone in Florida's commercial and CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 2 transportation history. It opened up the state's interior and created a navigable route across the peninsula that enabled commerce and settlement. It is equally significant for its historic role as a flood and drought control management tool. Its historic locks and dams at St. Lucie, Moore Haven, and Ortona are well-preserved examples of early twentieth-century lock and dam technology. Report Prepared by: David E. Port and Dena E. Hodes, New South Associates Date: December PART 1. HISTORICAL INFORMATION A. CHRONOLOGY Florida became a state with residents, most of whom lived in north Florida or Key West.
The first proposal to drain the Everglades was made by Senator Westcott. Swamp and Overflowed Lands Act granted the state of Florida 20 million acres of inundated lands for drainage and reclamation projects. The Board of Trustees of the Internal Improvement Fund (I.I.F.) was founded to manage state swamplands and use the proceeds of land sales for internal improvements. The I.I.F. neared bankruptcy because many railroad and canal companies defaulted. U.S. Army Engineers and surveyors inspected the Caloosahatchee River at Fort Thompson and recommended dredging the river at federal expense from the mouth of Fort Myers to the cataract at Lake Flirt. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 3 To reduce the debt of the I.I.F., Florida sold 4 million acres to Hamilton Disston for Disston was guaranteed half of the any additional land that he reclaimed. Simultaneous dredging and reclamation activities begin on the Kissimmee and Caloosahatchee rivers in the attempt to join these bodies of water via Lake Okeechobee. Steamers traveled from the Gulf of Mexico to the early settlement of Kissimmee, and the exposure of the "liquid heart" within the Okeechobee wilderness was seen for the first time via the waterway routes. State Engineer Duval reported acres had been drained. Land sales climbed from 25 cents an acre to an acre.
Traffic along the Caloosahatchee River was transporting worth of goods out of the Okeechobee Basin and carried an equal amount in general merchandise and equipment back into the interior. First regular steamship freight lines are established on the Caloosahatchee and Kissimmee rivers. First U.S. Department of Agriculture sponsored experimental farm was opened, growing thirty varieties of sugar cane, most of which were indigenous to Cuba and Java, on forty acres of land donated by Disston. The Panic and Depression of halted most drainage efforts and maintenance of the waterways. Disston committed suicide. The State patented acres in the Everglades from reclamation, bringing the state total to acres of reclaimed land to be sold. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 4 Florida's legislature passed the first comprehensive drainage law that created the Board of Drainage Commissioners, which was counseled by former Governor Jennings, and the Board began dredging operations in Everglades Drainage District was established. The District constituted an area encompassing the Lake Okeechobee Basin and the central and eastern parts of the Everglades in south Florida. The District had the power to build canals, establish other districts, and levy property taxes on reclaimed lands. Okeechobee Waterway, from the Gulf of Mexico via Lake Okeechobee to the Atlantic Ocean, was opened to shallow drift navigation. First steamship from Fort Lauderdale to Fort Myers traveled through Lake Okeechobee. Locks are built along the North and South New River and Miami Canals.
The Randolph Commission recommended continued drainage activities and canal maintenance that the Everglades Drainage District followed for the next fifteen years. The Everglades Drainage District built three locks along the Caloosahatchee River for flood control and improved navigation. The first lock at Moore Haven was finished in Continued reclamation activities lowered water tables and made navigation difficulty during periods of drought. Developed and reclaimed areas excessively flooded during the rainy seasons. East St. Lucie (Lock No. 2) completed. Devastating hurricane killed 300 in Moore Haven and the surrounding area. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 5 Catastrophic September hurricane of killed approximately inhabitants living around Lake Okeechobee. Drainage activity was halted due to the Depression. The Okeechobee Flood Control District was formed to assume responsibilities of the Everglades Drainage District. Corps' Chief Engineer recommended additional canals, locks, channels, and levees for the Okeechobee Waterway, setting the groundwork for the Corps' involvement. Extensive flood control improvements installed by the federal government near Lake Okeechobee. Hoover Dike, flanking three-quarters of the lake, completed in Excessive dry periods during introduced new problems. Rivers and Harbors Act provided federal projects for the Caloosahatchee and Lake Okeechobee drainage areas. Everglades National Park was created.
Dredging on the Caloosahatchee began. Construction began on Ortona and Moore Haven locks. Under the River and Harbors Act, the United States would maintain all the project works when completed and bear the cost of all drainage structures when constructed in connection with the project. Total cash contribution required of local interest and the state of Florida was reduced to Federal Flood Control Act adopted by Congress. This Act provided that the Federal government should improve or participate in the improvement of navigable waters or their tributaries for flood control purposes if the benefits they might accrue were exceeded by the cost of lives and social security of people affected. Moore Haven and Ortona locks completed.
Opening day celebration of the Cross-State Canal was March 19, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 6 St. Lucie Lock and Dam modernized with new lock chamber, spillway, and hydroturbine power plant. At the time, it was the most modern lock facility with "state of the art" innovations. Extensive flooding caused by two successive hurricanes left standing water covering as much as 5 million acres in South Florida. Comprehensive Plan of Flood Control for Central and Southern Florida submitted to Congress by the Corps and local and state agencies. Florida Legislature created the Central and Southern Florida Flood Control District vested in all functions and assets of the Okeechobee Flood Control District.
The same legislature provided for liquidation of the Everglades Drainage District and transfer of all its facilities to Central and Southern Florida Flood Control District by Okeechobee Flood Control District abolished. Extensive flood control and water conservation structures built in FCD areas. Water Conservation Areas created in Everglades. Rapid population growth in South Florida stimulated interest in managing protective works to ensure a dependable water supply for agriculture, cities, and Everglades National Park. Conflict developed between Park Service and FCD over release of water to Everglades National Park.
Legislature created Southwest Florida Water Management District and granted authority to the district to work with the federal government to build flood control structures in the district. Florida Air and Water Pollution Control Act enacted. w. P. Franklin Lock located near Olga is completed. This lock is the control mechanism between fresh and salt water, replacing Ortona's original role. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 7 The extreme drought of heightened awareness of water supply and environmental problems.
The Governor's Conference on Water Management in south Florida concluded that water quality was steadily deteriorating in practically all aquatic systems in southern Florida and that water quantity was not being managed to ensure a minimum adequate supply during dry season. Florida legislature created Special Project to prevent the Eutrophication of Lake Okeechobee following concerns that enhanced drainage in the Kissimmee River basin was allowing more nutrients to be transmitted into Lake Okeechobee, accelerating the aging process of the lake. South Florida Water Management District created by Florida Water Resources Act of Port Mayacca Lock completed on Lake Okeechobee's entrance to the St. Lucie Canal.
The lock is also the control mechanism between fresh and salt water on the east side of the Okeechobee Waterway. State Comprehensive Plan - Governor Askew's order directed all executive agencies to use the comprehensive plan as guidance in their planning decisions. The plan embodied the belief that reliance on natural systems is preferable to creation of engineering works. Flood control had become a secondary objective to Floridians, who were placing major emphasis on preservation, restoration, and enhancement of the natural environment. Frequent water quality studies were performed by the environmental impact assessments completed, and local and area water management plans mandated. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 8 B.
INTRODUCTION The Okeechobee Intracoastal Waterway, completed in the by the U.S. Corps of Engineers and based on earlier improvements, connected the Gulf of Mexico to the Atlantic Ocean via the Caloosahatchee River, Lake Okeechobee, and the St. Lucie Canal. The Caloosahatchee River is the waterway's portal to the Gulf, eastbound river traffic empties into Lake Okeechobee which is the second largest freshwater lake completely within the United States, covering a total area of 730 square miles. The final connection is the St. Lucie Canal that connects Lake Okeechobee to the Atlantic Ocean. The waterway includes the navigation channel and five locks and dams, two on the St. Lucie Canal and three on the Caloosahatchee River.
As noted, five locks and dams are positioned along the Okeechobee Waterway. Three of these locks and dams predate World War II and were instrumental in providing navigable passage across the lower interior of Florida. Ortona Lock and Dam is the youngest of the pre-war locks since its construction coincided with early dredging activities in In contrast, the St. Lucie and Moore Haven locks and dams were built on foundations of locks and dams built between and and incorporated existing features and structures into their design. Since the War Department and later the U.S. Army Corps of Engineers (Corps) have dredged, maintained, constructed new locks and dams, and made modifications on the Okeechobee Waterway, formerly known as the Cross-State Canal.
Currently known as the Navigable Cross- State Intracoastal Waterway and Locks, Dams, and Spillways, it is currently used for flood and drought control.
C.historical Context
For centuries, Lake Okeechobee remained detached from the rest of Florida, unaware of three centuries of Spanish occupation, France's vain struggle for a foothold, and the British experiment during the two decades following the Revolutionary War. 1 Antebellum plantations developed far to the north of the lake after Florida became a part of the United States and consisted of citrus groves, sugar cane fields, and cotton 1 Alfred Jackson Hanna and Kathryn Abbey Hanna, Lake Okeechobee: Wellspring of the Everglades (New York: The Bobbs-Merrill Company, 16. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 9 tracts. To the Gulf Coast came the tourists and the railroads implemented by Henry P. Plant, and then to the Atlantic as Henry M.
Flagler constructed the rail network from Jacksonville to Miami. Flagler's connecting rails encircled the northern, western, and southern edges of Lake Okeechobee at the towns of Okeechobee, Canal Point, Lake Harbor, and Moore Haven. In time, the region's two largest metropolitan centers, Miami to the southeast and Tampa to the northwest, were developed. Meanwhile, Lake Okeechobee remained almost isolated from the other four- fifths of Florida until its great water system was opened and its economic riches were tapped.
2 The first explorers and navigators of the Okeechobee Basin were the prehistoric Calusa Native Americans who constructed hand-dug canals for their canoes and implemented intracoastal traffic throughout the lake's waterways and southward within the Everglades towards the Strait of Florida and the Florida Keys. The second important epoch in Lake Okeechobee's history was sixty years of survey and exploration beginning when Florida became a U.S. territory in and ending with the Disston Purchase of The marked the first dredging and reclamation efforts to manage the Okeechobee Wilderness and its watersheds consisting of the Caloosahatchee and Kissimmee Rivers as well as Lakes Flirt, Hicpochee, and Okeechobee.
In the early Hamilton Disston was contracted by the State of Florida to dredge a navigable waterway from Lake Okeechobee north to the Kissimmee Chain of Lakes and west to the Gulf of Mexico, thereby opening the waterways to steamboat traffic and draining large areas of the Everglades for agriculture. Following Disston's pioneering efforts, the State of Florida authorized the Everglades Drainage District which was to be supervised by the State Drainage Commission and which continued dredging and reclamation efforts mainly through the sale of reclaimed public land. The land speculation and booms that followed for the next twenty-one years marks the fourth historical period.
In Flagler's railroad arrived to the lake, which advanced transportation but brought about the end of the steamboat era. By a $2 million highway penetrated the interior and 2 Ibid., 17. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 10 provided access from the east to the west coast. By four drainage canals, which included the length of the North New River, Hillsboro, Miami, and West Palm Beach Canals, along with the widening of the St. Lucie, were dug at a cost of nearly $15 million to reclaim the Everglades.
This venture undertaken by the State Drainage Commission and its result of reclaimed land was described as "the largest single body of highly productive organic soils in the entire world." 3 Two devastating hurricanes in and the tremendous loss of life and property that resulted, and the bankruptcy of the State Drainage Commission, triggered federal action. The Navigation Act authorized the War Department and the U.S. Army Corps of Engineers to enlarge the Caloosahatchee River and the St. Lucie Canal and to connect these two bodies of water with channels dug along the west, south, and east shores of the lake. Material dredged from these channels would be used to construct the first sections of an encompassing levee around the lake.
Ten years later and at a cost of $18 million, the Corps completed the southern portion of the Herbert Hoover Dike, an 85-mile levee along the lake's swollen southern shores to prevent further floods, hurricane damage, and storm destruction of human lives and property. The completed levee, which encompasses the entire 135 miles of shoreline and includes the raising of the original dike level to was finished in the mid-1960s. The final chapter of the Okeechobee Waterway's history to be discussed is summary of the Corps' post-war operation and maintenance of the locks, dams, hurricane gates, levees, and watersheds that encompass not only the Okeechobee Waterway, but also the Upper St.
Johns River Basin, the Kissimmee River, and the Everglades, covering some square miles under the management of the Central and Southern Florida Flood Control District which was authorized by Congress in Finally, this report and context attempts to provide a comprehensive narrative of Lake Okeechobee's history, the origins of the waterway, and the conceptualization of the intangible qualities of wilderness 3 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 11
Environmental Context
The story of Lake Okeechobee is peculiar to the characteristics of the 8 million acres linked to the lake by its vast water system consisting of canals, rivers, and drainages. However, the lake possesses only a slight relationship to coastal Florida's current affairs beyond its immense watershed used by the coastal cities and the environmental concerns raised by the reclamation and restoration of the Everglades coinciding with the lowering of the lake's level. Rather, the history of Lake Okeechobee has grown out of a distinctly different record consisting of lore and folk tales conditioned by its unique topography and remote surroundings.
The often repeated anecdotes of Florida's history, which are largely part of the average person's acquaintance with the coastal recreation centers, are alien to the history of the lake's region. 4 Unique geological formations and organic processes underlie the rich soils of the Lake Okeechobee area, which were rated in the as one of the richest agricultural regions in the United States. Cattle, sugar cane, citrus orchards, and winter vegetables have generated several billions of dollars annually since the giving the lake prominence among the more important lakes of America. The lake's basin is a formation of limestone and marl consisting of layers of sand, shell, and humus and constituting a shallow tropical sea 5 million years old.
Exposed to the sun and air, the limestone hardened into a shapeless mass full of holes. Above the limestone stratum, a layer of marl stretches across the surface and has the effect of sealing the permeable rock against water seepage. 5 Centuries of decayed animal and vegetable substances lie on top of the marl and form deep levels of muck or highly organic peat. In some places, the muck can be twelve or more feet thick. As sea levels rose and fell during the Pleistocene Era until the present, the changing shorelines carved out the lake's shoreline as well as the Okeechobee Basin, which extends from the Upper Caloosahatchee River Valley and Incline to the north and the Immokalee Rise and surrounding Everglades to the south.
The Okeechobee Basin's subtropical climatic pattern is defined as a "tropical savanna climate" with sharply alternating wet and 4 Ibid. 5 Ibid., 20 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 12 dry seasons in the southern watershed, while the northern extent is more moderately balanced and termed a "humid mesothermal climate." 6 The natural hydrologic patterns, which are self- regulating responses to the seasonal cycles of drought and flood, are generally influenced by interactions between climate and physiography. During the dry seasons, surface water levels drop and the stored water below the ground recharges the rivers and surrounding wetlands, while during the wet seasons, these reserves are recharged.
In the months with abundant rainfall, a natural sheet-flow of shallow grassy water carries the excess waters slowly through the streams and across the low lands, descending southward to the Gulf of Mexico and renewing the aquifers underlying the watershed. 7 In addition, the Okeechobee Basin combines terrestrial, freshwater, and estuarine components within its watershed, supporting a diverse abundance of flora and fauna. From the interior outward to the coastal areas, several different plant communities exist such as pine flat woods and saw palmetto prairies, sand pine and xerophytic oak, hardwood swamp forests, prairie grasslands, mangrove swamps and coastal marshes.
8 Lake Okeechobee was described by Isham Randolph, a prominent engineer of the as "the great liquid heart of Florida [that is] at the focus of the greatest agricultural drainage problem in our country." 9 Consisting of years of sediment and erosion, the geological matrix forming the lake's Pleistocene sea floor has caused the lake to remain relatively shallow with depths varying between 12' to Historically, lake depths were reported as deep as The variations are dependent upon rainfall, evaporation, overflow, and irrigation. Records reveal that as much as 50" to 55" of water, an amount equal in rainfall, are lost annually by evaporation alone. 10 The climate is of an insular rather than a continental nature 6 C.A.
Kimes and Crocker, "The Caloosahatchee River and Its Watershed: A Historical Overview," (Fort Myers, Florida: submitted to Florida Gulf Coast University Library Services and South Florida Water Management District under subcontract from Florida Center for Environmental Services, Agreement No. FAU DSR No. revised September available from ces. fa.u. edu/ library/ caJ.oos-wa.tershed/ index. INTERNET. 7 Ibid. 8 Ibid. 9 Hanna and Hanna, 17. 10 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 13 because of the influences from the near-by Atlantic Ocean and the Gulf of Mexico's coastal weather patterns. Rainfall is the most bountiful source of replenishing water to Lake Okeechobee and the rainy season lasts from April to November.
The primary source of the lake's replenishing water is the great Kissimmee watershed to the north. Originally as the Kissimmee drained into Lake Okeechobee, the overflow from the north would spill out to the southern shores, feeding the Everglades and the myriad rivers of saw grass and sedges. Before construction of the canals and dike and the subsequent reclamation policies, the overflow of Lake Okeechobee moved southward toward the Everglades, not in currents but almost imperceptibly as a mass, to fill the innumerable sluggish streams that crawled from the lake like "indolent serpents." 11 Not all of these serpent-like tendrils drained into the Straight of Florida to the south.
Some of them were hoarded in ponds and swamps to maintain nature's balance between extended wet and dry seasons, which man in his confusion upset, and is now desperately trying to re-create with water conservation areas and reserves. The last fifty years of the Everglades reclamation and water conservation policies have been exercises in recreating what was once a natural process.
Frontier Explorations
The saw a resurgence of federal surveyors in the 20 million acres of the Okeechobee wilderness. Surveys were largely halted during the Civil War. Once land was identified and appropriated, federal authorities patented it to the state, after which, it could be sold. Only a portion of the Okeechobee wilderness was officially surveyed, and most public land sales were from previously surveyed defaulted properties that had returned to the state. The increasing use of public lands for grazing and agriculture also fueled the necessity to identify and appropriate townships and ranges. Survey notes and accompanying plats made few references to settlements or inhabitants in the Okeechobee Basin. One of Captain F.A.
Hendry's lesser-known roles was his peacekeeping efforts with the Seminoles during the post-Civil War period. In 11 Ibid. , 2 0 . CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 14 the Hendry assisted Richard Henry Pratt in organizing a tribal leader's meeting in Fort Myers. 12 During this meeting, Pratt recorded information about several Seminole villages around Lake Okeechobee, two of which were west of the lake. One such village was "Tuscanugga" at Fort Center on Fisheating Creek while the other was "Old Chief" Tiger Tail's community in the vicinity west of the Everglades and south of Hendry's property. Hendry not only developed a thriving cattle business but he also continued to be involved in public service roles.
He served as Polk County's State Senator, Lee County Commissioner, and mayor of Fort Myers before his death in at age 86. During his political career, Hendry was an ardent supporter of the Okeechobee Waterway. Hendry County, formed in received its name from this cattleman as well as the LaBelle along the Caloosahatchee River, which was coined from the union of his two daughters' names, Laura and Belle. 13 Besides surveyors and cattlemen, other explorers in the Okeechobee Basin such as naturalists and sportsmen reported signs of settlements. In one visitor's account reported a Native American camp on the north side of the Caloosahatchee in a grove of huge live oaks about from the river's bank.
The same eyewitness also reported Seminoles living east of Lake Okeechobee and north of the Miami region who utilized campsites in the winter season. 14 Around the Fort Thompson area, Daniel Carlton, a cattleman with 900 heads of cattle and who held no land in Monroe County, employed Seminoles to watch after his herds in the free-range lands south of the Caloosahatchee River. 15 In U.S.
Army Engineers and surveyors inspected the Caloosahatchee River at Fort Thompson and recommended dredging the river at federal expense from the mouth of Fort Myers to the 12 Clausen et al., Cultural Resource Survey of Portions of the Port La Belle Development Tract, Glades and Hendry Counties, Florida, Report submitted to General Development Corporation, Miami, Florida, by CCC Enterprises, Inc., North Port, Florida, Survey Project No. July 43. 13 Ibid., 47. 14 Charles Hallock, comp, Camplife in Florida (New York: Forest and Stream Publishing Company, 15 Clausen et al., 44. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 15 cataract at Lake Flirt.
16 This survey coincided with the completion of public land surveys and land patents, and the bulk of the public land was sold to corporate owners related to railroad or drainage operations. Fort Myers citizens and the meager population of 200 inhabitants along the Caloosahatchee River region were interested in the survey because of the frequent floods that engulfed the river valley. The year prior to the survey, rains were so heavy that the valley was submerged from February 6 to December 1, 17 Many of the settlers living along the river's edge had abandoned their homesteads for drier and higher grounds. Under the direction of Captain Andrew Damrell of the Corps' Mobile District, Assistant Engineer Meigs was chosen to conduct the survey of the Caloosahatchee River.
Within three days, Meigs and his party had traveled from Fort Myers to the cataract at Lake Flirt. Another two days were spent crossing into Lake Hicpochee through the saw grass marsh, water lilies, and floating wild lettuce. By the end of the week, Lake Okeechobee could not be seen because of the endless dense and impenetrable saw grass in all directions. Instead of turning back, Meigs chose to burn a path through the saw grass. The river grew shallower as they proceeded eastward. As Meigs' procession was reduced to a crawl with the group having to carry their boats eastward in two feet of water, the engineer concluded that because there was no perceptible current within one-fourth mile of Lake Okeechobee, both Lakes Okeechobee and Hicpochee must be on the same elevation.
On his return back to Fort Myers, the seasonal rains were restrained and drought conditions were evident. Crossing the cataract at Fort Thompson was possible by horse or wagon, and from this point eastward to Lake Okeechobee was shallow enough to wade. Meigs recommended that if dredging operations were to proceed, they must occur during the dry seasons or periods of drought. A canal 40' in width and 6' in depth would allow secure passage through this region. 18 In spite of the sparse population and small trade of the region, Meigs further fueled the interest in future dredging operations by reporting that: 16 Ibid., 45. 17 George E Buker, Sun, Sand, and Water: A History of the Jacksonville District U.S. Army Corps of Engineers (Washington United States Government Printing Office, ca. 95.
18 Ibid., 97. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 16 "the principal advantage, however, to be expected from this improvement would arise from the partial drainage of the wide margin of saw grass marsh bordering the shore of the Upper Caloosahatchee and the Lower Kissimmee, and surrounding Lakes Hicpochee and Okeechobee. The soil of these marshes is a rich black loam, 5 or 6 feet in depth, and deemed by experts admirably adapted to the growth of sugar cane. " 19 In Hamilton Disston inspired Floridians and the nation to recognize the reality of reclamation and dredging operations that would be used to maintain and manage the Okeechobee Wilderness. Sketches and descriptions of Okeechobee's sub- tropical vast wildness were widely circulated.
In the book Our Native Land hundreds of illustrations and descriptions were gathered from across the country. Florida, "The Land of the Orange-Groves," was included in this assorted compendium, and Lake Okeechobee, situated in the midst of the Everglades, was depicted and illustrated at length. Only the introduction of Lake Okeechobee is described below. Far down in the Everglades, the almost unknown interior of Florida, surrounded by nearly impenetrable swamp and gloomy forests, lies the mysterious lake of the South, the vast Okeechobee. The old Spanish Conquistadors, Ponce de Leon and Hernando DeSoto, both heard of this grand lake from the Indians, and sought to reach it, but without success.
The early Indians of the interior looked on it as a symbol of the infinite, and with the sun it shared their worship. The veneration which all the Indians felt for this lake may account for the anxiety with which they always hid from the search of their white brethren. Its vastness filled the red-men with awe; and their imagination supplied what they could not discover. It was the paradise of the Indian, his happy hunting- ground on earth. Thus was the lake dotted with wondrously beautiful islands, and the far shores of 19 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 17 white and glittering sand bordered a land of crystal fountains, beautiful birds, and flowers.
20 RAILROADS AND DREDGING IN OKEECHOBEELAND With the advent of the Second Industrial Revolution in the many people who had made large fortunes were waiting for the right investment opportunity. South Florida was relatively underdeveloped, unsettled, and open for change. Developers and carpetbag government alike knew that the area needed new investments other than cattle, but south Floridians were not receptive to outsiders' exploitation of the area. Interest in public lands was still a matter for the Board of Trustees I.I.F., and "proceeds of their sale were directed by law toward the payment and interest on railroad bonds guaranteed by the state and issued during antebellum days. " 21 Of the railroads built prior to none were complete according to the terms of their charter.
Many companies had defaulted, and the lands had returned to the I.I.F. to be sold again. From to much of the returned and original public lands were sold for less than value. Most of the public lands remained mortgaged, and the sale was often insufficient to pay the interest on the debt. In spite of the lower price, many businesses still defaulted. The trustees began to offer land with a time frame on reclamation projects to large investors, and the I.I.F. Board was so desperate for reclamation and drainage to begin that public land was sold for 10 cents an acre instead of the it was worth. 22 This was the case in when the trustees sold 1.1 million acres to the New York and Florida Lumber Company in exchange for the settlement and reclamation of the Okeechobee Basin.
Creditors quickly stepped in to request receivership before too much money was lost. After the Civil War, few modifications improved conditions in transportation or opened the interior of the state. The Census counted inhabitants living largely in Tallahassee or within the coastal cities of Key West, Jacksonville and 20 Our Native Land: Glances at American Scenery and Places with Sketches of Life and Adventure (New York: D. Appleton and Company, 21 Hanna and Hanna, 92. 22 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 18 Tampa. With the exception of the few boats along the St. Johns and the Ocklawaha Rivers, limited attempts were made to settle the central and southern interiors of the peninsula.
Railroads were the most sought after solution, and after numerous bankrupt rail lines, the State was facing bankruptcy itself as well as the loss of any possible source of credit to keep the state functioning. In the end of Reconstruction and carpetbag government brought the return of a Democratic and Florida-controlled State Legislation. Florida's most insistent problem was public land sales. With all of the defaulted land transactions mainly coming from proposed and bankrupt rail lines that were never built, it was necessary to sell land only for cash value, and $1 million in cash was needed to help the state get out of debt. Samuel A. Swann was appointed by the trustees and authorized to sell 3 million acres at the minimum of 30 cents per acre. In Swann found a rara avis buyer.
Backed by the U.S. Circuit Court, the creditors decided to force the sale of all I.I.F. lands, which amounted to 14 million acres. Hamilton Disston became the savior to creditors and trustees alike. 23 Born in in Pennsylvania, Hamilton Disston was the son of an Englishman. He quickly learned his father's business and moved from an apprentice to a sawmaker, eventually opening a business himself. The Keystone Saw Tool and Steel Works became one of the biggest factories of its kind in the nation. After he became president of the company, production increased three times. Disston was only 34-years old at the time. Described as a playboy-like Pennsylvanian Republican and a veritable workaholic, Disston was admired by his employees and supporters alike.
In Disston made his first trip to Florida for a fishing vacation. South Florida's vast wilderness captured his imagination and he saw a chance to create and shape a primeval area. In he made a contract with Board of Trustees I.I.F. to "drain overflowed land adjacent to Lake Okeechobee in return for half the area reclaimed. " 24 This agreement meant that Disston would be able to purchase and drain huge tracts of land at a lower price before he would sell them to recover his 23 Ibid., 93. 24 Ibid., 95. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 19 reclamation expense. However, many investors and creditors would rather see public land being foreclosed or sold at auction, such as Francis Vose, an investor holding railroad bonds.
Through the courts, Vose argued that state lands should be placed in receivership and required the consent of bondholders before more lands could be sold. In Vose and the courts blocked Disston's agreement with the I.I.F. unless Disston would exchange with the creditors a portion of the original 9 million acres that he wanted to drain. Although the land was still tied up in litigation with the U.S. Circuit Court and creditors, Governor William D. Bloxham intervened and encouraged Disston to purchase enough land to secure the drainage contract. Disston undoubtedly had a special reason for being willing to go to the expense of draining the Everglades. 25 Sugar sold for 10 cents a pound and there was a shortage from Cuba during this time.
Disston boldly obtained 4 million acres for 25 cents an acre, becoming the largest single landowner in the country. The Atlantic and Gulf Coast Canal (A&GCC) and Okeechobee Land Company of Florida were chartered through Disston to handle the drainage contract with the state and acquire the lands reclaimed through drainage. The deadline to begin drainage was moved to January 1, and once started, reclamation happened quickly. Disston's land holdings ranged from St. Johns County in the north to Lake Okeechobee and west along the Caloosahatchee River. As a part of the Disston Purchase, the initial allocation of $1 million worth of land depended on a payment of and subsequent allocations were made as the installments came due.
The tracts contained acres each, except for the last 26 This arrangement was modified in time to find sufficient available acreage, and more surveys were needed when the land was drained. Squatters could buy their houses if they wished, and the state continued to sell Disston's land at 70 cents an acre. In Disston protested because he had chartered A&GCC and Okeechobee Land Company to sell his land. In addition, he considered the price that the state was selling his land too low. 25 Karl H. Grismer, The Story of Fort Myers Petersburg, Florida: St. Petersburg Printing Company, 26 Hanna and Hanna, 97. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 20 Prior to the end of when Disston's next payment was due to the I.I.F., land continued to be sold by the state.
The six- member group of Disston's investors started their venture with a joint capital of but Disston had already given the state one-third of it for the down payment and had used the remaining funds for initial start-up and drainage costs. Chances of meeting the next payment were slim. Just as the State of Florida had found an investor in the Pennsylvanian entrepreneur, Disston found an investor in his enterprise, Sir Edward Reed, who bought 2 million acres for from the I.I.F. before the Disston Purchase was declared in default. Reed planned a railroad with other investors, the Transit Peninsula and Tropical Railroad. This venture lasted until Reed's purchase meant that Disston had a more manageable 2 million acres to drain rather than the initial 4 million.
Several financiers started companies with Disston such as the Florida Land and Improvement Company and the Kissimmee Land Company to drain the lands. The A&GCC finally received legal recognition by the end of from the state legislature. Some critics of the sale thought that even though Disston did a service to the state, not all of the land was swampy and reclaimable. Squatters were reported on some land, and the purchased cost per acre was lower than Swann's minimum asking price of 30 cents an acre. These issues were contended and debated in the newspapers, and dissenters were adamantly vocally as late as Nearly every state legislature session began its new year with some sort of investigation of Disston's enterprise.
27 Railroads were built and land sales increased by almost 200 percent because of the Disston Purchase. His undertaking was one of the three largest in Florida. The other two ventures that attracted attention and coincided with Disston's drainage project were Henry M. Flagler's railroad on the east coast and Henry B. Plant's railroad on the west. In spite of Disston's untimely death in his venture was received as the first large-scale and successful attempt to begin intracoastal transportation across Florida's peninsula. 27 Ibid., 97 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 21 Scattered settlements appeared in the St. Lucie region in the early with the communities of Gomez, Hobe Sound, Jensen Beach, and Stuart.
Waveland, established in was the first community and postal center in the region. By there were forty-one inhabitants of the St. Lucie Inlet region, and by the turn of the century, the number had doubled. 28 While the St. Johns and Indian rivers had gained attention for water transportation during Hamilton Disston's drainage and reclamation project, the hazardous and unpredictable water inlets such as St. Lucie and Jupiter remained a deterrent to navigation. In the several plans were included to link the waterways together. By the early the St. Lucie waterway was proposed as a flood control and navigation route. According to one tourist book, which was written before Disston had started drainage and reclamation activities, the St.
Lucie River was already part of the Everglades reclamation plan. Twenty-five miles south the St. Lucie River, which is the principal outlet for the drainage of a vast territory lying east of Lake Okeechobee, is confluent with the Indian River; it has a wide and deep channel branching off into a north and south prong, and in constructing a drainage canal from Lake Okeechobee to the forks of the St. Lucie, opposite the mouth of the latter, it will be necessary to open an inlet connecting Indian River with the ocean. 29 In reality, the St. Lucie passage would wait for another twenty- five years. The lack of interior roads and the advent of the southward bound Florida East Coast Railway factored into the delay over the completion of an interior waterway connecting the Gulf to the Atlantic.
Operating simultaneously, four wood-burning dredges were used for Disston's reclamation of the Okeechobee Basin. Initially, only two were used in one on the Caloosahatchee and the 28 Historic Architectural Survey of Martin County, Florida Augustine, Florida: submitted to Growth Management Department, Comprehensive Planning Division of Martin County, Stuart, Florida, by Historic Property Associates, Inc., June 5. 29 George M. Barbour, Florida for Tourists, Invalids, and Settlers (New York: D. Appleton and Company, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 22 other on the Kissirrunee River.
Dredging along the Caloosahatchee River focused on expanding the headwaters and constructing canals from Lake Flirt through Lake Hicpochee to the Three-Mile Canal, which connected to Lake Okeechobee. Where Three-Mile Canal is today, there were originally two small lakes, Lettuce and Bonnet, which contained the remnants of a Native American canoe trail that joined Lakes Okeechobee and Hicpochee. Disston hired Captain J. Fred Menge and his brothers Joseph and Conrad of the New Orleans to operate his first dredge boat on the Caloosahatchee. 30 The New Orleans was built at Cedar Keys in especially for Disston's reclamation project. The 20' wide, 80' long dredge used twenty-four elevator type buckets to collect and carry off the mud from lake and river's beds.
The mud was dumped in a hopper and from there into a wooden chute into which a stream of water kept the mud from sliding out on the river's bank. This dredge could cut an average of 250 lineal feet of soft silty muck, 24' wide and 6' deep, in ten hours. This type of dredge was invented by Anton Menge and patented as the Menge Dredge, although more corrunonly known as Dredge No. 1. 31 Disston's Dredge No. 2 was brought to Lake Tohopekaliga by railroad to work from the north heading southward and connecting the Kissirrunee Chain of Lakes to the Kissirrunee River, which leads into Lake Okeechobee. 32 By the end of the first section along the Caloosahatchee was complete.
A lone cypress tree at present day Moore Haven soon became the famous landmark that marked the entrance and confluence of the Three-Mile Canal and Lake Okeechobee. 33 Three- Mile Canal's dimensions were narrow, measuring 22' in width and 5' in depth. Other canals were dredged through Observation Island on Lake Okeechobee as well as along the lake's north and western rims, from Okeechobee city to Bowlegs Landing, to provide faster access via the waterways and around the lake. "Wood canals" were constructed to isupply lumber for makeshift barges that towed the dredges by steamboats as well as the wood- burning boilers for the vessels. Lumber was also needed for makeshift camps such as the outpost on Observation Island and to 3 Clausen et al. , 5 0.
31 Conrad Menge, "Early Dredging in the Lake Okeechobee Region," oral history of author, Clewiston Museum, Clewiston, Florida, 32 Buker, 98. 33 Menge, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 23 plot the course of a new canal. Planks of wood or "soundings" were used to plot the canal's path as well as to test the muck below for rocks and outcroppings that would damage the dredge. 34 Two such "wood canals" are still in use and include the Nine- Mile Canal, also known as Industrial Canal, that extends from the southern bank of Lake Hicpochee to Lake Okeechobee where present day Clewiston is located, and Thirteen-Mile Canal, that later became the Miami Canal, which is located south and west of Lake Harbor.
More canals were dredged between Lakes East Tohopekaliga, Tohopekaliga, Cypress and Hatchenha into Lake Kissimmee. By August State Engineer Duval reported acres had been drained. 35 Disston's master plan envisioned that canals from the St. Johns River all the way to the Gulf would create the reality of a trans-state waterway. Dredging continued from Lakes Hart and Mary Jane (Amanda) toward the St. Johns River. In fact, the Disston Canal extended from the northeastern shore of Lake Hart and connected to the Econlockhatchee River, which snakes its way north then east to join the St. Johns River south of Lake Harney in Seminole County. However, this final stretch of the waterway, which consisted of approximately 22 miles along the meandering river, remained the least navigable section.
The New Orleans was "worn out" after completing the Nine-Mile Canal. The dredge was taken to the south shore of Lake Hicpochee where it had started, and then it was abandoned. A new dredge was then built at Kissimmee for further work along the Caloosahatchee River. Its hopper was equipped with tumbling wheels instead of sprockets, and the ship floated on two pontoons, one bolted to either side, for more stability. Dredges were dismantled during transportation and then reassembled in their working area. The first work done with the new dredge consisted of digging two cross canals north and south of the Caloosahatchee River between Fort Thompson and Lake Hicpochee.
All of the previous canal work and dredging had not succeeded in lowering the lake level by and new canals were constructed to drain marshes on either side of the main canals, thereby 34 Ibid. 35 Hanna and Hanna, 9 9 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 24 further distributing and displacing the water level. 36 To confirm Disston's work, the Corps of Engineers surveyed the Caloosahatchee River in The Corps' annual report included descriptions of the area, noting the high banks from Fort Thompson to the mouth of the river. In addition, the Corps' survey confirmed that the waterway was navigable, and the Corps began planning additional work on the waterway such as clearing the banks from snags and widening its channel.
The Corps also recommended as early as that wing-dams and submerged jetties directing the river's current should be constructed in addition to continued dredging operations. Later surveys evaluated the gradient between Lake Okeechobee's mean low-water level, which was above sea level, and at LaBelle, which measured above sea level. At the latter location, LaBelle's elevation was similar to the Gulf coastal datum at Punta Rassa. The fall from Lake Okeechobee to LaBelle was precipitous, especially over the cataracts west of Ortona. The shallow river below LaBelle was equally problematic because it accumulated the shoal or silt and sand from the frequent flooding carried downstream. The following excerpt is from the Corps' Annual Report of the survey.
For 17 miles from its mouth, the [Caloosahatchee] river is broad and has a channel depth from 6 to 20 feet, with the characteristics of an estuary. This portion of the river is obstructed by oyster bars. Great beds of snags obstruct the upper river. From Alva down the country is being settled rapidly for the culture of sugar-cane, pineapples, cocoa-nuts, oranges, limes, and lemons. Fine cattle ranges exist along the upper river. The works were not intended for the benefit of navigation, but they have incidentally opened a water route [with] the exception of the cut-offs, which on account of their bad location, are an injury to the river. 37 Draining marshes also had the advantage of reclaiming rich fertile agricultural lands.
During their work, the Menge brothers grew rice stalks that were so tall, over 5' in height, that the stalks would collapse under their own weight. 38 The 36 Menge, 37 Kimes and Crocker. 38 Menge, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 25 second dredge, Dredge No. 2, was responsible for the construction of the Thirteen-Mile Canal (or the first half of the Miami Canal), which was the last canal dug by the Menge brothers. The dredge was dismantled and towed by the steamboat Roseada back to Kissimmee. During the voyage across Lake Okeechobee, a storm rose suddenly and sank the barge carrying the dredge, never to be seen again.
39 Three years after Disston had started his operations, engineers claimed that the frequent flooding seen in recent years was now a thing of the past because dredging operations and reclamation had lowered the water levels along the Kissimmee River and Lake Okeechobee. In the mid-1880s when the flooding cycles resumed, the thankful and laudable testaments that settlers had given became voices of dubious concern. In Corps District Engineer Captain William M. Black commented on these changing attitudes in his annual report, claiming that too much water from Lake Okeechobee descending westward was responsible for the flooding of cultivated fields.
These voices of concern would reoccur for the next forty years, rising in pitch and fervor in proportion to the tragedies and losses of life and property. In the mid-1880s, Disston's engineers realized that their operations were not solely responsible for lowering the water levels, and dredging resumed over the next decade to construct new canals, widen existing ones, and maintain a navigable waterway from Kissimmee to the Gulf of Mexico via Lake Okeechobee. Another lesson to be learned and repeated in Disston's efforts was that the maintenance of the waterways, like the surrounding wilderness itself, could be managed for a time, but the Okeechobee watershed could never be continuously regulated and controlled.
Nevertheless, with State Engineer Duval's endorsement of the reclamation project, the Trustees of the I.I.F. agreed that the dredging contract had achieved the goals of the Disston Purchase. In A&GCC and Okeechobee Land Company were deeded approximately 2 million acres with the privilege of buying additional reclaimed land at 25 cents per acre. Altogether, Disston's franchises had overspent on reclamation and on extra land. At the height of its 39 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 26 landholdings, A&GCC and Okeechobee Land Company included the entire shore of Lake Okeechobee and most of the Township's sections that lined the Caloosahatchee and Kissimmee rivers.
In as the drainage contract with the state was completed, the Disston Land Company came into direct ownership of all of the Okeechobee Basin. 40 Between and there was a widespread pattern of land acquisition that involved either persons or corporations playing some role in the development of south Florida's state-acquired public land. 41 Some of the larger corporations besides A&GCC and Okeechobee Land Company included the Plant Investment Company, the Louisville and Nashville Railroad Company, and the Wisner Land Company. The first two companies represented networks of land developers spreading throughout Florida and fueled by indirect aid of land grants from the I.I.F. as provided by law. 42 The Wisner Land Company invested in land for the resale or development of properties.
In addition, as dredging continued and marshes were drained, more land was surveyed and made available. One such surveyor was John A. Henderson who investigated and documented much of the swamp and overflow land in south Florida. Henderson was compensated with over acres of land, and after his death in his heirs, John w. Henderson, Jennie H. Murphree, and Flora A. Waldo, benefited with several tracts of land from Henderson's survey contract. 43 Many of the topographic quad maps of south Florida look like patchwork quilts made of Townships and Sections, a result of the original and then later surveys as reclaimed public land became available. Most of the land lining the Caloosahatchee River changed hands in the and and was sold to cattle ranchers and timber industries.
Commercial and sport fishermen were also commonly seen taking advantage of the River and Lake beyond. 44 40 Hanna and Hanna, 41 Ibid., 54. 42 Ibid. 43 Ibid. 44 Ibid., 58. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 27
The Caloosahatchee River
From prehistoric civilizations to Disston's dream, the Caloosahatchee River has been the Gulf coastal entry to Lake Okeechobee and later, structurally, half of the Okeechobee Waterway. However, the river, like the wilderness itself, has always been an inadequate conduit for navigation and flood control, for it provided a torrent of water rushing downstream to fertilize its river valley. Before dredging operations, the river consisted of almost 200 bends and turns in the river. Similar to the Kissimmee River, the function of these turns was to slow the excess of water being carried out to the ocean, thereby saturating the wetlands and the below ground aquifers along the rivers' valleys.
While dredging operations did straighten both rivers, adjacent drainage canals were needed to carry off the excess water, a function once provided by the natural turns in the river. A report in by Colonel James M. Kreamer, Chief Engineer of the Okeechobee Drainage Company and namesake for Kreamer Island in Lake Okeechobee stated: Further drainage through the Caloosahatchee is barred from the fact that the capacity of the upper Caloosahatchee River at Fort Thompson is fully taxed at present to carry the water reaching that point via the drainage canals already constructed; and the residents of that region are petitioning the Internal Improvement Board to provide relief during and subsequent to the rainy season by closing the canal at a point west of Lake Hicpochee.
45 When the residents of what was then Lee County were not satisfied that their earnest pleas and requests to the I.I.F. Board were heard, they took matters into their hands and constructed earthen dams along the waterway at the headwaters of Lake Hicpochee. The dams were shortly dismantled, but clearly, the vigilantism and frustration from local residents were part of the mounting tensions that were proportional to the inadequate responses from the State Drainage Commission. During the the towns of Alva and Olga were established along the Caloosahatchee River; Lee County was formed, 45 Kimes and Crocker. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 28 encompassing 2 million acres and the entire Caloosahatchee Region; Fort Myers became an incorporated town, and thousands of acres of new citrus farms were developed since the south Florida river region had survived the devastating North Florida Citrus Freeze of 46 Another survey conducted by the Corps' engineers in identified approximately sixty farms along the Caloosahatchee River. 47 By traffic along the Caloosahatchee River was transporting worth of goods out of the Okeechobee Basin and carried an equal amount in general merchandise and equipment back into the interior. 48 Disston's dredging did change the physical shape of the river. In the next fifty years, the river's natural channel would be altogether modified.
Disston and the Corps' dredging of the Caloosahatchee, and later the creation of the St. Lucie Canal, would reveal the inadequacy of the enormously expensive, time- consuming, and complicated task of draining the Everglades and diverting the lake's excessive water. 49 After Disston's dredging of the Caloosahatchee, Captain J. Fred Menge and his brothers later operated a steamboat, the Suwanee, which took tourists sightseeing from Fort Myers to Fort Thompson and later to Lake Okeechobee. The Suwanee, a two-deck stern wheel steamer about 75' in length, was originally called the Susie Band owned by the New Orleans' Times Democrat newspaper. In the Susie B's first expedition up the Caloosahatchee River brought journalists, tourists, and sightseers to record and watch the dredging operations.
On a second expedition a year later, journalists visited with a Mr. Frazier who was uthe last inhabitant of the Caloosahatchee" and who lived near the river. It was during these expeditions that the Menge brothers decided to purchase the Susie B. W. Daniel Frazier had bought land from Hendry outside the Thompson community and was reported to be the postmaster of the post office of "Thompson. ,,so In in a letter to the editor of a Tampa newspaper, Fraser also described his house as being located 100 yards from the newly dredged channel in the 46 Ibid. 47 Ibid. 48 Ibid. 49 Ibid. so Clausen et al. , 51. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 29 Caloosahatchee River. After the second expedition, Pager M.
Baker, editor and manager of the Times Democrat, purchased land in along Coffee Mill Hammock, the area between the present day Ortona community and the Lock and Dam. Other Louisianans and associates of Baker followed suit, and Ortona's first inhabitants probably settled along the river's edge and surrounding area. 51 In the Suwanee was outfitted with a hydraulic dredge with a suction hood for the Caloosahatchee River Improvement Project with partial funding and supervision in part by the Corps. The District Engineer, Captain William M. Black, was responsible for later dredging operations along the Caloosahatchee River for navigation and flood control purposes.
Captain Black was also the architect for the hydraulic suction dredge that was installed on the Suwanee and his design influenced dredging operations and blueprints for the next fifty years. In July the Menge brothers moved the Suwanee and another dredge they owned, the St. Lucie, to begin excavations along the Jupiter inlet and the Indian River, where the Lower St. Johns River empties into the Atlantic coastal waters. The Suwanee, like the St. Lucie, was described as a shallow- draft, square-bowed scow measuring in length with a 24-foot beam. 52 Much of her top machinery had been removed and shipped by rail from Fort Myers, and eight days were spent re-outfitting the vessel.
Both dredges were suited for their tasks having been equipped with dredging and snag equipment, and altogether performed well for general-purpose operations on smaller rivers. The Suwanee's suction dredge discharged slurry upon the banks through pipes swung perpendicular to her sides, while the vessel's derrick provided lifting power to raise rocks and snags from the river bed. 53 The Menge brothers also provided freight and passenger service along the Caloosahatchee River. Freight included fish, furs, alligator hides, and mail. For over thirty years, the Menges operated a boat line using the Flat Top Cypress or Lone Cypress Tree, surmounted with a flag and advertisement signs, at the site that would later become Moore Haven and its first lock.
This landmark was the only navigation 51 Ibid., 52. 52 Buker, 118 53 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 30 guide on the lake to mark the entrance of Three-Mile Canal or the opening from Lake Okeechobee to the Caloosahatchee River. Tourists continued to visit the area including Thomas Edison, his wife, and their friends whom between and chartered the Suwanee every year for a few days during the fishing season. Since there was no railroad in Fort Myers, the town of Punta Gorda on the Gulf Coast was the location where most of the Suwanee's passengers boarded. The hurricane of wrecked the Suwanee as well as most of the town of Moore Haven. The storm blew the boat ashore and later flooding buried it in the silt. In Henry Ford offered to rebuild the boat.
Fred and Conrad Menge and Mr. Ford scavenged what was left of the ship outside of Moore Haven. The Menge brothers reconstructed the hull and shipped it to Dearborn, Michigan, where Ford was waiting with the original, but refurbished, boiler and engines. In the new Suwanee made its maiden voyage on a small river in Greenfield Village, Michigan. 54 In one of the Corps survey reports dated the following summary was made of the upper Caloosahatchee River region that supported future dredging activities, if managed responsibly, along the water route.
It is only natural that during heavy rainy seasons, overflow waters from Lake Okeechobee passed down the river will reach the so-called bottom of the hill near LaBelle where it spreads out over the entire community, drowning out the crops, killing the citrus trees, driving the inhabitants from their homes, and holding backward the development of one of the most fertile and productive portions of Florida. In the early years, south Florida in the vicinity of the Caloosahatchee River, although not thickly settled, was recognized for its adaptation to the growing of citrus fruits. Stimulated by the so-called big freeze in and the culture of the citrus fruits increased very rapidly in the Caloosahatchee River Valley, and all goods [were] necessarily transported by water.
Extensive pasturage 54 Menge, 131 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 31 existed throughout the valley, and cattle raising was one of the main industries. Very large catches of fish were brought down the river from Lake Okeechobee, and after the railroad reached Fort Myers in a large tourist trade developed. During the year the water level in Lake Okeechobee was so lowered by drainage operations from the State of Florida that navigation in the upper Caloosahatchee River was ruined and the settlers abandoned their homesteads and moved away. The State of Florida began dredging in a channel in Lake Okeechobee to LaBelle. The Caloosahatchee River has a brighter prospect now than at any time in its history.
It is this upper river region that is the backbone of Lee County, which originates the shipments over the lower river. 55 The Hendry's family interest in the Fort Thompson area remained throughout the changing years of the river valley and land proprieties. The Corps had first benchmarked this area in the under Captain Black's surveys of the Caloosahatchee River. Corps' engineers plotted benchmark No. 4 on the south side of the river in an overflowed prairie. 56 Surveyors' notes record that in the the flood state of the river was above sea level in and 17' in which was between to above normal grade. These early recordings certainly coincide with future flooding reports along the Caloosahatchee as well as previous ones during the Second Seminole War.
57 In the naval officers reported that it was possible to moor their vessels alongside the palisade at Fort Thompson. Two descriptions of Hendry's house along the Caloosahatchee remain, although one of these images may be corroborated from historical photographs. Lawrence Will described the structure as a two-story settlement on a little mound near the 55 U.S. House, "Examination of Caloosahatchee River, Florida, from Mouth to Fort Myers," Congress, Session, Document No. 56 Clausen et al. , 71. 57 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 32 edge of a hammock, unfinished and unpartitioned. 58 The Hendry holdings, in addition to the lands of Daniel Carlton and Fraser, became the properties of E.E. Goodno in the early years of the twentieth century.
59 Goodno not only bought a house in the Fort Thompson area, but he also remodeled a building described as previously owned by the Hendry family. This latter structure was known as the Fort Thompson Park Hotel. The complex consisted of an icehouse from the structure as well as river access from the south bank of the Caloosahatchee. A wooden trestle carried tramcars loaded with ice from the icehouse to fishing boats docking for supplies. 60 Twice a day, steamers from Fort Myers would bring sportsmen and vacationers to the riverside hotel. However by the steamboat traffic along the river was dwindling as the State's dredging effects combined with droughts lowered the water table and made navigation infrequent.
Goodno later sold his holdings to Henry Ford in and moved southward to the present day community of Goodno where he hoped to capitalize on the presence of the Seaboard Coast Line railroad. Many cattle pens and chutes stood alongside the tracks, but the collapse of the Florida real estate land boom in brought an end to Goodno's expectations. 61 In fire destroyed the Fort Thompson Hotel as well as Hendry's original two-story ranch house. Mr. Jerome G. Attanasio, an immigrant born in the town of Ortona, Italy, first settled Ortona, Florida, then referred to as Chiaha from the Seaboard Atlantic Coast Line Railroad maps. Attanasio was originally interested in creating a vineyard, but the soil proved too wet for growing grapes. Like many farmers, he switched to citrus orchards.
On June 6, Ortona was first recognized as a town. The community's actual name was Ortona Little Farms, but the clerks at the Glade County Courthouse reduced the town's identity for brevity to Ortona. Attanasio fabricated his own welcome sign for the fledgling village, reflecting his hopes, which read "Little Town - Watch It Grow. " 62 58 Lawrence E. Will, A Pioneer Boatman Tells of Okeechobee Boats and Skippers Petersburg, Florida: Great Outdoors Publishing Company, 49. 59 Clausen et al., 59. 60 Will, Pioneer Boatman, 49. 61 Clausen et al., 60. 62 Larry Lucky (Glades County Tax Assessor), unrecorded interview with author, 13 April CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 33
Vogue Explorations and the Kissimmee Frontier
As some of the links in Disston's complex waterway chain began to unravel, these weaknesses revealed the following fundamental lesson that would take another half-century to fully understand: that dredging and reclamation are continual projects and processes needed to maintain and manage the Okeechobee watershed. However, the repercussions from the combinations of droughts and constant dredging lowered the water tables and made navigation equally problematic. One effect of Disston's reclamation project was the two million acres of uninhabited and fertile land to be utilized and sold to prospective landowners and speculators. The other effect was the national and international interest generated in cheap rich soils, undeveloped lands, and access to a wilderness waiting to be tamed.
If nothing else, Disston's unexpected progress fueled the interest and imaginations of thrill seekers, naturalists, journalists, and explorers, all of whom recognized that the dredging operations dissected a water route through the Okeechobee wilderness. The New Orleans' Times Democrat promoted three explorations of the Okeechobee interior during Disston's drainage and reclamation project. By directing public interest to the lake region, the Times Democrat inspired other newspapers to circulate the exciting narratives of "arduous undertakings" in the name of exploration amidst the "wild confusion" within the myriad marshlands. 63 Though all of the explorations were not steeped in heroic bravado, each contained a solemn awe and respect for the vast watery wilderness.
As late as the sightseeing expeditions were undertaken by steamboats to carry thrill seekers, newspaper reporters, and prospective landowners In Angelo Heilprin's scientific expedition into the Okeechobee Wilderness for Philadelphia's Wagner Free Institute of Science identified and documented the diverse flora and fauna of the Okeechobee Basin as well as the geological and paleontological attributes of this region. The region about the Caloosahatchee, and more particularly the interior tract which harbors the 63 Hanna and Hanna, 110 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 34 headwaters of that stream, are so little known that we found it almost impossible to obtain any information that could prove of advantage to us in our intended exploration of the southern wilderness. The most that could be ascertained was that at certain intervals along the river we would come across settled hamlets or plantations, but the approximate distances at which these furthest outliers of civilization were to be met with were so vaguely stated, and differed so materially among themselves, that it was impossible to place any implicit reliance upon them.
No scientific observations, other than those pertaining to pure topography and hydrology, had ever been made in this section of the State before, which fact, coupled with the hope that along this stream we might expect to find a more reliable clue to the true physical history of the State than along any other, provided a geological profile was offered, made us anxious to enter the terra incognita. The results obtained amply warranted our determination. 64 Corporate information gathering, as before, also drove explorations. In J.E. Ingraham, President of the South Florida Railway, an affiliate of the Plant Investment Company, hired former employees from the experienced Disston drainage crew and organized the "Everglades Explorers".
"Hoisting the flag of the Plant System, a Maltese cross with a P in the middle, at the bow of their flagship of their little fleet of skiffs and canoes, they entered the marshlands on March 21. " 65 The popular images conveyed through newspaper accounts and illustrations made explorations of Florida's wilderness as unconquerable and unimaginable as Stanly and Livingston's "Dark Continent" of Africa in the The Everglade Explorers' route began at "Shirt Tail Camp" on the Gulf Coast, south of Fort Myers, and proceeded northward against the current of the river of grass toward Lake Okeechobee. After fourteen days, food supplies were critic ally low and they had only moved approximately 24 miles into the everglades' interior.
On April 4, Ingraham abandoned the survey and persuaded a Native American 64 Angelo Heilprin, Explorations on the West Coast of Florida and in the Okeechobee Wilderness (Philadelphia, Pennsylvania: The Wagner Free Institute of Science, 65 Hanna and Hanna, 114 . CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 35 guide to direct him toward Miami, which was only 25 miles from their stopping point. Only two of the twenty-two explorers were willing to return and complete the survey, and Ingraham was not among them. However, the chief virtue of Ingraham's experience was the coastal paradise found along the semi tropical tip of south Florida. Ingraham was deeply impressed with Miami's potential and soon after tried to convince Plant to extend his operations southward.
When Plant declined, Ingraham entered into an association with Flagler. Four years later in Flagler' s Railroad connected with Miami and thus began the amazing growth of the beachfront metropolis southeast of Lake Okeechobee. In later years, the Menge brothers developed a freight and passenger service with a fleet of steamers in addition to the Suwanee such as the City of Athens, Gray Eagle, Ralph Baker, Anah C., Corona, Thomas A. Edison, Nyanza, and the Ada May. 66 Captain J. Fred Menge settled in Fort Myers and married Virginia Lee Hendry.
Other important ships of distinction include the following: Captain Hall's steamers the Bertha Lee (first steamboat up the Kissimmee Waterway), Schipman, and Naomi's I, I I, and I I I, and Captain Johnson's steamers: Mamie Lown (Schipman's twin), Cincinnati, Roseada, Lillie, and Osceola. Captain Johnson was the last captain who offered steamboat passenger service in the mid-1920s. Other boats include the Philadelphia, Rosalie (Disston's steamer), Colonist, Arbuckle, Spray, Leader, Mary Belle, Hamil ton Diss ton, Mary Diss ton, Waunita, and Astatula. Many of Disston's boats were built in Kissimmee.
By the fall of steamers traveled from the Gulf of Mexico to the early settlement of Kissimmee, and the exposure of the "liquid heart" within the Okeechobee wilderness was seen for the first time via the waterway routes. Excitement was everywhere, as well as the realization that if Disston could maintain the Econlockhatchee River and connect to the St. Johns, the trans- state waterway would be the least expensive canal route connecting the Atlantic to the Gulf and vice versa. 67 A year before, Captain F.A. Hendry had prophesied optimistically that by the winter of 66 Ibid., 67 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 36 "steamers built at Pittsburgh may descend the Mississippi, steam along our Gulf Coast, ascend the Caloosahatchee into Lake Okeechobee, and after traversing the region of the unknown and steaming up the Kissimmee, wake the echoes of Orange County as they greet the new Kissimmee City rising like magic in a wilderness of tropical verdure." 68 The "magic" Kissimmee was a cattle camp when Disston first arrived. Disston looked for permanent settlers from northern cities and Europe to cultivate the reclaimed land. His first colony was on Lake Conway near Orlando and consisted of 250 financially responsible families from New York who had enough money to sustain themselves for a year. Early settlers paid to an acre in the majority purchasing between twenty to eighty acres of farmland.
Disston's profit was generous considering he paid twenty-five cents an acre. Though the area was extremely primitive, the opening of the waterway from Lake Okeechobee to the Gulf helped growth occur, as did Flagler's railroads to the North. In addition, Disston established a steamship line with four steamboats running a 36- hour schedule between Fort Myers and Kissimmee, three decades before the rail lines would penetrate the Okeechobee interior. 69 Disston's genius was that he thought in sustainable terms and tried to develop an infrastructure around Kissimmee.
His idealistic vision can be seen in the agribusiness of sugar and rice that brought in potential land owners; the sugar refineries that attracted workers and other farmers from abroad; the banks bewitched by businesses and Disston's land offices and speculators; and his steamship operation, which not only opened trans-state transportation, but also built the wood-burning boilers and engines in the boatyards in Kissimmee. The Disston Works were not only turning out steamboats but also dredges to continue drainage and reclamation well after Disston had completed his contract with the state in In the some of these sustainable ideas were later adapted by the Flagler system and within his enterprises consisting of the 68Ibid. , 101 . 69Charles E.
Harner, Florida's Promoters: The Men Who Made It Big (Tampa, Florida: Trend House, 16. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 37 Model Land Company, the Southern States Land and Timber Company, and the United Land Company. As the Menge brothers' experiment with rice stalks proved, reclaimed land was extremely fertile, and reports were widespread that "the land had only to be touched to give crops." 70 In land was sold as high as an acre. Disston planted nearly acres of rice and acres of sugar cane and started the production of two sugar refineries, one in Kissimmee and the other on the shores of Lake Okeechobee. In the St. Cloud Sugar Plantation at the disposal of the U.S.
Department of Agriculture (USDA) opened and experimented with growing thirty varieties of sugar cane, most of which were indigenous to Cuba and Java, on forty acres of land donated by Disston. Between to Disston continued dredging operations that converted hundreds of thousands of swampland into fertile soil; lowered the Kissimmee lake levels from 8' to opened up most of the farmland around Lake Okeechobee; dug the first eight miles of the Miami Canal; made possible the cities that ring the Lake and first proposed the St. Lucie Canal as evident on an railroad map, long before the idea was authorized by the State Drainage Commission. Lake Okeechobee's water level dropped over a foot.
With all of the new lands opening, Disston was acquiring increasing amounts of real property to borrow capital for additional developments. Similarly, the I.I.F. was pursuing new railroad contracts with renewed interest, chartering 564 companies seeking land grants, and of these, 251 were wholly or partially built, while 154 of these rail lines actually operated. 71 However in an economic panic occurred in the U.S. followed by one of the worst depression the nation has ever seen. Disston mortgaged $2 million in holdings to revive his enterprises, including the Sugar Plantation as well as his land offices in Kissimmee. Within a few years, the dredges had stopped working and the steamboats quit running as Disston's wealth dwindled.
On April 30, after attending a theatre in Philadelphia, Disston went home and filled the tub for a hot 70 Hanna and Hanna, 101 71 Harner, 1 7 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 38 bath, whereupon he sat down in the water and shot himself in the head. 72 The Jacksonville Florida Times-Union reported on May 1, that Disston had "done more to develop the state than any other man or body of men in the United States. " 73 His heirs were apathetic of his vision, and most of the land was forfeited for taxes. In Disston's Land Company and vast empire was valued at million, and Disston himself had hoped to one day receive as much as ten times this amount when the value of land and bonds matured.
After liquidation by a court order to meet his debts, Disston's empire was sold for 74
The Early Twentieth Century
By the State became involved in a politically motivated drainage project of the Everglades, including the reclamation of lands east and south of Lake Okeechobee. There was already abundant farmland and the Okeechobee area had been sufficiently surveyed and patented. However, vast tracts of available public land were eyed attractively by railroad companies, agriculturists, developers, and eager landholders. Governor William S. Jennings, cousin of William Jennings Bryan, decided that the remaining public trust lands from the I.I.F. should be saved for Floridians. In the Governor patented acres in the Everglades bringing the state total to acres. 75 The railroads angered by the loss of possible land took their dispute before the Florida Supreme Court.
After the Civil War, Florida was bankrupt and dispirited, and so in the State utilized its only available revenue-maker, the swamp and overflowed lands, and sold vast areas to railroad companies, which in turn exacted an "usurious rate of interest" for aiding to the growth and development of the northern and western portions of the state. 76 These sections of Florida benefited from the sacrifice of other areas, and south Florida remained an orphaned stepchild dependent upon corporate and state interest 72 Ibid. 73 Hanna and Hanna, 74 Ibid. 75 Ibid., 76 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 39 for subsistence.
Between and 15 million acres of swamp and overflowed lands were granted to the railroad companies, which consisted of the Florida East Coast (Flagler), the Atlantic Coast Line (Plant), and the Seaboard Air Line. 77 The remaining 5 million acres out of the original 20 million acres of swamp and overflowed lands given to the state by the Federal Government in were largely in south Florida's undeveloped and uninhabited Okeechobee Basin and Everglades. In Florida's Supreme Court decided that if any lands were left over from the expense of drainage, then railroad claims were to be settled first and individual claims second. Governor Jennings realized that owning land was political power.
With political capital, property, and wealth, these components were interwoven into the goals of exploitation and profit from the railroad companies. Jennings also deduced what the inevitable outcome from land disputes and litigation would be. From to he pushed for state-controlled drainage projects as a logical way to deny land grants to railroad companies. Reclamation of the Everglades was viewed as being extremely lucrative because the cost of land at an acre was far less than what it would yield later with fruit crops, which was estimated at to an acre. 78 Those who held ownership of the Everglades would also be able to influence future fortunes, land policies and reclamation, and political power.
With Jennings' term ending, he looked for someone like him, someone who would support liberals and anti-corporationists by preserving public land for Floridians. 79 Governor Jennings looked to Napoleon Bonaparte Broward, who not only had a colorful adventurous life, almost a living-legend with his smuggling exploits during the Spanish-American War, but who also appealed to a broad spectrum of ordinary and disenfranchised voters who felt that politics equated wealth, corruption, and public exploitation. Broward's platform stated that he wanted Florida to reach new heights of prosperity while safeguarding democracy and the people's best interest. The Everglades would become Broward's manna and gift to Floridians. 77 Ibid.
78 Ibid., 79 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 40 Broward wanted to reclaim all of the Everglades and not just sections or portions at a time like what had been done around Lake Okeechobee with earlier dredging efforts and what was proposed by opportunists and developers. Without adequate knowledge of how such a project could be realized, he used the catchphrase "water will run downhill" to counter opponents and win support for his ideas. Humorously, the inexperienced yet vocal candidate once said that all that had to be done for reclamation was to "knock a hole in the wall of coral and let a body of water obey a natural law and seek the level of the sea.
" 80 This example of the reclamation mentality and lack of science would inevitably cause Broward's drainage efforts to fail from its inception in until Seventeen years earlier, Angelo Heilprin observed and documented that there was no evidence of the coral theory of Florida's peninsula. On the contrary, all the facts point conclusively against such theory, and indicate that the progressive growth of the peninsula, at least as far as Lake Okeechobee, has been brought about through successive accessions of organic and inorganic materials in the normal methods of sedimentation and upheaval. 81 Shortly before the election, the Okeechobee interior was under seasonal flooding at the time giving Broward's platform more credibility. He won the election by a narrow margin.
The USDA also backed Broward knowing that rice, sugar, and tropical fruits that could not be grown elsewhere in the country could be harvested in the Everglades. Soon the governor's reclamation vision became policy in action. Broward inspected the region by boat and then advised the legislature in a special meeting that a canal was needed from Lake Okeechobee to the St. Lucie River, a distance of 22 miles, which was to be followed by another canal that would meet up with the St. Johns River. This new waterway, together with the Caloosahatchee, would create the intracoastal passage that Disston had dreamed about. With 740 miles of inland waterway, some 6 million acres would be reclaimed for cultivation and transportation.
82 Broward expected that this operation would 00 Buker, 81 Heilprin, 82 Hanna and Hanna, 12 5 . CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 41 also prevent flooding around Lake Okeechobee because the lake level would be lowered 4' to 6' from dredging and reclamation operations. 83 The project was earmarked for and dredging was scheduled for eighteen months. 84 The Board of Trustees of the I.I.F. expected to start at once, but Broward was cautious, knowing that the trustees had abused their responsibility in the past by lavishing public lands on railroad companies. The Governor preferred to have a joint resolution for a constitutional amendment or a statute creating a drainage district empowered to oversee reclamation.
To his surprise, Broward received both statute and amendment so that the drainage operation would proceed responsibly. In Florida's legislature passed the first comprehensive drainage law that created the Board of Drainage Commissioners, which was counseled by former Governor Jennings, and the Board began dredging operations in 85 The Board also had the power to build canals, establish additional drainage districts, and accommodate the need to move water out of the Everglades into Lake Okeechobee and to discharge through the Caloosahatchee River. The Board of Drainage Commissioners consisted of the same personnel as the Trustees of the I.I.F., though their official powers and duties were entirely separate and distinct.
By the Caloosahatchee River region's population exceeded inhabitants and all freight and passenger traffic was still moved through Fort Myers. 86 Coupled with continued flooding of the river, dredging activities continued by the Corps and the newly established Everglades Drainage District, which constituted an area encompassing the Lake Okeechobee Basin and the central and eastern parts of the Everglades in south Florida. From this large District, several smaller districts were created in later years as the business of land speculation and development was closely intertwined with reclaimed land. Both the Moore Haven and West Palm Beach Drainage Districts were established in the from the Everglades Drainage District.
Some twenty reclamation districts were created between Duval and Dade Counties and extended westward to encompass large areas of 83Charlton w. Tebeau, A History of Florida (Coral Gables, Florida: University of Miami Press, 84 Hanna and Hanna, 12 5 . 85 Tebeau, 86 Kimes and Crocker. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 42 Glades and Hendry Counties. Technically, the area was generally known as the Everglades Drainage District, and smaller districts were linked to settlements such as Moore Haven and West Palm Beach.
These fledgling settlements with district status then in turn funneled funds from the State's Board of Drainage Commission to subsidize improvement projects within their districts for continued dredging and for the construction of bridges, roads, canals, locks, and dikes. In the early years from to the the Everglades Drainage District oversaw all of these improvements during the dredging and reclamation of state-owned unsurveyed lands. Essentially, the State's responsibility was to collect the proceeds from land sales and taxes, and the District was to distribute the funds. As agreements were reached on the draining of the Everglades, arguments arose over how much money should be generated for this project. Broward had estimated the land value between $5 million to $60 million.
87 The Board attempted to levy a yearly tax of 10 cents an acre on swamp and overflowed lands for the entire state and later five cents an acre in the Everglades. In voters turned down the Drainage Act, and the U.S. Supreme Court later deemed the Board's authority to levy taxes was unconstitutional. 88 In the legislature amended the act to specifically create the State Drainage Commission, which replaced the Board of Drainage Commissioners. This amendment gave the legislature the power to define the Everglade's boundaries, to levy an annual tax of five cents an acre upon the lands in the District, and to authorize the use of this tax for drainage and reclamation projects. 89 Broward then changed his plans.
He moved the location of the drainage canal to the New River instead of the proposed St. Lucie River because large quantities of state-owned unsurveyed lands were located south of Lake Okeechobee. Many protested this move, including railroads and timber companies who were competing for the dredging contracts and subsequent reclaimed lands. The North New River Canal began in and moved slowly 87 Hanna and Hanna, 12 5 . 88 Tebeau, 3 4 7 . 89 G.E. Dail, Organization for water Conservation in Florida Petersburg, Florida: University of south Florida Press, submitted to Central and Southern Florida Flood Control District by Florida Conservation Workshop, Center for Continuing Education, July 5. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 43 from the North New River, through the Everglades, and into Lake Okeechobee. Two dipper dredges, the Okeechobee and the Everglades, were the first vessels to commence work on this project. 90 In all of the excitement to watch water run down hill, neither Broward nor the State Drainage Commission ever had a qualified drainage engineer or hydrologic study examine the reclamation project. It was not until after Broward's reelection defeat that the District employed the first qualified engineer. When engineers arrived to the Okeechobee Basin to inspect the work, they were confronted with the most basic, yet complex of problems that persist to this day. The only way to control the level of water in the Everglades is to control Lake Okeechobee because overflow from the lake runs south.
Inversely, only so much overflow can run south, so east and west discharge routes are needed to regulate the lake's water level, which in turn affects the underground aquifers and the Everglades' water reserves. Understanding the precise combination of these factors has been an ongoing lesson in the Okeechobee Basin's watershed and hydrologic dynamics. Reclamation consumed more money than anticipated. During the Democratic National Convention in Broward solicited Richard J. Bolles to purchase acres of state-owned swamp and overflowed lands in the Okeechobee Basin at $1 million. A few days before Broward relinquished his governorship, the I.I.F.
and Bolles signed a contract for overflowed state land to be used "solely and exclusively for drainage and reclamation purposes." 91 Bolles was interested in land speculation and exploitation and "was destined to exert a new and unwelcomed influence on the history of Lake Okeechobee. " 92 Broward ultimately had been too optimistic in a state-controlled reclamation project, and by the North New River Canal had progressed only 15 miles at a cost of well above the predicted budget. 93 A survey by the supervising engineer, James O. Wright of the USDA, suggested eight canals south out of Lake Okeechobee and a 90 Buker, 91 Hanna and Hanna, 92 Ibid., 93 Tebeau, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 44 reconditioning of the Caloosahatchee River would make reclamation feasible and possible. These plans nearly coincided with ones already underway so the trustees and the state legislature fully endorsed Wright's recommendations. However in the years following Wright's recommendations and the scandalous aftermath, Wright did acknowledge that landowners downstream from the lake would be in perilous harm without the structural features of locks and dams to mitigate the lake's water levels and potential damage during discharge: There is grave apprehension that any enlargement of the upper portion of the Caloosahatchee will cause it to overflow its banks along its lower course and damage the citrus groves.
Such will not be the case when Lake Okeechobee is lowered and the discharge brought under control. There will not be as much water brought down this channel as is now carried by it in time of high water. 94 Albert Gilchrist followed Broward as governor in In politicians critical of the drainage idea and citing that a great scandal was occurring gained enough support to launch an investigation into the reclamation project and Wright's report. It was believed but never proven that the USDA, the Florida East Coast Railway, the Board of Trustees of the I.I.F., and other Florida land companies were conspiring for lucrative reasons. Fearing the scandalous repercussions, Congressman Frank Clark from the Lake Okeechobee area wanted to show that he did not obstruct the inquiry.
Excerpts from Wright's survey were originally manipulated by Governor Gilchrist, but Wright's report later went through three revisions (Report Nos. 1, 2, and 3) within the USDA. The last report had drifted far from the original survey. Critics thought that Wright's Report No. 3 made recommendations favorable for drainage because Wright had become the chief drainage engineer of the Everglades Drainage District. The USDA later printed a different version of his report because it said the first one was incomplete and too favorable. Hearings were held to examine whether there was any collusion between federal agencies or between companies that misrepresented the Everglades drainage project. 94 Kimes and Crocker. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 45 When Dr.
Thomas E. Will, who was associated with the Everglades Land Company, finally printed Report No. 3 as Senate Document No. 89, this official document became proof that reclamation was financially feasible and profitable for developers. The report was then popularized and distributed by eager land opportunists. It was also proof that indeed many pockets were being lined, and Wright had been predestined to be the scapegoat. When the first printing of Document No. 89 was exhausted, Senator Nathan Bryan secured the printing of additional copies. After these hearings, Wright resigned, citing political reasons. Excerpts from his report were widely circulated, and both State and private agencies used extracts to promote land speculation.
95 After Broward's defeat in and his death in reclamation no longer remained a state-controlled policy. Private companies with proven records and competent engineers were solicited and awarded contracts for dredging operations by the State Drainage Commission. In the Furst-Clark Construction Company of Baltimore, Maryland, and Galveston, Texas, was awarded the contract to resume work and bought four dredges from the state (the Everglades, Okeechobee, Caloosahatchee, and Miami) to continue construction on the North New River Canal. The Furst-Clark Construction Company had a secure reputation for dredging operations having a year before been awarded the Cape Cod Canal project in Massachusetts.
96 The Company was equipped with a fleet of hydraulic suction dredges, vessels like the Suwanee in design, but altogether sturdier and larger. In addition, Furst-Clark had a host of steam-powered land excavators or drag-lines that were transported by rail as well as towing craft for the dredges. Fuel oil was also transported by rail from Galveston, Texas. While little information is known of the specific North New River dredging operation, the Cape Cod Canal experience provides an account of Furst-Clark's excavation procedures. The four dipper dredges were much like the ones used initially in Disston's reclamation project, and they provided steady, reliable results. Hydraulic suction dredges were also probably used since they were prevalent at the time and in the area.
95Tebeau, 96Robert H. Farson, Cape Cod Canal (Yarmouth Port, Massachusetts: Cape Cod Historical Publications, 35. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 46 Dredging technology circa also employed land excavators that were ungainly 110-ton contraptions equipped with 100-foot booms that swung eight-ton buckets and they were capable of moving 800 cubic yards a day. Unfortunately, their immense weight severely limited their mobility, and in the process, a considerable amount of rounded logs were needed to roll these machines over the swampy and soft ground. Hydraulic dredges normally kept their discharge lines or pipes out to stern, pumping sand into the marshes and over the new canal's bank.
These dredges were also equipped with a cutter blade that occasionally clogged on stumps, rocks, and even dinosaur and prehistoric mammal bones. In during the dredging and straightening of the Caloosahatchee River, a massive mastodon graveyard was excavated in the Caloosahatchee riverbed west of Ortona Another type of dredge probably used on the North New River was a ball dredge. These vessels were equipped with a one cubic yard bucket fashioned like a steel hollow ball with fingers. The ball was suspended from a long boom that dropped the orb into the shallow water, opening upon impact below the water's surface. The ball engulfed the rocks and materials. The boom was then raised and turned away from the canal to deposit the debris and muck.
In the State Drainage Commission authorized intensive canal construction, and the basic design and form of the Okeechobee Waterway as it is known today was finished later that year. Shallow drift navigation via the Caloosahatchee River, Lake Okeechobee, and the St. Lucie Canal was made available, and no locks or darns had been installed along the waterway. The St. Lucie Canal functioned as a floodway and irrigation channel in these early years. 97 The North New River Canal was known to be rocky and therefore shallower, which was one of the main reasons why dredging operations continued on the St. Lucie Canal during the time.
Based upon Cape Cod Canal's procedures and corroborated through the Stuart newspaper, Furst-Clark operated two dredges in tandem with the sturdier and larger dipper dredge excavating a deep initial depth which was then followed by the suction dredge that leveled the canal to an even below sea level elevation, widening 97 Kimes and Crocker. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 47 and deepening the 25 mile cut. 98 According to statements collected from the Stuart News from The work of digging the huge St. Lucie-Okeechobee drainage and shipping canal is progressing nicely and is being hurried along with night and day shifts. Two dredges are employed in the work, each operating from the Okeechobee end.
The small dredge, which precedes the larger, [has done more or less preliminary work for almost the total distance and] is now about two and one-half miles from the lake and is advancing at the rate of about 600 feet a day. The smaller dredge does the work of pulling stumps and blocking-out work in addition to piling up rock and earth to a height of 10 or 12 feet along the dredge spoil lining the canal's banks. The larger dredge Clark], which completes the actual work of digging the huge ditch [and has the advantage of its suction pumps], has reached a point of about one and one-half miles from the Okeechobee end and is excavating dirt at about cubic yards daily.
[This indicates that there will be a wall of earth and rock 20 to 30 feet high along both sides when the canal is completed through the pine lands]. If this rate could be maintained constantly, work would be finished in a year. Actual digging operations on the canal have been in progress for about five weeks. It is probable that the Furst-Clark Construction Company, the contractors, will also put a dredge at the St. Lucie end of the canal so as to expedite the work, although no definite announcement to this effect has been made. 99 In June the Stuart News noted that the dredge San Diego had begun cutting through the St. Lucie Inlet while on the lake side, the canal had been completed to a point about 5 miles eastward of lake Okeechobee.
Apparently, optimism fueled exaggeration and expectation as noted in the following statement: 98 Farson, 40. Lucie Canal, Approved in Is Boon to Agriculture Here," The Stuart News, 9 January Anniversary Edition. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway} HAER NO. Page 48 The St. Lucie Canal will be the main control canal of the immense Everglades drainage system, the largest drainage project in the world.
The huge ditch will be twenty-five miles in length, 200 feet wide at the top, 160 feet at the bottom, with a minimum depth of twelve feet-Indications are that digging operations will now go steadily forward until the completion of the canal and that no further hitch-up will result, as the Internal Improvement Board of Florida and the United States War Department have come to a thorough understanding. 100 Another common operating procedure was the purchasing and selling of equipment as Furst-Clark had done by acquiring the four dipper dredges from the State Drainage Commission to begin the North New River operation.
The Suwanee was in use in various general-purpose tasks such as dredging, freight, and passenger service for forty-four years before her demise in the hurricane of September and most vessels in a dredging area were worth more because of their location and accessibility. Similarly, when Furst-Clark abandoned the Cape Cod Canal project in October they turned over their dredges and other equipment to the Massachusetts-based Canal Construction Company to recoup their losses . 101 After completing the North New River Canal in Furst-Clark continued dredging operations along the West Palm Beach and then widened and enlarged the St. Lucie Canal from until By this time however, three new dredges, the Clark, the San Diego, and the Caloosahatchee, were used for the second phase of St.
Lucie's canal excavation. In Congress appropriated for the initial dredging of the St. Lucie Inlet, and the contract was awarded to the Standard American Dredging Company. Undetected coquina formations, rocks in the channel, and limited State funds hampered progress. In the Bowers-Southern Dredging Company was also used along the St. Lucie Canal, and it is uncertain if they replaced the Furst-Clark Company or if they were subcontracted to do further excavation of the canal. As World War I began and oil became scarce because of the war effort, the dredges were converted to wood burners. Logging 100 Ibid. 101 Farson, 52. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 49 crews nearly deforested central Martin County finding fuel for the machines.
Bowers-Southern Company went bankrupt and the canal's construction again lurched onward, dependent upon funding supplied by the Board of the Everglades Drainage District. Reclamation was a state-owned business dependent upon land speculation and profits. In times of land booms and fervid speculation, the State had the funds to distribute to the District proceeds for drainage and reclamation, thereby opening more land to developers and investors which meant more money back into the hands of the State. During construction of the North New River Canal in Wright was made Chief Engineer for the remainder of this project as well as for all drainage operations in the Everglades Drainage District.
The District allowed him to "fix his own salary." 102 In addition, the Furst-Clark Company obtained an amendment to their contract in for the placing of "permanent locks in said canals" that they were constructing. 103 The Furst-Clark Company built five locks that permitted access into the lake, and these locks were located at the lakeshore entrances of Moore Haven (Caloosahatchee Lock No. 1), the St. Lucie Canal (West St. Lucie Lock No. 1), and at the North New River, Miami and West Palm Beach Canals. The Furst-Clark Construction Company built the last three locks in and and they were responsible for the dredging of these canals as well as the Hillsboro. The Everglades Drainage District built two other locks near Ortona around (Caloosahatchee Locks No. 2 and No.
3 at Citrus Center and Lake Flirt), although little information is known about their exact location and who constructed the locks or their attendant's houses. 104 In preparation for the new town site of Moore Haven, the U.S. Sarasota suction dredge, cleared the Caloosahatchee River in from LaBelle to Citrus Center, and the Everglades Drainage District constructed new locks. One was located at Citrus Center (Caloosahatchee Lock No. 2) and the other (Caloosahatchee Lock No. 3) on the west end of Lake Flirt, and both were constructed after The new locks assisted in the 102 Hanna and Hanna, 103 National Register of Historic Places Inventory - Nomination Form, "Lock No. 1, North New River Canal," Florida Master Site File, Located in R.A. Gray Building, Tallahassee. 104 Clausen et al., 62.
CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 50 navigation over the Lake Flirt basin, which was known to be shallow during seasons of droughts and swollen during floods. Caloosahatchee Lock No. 1 was planned to be located near Moore Haven, and the actual construction of the lock began in although some accounts claim the lock was actually built as early as . 105 The Furst-Clark Company also excavated and constructed the South New River Canal and Lock, which thereby connected Lake Okeechobee via the North and South New Rivers to Fort Lauderdale and the Atlantic Ocean. The North New River Lock No. 1 became operational in March The opening of the lock led to increased agricultural exploitation of the newly drained land along the New River Canal.
Produce grown in the Okeechobee Basin was brought down the canal to the railroad at Fort Lauderdale. Similarly, settlements were established around the lake end of the North New River, Miami, and West Palm Beach Canals. Boats traversed the distance between Lake Okeechobee and Ft. Lauderdale in flotillas. This action made the trip go faster because more than one boat could use the lock concurrently, making its use more efficient. Rows of fish houses, lining the channel's length near the up-lake entrance, were constructed overhanging the North New River Canal. Catfish was an equally important cargo. Flat, shallow, small launches transported the fish in box-like cabins constructed on these vessels to awaiting railroad freight cars downstream.
106 The locks along the North and South New River, Miami and West Palm Beach Canals were similar in design to the locks built at both of the St. Lucie facilities in the These locks were located at or near the head of tidewaters, usually from the lake's shoreline. The to locks replaced the existing muck, earth, and stone dams that had been constructed by Disston to release overflow. While the dimensions vary between lock chambers, the earlier structures consisted of a single lock approximately in length and 25' in width with a wing-dam extending up-lake and connected to a large movable sluice gate.
Earthen cofferdams were constructed in front of the lock facilities to protect them from damage from upstream 105 Nelson Manfred Blake, Land Into Water-Water Into Land: A History of Water Management in Florida (Tallahassee, Florida: University of Florida Press, 106 National Register of Historic Places Inventory, 4. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 51 water pressure and high water. The locks were constructed of parallel poured concrete walls with a depth in the chamber of 14' from top to foundation, measuring 6' thick at the foundation of the wall and tapering to 3' at the top. On the outside of the chamber, a small wing-dam of poured concrete was located.
This auxiliary dam functioned as a reservoir to retain the water between the unfilled areas between the lock chambers' walls and the canals' banks. Essentially, these early locks appeared as floating locks or island-like structures in the midst of the canals that connected to Lake Okeechobee because they emerged as wide inlets approximately south of Lake Okeechobee's shoreline. The upstream main wing-dam facade extended approximately 40' across and was also constructed from poured concrete. A wooden catwalk and a metal handrail extended across the top of this structure providing access along the wing-dam to the lock gates. Paired wooden gates at either end regulated the water level while also controlling the entrance to the lock chambers.
The gates closed to form an interior angle of 142 and pointed upstream. Horizontal 1' x 1' timbers, spaced at each end with 1' x 1' blocks, were spiked together using x iron straps to form the main gate structures. The gates were sheathed on the upstream side with vertical 2" x 8" boards nailed in a butt joint forming a watertight seal. At the base of each gate was a hand-operated butterfly valve that was used to control the water level in the lock when a boat was raised or lowered. The gates were operated through a miter-geared rack and pinion mechanism. In at North New River Lock No. 1, this old lock was intact and recommended as a National Eligible property. At the time of recordation, the manual operating mechanism was documented as operational.
107 Adjacent to these locks, there were auxiliary structures that influenced how future lock facilities were to be designed and operated. At the North New River Lock, a small poured concrete radio and U.S.G.S. recording station was built in October and remained in use until Another common feature found at the majority of the lock facilities was the lock tender's quarters. These residences also functioned as office space, and their floor plan typically consisted of a three-room wood frame 107 Ibid. , 2. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 52 bungalow with a simple low gable roof supported by eave brackets. Built in July the bungalow at North New River Lock had its shed roof porch extending to the west of the house.
The original plans for the house still exist today at the Land Records Section - Bureau of State Lands in Tallahassee, Florida. The three post-1930s lock and dam facilities at Ortona, Moore Haven, and St. Lucie were all designed with Lock Masters' Houses and Lock Assistants' Quarters. Most observers, Okeechobee residents, engineers, and politicians considered the dredging of the St. Lucie Canal to be the panacea for controlling the lake's water level. The dredges utilized for the excavations were similar to hydraulic suction vessels like the Suwanee. The suction dredge discharged slurry upon the banks through pipes swung perpendicular to her sides, while the vessel's derrick provided lifting power to raise rocks and snags from the riverbed.
Violent accidents were common during dredging operations. Workers were often sucked into the pipe after falling overboard; the protective dike that held the lake's water level back would break and 10' walls of water would engulf workers and equipment; and dynamite used to blow up stumps and rocks would unwittingly explode when the people lit the fuses. In the estuary region of the St. Lucie, shark attacks were common, as were alligator attacks further inland.
Early Intracoastal Traffic and Locks
Situated on the Atlantic end of the St. Lucie Canal, Stuart was like most places in south Florida, a booming frontier town of 700 residents. In nine million pounds of fish were sent by rail from Stuart. But even with the advent of railroad and the decline of steamboat traffic that transported the fish to markets, shallow draft traffic allowed the passage of many small ships and vessels to get to the railroad hubs. The canals and waterways "represented the most tangible sign that the frontier was being bent by the will of man. ,,ioa On August 25, the North and South New River Canals were completed, and the first steamship, owned by Bolles' and christened the Queen of the Everglades, made its maiden voyage 108 Thomas E. Weber, Jr. , ed. , "The Digging of the St.
Lucie Canal," The Stuart News, Three part series, Copies obtained from St. Lucie's Visitor Center, u.s. Army Corps of Engineers. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 53 with prospective land speculators and financial backers. The journey from Fort Myers to Fort Lauderdale took two days with passengers stopping overnight at Bolles' hotel at Lake Harbor and marveling at Bolles' lush vegetable garden, grown in fertile reclaimed soils. 109 Regularly scheduled steamers to Lake Okeechobee and across the waterway included the Suwanee, Lily, and Passing Thru carrying freight, mail, and passengers.
Toll receipts were kept at North New River and identified as early as September The projected revenue received from lock traffic was the basis of maintaining and managing the locks.no In and in the following years, the Everglades District increased drainage and reclamation activities in proportion to land sales and speculation. However, this increased effort also intensified flooding problems along the upper regions of the Caloosahatchee River. Excessive drainage activities and heavy rains in had caused the river to flow upstream from LaBelle to Lake Okeechobee. When met with downstream discharges from the Lake, the river would swell and overflow its banks.
The Caloosahatchee had a higher elevation than the water level at the lake, and the river's waters crested 8' above the 12-foot banks at LaBelle. 111 Landowners along the river and floodplains called for an end to the drainage and discharge into the Caloosahatchee. A loose compromise was reached and the District agreed to build three locks along the river. The Florida legislature passed acts modifying reclamation tax rates from a single rate to a gradual set of rates in terms of these proposed structures, maintenance, and anticipated benefits. 112 Three facilities were constructed along the Caloosahatchee River at Lake Flirt, Citrus Center and Moore Haven in addition to the four canal locks along the lake end at the North New River, Miami, and West Palm Beach Canals and the west St.
Lucie Canal (No. 1), which was completed in near present day Port Mayaca. East St. Lucie Lock (No. 2) was constructed between and and the St. Lucie Canal was partly operational in and then completed in LaBelle remained an important intermediate town along the river and 109 Hanna and Hanna, 110 National Register of Historic Places Inventory, 4. 111 Kimes and Crocker. 112 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 54 catered to the steamer and freight traffic with its deep harbor basins. The lock facility at Citrus Center (Caloosahatchee No. 2) east of Lake Flirt was presumably constructed after while another (Caloosahatchee No. 3) was built at the west end of Lake Flirt around the Fort Thompson area near the ford. Caloosahatchee No.
1 at Moore Haven was built in 113 Present day Ortona L&D is situated between the historic east and west ends of Lake Flirt. From the to the this lake with its dredged navigable canal was regarded either as a muddy hole or a swollen river that could not regulate Lake Okeechobee's discharge. The Citrus Center facility was described in historical accounts and photographs show the facility flooded in Informant interviews describe the lock at Lake Flirt along the falls at Fort Thompson. Reedy Canal was located adjacent to the Lake Flirt's lock, and barges brought cement in from the new town of Moore Haven to build these locks along the river.
114 Historic accounts also describe Lake Flirt overflowing its banks during rainy seasons from excessive floodwaters, and these two lock facilities along the Caloosahatchee were known to divert the discharged swollen water eastward and back upstream toward Lake Okeechobee in the mid-1910s. The lock facilities' exact locations are unknown since they were both dismantled in during the Corps widening and straightening of the upper Caloosahatchee River. The Everglades Drainage District Commission's Annual Report states that their original report recommended "the St.
Lucie Canal [will] be constructed as a combined control drainage, navigation and power canal with a single combined lock, dam and power house." However, their report also says that "As finally planned and constructed, the power feature was abandoned, and two control locks and dams were provided, No. 1 at Lake Okeechobee and No. 2 at one and two-thirds miles from the outlet into the St. Lucie River. A dredge pass and dry dock were added as part of control lock and dam No. 2." 115 The original St. Lucie Lock No. 2 included an eight-gate spillway, 113 Will, Pioneer Boatman, 13. 114 Lucky. 115Everglades Drainage District Commission, Annual Report of Everglades Engineering Board of Review (Presented to the Board of Commissioners of the Everglades Drainage District, Tallahassee, Florida, 36.
CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 55 dredge pass, and lock that was completed by The original lock was abandoned in and replaced by a larger electrically operated lock chamber that was built into the expanded south bank of the canal. The old lock chamber was filled in though it does retain some of its original and structural integrity. The new lock facility followed the Corps' recommendations of flood control responsibilities in south Florida in The new facility also featured a hydroelectric powerhouse, and five resident houses were erected for the lock tenders thereby creating a self-contained and operational community modeled after Ortona and Moore Haven lock facilities.
116 Between the late and early the Everglades Drainage District constructed a series of canals and levees resulting in the eventual disappearance of Lake Flirt. During this time, construction of a control work began near the Citrus Center lock east of present day Ortona. There is limited information of the Caloosahatchee locks prior to the Ortona L&D in this region of the Caloosahatchee River, and their locations were presumably on the dredged Caloosahatchee River prior to the Corps' excavation of a new, straighter river channel in the mid- The Caloosahatchee Canal replaced the natural course of the upper river channel. When the Okeechobee Waterway opened in the Corps dismantled the older locks along the Caloosahatchee River as well as West St. Lucie Lock No.
1, which was replaced with a weir. However, as early as the Citrus Center Lock was reported to "reorganize the topography there, although not as extensively as its Corps replacement." 117 After the locks at Lake Flirt and Citrus Center in and Moore Haven in were operational, the Caloosahatchee River remained turbulent. Lake Okeechobee's discharge sent its overflow rushing down the channel and canal networks inundating the croplands downstream. The river valley's residents considered their interests to be at odds with the State Drainage Commission's efforts that valued dredging operations for navigational purposes over flood control. 118 With Federal Gary D. Ellis and John J. Ellis, An Intensive Cultural Resources Survey: 116 St.
Lucie Lock and Dam Recreation Area, Martin County, Florida, Report submitted to U.S. Army Corps of Engineers, Jacksonville District, by Ellis Archaeology, Lecanto, Florida, Contract No. DACW-92-M-0634, March 25. 117 Clausen et al., 62. 118 Kimes and Crocker. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 56 government intervention through the Corps and War Department, conflicts between landowners and agencies developed over drainage solutions and the intent behind these strategies. Each side envisioned a different solution for the management of the lake's discharge and the river.
In an effort to bring together these different perspectives, the Florida State Legislature created the Caloosahatchee Improvement District in August for the purpose of providing drainage, flood control prevention, irrigation, and navigation west of the Everglades Drainage District, specifically to the Caloosahatchee River Valley. The Caloosahatchee Improvement District's borders were enlarged to encompass the area from Fort Thompson westward to Fort Myers, 45 miles in length, 12 miles in width, and acres of land in Lee, Hendry, and Glades Counties.
119 The Caloosahatchee Improvement District attempted to discharge overflow eastward toward the uplake side of the river before it would reach LaBelle and the lower river valley, thereby attempting to alleviate some of the prevalent flooding in the region. Both the Everglades Drainage District and newly formed Caloosahatchee District placed the financial responsibilities for these improvements with the Corps of Engineers, while the Corps assumed the Districts were responsible for all improvements that it took upon itself. The George B. Hills Company recommended that an improvement tax should be levied for the proposed benefits to the residents of the river valley to compensate for cost incurred.
120 Unfortunately, land sales were retarded in the river valley because of the financial responsibility dispute, which in turn affected the Caloosahatchee District's revenue source and continued dredging operations. The Caloosahatchee Improvement District was dissolved in because of inadequate funding. CIVILIZATION AND MITIGATION COMES TO THE WILDERNESS I have bought land by the acre, I have bought land by the foot; but by God, I have never bought land by the gallon. 121 Land booms reverberated throughout the Okeechobee Basin. With popular media sensationalism echoing from the and 119 Ibid. 120 Ibid. 121 Hanna and Hanna, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 57 consolidated landholdings from A&GCC, land was a fashionable commodity.
In the early land was still relatively cheap, especially to the unsuspecting buyer. Advice was widely given that instead of growing crops on potential reclaimed land, one ought to try harvesting the fish. Another widespread joke at the time depicted a farmer behind a plow, which was attached not to a horse but a flatboat. 122 Thousands of landowners were disillusioned by what they had actually bought in the Okeechobee interior, and stories began to circulate widely. In newspapers, land speculators and developers were synonymous with blood- sucking mosquitoes and were as equally disrespected. In Florida's population had grown to citizens. However, the Okeechobee region was still sparsely populated, averaging two inhabitants per square mile.
Large tracts of land began to be sold to developers from companies, mostly from lumber and turpentine industries, which had already depleted the timber resources of the area and spoiled the landscape. Speculators then sold this land to people as sight unseen, and the purchases were often called "land by the gallon. " 123 During the steamboats had been used on the lake and the canals, making regular runs to Kissimmee. Some were used to transport materials to build the locks and dams, but the majority of the traffic carried tourists, sport fishermen, potential landowners, and fish, the most profitable "crop" of the Okeechobee interior. Icehouses and factories were equally as lucrative since steamships and railcars both needed ice to keep the fish fresh.
Travel was slow with steamboats, and Flagler's railroads, which penetrated three-quarters of the coast of Lake Okeechobee, quickly replaced and efficiently eliminated the need for the steamboats. By the Florida East Coast Railroad ran through the Okeechobee area around the lake with depots at Port Mayaca, Canal Point, Chosen and Lake Harbor. Another railroad, the Seaboard Air Line Railway extended from west central Florida through Okeechobee city and into West Palm Beach, while the Atlantic Coastline, part of the Plant system, reached Moore Haven in and Clewiston in These distribution areas replaced the steamboats that transported fish to the Gulf Coastal markets. More importantly, railroads improved 122 Ibid. 123 Ibid. , 13 5. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 58 transportation and allowed easier and more rapid travel into the Okeechobee Basin for potential landowners and developers wishing to stake their claims. Interestingly enough, the Everglades District made improving navigation along the Caloosahatchee River and Lake Okeechobee its primary concern. Yet, dredging operations coupled with droughts during the first twenty years of the twentieth century dropped the water table in Lake Okeechobee and the Caloosahatchee so drastically that the blossoming riverboat navigation on the river was terminated in the 192 Os. 124 Historically, the Lake Okeechobee region was the last of its kind to witness the death of the steamboat era.
Flagler had one of the three largest land corporations, which consisted of the Flagler system or Model Land Company, the Southern States Land and Timber Company, and the United Land Company, the successor to Diss ton's interests. 125 The Flagler system sold land to new settlers with the provision that the company would provide assistance during cultivation and bad frosts. Though settlers were often disillusioned that the land promised was not what was guaranteed, Flagler's assistance was both offered and proven to be genuine. The Flagler system employed experts in agriculture, cattle raising, and fruit growing while enabling farmers to transport crops more quickly to market than by steamboat. The U.S.
Department of Justice filed charges on some of these companies for false advertising and fraud, and many were often found guilty. However, the abuses of these companies paled in comparison when Bolles began to sell off his land. The Florida Fruit Lands Company was the first of Bolles' companies to be organized with the intent of selling and developing large tracts of land. Its acres in Dade and Palm Beach Counties were divided into farms, varying in size from ten to 640 acres . 126 A planned community named Progresso was designated to be the center of the town site. The entire infrastructure surrounding the community was planned and included schools, parks, public buildings, churches, and factories.
Each landowner would own a farm and a town lot, and contracts were put on sale at 00 a piece. 127 Another 124 Clausen et al., 90. 125 Hanna and Hanna, 13 5 . 126 Ibid., 127 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 59 of Bolles' sister land companies followed a similar approach. The Okeechobee Fruit Lands Company offered acres of land on the southern shore of Lake Okeechobee. Capitalizing on the well-paying business of land speculation, other companies entered the Okeechobee interior with the intent of making a profit on people's dreams. Some of these companies were not located in Florida such as the Florida Everglades Land Company of Chicago or the Everglades Land Sales Company and the Chambers Land Company of Kansas City.
Other companies recycled their real estate literature and sales pitch such as Bryant and Greenwood whose policy was to sell a tract and then, under a new name, begin another promotion. By fifty real-estate agencies from Chicago were selling land in the Everglades. 128 Other developers capitalized on the Federal endorsement of Senate Document No. 89 such as the Florida Everglades Reclaimed Land Company of Pittsburgh or the Everglades Plantation Company. Bolles had perfected the easy grifting of selling dreams via land, and once that art was perfected and widely circulated, "lantern slide lectures and a display of Florida products three times a week" were seen in strategic markets across the country and played out like dinner theatres.
129 Tracts of land were being sold for as much as an acre, yet according to Dr. John Gifford of Miami, an ardent supporter of reclamation, the cost of drainage was estimated at $1. 00 per acre. 130 While many companies were brought to court, Bolles' conviction was relatively mild. He was given the provision mandating that the Florida Fruit Lands Company could collect no more money "until the State of Florida had completed its contract to drain and survey the Everglades . 131 The planned community of Progresso was never developed, and Bolles death in prevented further lawsuits. Coinciding with the Wright hearings and aftermath in a conference was held in New York and attended by Everglades' landowners and Governor Gilchrist to determine how to continue the funding for drainage.
Large landowners initially refused to pay back taxes for they were anticipating the profits from the 128 Ibid., 129 Tebeau, 130 Ibid. 131 Hanna and Hanna, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 60 eventual drainage. However, a compromise was reached when the owners agreed to pay back property taxes and the District agreed to spend the money for 200 additional miles of canals in future dredging operations. The trustees decided to issue new bonds to cover the cost. Gilchrist estimated $6 million would be sufficient. The new Governor, Park Trammel, put a plan before the state legislature, which included the bond idea for additional revenue.
He also "advocated local drainage districts to cooperate with the state by working out lateral canals and one or two experimental farms to aid in solving agricultural problems. " 132 The idea was put forth that the Federal Government should help create a navigable cross-state waterway through Okeechobee. In addition to maintaining the Caloosahatchee River and Fort Myers' harbor, the War Department had taken jurisdiction of the lake to regulate its depth, so the idea was extremely feasible and practical. When reports on the canals' progress came in a total of 142 miles had been dug at a cost The state legislature rezoned the Everglades Drainage District, taxed accordingly to how close the canals were to property owners, and authorized the bonding of land.
This was the first state-attempt since Broward's term to re-examine and reorganize future reclamation projects. Farmers, land owners and developers, cattle herders, and boat operators all had a vested interest in Lake Okeechobee's water. While farmers, ranchers, and developers saw the high waters and frequent destructive floods as a threat, boat operators knew that low water levels limited navigation. Since Disston's dredging and reclamation projects, the prevailing attitudes favored the farmers and landowners' position, knowing that without inhabitants and settlements, there would not be a need for continued maintenance of the waterway and lake level.
As settlements grew around the Okeechobee interior, the lake's level was regulated downward to balance the agricultural economy and communities. Developed areas were also more prone to frequent and destructive flooding. When the lake's outlets and discharge became critically low during extended dry seasons, the Corps entered the debate to protect the navigable sections of the waterway for the public domain. 133 132 Ibid. 133 Buker, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 61 When Lake Okeechobee overflowed its banks, its waters generally rose 20' above mean sea level (AMSL). Normally, the lake's level averages between 11' to In the trustees of the I.I.F.
applied for a permit from the War Department to connect its three main Everglades canals (North New River, Miami, and West Palm Beach) to Lake Okeechobee. The Corps stipulated that the lake's level should not be allowed to drop below AMSL. In the lake's water had achieved this level. Though the continued dredging and construction of the St. Lucie Canal were largely credited for this drop, the Okeechobee Basin was in fact in another prolonged drought. 134 In the War Department filed a permit to continue dredging navigable sections of the waterway. At the same time as the permit was being filed, the Everglades Land Sales Company submitted a report more damaging than the aftermath of the Wright scandal.
Their report recommended that drainage and control of the floodwaters should be two separate projects. Future development was dependent on accepting two conclusions. One, reclamation was too expensive and impractical for the resulting small farms that were formed; and two, the completed and projected canals would not drain the Okeechobee interior unless the costs of reclamation practices were supplemented by private land owners and if these practices were continued on a steady schedule. For the first time, the threat of grass fires was mentioned and that too much drainage would cause these fires as well as the loss of the muck soil. This report refuted all of Wright's claims.
Although made to a private company, the importance of this report was so great that it was distributed to several land companies and eventual found its way to the I.I.F. The trustees decided to send a reputable engineer to survey the land so the public would buy bonds in better faith. In Isham Randolph of Chicago was chosen as head engineer. His assignments were to create the Florida Everglades Engineering Commission, to complete a comprehensive survey of the Everglades Drainage District, and to submit a competent drainage plan with recommendations. 135 Two other men, Marshall Leighton and Edmund Perkins, were also on the Commission. Because of the problems with Wright's report, the information gathered could not be shown to anyone until it was completed and 134 Ibid.
135 Hanna and Hanna, 16 6 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 62 confirmed. The budget for this survey was set at In October the Randolph Report, otherwise known as Senate Document No. 89, was completed, accompanied by a wealth of detail such as maps, rainfall charts, tidal flows, benchmarks, photographs, and a bibliography. The report stated the work completed so far would have been done better if it had been orderly and if it had been done in accordance with demand. It also reported that land holdings were widely scattered because of haphazard land sales from previous years.
The recommendation was to keep draining "in one continuous project and with the greatest expedition possible." 136 Other recommendations that followed were influenced during the initial construction of the early canals. The North and South New River and the Miami Canals were completed while the West Palm Beach Canal was nearly finished. Based on these events, Randolph proposed three additional canals and their locations would be between the existing four. Lake Okeechobee's flood control required "a new waterway with locks and power plant" on the St. Lucie River. This proposed canal, which was the original route chosen by Broward and surveyed as early as for flood control and navigation, ran from Stuart to Port Mayaca and was estimated to cost $2. 5 million.
137 Shallow dredging had already been enacted on the water route in but the actual construction began on the widening of the St. Lucie Canal in by the Furst-Clark Construction Company. For future consideration, canals on the southwest shore of the lake were suggested to possibly drain this region adjacent to the Everglades. The total price for reclamation and drainage was expected to be around million. Like Disston's dredging and reclamation project, the Randolph Report failed to consider that the year the survey was completed, was a drought year. Although the recommendations made were carried out, the cost estimates were too low and reclamation still continued slowly after the Randolph Report due to the lack of funds.
Farmers on these lands struggled and were angered at the unnoticeable progress with reclamation. They formed a "Back to Broward League." Another drainage supporter was the Everglades Drainage League formed in by Marshall, who later became a legislator. This organization was 136 Ibid., 137 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 63 based in Ft. Lauderdale and its goal was "justice for men and women in the U.S. who [had] bought Everglades land." 138 The League filed lawsuits against the I.I.F. in the Florida Supreme Court, and when that was denied, the same suit was filed in the Federal District Court of Florida.
The goal was to forfeit the state's rights to the Everglades because of its failure to drain them and because of "illegal" drainage taxes used to secure bonds. 139 Although the case failed, the fact that it was filed shows the desperation and disappointment of south Floridians. In the mid-1910s, the lands east of Lake Okeechobee were regarded as the evergreen Garden of Eden. The West Palm Beach Canal had opened extensive tracts of reclaimed land, and the dredging of the St. Lucie Canal was watched with great anticipation and forecasted to not only lower the lake's level but also provide additional fertile agricultural tracts. Stuart was already being groomed as Fort Myers' sister port city on the Atlantic coast, and the town enjoyed the recognition and notoriety of being the gateway to St.
Lucie's excavation. On the other side of the canal, Port Mayaca emerged in the as the entrance to Lake Okeechobee. Unfortunately in the Furst-Clark Company's dredges hit a shelf of rock slowing the project's progression and supplies had to be brought in by wagon trails. The lack of accessible roads was another factor, and landowners around Stuart met on May 1, to discuss forming a new county in order to expedite roadwork. 140 It was 194 7 before paved roads were seen in Indiantown and along the canal's banks. In the new Florida Governor, Sidney J. Catts, wanted to sell all 1.5 million acres of state-owned swamp and overflowed lands at to an acre to pay off the reclamation debt, again privatizing drainage .
141 Fortunately, Spitzer, Rorick, and Company from Ohio bought bonds worth million before this could happen. New canals were then started and old ones were improved with references to the Randolph report. Construction continued on the St. Lucie Canal from Port Mayaca to Stuart and also began on the Indian Prairie Canal on the west shore of Lake 138 Ibid., 139 Ibid. 140 Weber, Jr. 141 Hanna and Hanna, 1 71 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 64 Okeechobee. Within eight years, bond sales totaled million. While drainage taxes had increased, there was still a lack of funding, meaning that not all of the projects undertaken could be financed. Contracts were either honored intermittently or closed to save money.
Undependable revenue sources and the inevitability of war were two reasons why the construction of the St. Lucie Canal took a decade to complete, three times longer than the time needed to complete the North New River. However, the decade from to gave witness to the most reclamation activity in the history of the Okeechobee Basin, with the exception of the Central and Southern Florida Flood Control District. During this period, more than half the excavation of the Everglades occurred in addition to 453 miles of canals, 54 miles of levees, and fourteen canal locks. Construction began on the following locks during this time, and in most cases, the facilities were finished within a year or two: the old Lake Flirt (ca. Citrus Center (ca. Moore Haven and St. Lucie No. 1 and St. Lucie No. 2 St.
Lucie Lock No. 2 was completed by and took seven years to finish due to insufficient funding. All of these reclamation activities coincided with increased population, new rail lines and the first interior highway along the lake's shore, land values quadrupling, and acreage under cultivation tripling. 142 In with the end of World War I, work resumed methodically. On January 19, the St. Lucie Canal was officially dedicated. During dry seasons, the lake's level dropped by nearly six feet, which in turn made navigation difficult without continued maintenance and dredging of the waterways. During wet seasons, thousands of small farms would be inundated. The biggest impact of the St.
Lucie Canal was that it did have the same effect of the opening of the West Palm Beach Canal, which provided accessibility, irrigation, and potential development to all of the fertile reclaimed land. 143 Citrus and agricultural company's flocked the banks of the canal, especially in light of the frost that harmed all the citrus crops in north Florida, yet the orchards were spared in the Okeechobee Basin. Although the state had authorized and sold over $10 million in bonds by the collapse of the Florida land boom in 142 Buker, 143 Weber, Jr. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 65 brought an end to state-controlled waterway maintenance and reclamation projects.
The State Drainage Commission had exceeded its credit, and the state had exhausted its financial responsibility having been involved for the most part with reclamation since the Swamp and Overflowed Land Grant Act of From to total expenditures for the District were approximately $18 million. 144 In maintenance on the North New River, Miami, and West Palm Beach Canals, which had provided extensive waterway traffic and toll revenue for over a decade, was abandoned. The droughts of the early and the lowered water tables in the Okeechobee Basin caused the decline of intracoastal traffic along the waterway. The canals had been shoaled from lack of dredging and navigation was no longer practical.
Railroads and highways had replaced canals as the primary transportation artery to and from the lake. In the locks along these three canals were permanently closed and allowed to deteriorate. 145 Investors, pioneers, developers, businesses, and landowners whom in good faith had settled the Okeechobee Basin and resided around the lake were not to be ignored and silenced because the funding for reclamation stopped. Because of its history and the time invested, the need for continuing drainage projects and flood control management was loudly and dramatically heard with a series of natural disasters. THE
Town of Moore Haven
In in midst of saturated land speculation of the Everglades real estate market, L.A. Holland became a business associate of Richard J. Bolles. With tracts of land being sold as high as an acre and the cost of drainage estimated at a dollar per acre, numerous land developers and companies found a profit in the selling of dreams with cheap reclaimed land attached. Holland started his own land business by buying and subdividing a block of land along the Hillsboro Canal. Holland's firm enticed the energetic entrepreneur James A. Moore of Seattle to investigate the profitable market of land speculation in the Everglades. Moore a resourceful real estate agent in Washington made his fortune building hotels and business districts in the San Francisco Bay area.
Consequently, he lost most of his fortune in an attempt to build a steel 144 Dail, 5. 145 National Register of Historic Places Inventory, 4. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 66 industry on the West Coast. With the few thousands he salvaged, Moore bought some of Holland's dry land on the Hillsboro Canal. Wanting a larger tract, Moore purchased acres for per acre west and south of the Lone Cypress Tree, which was known as the "John A. Henderson heirs" tract. 146 Moore was magnanimous with enthusiasm. After acquiring the initial tract and investment, Moore organized the South Florida Farms Land Company, became its president, and sent dozens of salesmen to Kansas, Nebraska, and the Dakotas to recruit farmers who dreamed of owning cheap, fertile land.
In preparation for a new town site, the U.S. suction dredge, Sarasota, cleared the river from LaBelle to Citrus Center, and the State of Florida constructed two new locks. One was located at Citrus Center (Caloosahatchee Lock No. 2) and the other (Caloosahatchee Lock No. 3) on the west end of Lake Flirt, and both were constructed after The new locks assisted in navigation over the Lake Flirt basin, which was known to be shallow during drought seasons and swollen during floods. Caloosahatchee Lock No. 1 was planned to be located near Moore Haven, but the actual construction of the lock began in In late summer Moore sent Jack L.
Taylor to lay out what would become the Moore Haven town site on a section of Moore's land at the confluence of Three-Mile Canal and the entrance to Lake Okeechobee where the Lone Cypress Tree stood. Under Taylor's direction, the land was cleared, drained, and landscaped with green corn, water oaks, and poincianas. Taylor also supervised the construction of a boat dock, the Moore Haven Hotel, and several buildings to welcome new arrivals. The first settlers were W.E. and Rinda Daniels from Kentucky. Daniels became the town's first postmistress. As salesmen continued advertising the town's promise of growth and prosperity, incoming residents were being housed temporarily in tents and tarpaper shacks.
Moore enlisted the support of other influential individuals who were eager to witness the first settlement in the Everglades. One of Moore's contacts was Judge Alton B. Parker, the Democratic candidate who ran against Theodore Roosevelt for presidency in Moore and Parker collaborated in to 146 Hanna and Hanna, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 67 secure the financing of a rail line and train depot for Moore Haven, and Plant and Flagler's competing rail lines were projected to encircle three-quarters of Lake Okeechobee's shoreline. Completed in the Atlantic Coast Railroad Line, part of the Plant system, extended from Palmdale to Moore Haven and established the town as the center of the catfish industry for Lake Okeechobee.
Rail spurs were located adjacent to the docks and fish houses that lined the canal, and these same lines were also utilized with the construction of the Herbert Hoover Dike and the Moore Haven In the rail line was extended to Clewiston and was frequently called the "Hinky Oink" because of the slow and bumpy ride. This rail line was the first one built on dredged Everglade muck. Parker also purchased acres at the cost of an acre in the area west of Moore Haven and encouraged his brother Fred to start a dairy farm in the rich reclaimed fields. Another pioneer whom Moore attracted was Will H. Stevens, a newspaperman from Stuart.
With an assembled newspaper plant, Stuart made his passage from Fort Lauderdale aboard a flat-bottom paddle wheeler and began the town's first publication: the Moore Haven Times. William Jennings Bryan, the noted orator of the early twentieth century, lent his talents to promote "Everglades Muck" and encouragingly purchased two town lots and a forty-acre tract. Governor Sydney Catts also purchased 320 acres in these early speculation years as did Alonzo C. Clewis, the financial developer of Clewiston. Moore Haven became the first organized settlement in the Everglades that warranted the title of a town while also serving as a way station on the early Cross-State Waterway from Fort Myers to Fort Lauderdale.
Throughout the history of Okeechobee's waterway, Observation Island, which lies east of Moore Haven at the entrance to Lake Okeechobee, was also used as a rnoo.ring area tu rest and gather supplies. With the promise of the near-completion of the St. Lucie Canal, the town of Moore Haven would serve the purpose of being one of the few locales where navigational travelers could rest and replenish supplies within the Okeechobee interior. The years from to were considered the Moore Years in Moore Haven. In this short time, hundreds had purchased land from Moore; the town had drawn CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 68 397 men and three women; and over a dozen wood-framed business buildings were constructed.
147 In despite his promise of a farmer's paradise, James Moore began to experience financial difficulties. These prompted him to sell his interests in the land company to Charles M. Busch, the developer of Ventnor in Atlantic City and Vice President of the Fidelity Bank and Trust Company, and John J. O'Brien, a former city editor of the Philadelphia Public Ledger. O'Brien's favorable opinion of the Moore Haven area and its fertile black soils and abundant yields encouraged him to further promote land sales in the region. A disagreement between Busch and O'Brien ended their relationship, and O'Brien took his shares of the land company to form a new one, the DeSoto Stock Farms Company. Enlisting a partnership with George Q.
Horwitz, a prominent Philadelphia lawyer, O'Brien and Horwitz surveyed their company's holding which amounted to acres west of Moore Haven. Before their firm's operations were underway, Horowitz died and left his interest to his widow, Marian Newhall Horwitz. Horwitz, a daughter of a vice president of the Pennsylvania Railroad and sister of a Morgan partner, was well versed in "her stewardship of wealth, position, time and ability to civic and philanthropic organizations. " 148 Horwitz first visited Moore Haven on February 13, to inspect her husband's financial holdings. The widow immediately became active in the town's development and welfare of its citizens and involved in promoting the community as whole.
As partners, Horwitz and O'Brien built and operated a general store, formed a vegetable exchange, organized the First Bank of Moore Haven, planted large farm tracts, and promoted various civic and cultural projects for the town. Horwitz oversaw most of these new ventures and jointly managed the land development company. Just a year before Horwitz's business operations, the town of Moore Haven had only three women citizens. Before the passing of the Nineteenth Amendment granting women the right to vote, Moore Haven was organized on an equal suffrage basis and Marian Horwitz became one of the first woman mayors in the country. Shortly afterwards, she was appointed to the staff of Governor Sydney J. Catts. Before her partner was inducted into military service in World War One, 147 Ibid.
148 Ibid. , 2 4 7 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 69 Marian married O'Brien and carried on her civic and business careers in his absence. Such was her acceptance that Horwitz was hailed as the "Duchess of Moore Haven" and a column in the Saturday Evening Post featured her in "Who's Who- and 149 In the the O'Briens are also credited for the founding of the towns of Newhall, Sand Point, and with A.C. Clewis' financial banking, the town of Clewiston, laid out and designed for the cost of by John Nolen, a pioneer in the American city planning movement. During these early years of Moore Haven's development, the town flourished and crops were bountiful. In the year's harvest yielded over bushels of potatoes and acres of land sales.
On June 8, the town of Moore Haven was incorporated, and the promise of a farmer's paradise was realized with the occurrence of year-round harvests. Moore Haven's streets had been paved with marl-hard surfacing; the bungalow craftsmen houses were new and quaint in appearance and construction; and the Eden-like growth of trees, shrubs, front lawns, and flowers created a pleasant surrounding in the midst of the Okeechobee wilderness . 150 The main thoroughfare bordering the canal was turned into an open square surrounded with businesses and lined with Royal Poincianas whose falling blossoms created a crimson carpet for pedestrians. With the arrival of the railroad in visitors and settlers could reach Moore Haven either by rail or water.
151 The advent of the railroad did not bring an immediate end to the riverboat traffic although it did start the inevitable decline in river navigation eventually replacing it as the main form of transportation. As early as mail was brought three times a week by boat from Fort Lauderdale, and the number of visits increased until the arrival of the railroad. By four passenger boats and three freight vessels were traveling three times a week between Moore Haven and either Fort Myers or West Palm Beach. However after riverboat traffic was decreasing now that the rail lines and roads could ship goods more expediently than the steamboat paddle wheelers. By at least a dozen trucks were in use at Moore Haven hauling vegetables and freight. These trucks were the first ones used 149 Ibid. 150 Ibid.
151 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 70 in the Everglades, and the South Florida Farms Land Company originally constructed and maintained the shell, rock, and marl- hardened streets. Civic responsibilities after maintained the roads following the formation of the Road and Bridge District serving Moore Haven and Palmdale, and streets were temporarily repaired although unpaved until late In road works were combined with flood prevention discussions, and an application was made to form a drainage district benefiting Moore Haven and the surrounding area. In cooperation with the State Drainage Commission representatives, a 22-foot earthen muck dike was constructed to protect the town against the overflow of the lake's water during flooding seasons.
In the town operated a 1-cylinder, 60-horsepower diesel engine housed in a warehouse building located next to the canal and built by the South Florida Land Company. In the same structure, an icehouse was installed catering to both the needs of area fish houses, rail lines and steamboats to keep their freight of fish fresh while also providing ice for the citizens. Electricity was available daily from 6 a.m. until 10 until when 24-hour service became available. In the same year, the First Bank of Moore Haven was opened and financed by the O'Briens in the commercial center of town.
During subsequent years, two more banks were opened, a testimonial to the rapid growth of Moore Haven in the late However within four years, all of the banks failed: First Bank went into receivership in Everglades State Bank in and the Bank of Moore Haven in Moore Haven's first lock was completed in and consisted of a simple cofferdam measuring The construction of the lock aided in navigation and encouraged visitor's to dock and depart from their vessels thereby promoting interest in Moore Haven's civic square overlooking the canal. Several commercial fishermen also lived on houseboats on the shores of Lake Okeechobee and would take advantage of the lock's convenient location. Fishing guides were also widely available.
A series of events would begin in that would forever change the course of Moore Haven's future. The first notable event was the redistribution of DeSoto County into five new counties, one being Glades County with Moore Haven as its seat. Construction of the present County Courthouse began in The second CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 71 important event in was the construction of a hand-operated swing bridge built by the architect and resident Frederick Valdemer Gram. Prior to the construction of the bridge, ferryboats would take vehicles across and wagons could navigate some of the shallower waters of the Three-Mile Canal.
On April 26, a devastating fire consumed the middle of the main block of Moore Haven's town center, destroying twenty-two businesses and six residences. The destroyed buildings were never rebuilt. In the following year, another fire consumed the Moore Haven Times building and thereby destroying the town's records and documentation of its early history. Later in floods inundated the town and heavy rains deluged the area from May until December. Dredging activity continued under the supervision of the State Drainage Commission to further improve navigation and flood prevention along the upper Caloosahatchee River and Three-Mile Canal. As the dredging was near completion, a pump was installed in mid-1925 near Newhall that would also serve the outlying Moore Haven area.
The leveling and terracing of Moore Haven's canal banks continued until While some pioneering residents evacuated with the fires and floods, amazingly so many chose to stay. From to forty-two new building permits were issued, establishing a two- year record of growth and development for the city. Increased building projects continued until with commercial growth constituting a full range of services to the community in spite of the fire and floods. Another diesel engine was added to the power plant; the city's first water filtration system was installed; the Inter County Telephone Company from Naples took over and expanded phone service; and the first Moore Haven public schools were built.
These facilities remain as the only public elementary, middle, and high schools that serve Glades County. In 19 2 3, a new town charter was drawn up and adopted. The town's population continued to increase and by approximately citizens were claiming Moore Haven as home. Yet in this year, the town suffered a fatal misfortune that would alter its history and future. The town's physical lay out, population, and economic growth would never fully recover following the hurricane of September 18, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 72
Nature's Devastation and Government Intervention
The outbreak of World War One halted most major reclamation projects, yet drainage continued at a leisurely pace. In the shadow of the Lone Cypress Tree, Moore Haven's first lock, completed in consisted of a simple chamber 25' in width by in length. This lock, like the earlier ones built by the Everglades Drainage District, featured a manually operated single structural steel miter gate with paired wooden gates at either end, which in turn also regulated the water level and controlled the entrance to the lock chambers. Before this time at the confluence of the Three-Mile Canal and Lake Okeechobee, navigating the shallow water was difficult and prolonged. Steamers and boaters who had endured frequent delays in the shallow narrow channel welcomed Moore Haven's locks.
However, the locks provided little protection from the lake's flooding, and citizens of Moore Haven had constructed a low muck-filled levee collected from past dredging excavations to prevent frequent flooding, even though the early were relatively dry seasons. The old Moore Haven locks were operated by hand, and a lock tender's house (non-extant) was located nearby and designated as the State House. In Fred A. Flanders was one of the earliest lock tenders at Moore Haven, and eventually became the official Lock Master at Moore Haven L&D in After the locks at Moore Haven, Lake Flirt, Citrus Center, and St.
Lucie, as well as the North New River, Miami, and West Palm Beach Canals were added to the waterway, Lake Okeechobee's discharge via the system of locks and canal networks still proved to be unable to distribute excessive floodwaters. Downstream regions were inundated, paralyzing croplands and livestock. The battle line over drainage efforts was still drawn between the merits of navigation versus flood control. By the reclamation of some lands was becoming evident. In the USDA developed an experimental sugarcane station at Canal Point while the Florida legislature established a similar agricultural station at Belle Glade to study soil related issues. Muck land soils, while extremely fertile, lacked some of the basic minerals needed to grow crops and sustain grasslands for livestock.
Once that mystery was solved, crops such as sugarcane, tomatoes, beans, peas, peppers, and potatoes CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 73 were grown conunercially. 152 By two thousand inhabitants resided in the Okeechobee Basin and sixteen settlements dotted the lakeshore. 153 Prosperity was relative during the numerous wet years when these settlements were flooded out, and abundant during the dry spells with exception to the threat of muck or peat fires. The early railroads, boats, and highways provided more access to the interior of south Florida, and the first highway to penetrate Lake Okeechobee's shoreline was constructed in William J.
"Fingy" Conners came to West Palm Beach from New York in After witnessing the opening of the West Palm Beach Canal to Lake Okeechobee, Conners saw the potential for various large-scale agricultural pursuits. After purchasing acres of land east of Canal Point, Conners attempted farming but with little luck. His next investment was the Southern States Land Company's experimental farm, where he planned a stock farm and named the area Connersville. Purebred cattle did not thrive well in the Okeechobee Basin and Conner's hog raising pursuits were flooded out. Yet Conners continued to buy land including the town site of Okeechobee and tracts between Okeechobee and Canal Point. From his initial purchase, Conners owned approximately acres.
To provide access to his land, Conners was authorized by the state to construct a 77-mile toll road from Palm Beach County to the town of Okeechobee, which included a scenic vista along a section of the shoreline. 154 Sand and muck saturated with oil and lined with crushed lime rock obtained from the dredging of the St. Lucie Canal constituted the road's materials. On July 4, Conners collected his first tolls and began to sell the land he had amassed. A year later, Conners died, and after abolishing the tolls, the state maintained the road. 155 The St. Lucie Canal was partly operational by following the completion of the west St. Lucie Lock No.
1 where Port Mayaca was developing as a potentially large citrus conununity engineered and termed as "scientific agriculture by water control." The canal from Lake Okeechobee eastward was utilized for drainage and irrigation purposes with increasing navigation, 152 Dail, 6. 153 Tebeau, 154 Ibid. 155 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 74 and construction continued through to repair damages following a hurricane of that year. The storm was the first of three that would substantially alter the interior of south Florida. Although construction continued intermittently through early the canal was estimated to be 70 percent operational by the year's end. East St. Lucie Lock No.
2 was technically finished a year before, and the facility included an eight gate spillway, dredge pass, and lock chamber. The gates of the lock chamber were operated manually. Little development occurred at Port Mayaca, and even today, the region is relatively barren of buildings. Originally, the sons of Henry Phipps, former partner of Andrew Carnegie, acquired acres north and south of Port Mayaca and were promoting the land as the new Coral Gables 156 As millions of dollars were set aside for this project, the land boom collapsed in and with it, the future city of Port Mayaca.
Yet a year before, large-scale agricultural companies such as Bessemer Properties and the Port Mayaca Company began planting sugar cane, oranges, and winter vegetables and were showing the profitability of agribusiness. Port Mayaca survived as a name place for the region and as the entrance to Lake Okeechobee from the St. Lucie Canal. Reclamation activities assisted with the construction of roads and irrigation ditches, and forty-acre farm tracts were made available to investors and potential farmers.
According to the Stuart News, First tangible result of the canal for large-scale agriculture was the pioneering efforts of the Port Mayaca development back around created by Bessemer Properties Inc., a Phipps company, which saw the opportunities for agriculture through scientific water control by tapping on to St. Lucie Canal with pumps to provide irrigation in dry spells. At the same time, a series of canals discharged excess water into the canal during wet spells. The Port Mayaca Valencia orange groves today represent the first big-scale successful planting of citrus in Martin County. Port Mayaca could well be said to be the test plot on which millions were spent to prove, by trial and error, 156 Hanna and Hanna, 2 3 0 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 75 with the best possible scientific agricultural advice, what could be done by enlisting the aid of the man-made waterway. Port Mayaca was an outstanding "first" because it squarely faced up to the fact that the problems of drainage and water control must be solved if agriculture was to be successful in Martin County. 157 During the early the Charter President of the Gulf, Okeechobee, and Atlantic Waterway Association was Walter P. Franklin, the namesake of the Franklin L&D which was built in over 20 miles west of Ortona. Franklin was an owner of a hardware store in Fort Myers and served as the city Mayor in and In the the organization had requested and received funding for dredging and levee work to continue with the cross-state waterway.
Following the two hurricanes of and Franklin appealed directly to President-Elect Herbert Hoover to have the Federal Government shore up the sections of levees around the lake. In heavy rains flooded the Everglades, even though the previous years were During times of high water levels, the canals could not carry off the excess quick enough, yet during droughts water was steadily drained, which was detrimental to the reserves below ground. Many grass and muck fires burned over the glades, which brought up the fact again that having a lower water table was not necessarily a better solution. In addition, excessive droughts and numerous fires destroyed the organic topsoil, leaving the sterile subsoils exposed. 158 Following successive wet seasons, the lake's water level in swelled to 19' AMSL.
In September unusually heavy rainfalls were followed by the Labor Day Hurricane "that signaled the end of the land boom in places like Miami" and that swept the water out of the southwestern part of Lake Okeechobee . 159 Wind, rain, and rising waters merged into a massive strike concentrated upon the lake's 157 The Stuart News, 9 January 158 Lucy Wayne and Martin F. Dickinson, Cultural Resource Survey of the St. Lucie Bank Stabilization Project, Martin County, Florida, Report submitted to U.S. Army Corps of Engineers, Jacksonville District, by Water and Air Research, Inc., Gainesville, Florida, Contract No. DACW17-87-C-0047, November 17. 159 Tebeau, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 76 southwestern shore.
The lake-driven tidal wave was propelled by 135 mile per hour winds and crashed against the 22' earthen dike. Three miles of levee crumbled. The raging floodwaters engulfed the towns of Moore Haven and Clewiston, injuring and killing over 300 people in the Okeechobee Basin. 160 Few individuals from this generation are alive today, and those that are distinctly recall the hurricane's destruction and flooding that inundated their residences (Appendix A: Ray Thielan oral history). Governor John w. Martin declared that the failure to fund reclamation projects and maintain its steady progression was the cause for this tragedy. He therefore proposed a $20 million bond issue.
As the Corps' Jacksonville District held public hearings at Pahokee and Moore Haven to gather local information, Governor Martin appealed to the Secretary of War to request that Congress provide Federal Aid for flood control of the Okeechobee area. Other agencies were also earnestly requesting intervention and direction from engineers and drainage authorities. It was clearly apparent that since Disston's dredging and the piecemeal reclamation efforts of the past forty years, the watershed's dynamics had never been thoroughly understood. Following the hurricane, the State called upon the Corps to widen and deepen the St. Lucie and Caloosahatchee waterways in order to increase runoff during excessive lake levels.
Lieutenant Colonel Mark Brooke recommended that the channels should be straightened and dredged to a width of 80' and a depth of 6' as a preventive measure for future flooding. However, the Corps District Engineer qualified this by stressing that the state must construct and maintain similar channels from the western to the eastern boundaries of the Everglades Drainage District and must include additional locks and dams along the waterway. 161 Soliciting a second opinion in the State Drainage Commission appointed three engineers, which constituted the Engineering Board of Review, to examine what was previously done in the Everglades Drainage District. Fred C. Elliot was Florida's Chief Drainage Engineer and supervised the review process.
Based on the survey's findings, an engineering 160 Ibid. 161 Buker, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 77 proposal recommended more east and west canals, pumping stations, a revision of the St. Lucie Canal, and a 27' levee on the southern shore of the lake. All of this work was to be done by units or teams assigned to a specific task. 162 The survey also found that the actual land under cultivation following twenty- two years of reclamation and drainage was comparatively small.
163 Elliot was one of the first engineers to think in terms of units, or more precisely, a unit approach to a multifaceted problem that consisted of navigation, flood control, irrigation, construction of new facilities and maintenance of existing levees and locks along the waterway, and continued dredging and reclamation operations. Elliot's proposal included material similar to the Randolph Report recommendations, but it was modified and adapted to account for wet and dry seasons and the ever-growing complex interrelationship between the lake's water and reclaimed land. Elliot estimated the cost for this undertaking between $20 and $25 million. Litigation prevented the sale of the bonds, which meant a lack of funding.
None of the projects undertaken or proposed were finished or financed following the aftermath of the storm and its wake of controversy. Other individuals and agencies transpired to promote their own agendas, which inevitably lead to clogged litigation in the courts and the state legislature. Drainage operations were closely tied to the politics in Tallahassee and far removed from the realities and individuals around Lake Okeechobee. 164 Reclamation taxation had reached a breaking point for the landowners never had a clear idea of what they were paying since they had no part in determining expenditures of the District. Larger landowners faced excessive taxes and possible confiscation for proposed benefits such as Elliot's engineering program.
These benefits were far in the future and represented long-term investments in an environment that was proven to be volatile and uncertain. In addition, the proposed recommendations earmarked for $20 million outweighed the State Drainage Commission's total expenses of $18 million from to The District remained impoverished, subject to intense scrutiny in the wake of the 162 Tebeau, 163 Kimes and Crocker. 164 Hanna and Hanna, 2 61 CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 78 devastating storms, and eventually defaulted on its bond payments on January 1, 165 In Congressional Representative Herbert J.
Drane introduced a bill that authorized the Secretary of War to survey the Caloosahatchee River, Lake Okeechobee, and their drainage areas to determine what control works were necessary for navigation in association with flood control. The bill became law in February and Congress authorized Drane's report in April 166 Coinciding with Drane's report in the U.S. House of Representatives assigned areas of jurisdiction and financial obligations to both the Corps of Engineers and the State Drainage Commission following the aftermath of the dissolved Caloosahatchee Improvement District and the hurricane of 167 THE PALM BEACH HURRICANE, SEPTEMBER In loss of life the Okeechobee hurricane ranks among the greatest of American disasters.
The largest loss, of course, was in the tragic hurricane of which wiped out the island metropolis of Galveston, Texas, and in which it has been estimated that from to persons perished. Ranking next was the bursting of the mountain dam at Johnstown, Pennsylvania, which destroyed to people in the valley below. The only other catastrophe in the country which closely approaches the loss of Okeechobee was the raging forest fire of Peshtigo, Wisconsin, which occurred simultaneously with the great fire of Chicago, and which is said to have claimed Our hurricane [of even outranks those great marine disasters in which went down with the Lusitania and in the Titanic.
168 In September the Palm Beach Hurricane moved inland to Lake Okeechobee, toppled an 8' dike, and with destructive flooding, swept away an estimated lives and hundreds of homes and 165 Dail, 7. 166 Kimes and Crocker. 167 Ibid. 168 Lawrence E. Will, Okeechobee Hurricane and the Hoover Dike (Belle Glade, Florida: Glades County Historical Society, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 79 businesses in a single night. The Okeechobee Basin had been inundated with a month of heavy rains, and wind speeds reached 160 mile per hour. The barometer dropped to a point lower than any previously known and recorded pressure-mark in the United States and only exceeded in a few instances in other parts of the world.
169 In addition to this loss of life and property, wildlife suffered immensely. Hundreds of alligators and thousands of fish were washed over the banks and left to die as the water receded. Livestock from many farms and ranches were completely destroyed. Most tragically, many families never knew what became of loved ones as "the curtain of oblivion dropped forever." 170 With damage to the rail lines and with only two highways (the Conners and Palm Beach Road) leading to the southern shore of Lake Okeechobee, traffic into the interior was reduced to a crawl particularly in some areas where it took thirty to forty days for the lake's water to recede to permit passage. 171 The eeriest scenes and eyewitness accounts made the front pages and horrific images were transmitted to the nation.
These selected vignettes accompany the following descriptions. Hundreds of empty coffins were in public display because there was no dry land in the vicinity for immediate interment and little could be done to transport the volume of deceased. Mass burials were assembled in a common grave excavated made by a dredging vessel's drag-line, which was working on the lake end of the St. Lucie Canal at the time. Finally, with the fear of cholera and other diseases encroaching, funeral pyres accounted for hundreds of unidentified bodies at several locations dotting the lake's shore.
Reports indicate that the bodies burned like cord wood and that after three days of decomposition and having been stained with dark slurry and swamp muck, determining ethnicity for these bloated bodies was impossible: all of the unburied bodies were blackened with rot. The largest mass grave consisting of early settlers was excavated at Port Mayaca near the south bank of the St. Lucie Canal. The first major citrus grower in western Martin County, Bessemer Properties, donated five acres of land for this interment. Today, a slightly raised mound formed in an arc corresponds with the outline of the mass grave. A marble plaque marks the burial 169 Kimes and Crocker. 170 Hanna and Hanna, 171 Will, Okeechobee Hurricane, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 80 ground of the victims. The simple inscription on the stone reads: IN MEMORIAM TO THE PIONEERS IN THIS MASS BURIAL WHO GAVE THEIR LIVES IN THE HURRICANE SO THAT THE GLADES MIGHT BE AS WE KNOW IT TODAY 172 For years afterwards, as the cultivation of the soil continued in the fertile lands, it was not uncommon to till over or come across a forgotten sun bleached skeleton. Engulfing the Okeechobee Basin for more than forty years and existing through fair-weathered and disappointing State-supported drainage works booming only in times of prosperity and newly issued bonds, land speculation fever was both stopped and extinguished by this hurricane's destruction of life and property.
Knowing this tragedy could have been prevented, there were few words for this catastrophe; there were only images captured by photographs and recorded by gripping survivors' stories. Fierce outcries demanded swift and immediate action. Once again, Federal participation was requested. Having been made a scapegoat for this disaster, Elliot, the District's Chief Engineer, was most vocal during this time. Elliot called attention to the fact that technically the State was not draining the Everglades from its coffers since, aside from land sales and drainage taxes on state-owned lands, Floridians had never paid for reclamation. The State was the largest landowner in Florida, and drainage operations were self-sustained revenues proportionally related to land booms and newly issued bonds.
Elliot explained further that it was Florida's own financial contribution that needed to be reexamined as well as the inept State Drainage Commission and the Board of Trustees of the I.I.F. in Tallahassee. "No money has ever been appropriated by the State for drainage, no general State tax is imposed for such purpose, the bonds issued for carrying on the work are not an obligation of the State, and no law authorizes the State, itself, to take part or have in hand in this drainage enterprise-[yet the] highest public 172 Historic Architectural Survey of Martin County, Florida, 46. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 81 officials direct the work.
In its broad, economic sense, the State views the drainage of the Everglades as the means of developing a tremendous potential asset within its domain. " 173 In December House and Senate Committees called for a review of Drane's report, which had been pending since its submission in April. At the end of the year, Congress allocated almost $18 million for expenditures of navigation, drainage, and flood control measures. Following the aftermath of the hurricane, President-Elect Herbert Hoover, on his return from Brazil, stopped in Miami to personally view the destruction. As one of his first official acts of office, President Hoover instructed Congress to authorize the Corps' involvement and to come to the aid of the State.
Until this point, the Corps could only provide recommendations, and had been recommending the same proposals the Randolph Report addressed as well as what Elliot had planned. During the proceedings of the House Flood Control Committee, Fred Davis, Florida's Attorney General, reverberated Elliot's sentiments but from the Tallahassee or northern Florida perspective. In January Davis claimed that most of the Everglades residents were from other states and it was difficult to get people in other parts of Florida "interested in whether they perish or not. " 174 When questioned, Davis reiterated that people should be kept out of the Everglades altogether and seasonal Yankee tourists had essentially settled south Florida.
Controversy over Davis and Elliot's statements reverberated loudly throughout the country, and it was apparent the State of Florida was in the business of land reclamation, not flood control. A full year was spent recovering from Davis' statements, repairing its harmful implications, and redirecting legislation back onto what was the most important issue of the time: that lives perished because of political, economic, and legal impediments. By December legislation was introduced calling for Federal cooperation, and the Okeechobee Flood Control District was created by the state legislation to cooperate with the Federal Government in a plan to provide flood protection to south 173 Hanna and Hanna, 174 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 82 Florida.
Unfortunately, the Great Depression completely halted drainage activities until legislation authorized further action and funds were allocated. The State of Florida was initially charged with the responsibility of straightening the Caloosahatchee River, maintaining the necessary locks and dams from the western to eastern boundary of the Everglades Drainage District, providing pertinent information to the Secretary of War, and ensuing that rights-of-way, free passage, and additional improvements were provided along the Caloosahatchee River. 175 These primary responsibilities were assumed under the Okeechobee Flood Control District.
The Navigation Act was passed in Congress and signed by President Hoover in July Originally, the bill had been sent to the House Flood Control Committee in where it had been withdrawn because of Davis' statements and congressional concerns fearing that it would extend the Corps' flood control programs beyond the Mississippi and Sacramento Rivers. 176 The next reincarnation of the bill went before the House Rivers and Harbors Committee where it was then passed to the Senate Committee of Commerce. The bill proposed that the State should shoulder percent for the cost of improvements as well as for all land purchases.
177 The Senate called for further review of the plans to determine if modifications could be made to the bill which would allow for "a reasonable and necessary measure of safety within a practical limit of expenditure with a view arriving at an equitable and feasible proportion of cost" between the Federal government and the State . 178 The Rivers and Harbors Act also known as the Navigation Act authorized the Corps to provide deeper and wider channels on the Caloosahatchee and St. Lucie Rivers and to control and manage Lake Okeechobee and the waterways associated with the Everglades Drainage District.
The discrepancies between the original bill's names reflect the division between the merits of navigation versus flood prevention as well as the life span of the bill's journey through House and Senate committees. This act standardized the policy the Federal government would take regarding all flood control matters, which was to be under the 175 Kimes and Crocker. 176 Buker, 177 Kimes and Crocker. 178 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 83 jurisdiction of the Secretary of War, who in turn supervised the Corps. In the absence of a sound and successful drainage and reclamation history, special dispensation was made to Florida to allocate federal funding more expeditiously.
179 After a year of volleying between the House and Senate, the bill made the provisions that the original height of the levee was to be reduced as well as the amount the State would have to invest and provide for this project. A cost of $2 million was proposed for State land acquisitions and rights-of-way for the waterway. 180 Packaged within this navigation legislation, the act made provisions for a navigable channel 6' deep and 80' wide as well as for the construction of a levee that flanked three-quarters of the lake. Already in place, the Corps had proposals coinciding with previous surveys and reconunendations for future work along the Okeechobee Basin.
The project began at LaBelle on December 10, and the Corps proceeded to dredge and align the river to make the passage navigable and wider for the larger equipment needed. Born from the collection of proposals and studies in the Okeechobee Basin and watershed, many of these construction plans, which were awaiting development, were adapted. Materials dredged from Lake Okeechobee's rim or belt-canal and the rivers were used to construct the Herbert Hoover Dike, a 140-mile long 34' high levee that surrounds the shoreline of Lake Okeechobee. The height of the levee varied, from 34 to which is 20' or more above normal lake level. In later years, additions to the height of the levee were made. The levee's height is also 5' above the highest known point the lake has ever reached.
Within the protective series of levees, the southern half of the lake was bound like a swinuning pool while the northern half contained a V-shaped levee protecting the town of Okeechobee and the entrance to Taylor Creek. There were also four flood way channels (Indian Prairie and Harney Pond Canals, Kissinunee River and Fisheating Creek), that were maintained to regulate excess water in addition to sixteen drainage spillways along the St. Lucie Canal. The levees were extended to completely circumference the lake's shore after these initial sections were constructed. Detached from the round bowl-like Dike that holds 179 Ibid. 180 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 84 the lake's water, additional side levees function as flanges, paralleling the entrances at Fisheating Creek and the Kissimmee River. Finally, unlike previous construction plans that had recommended canals through the center of the lake, the Corps proposed using the rim or belt-canal. This route made construction and repair of the Dike more efficient, and the perimeter canals would be advantageous to maintaining the lakeshore channels as well as repairing the levee in the future. 181 The 194 7 hurricane and great flood demonstrated the levee's worth by its minimization of the loss of life. 182 On June 26, the Permanent Appropriation Repeal Act authorized the Corps to operate and manage the locks and dams along the Okeechobee Waterway.
Funding for this endeavor was provided from the House Rivers and Harbors Committee. In the Corps was granted congressional authority for all of the national flood control projects. The Federal Flood Control Act provided that the Federal Government should improve or participate in the improvement of navigable waters and their tributaries for flood control purposes if the benefit accrued might prevent the loss of lives and social security of the people affected. 183 In this year, the Corps officially assumed responsibility for the Okeechobee Waterway and its watershed.
Constructing the Cross-State Canal
Prior to the War Department had only been engaged in the improvement of navigation and spent approximately million on the upkeep of the rivers and harbors in the Okeechobee Basin. 184 After the Okeechobee Flood Control District was authorized in the Federal Government assumed an active responsibility with the first of many management plans. The Corps adapted Chief Engineer Elliot's proposal recommending the construction of floodway channels, control gates and major levees along the lake's southern and northern shores. The Okeechobee Flood Control District was required to furnish all lands, maintain the works and contribute $2 million toward the construction costs.
During the Depression, the Permanent Appropriation Repeal Act of reduced Florida's contribution 181 Buker, 182 Hanna and Hanna, 183 Kimes and Crocker. 184 Dail, 6. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 85 to and made the Corps responsible for operations and maintenance, thus relieving the Okeechobee Flood Control District of continuing responsibilities in the Okeechobee Basin. Government intervention was critical of Florida's history of reluctance to manage a continuous reclamation project. Considering the diversity and demographics of Florida, the hesitancy of the people of the state to shoulder flood control and reclamation from general tax revenue was understandable.
Nevertheless, Elliot reminded Floridians that technically they had paid nothing toward reclamation efforts thus far. Their history of intermittent interest in dredging operations lead to the collapse of the State Drainage Commission's control over the Everglades Drainage District as well as the failure to maintain and manage Lake Okeechobee's watershed. Elliot estimated land values around the lake in were speculated at After the $18 million spent by the State Drainage Commission on reclamation projects in the District in the last twenty years, Elliot believed that these same land values had risen to million.
185 The cost was earmarked initially at for the Okeechobee Intracoastal Waterway project, then known as the Cross-State Canal, yet by the time it was finished for intracoastal traffic in the price had exceeded $19 million. 186 After completion of St. Lucie's new Lock and Dam and continued work on the levees, the total cost was projected at $24 million in Construction on the Herbert Hoover Dike began in and raising the Dike level continued until when the Dike was officially considered finished. The levee was officially dedicated to the former president at Clewiston on January 21, In sections of the Dike along the southern shore were raised again. The total construction cost of the Herbert Hoover Dike over three decades has been estimated at $60 million.
187 The present controversy however is the seepage that occurs along the Dike's southern levee, and repairs and maintenance to the Dike have been ongoing throughout its seventy-year history. During the first two years of the Okeechobee Waterway project, Corps' engineers spent the majority of their time conducting 185 Hanna and Hanna, 186 Ibid., 187 Will, Okeechobee Hurricane, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 86 surveys and verifying or disproving previous data. The Corps' Jacksonville District was faced with correcting past mistakes while providing contemporary construction and at the same time, plan for future management and maintenance of the waterway. 188 The level of detail that the Corps extracted in the Okeechobee Basin was meticulous.
Utilizing data from the Corps' original surveys in the engineers also accounted for the history of floods and hurricane damage, hyacinth removal, high and low lake levels, pumping stations, and water conservation areas. Together, this data was assimilated and converted into management plans for future maintenance of the waterway. The Corps also worked locally with residents, something that the State Drainage Commission in the Everglades District and the Trustees of the I.I.F. had not been previously successful in accomplishing. The Corps employed both Fred A. Flanders, the lock tender at Moore Haven, and Fred C. Elliot, the State's Chief Drainage Engineer, during this project and after its completion.
In addition, the Corps utilized Spadaro Construction Company for the construction of Moore Haven and Ortona Locks and Dams. Antonio Spadaro lived in Citrus Center and owned the company, and subcontracted electrical and plumbing jobs locally. The Corps also employed Macwilliams Construction Company in to handle the majority of the dredging operations. Up until this time, the Corps had relied on their pipeline dredges, the U.S. Congaree and the U.S. Sarasota, in addition to a flotilla of hopper dredges, tugs, and survey boats. During the Great Depression, the Corps hired locally and abroad, thereby maximizing a labor force for this monumental project. In the early years of the New Deal, construction increased under impetus from President Franklin D.
Roosevelt's Public Works Administration, which spent million for the Okeechobee Waterway. Corps and State funds brought this total to over million. 189 As construction reached its height in the Corps' major source of construction funds came directly from Washington in the form of unemployment relief. In the fiscal year of funds for the project were scaled back. Ortona's lock logs record the bare necessities of expenditures between when it first opened and when it had to make do with 188 Buker, 189 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 87 less. However by this time, the Okeechobee Waterway was over 90 percent complete.
190 Between surveys, construction began immediately on the southern levee between Moore Haven and Clewiston in January This was followed by a 12-mile levee along the eastern shore as well as another levee on the western bank between Moore Haven and Fisheating Creek, where Nicodemus Slough is today. Looking at Moore Haven's topographic quad maps, the Moore Haven L&D as well as the Herbert Hoover Dike are not contained within a surveyed or patented township or section. It is speculated that the Dike and the Lock that was constructed shortly afterward were actually not on the lake's original shoreline.
Based on photographs of the time and knowing that the lake's rim canal followed the southern shoreline, sections of the Dike were built between the shallow interior of the shoreline and upon the old state levee constructed of muck. The Corps' big dredge, the U.S. Congaree, first excavated the Caloosahatchee River to facilitate moving heavy equipment into the lake and thereby further altering the river's original channel, especially around the Ortona area. Work on the construction of the levee was under six separate contractors or units like Elliot had recommended, while a dozen more contractors, most importantly the Edgar H. Latham Company, built the hurricane gates, locks, culverts, and other control structures.
Construction peaked from to 191 As originally constructed, the Herbert Hoover Dike bordered only the southern half of the lake and contained a short section to the north, overlapping known flooded areas from the aftermath of the hurricane. From past flooding and hurricane histories, the lake's water level, in principle, was believed to act like sloshing waves in a tilted pot of water. Winds from the hurricane were estimated to be over 160 miles per hour, and the convection force of the hurricane winds further added to the intensity. The lake level was also swollen from recent rains and reached 16' AMSL, with an additional 10" of rain brought about by the hurricane. Sections of the lake's old southern levee varied between 22' to 28' above sea level.
As wind and water were propelled southward during the storm, surging and overflowing the lake's levee, the pressure against the 190 Ibid. 191 Will, Okeechobee Hurricane, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 88 protective barrier was so tremendous that many portions of the levee were cut down to two to three feet, and in some places, carried away all together. This meant that a tidal wall of water 22' high with winds clocked at 160 mile per hour propelled the tidal wall forward, and this force is what extinguished the lives and structures behind the southern levee. As the hurricane winds turned from a northerly to southerly direction, the imaginary pot tilted in the opposite direction.
The north side of the lake, which had been virtually dry for miles, suddenly became inundated as the tidal force and kinetic energy that was built-up expounded northward, covering a third of the area that was flooded on the southern side as well as a third of the damage. 192 As contractors rebuilt the original southern levee that had been constructed of sand and muck, the above-ground part of the new Dike was of hard, rockier material and contained a ten-foot deep "toe" in front and back of the lake's shoreline. 193 The Dike is or more in thickness at its base, and tapers upward to a crown of ten feet.
Over the years, the height has been increased along the southern levee to a height of and raising the Dike's height resumed again in The surface elevation along the southern shore is approximately 15' AMSL; along the north shore it is 21' AMSL. The Dike rises 25' above surface level in these areas, which matches the anticipated and recorded lake level during severe storms . 194 To protect from erosion, the levee was seeded with grass and the barrier islands along the lake's southern and western shores were planted with Australian pines and bamboo. In the event that another hurricane as equally damaging as the storm would threaten the Okeechobee Basin and the lake's levees, the tall stately Australian pines would obstruct most of the wind and water damage.
In addition, much of the dike's top was asphalted with roads and later maintained as part of Florida's National Scenic Trail. The most important features of the Dike are the six hurricane gates situated at the main canals with Moore Haven Lock being technically referred to as Hurricane Gate No. 1. The other five gates are also assigned a numerical classification and are located at Clewiston (the Nine-Mile Canal and where Hartog 192 Ibid., 193 Ibid., 185 194 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 89 docked for the night), Lake Harbor (Miami Canal and Gate No. 3), Belle Glade (at the confluence of the North New River and Hillsboro Canals, Gate No. 4), Canal Point (West Palm Beach Canal, Gate No. 5), and Taylor Creek (Gate No. 6).
Interestingly enough, the entrance to West St. Lucie Lock No. 1 from the lake at Port Mayaca remained in use until the old lock was removed in thereby giving unimpeded discharge from the lake. Similarly, the old locks at Citrus Center and Lake Flirt on either side of the new facility at Ortona were dismantled in the following year. From until the entrance to the St. Lucie Canal did not have a hurricane gate or lock until Port Mayaca's lock and spillway were built in Environmental concerns such as saltwater intrusion from the St. Lucie Canal during droughts and pollutants brought down to the lake from the Kissimmee watershed that continued into the canal were some of the reasons for the new lock's construction at Port Mayaca.
The six hurricane gates are all sector gates with each section or half being pivoted on a vertical cylinder. Each gate averages 34' in height, almost 2' higher than the Dike itself. When they are closed, they form a continuous part of the levee. Although no relief valves are required, Moore Haven did install a spillway in the mid-1960s. These hurricane gates can be opened and closed against any headwaters thereby greatly reducing the time of operation. Each gate is also equipped with manual miter cranks for use in case of emergency. The design of these gates was perfected in Switzerland and Germany. 195 In there were four locks that permitted access into the lake in addition to the hurricane gates, however only the Moore Haven lock was operational.
The older locks at the entrance of the North New River, Miami and West Palm Beach Canals were dismantled or by-passed with the enlargement of the canals. West St. Lucie's Lock No. 1 was dismantled in and the Citrus Center (Caloosahatchee Lock No. 2) and Lake Flirt (Caloosahatchee No. 3) locks were removed in Furst-Clark Construction Company built the North New River, Miami and West Palm Beach locks in and and the new hurricane gates were located along the levee's wall in front of the older existing locks. Each hurricane gate was equipped with radio and meteorological instruments, and together, they were in communication with each other and the Corps' Clewiston South 195 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 90 Florida District Operation Office.
196 As the Okeechobee project grew in physical size, maintenance costs rather than construction costs became the greater expenditure. By maintenance costs were million compared to the allocated for new construction. 197 Moore Haven's new lock was completed in two years before the waterway was officially opened. The lock was substantially larger and was used as the blueprint for Ortona and St. Lucie's new lock chambers and site facilities. The chamber was x and two lock tender's houses were built at the facility. Fred Flanders, the former lockmaster of the old lock, occupied one of the lock houses located on the edge of the chamber and played an instrumental role in consulting with the Corps during the new lock's construction.
His lock tender house also served as a temporary City Hall during the late Other buildings at the facility included the control house, warehouse, an emergency generator house, and a boathouse with dock. The rail lines behind the fish houses west of the boathouse were utilized during the lock's construction. Newspaper accounts from the Glades County Democrat report that the opening celebration and formal dedication of the Cross-State Canal was made on March 19, A flotilla of dignitaries journeyed from Stuart to Fort Myers, Florida, along the Cross- State Canal, making an overnight stop in Clewiston. These representatives included U.S. Secretary of Commerce Daniel C.
Roper who represented President Roosevelt's behalf, Florida State Senator Claude Pepper, Franklin, and members of the Okeechobee Flood Control District such as Attorney General Cary Landis, Commissioner of Agriculture Nathan Mayo, and State Treasurer Knott. Within the first three months of the waterway's opening, over vessels passed through the Cross- State Canal. Franklin, the veteran waterway leader, gave this keynote address to the gathered honoraries in Clewiston. The Cross-State Canal was the greatest achievement in Florida's history and one of the biggest small things that has happened in the entire United States. This canal, connecting Stuart to Fort Myers, was suggested by Jefferson Davis in when he was Secretary of War. He 196 Ibid.
197 Buker, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 91 recommended to Congress that this was the most logical place for a canal from the Atlantic to the Gulf, and less than a hundred years later we are realizing his predicting. Parts of the existing canal will be used; large locks will be built. Again I tell you, the younger men must take up the burden and complete this as a ship canal of major importance, as we planned it when we started work on it a quarter of a century ago. 198 The waterway and its locks were officially completed on August 6, thereby saving 255 miles from the more traditional route of journeying around Cape Sable in the Florida Keys to connect the Gulf to the Atlantic.
Construction began in the early on the new lock chamber, spillway, hydroelectric power plant, and facilities at East St. Lucie Lock No. 2, and these modifications were proposed as early as Since the lake was meant to be a storage basin for Kissimmee's watershed and other streams, it was necessary to regulate discharges and maintain an approved and appropriate lake water level during rainy and dry seasons. Only the District Engineer in Jacksonville had the authority to determine the height of the lake's water level when Moore Haven and Ortona Locks and Dams were open, and this responsibility passed to the Area Engineer at Clewiston's South Florida District Office in the With this understanding, the Caloosahatchee River and St.
Lucie Canal were enlarged considerably and constructed with lock and spillway facilities to maintain and manage the distribution of water. Under this design, the Ortona L&D was able to discharge under flood conditions up to cubic feet per second while St. Lucie could distribute if and when the lake's level reached a critical mass of 17. 5' . 199 The desired minimum of the lake's level was kept between 15' to and over time, this level has been lowered to Coinciding with the late Everglades Restoration Project, the proposed lake's level may be reduced to 12' above sea level.
One of the major differences between the Caloosahatchee River and all of the other drainage and navigable canals that 198 "Roper Stresses Importance to Commerce of Developing Stuart-Fort Myers Ship Canal at Ceremonies Today: National and State Officials Witness Opening of Cross-State Waterway," Stuart Daily News, 22 March 199 Will, Okeechobee Hurricane, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 92 constitute the Okeechobee watershed and the St. Lucie waterway is the fact that the St. Lucie Canal was never properly dredged. The walls of this canal are at right angles to the water level, whereas the river and other canals have been landscaped to allow for some curvature along the waterway's banks. The linear walls of St. Lucie's Canal precipitate the erosion process.
During the early while the work was underway, discharges from the lake through the spillways at the St. Lucie facility concerned many along the Atlantic coastal areas. The dark water from the lake and canal stained the St. Lucie River and it could be seen 5 miles out to sea. Sand and silt from the lake and canal's bottom were carried downstream, especially during the torrent discharges resulting from excessive water levels in times of hurricanes and floods. The dark murky, slurry waters smothered marine life, disrupted the estuary's natural balance between brackish salt and fresh waters, and created shoals where the St. Lucie River had once been deep and clear.
200 The discharges did not kill the estuary and marine life overnight, but was the beginning of a long period of decline for the St. Lucie River. These incidents were ignored during the Depression years, but they were soon remembered and often revisited as growing environmental concerns were weighed against effective flood control management strategies. In the the Corps recognized the inherent danger and responded with the construction of sixteen drainage spillways and ditches running along the St. Lucie Canal. By the mid-1940s, the Corps maintained progress reports of the Okeechobee Intracoastal Waterway Project.
As additional work was appended to the project with the inclusion of tributary channels and the construction of needed culverts, pumps, and spillways, the original design grew in proportion to the work that was necessitated and the maintenance required to manage what had been done. Although the waterway itself was over 90 percent completed, the total project as a flood control and navigation endeavor was 83 percent finished. The following table, compiled from the Corps' As-Built of the Okeechobee Waterway and Tributary Channel, summarizes both the work completed to date and the work remaining: 200 Weber, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 93 PROJECT: A channel 8 feet deep from Fort Myers to the Intracoastal Waterway, Tributary Channel, St.
Johns River to Miami, Fla., near Stuart, with widths of 90 feet from Fort Myers to Moore Haven, miles, thence 80 feet along south shore of Lake Okeechobee to hurricane gate (No. 2) at Clewiston, 13 miles, thence 100 feet across lake and in St. Lucie Canal to St. Lucie Lock, miles, and thence 80 feet to the St. Johns River - Miami waterway near Stuart, miles; A side channel 8 X 100 feet from project turning basin to municipal yacht basin at Fort Myers; Replace old locks Nos. 1 and 2 in St. Lucie Canal with a single new lock; A (deep harbor) basin 8 X 200 X 400 feet at Stuart. PROJECT Maintenance of features completed under previous projects as INCLUDES: follows: Clewiston to St. Lucie Canal, miles; Under maintenance, the operating and care of St.
Lucie Lock; Operating and care of Moore Haven and Ortona Locks; A channel 6 X 60 feet in Taylor Creek from town of Okeechobee to lake, 4 miles. PROJECT ALSO INCLUDES MAINTENANCE UNTIL 1 JULY WHICH THEN WILL BE MAINTAINED UNDER THE CENTRAL AND SOUTHERN FLORIDA (C & S FLA.) PROJECT: A levee along south shore of lake, miles long, and a north shore levee miles long (levees to be improved and enlarged under C & S FLA. Project); 4 auxiliary floodway channels; collection and evaluation of meteorological data; and operating and care of spillways at St. Lucie and Ortona Locks, 5 hurricane gates, 20 drainage culverts around the lake, 16 drainage spillways along St. Lucie Canal, and a radio-telephone network of 8 stations. MEAN TIDAL 1.
7 feet at Punta Rassa, 0.7 foot at Fort Myers, perceptible at RANGE: Ortona and St. Lucie Locks, and 2.6 feet at St. Lucie Inlet PROGRESS: 83 percent complete. Work remaining to be done: Dredge side channel at Fort Myers; deepen waterway to 8 feet from Fort Myers to Moore Haven; dredge Clewiston approach channel 8 X 100 feet; dredge basin at Stuart; and under existing contracts, install 7 steel Taintor gates in spillway at St. Lucie lock and an auxiliary lock gate, and complete dredging to deepen St. Lucie Canal and approach channel to 8 feet, plus over depth, from a point in the lake about feet west at Port Mayaca to St. Lucie Lock.
AUTHORIZATION FOR EXISTING PROJECTS ACTS WORK AUTHORIZED DOCUMENTS 26 June Operation and care of locks and darns Specified in Act Permanent provided for with funds from Appropriation appropriations for rivers and harbors Repeal Act 26 August New lock and weir structure in St. Rivers and Harbor Lucie Canal Commission Doc. 2 March Deepening to 8 feet from Fort Myers to Harbor Doc. St. Johns River - Miami Waterway near Stuart via channel across lake from Clewiston 2 March Channel to yacht basin at Fort Myers Harbor Doc. and a basin at Stuart Source: U.S. Army Corps of Engineers, As-Built of the Okeechobee Waterway and Tributary Channel, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 94
Managing the Waterway
Between the and floods and droughts recurred as the Corps continued dredging operations and widening the waterway's channels. The droughts of the early became critical as saltwater began to seep into several municipal systems. As the lake's level was lowered by as much as 5', the underground aquifers were reduced by as much as seven feet and allowed for saltwater intrusion especially in the dry seasons. During this drought, regulating the water flow was strictly curtailed, later causing harmful effects as toxins and salinity levels rose. With heavy rains in and controlling the rate of discharge seemed to repair the salinity damage that had been done. Actually, the damage was simply carried further downstream.
The hurricane and great flood of September 17, almost twenty-one years to the day of the hurricane, inundated more than 5 million acres, and damages were estimated at $60 million. 201 As the black and red, square hurricane flags were raised, Lake Okeechobee was at its highest recorded lake level, over 20 feet above sea level. However, the Herbert Hoover Dike withstood the tremendous pressure, and damage to the levee and locks was negligible. Two years later in August another hurricane pelted the lake with the eye of the storm passing directly over the Okeechobee Basin. The Corps reported that the storm had "operated against the $24 million levee for a period three times as long as any previous storm and with greater intensities.
" 202 Enduring winds ranging from 7 5 to 12 0 miles per hour for a period of seven hours, the Dike once again held with only minor damages estimated at to the locks and levee. Considering the expense of the locks and levees, the damage prevented had proven to officials that the Dike and locks were a worthy investment. Though discharge was regulated and damage was minimal to Lake Okeechobee, the detrimental effects of relieving excess water were seen downstream of the St. Lucie Canal as well as the Caloosahatchee River. The spillways at St. Lucie were thrown open for most of the year in to relieve the swelling, and the reported 5 million acres of flooded lands and $60 million in property loss were mostly impacted on the livestock and agricultural lands that were flooded east of St.
Lucie's 201 Dail, 7. 202 Will, Okeechobee Hurricane, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 95 spillway. Similarly, while the Caloosahatchee River has always been a conduit for carrying freshwater runoff to the estuary, the man-made alterations along the waterway has changed the freshwater and saltwater gradient in the lower reaches of the river valley. Before dredging activities, freshwater traveled slowly, remaining in the estuary for longer periods of time, and allowed for a gradual mixing thereby sustaining a balance between ecosystems. As the river's channel was made deeper and run-off was faster, the greater quantities of freshwater entering the estuary disturbed the natural balance.
203 Pollution was also a major source of concern as floodwaters permeated and stretched along the swollen St. Lucie River. Bank erosion and salinity levels were also impacted by the torrent of excess waters released from St. Lucie's lock and spillway. In light of the flood damage, a more efficient water management system was proposed. The difference between the and the hurricanes was that the lake level had not been maintained at a safe elevation and subsequent flooding occurred. In addition, the Corps was also concerned with rising toxins and salinity levels during severe droughts, which meant that the management system and flood control plan must account for more than draining excess water.
Fresh water had to be kept in sufficient volume to provide a barrier in the underground aquifers from the intruding seawater. Florida's first comprehensive water management program was initiated in when the Federal Government authorized the South and Central Florida Flood Control Project. Designed to remove excess water rapidly throughout the drainage area, the project also stores excess water in large conservation pools. Water is also pumped in and out of Lake Okeechobee during the dry and wet seasons. The following year, Florida's legislature created the Central and Southern Florida Flood Control District an agency responsible for monitoring and collaborating on all non-federal cooperative operations along the peninsula.
The FCD was "the most far-reaching water program ever undertaken" in Florida until the Everglades Restoration projects were initiated. 204 The FCD is now in charge of the Dike as well as of water control in the Everglades and the Upper St. Johns and the Kissimmee River Basins, while the Corps maintains and operates the locks 203 Kimes and Crocker. 204 Dail, 8. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 96 and dams along the Okeechobee Waterway. Most importantly, the FCD assimilated the territory, operations, and responsibilities of the Everglades Drainage District and the Okeechobee Flood Control District. The objectives were broad and encompassing.
From its inception, the Corps and the FCD have built a management system to provide not only flood damage prevention, but also water conservation, maintaining ground water levels, salinity abatement, navigation, preservation and enhancement of fish and wildlife, and public recreation. 205 The FCD is essentially an elaborate network of canals, locks, dikes, and levees designed to drain and conserve water levels. The new system was all- inclusive as it planned to protect farms already developed, add reclamation lands that were suitable for agriculture, and set aside lands that would remain in their natural state in addition to protecting wildlife and improving navigation.
206 Authorized by Congress by the Flood Control Act of the first phase of the Central and Southern Florida Project called for the protection from floods and water conservation practices of the agricultural lands south of Okeechobee as well as the highly developed urban centers on the lower east coast of the peninsula. 207 Additional levees encircled the Everglades agricultural areas and rural settlements; four more pumping stations were added to the lake; the Dike was enlarged; and many lesser works expanding canals and placing spillways in key locations were performed. Much of these secondary works were directed toward establishing water conservation structures and areas.
The Central and Southern Florida Flood Control District was established in by the state legislation to responsibly manage the Federal conditions that had been established by the Flood Control Act and the Corps' management plans. 208 These responsibilities include providing rights-of-way intervention, relocating bridges, roads, and public utilities, and to act as the intermediary agency between Federal agencies and the State or other non-Federal organizations, thereby relieving some of 205 Ibid. 206 Buker, 207 Ibid. 208 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 97 the responsibilities from the Corps and the Federal government.
As the vast dynamics of the Kissimmee and Okeechobee watersheds were being grasped, not to mention how these management plans impacted the Everglades, contiguous watersheds were brought into the second phase of the Central and Southern Flood Control Project and under the jurisdiction of the In Congress added the Upper St. Johns and the Kissimmee River Basins as part of the second phase of the new program and management plan. Between the late and the FCD added water conservation areas and natural reserves to maintain the balance between regulated and environmental processes. The flood control umbrella includes Glades, Martin, Hendry and Dade Counties for the Okeechobee Basin.
Agricultural and conservation areas as well as natural reserves include 64 square miles in Hendry County, 39 square miles at Nicodemus Slough in Glades County as well as several key locations in Martin and in southern Dade Counties. 209 The flood control umbrella was tested with heavy wet seasons in and which was followed by the driest years on record. The FCD began to examine evaporation's effect on the lake level as well as its discharge. As acres of farmland were irrigated by water drawn from the lake, large sections of the Everglades withered and wildlife was endangered.
Three water conservation areas consisting of square miles were proposed to be completed by for water storage areas, but lack of funds and rapid growth and development in south Florida delayed completion of the comprehensive management plan. 210 The drought was broken in the fall of when heavy rains had an adverse effect, inundating the withholding and storage regions as they quickly exceeded the desired levels of water. Wildlife was again threatened because deer and other birds and animals could not forage for food in the flooded conservation areas. 211 The FCD began to work in cooperation with new agencies such as the U.S. Fish and Wildlife Service and Florida's Game and Fresh Water Fish Commission.
Consulting in tandem with the Corps' Jacksonville District engineers, a long-range study was conducted to examine the multitude of complex problems. In 209 Ibid., 210 Ibid., 211 Ibid. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 98 a new plan was submitted to Congress recommending refining many operating procedures that had been done in the past. In addition, navigational canals were deepened, more pumping stations were built, secondary canals and levees were constructed, and the height of the Herbert Hoover Dike was raised again so that the lake's level could sustain 21' of water above sea level in times of need. Salinity control structures were added to all canals leading to the ocean to prevent saltwater intrusion.
Coinciding with these structures, the freshwater levels in the interior were kept at least 2' above that of the sea water. 212 By the new plan was 39 percent complete. Since its involvement with the Okeechobee Waterway, the Corps had constructed a grand total of 917 miles of levees, 950 miles of canals, 30 pumping stations, 192 floodway control and diversion structures, 57 railroad bridge and two highway bridge relocations. 213 In addition, between the years of and the waterway, which serves both commercial barges and recreational vessels, averaged tons that locked through as well as passengers per year.
214 As the lake and waterway have been maintained, regulated, and managed for the last seventy years through Corps supervision, the latest complex problem has been the Everglades Restoration Project coinciding with the lowering of the lake's level. This same paradox has been around since Disston's time: how to manage the lake level, which directly impacts the surrounding area during times of drought and seasonal flooding. The questions are essentially how do you maintain the balance and at what cost. Conserving water for farm use, the Everglades water conservation reserves, underground aquifers, balancing salinity levels, south Florida's consumption, recreation, navigation, and wildlife are all complicated by flood control prevention and managing the lake's level.
Over recent years, the St. Lucie Canal has brought the St. Lucie Inlet and its river various pollution problems including farm chemicals, oil residue from highways and bridges, and phosphorous from livestock. Housing developments, golf courses, and continued land development compound these adverse effects. 212 Tebeau, 213 Buker, 214 Ibid., CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 99 Fishermen's glorious stories of award-winning and record catches are disappearing, as are the wildlife and fresh water fish, as are the fishermen themselves with lowered lake levels.
The small five to ten acre farms and the health and productivity of the rancher's livestock are also jeopardized, as are the natural balance of Lake Okeechobee's watershed, its waterways, and the Everglades if the water levels are not regulated and negotiated with environmental scrutiny and scientific impunity. The Everglades Restoration Project, like Disston's dredging operations that began over a century ago, has a sequential past that is also linked to Okeechobee waterway's history.
Designed to supply water to urban areas, drain and reclaim fertile agriculture lands, and control floods, the Everglades drainage project was initiated in By there were four major canals crossing the Everglades from Lake Okeechobee to the Atlantic Ocean and a low State-built sand and muck levee surrounding a few populated sections of Lake Okeechobee. In turn, these early events drastically reduced the amount of water that flowed into the Everglades via the Kissimmee River and increased the vulnerability of the Everglades to drought, sea level rises, and destructive storms. In the Everglades National Park was created to attempt to preserve and protect existing areas of the Everglades.
In approximately square miles of swamp and marsh were enclosed to control the overflow from Lake Okeechobee and to make the land useful for agriculture as part of the watershed conservation management plan. However, rapid population growth in south Florida conflicted with the interest in the management of protective watersheds to ensure a dependable water supply for agriculture, cities, and the Everglades National Park. If the FCD controlled the release of water to the Everglades, then this agency also determined the Park Service's role in water management as well as the Everglades' ecosystem and ecological future. In heavy rainfalls followed by pollutants from the lake's overflow and discharge destroyed approximately 120 square miles of the mangrove swamp.
After a hurricane in acres of the Everglades were destroyed. Muck and grass fires also threaten the Everglades during droughts. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 100 The Everglades watershed once covered almost a third of Florida. Two hundred years ago in the Everglades, the curvature of the landscape, blended with gravity and slopes, was so gradual that water moved slowly and formed no channels. Instead, a wide, shallow sheet of water about 110 miles wide conducted the flow. The natural process would take almost a year for Lake Okeechobee's water to flow south to Florida's Bay.
The heart of the "river of grass" was an interconnected array of sloughs, wet prairies, cypress swamps, mangrove swamps, freshwater lakes, streams, and lagoons covering approximately square miles. The contiguous watersheds of the Upper St. Johns and Kissimmee River and Lake Okeechobee Basins all flow southward along the central and southern interior of Florida's peninsula. Managing and maintaining these basins with flood control policies obviously has a cumulative effect on the trickle down natural process.
In the late nineteenth century, the natural processes of the Okeechobee watershed were interrupted by Disston's 2 million acres of reclaimed land and his system containing over 700 miles of canals and levees that were built to improve navigation, prevent flooding, and promote agricultural development. These events had a significant impact on the Everglades. Though the dredging efforts failed, by the an additional 400 miles of drainage canals had been built. According to Protecting Everglades National Park distributed by the National Parks and Conservation Association, it is estimated that the original Everglades ecosystem has shrunk to less than 50 percent of its original size.
While the Everglades can absorb almost an unlimited amount in the summer, excess water in late winter and early spring has seriously impacted the nesting and feeding grounds of several waterfowl species. Wading bird populations, which are indicators of ecological health, have decreased by more than 90 percent, from in to in In addition, the water is polluted with high levels of mercury and phosphorous and other excess nutrients from fertilizers used in agricultural areas. This runoff stimulates the growth of cattails, which have overrun the natural saw grass vegetation and disrupted the natural food web. Factors in the equation of how to manage the Okeechobee Waterway and how to balance wildlife and modernization are the central foci behind the Everglades Restoration Project.
CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 101 In State legislation created the Southwest Florida Water Management District and granted authority to the district to work with the federal government and other agencies to build new flood control structures in the district. This became the first of five water districts that soon encompassed all of Florida by The Florida Air and Water Pollution Control Act of The Florida Water Resources Act of and the South Florida Water Management District of were all part of a growing consciousness and embodied belief that natural systems are preferable to the creation of new engineering works. By the flood control had become a secondary objective.
More emphasis has been placed on preservation, restoration, and enhancement of the natural environment. With the completion of Lake Okeechobee's environmental impact assessments and a greater willingness to diffuse knowledge between local and district agencies, water management plans are mandated with greater ease and willingness. 215 The Everglades Restoration Project and the lowering of Lake Okeechobee's water level coincide with these recent comprehensive approaches. The Okeechobee Waterway, as a Federal navigation project, was first authorized under The Rivers and Harbors Act of also known as The Navigation Act since at this time flood control projects were discouraged in Congress.
Later the waterway was authorized under Federal management with The Permanent Appropriation Repeal Act of June 26, when the U.S. Corps of Engineers became the official stewards of the Okeechobee Basin. This waterway evolved from the War Department's dredging of the rivers and lake in the the construction of the St. Lucie Canal in and its first lock in the first Moore Haven Lock in and the Herbert Hoover Dike around Lake Okeechobee in the 215 Kimes and Crocker. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 102 PART II. LOCK AND DAM DESCRIPTION A. General Statement The three historic properties investigated are integral parts of the Okeechobee Waterway, a contiguous 155-mile intracoastal navigation system across the Florida peninsula.
The waterway includes the navigation channel and five locks and dams, two on the St. Lucie Canal and three on the Caloosahatchee River. The three locks and dam facilities include concrete locks and dams and ancillary structures such as control house, lock tender's houses. The history of the waterway dates back to when Hamilton Disston began dredging the Caloosahatchee River and the Kissimmee Chain of Lakes in an effort to drain large areas of the Everglades for agricultural and transportation purposes. By boats could travel from Lake Kissimmee, the Kissimmee River, Lake Okeechobee, and the Caloosahatchee River.
The Okeechobee Waterway, as a Federal navigation project, was first authorized under The Rivers and Harbors Act of also known as The Navigation Act since at this time flood control projects were discouraged in Congress. Later the waterway was authorized under Federal management with The Permanent Appropriation Repeal Act of June 26, when the Corps became the official stewards of the Okeechobee Basin. This waterway evolved from the War Department's dredging of the rivers and lake in the B. Physical Description The most important structures at these lock facilities included the lock chamber, spillway, sector and vertical gates, associated electrical equipment and motors, control houses, machinery rooms, and the lock tender and assistant's houses.
Each is individually described in the following documentation. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 103 PART III. SOURCES OF INFORMATION A. Engineering Drawings and Plans The U.S. Army Corps of Engineers South Florida Operations Office, Clewiston District, maintains a complete collection of plans for the three locks and dam complexes with "as-built" drawings and also the Operational Manual for each of the lock facilities. The "as-built" plans have been electronically scanned and preserved on compact disks.
The collection of plans for each lock and dam has been placed on deposit at the following Florida repositories where they are publicly accessible: the University of Florida Library, Gainesville; the State of Florida Library, Tallahassee; and Florida State University Library, Tallahassee, Florida. B. Early Views and Historical Data The data used in preparation of the historical context came from many sources. Previous surveys done by Historical and Architectural Research Services and Ellis Archaeology established some background history of the locks and dams and gave an inventory of the town of Moore Haven and the buildings at St. Lucie Lock. Research was carried out at the Master Site Files in Tallahassee, Florida, for previous surveys and reports.
The libraries in Clewiston, Miami, and Stuart, Florida, had many invaluable books used for background and history of Glades, Martin, and Hendry Counties, Lake Okeechobee, the Everglades, and the settlement of south Florida. Sun, Sand and Water-A History of the Jacksonville District U.S. Army Corps of Engineers by George E. Buker (ca. contained excellent information on the Corps involvement in the Lake Okeechobee Basin from the until the late following the formation of the Central and Southern Florida Flood Control District. The Clewiston Museum's archives contained newspaper articles of the locks and dams construction period, which gave insight into the construction and the views on these federal projects voiced by the local townspeople.
Other newspapers were explored including The Miami Herald, The Stewart Daily News, Glades CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 104 County Democrat, and The Atlanta Journal - Constitution. The Clewiston News contained a collection of articles written by Twila Valentine called Lake Okeechobee-Lady of Mystery that detailed the history of Lake Okeechobee and past and present issues. St. Lucie's Visitor Center contained other information on St. Lucie's lock and its history.
Photographic and archival research was also conducted at the Florida State Archives, South Florida Flood Control District Office, Historic Museum of South Florida, Glades County Courthouse, Martin County Courthouse, Historical Society of Martin County, and the Kissimmee Historical Society/Pioneer Museum. Finally, Mr. Ray Thielan graciously gave an informal interview on all three of the locks, his position at each, and the history of the town of Moore Haven.
Another source that was also used, primarily for the timeline and the history of the Caloosahatchee River, was a web site created by the Florida Center for Environmental Services, which was prepared in association with the Florida Gulf Coast University Library Services and South Florida Water Management District The maps and historic views follow on pages C. Interviews Lucky, Larry (Glades County Tax Assessor). Unrecorded interview with author. 13 April Menge, Conrad. "Early Dredging in the Lake Okeechobee Region." Oral history of author. On file at the Clewiston Museum, Clewiston, Florida. Thielen, Ray. Interview by author. Moore Haven, Florida, June New South Associates. Mr.
Ray Thielan, former lockmaster of Moore Haven, was interviewed on two occasions in June at his home in the town of Moore Haven. Mr. Thielan is the last lockmaster who not only remembers the actual construction of the Ortona and Moore Haven facilities, but who also worked on the construction of the Herbert Hoover Dike during the Depression. Mr. Thielan retired in from the Moore Haven facility. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 105 Transcripts of the interviews with Conrad Menge and Ray Thielen are included in Appendix A. D. Bibliography Primary and unpublished sources: Beard, Daniel B. Wildlife Reconnaissance: Everglades National Park Project. Submitted by U.S. Department of the Interior, National Park Service.
October "Datum Planes in the Caloosahatchee River - Lake Okeechobee Drainage Areas, Florida." Letter from the U.S. Coast and Geodetic Survey and the U.S. Engineer Department, mid-to- late Copy obtained from the Corps' South Florida Operations Office, Clewiston District. Everglades Drainage District Commission. Annual Report of Everglades Engineering Board of Review. Presented to the Board of Commissioners of the Everglades Drainage District, Tallahassee, Florida, Copy obtained from Historic Museum of South Florida, Miami. Florida Department of Natural Resources Division of Land Management, Bureau of State Lands Land Title Section. Field Notes, Vol. p. Located in Commonwealth Building, Tallahassee. Florida Department of State.
Division of Archives, History and Records Management, Bureau of Historic Sites and Properties. Florida Master Site File, nd. Located in R.A. Gray Building, Tallahassee. National Register of Historic Places Inventory - Nomination Form: "Lock No. 1, North New River Canal." Florida Master Site File, Located in R.A. Gray Building, Tallahassee. Okeechobee Flood Control District: A Report to the Board of Commissioners Presented to the Board of Commissioners of the Okeechobee Flood Control District, Tallahassee, Florida, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 106 Operation Manual: Moore Haven Lock. Department of the Army, Jacksonville District, Corps of Engineers. SAJP 16 November Copy obtained from the Corps' South Florida Operations Office, Clewiston District.
Operation Manual: Ortona Lock. Department of the Army, Jacksonville District, Corps of Engineers. SAJP 18 October Copy obtained from the Corps' South Florida Operations Office, Clewiston District. Operation Manual: St. Lucie Lock and Dam. Department of the Army, Jacksonville District, Corps of Engineers. SAJP 18 October Copy obtained from St. Lucie Lock and Dam Reservation. Operation and Maintenance Manual: Central and Southern Florida Flood Control Project As Maintained by the Corps of Engineers. Department of the Army, Jacksonville District, Corps of Engineers. SAJP 1 December Copy obtained from the Corps' South Florida Operations Office, Clewiston District. U.S. Army Corps of Engineers. Annual Report of the Chief of Engineers. Vol.
1, Lake Okeechobee and Okeechobee Waterway Historic Properties Management Plan. February Okeechobee Waterway. Map collection. Jacksonville Florida District. U.S. House. nExamination of Caloosahatchee River, Florida, from Mouth to Fort Myers." Congress, 2 ct Session. Document No. Newspapers: Glades County Democrat, 26 April - 16 July Stuart Daily News, 22 March - 20 July Stuart News, 9 January - CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 107 Secondary and published sources: "20-Foot Road to Lake Okeechobee." Stuart Messenger 9, no. 36 (17 July "Along the Caloosahatchee." Fort Myers Press 20, no. 41 (29 September 1. Barbour, George M. Florida for Tourists, Invalids, and Settlers. New York: D. Appleton and Company, Blake, Nelson Manfred.
Land Into Water-Water Into Land: A History of Water Management in Florida. Tallahassee, Florida: University of Florida Press, Blatchley, Willis Stanley. In Days Agone: Notes on the Fauna and Flora of Subtropical Florida in the Days when Most of its Area was a Primeval Wilderness. Indianapolis, Indiana: The Nature Publishing Co., Buker, George E. Sun, Sand, and Water: A History of the Jacksonville District U.S. Army Corps of Engineers Washington United States Government Printing Office, ca. Burns, John A., ed. Recording Historic Structures. Washington, The AIA Press, Clausen, M. Almy, Clausen, M. Fryman, J. Milanich, J. Van Winkle, J. Wallace, and B. Wharton. Cultural Resource Survey of Portions of the Port La Belle Development Tract, Glades and Hendry Counties, Florida.
Report submitted to General Development Corporation, Miami, Florida, by CCC Enterprises, Inc., North Port, Florida. Survey Project No. July "Contract Unit Prices: Canal Lock, Florida." Engineering News Record no. 15 (12 October Crane, Verner w. The Southern Frontier, Ann Arbor, Michigan: University of Michigan Press, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 108 Dail, G. E. Organization for Water Conservation in Florida. St. Petersburg, Florida: University of South Florida Press. Submitted to Central and Southern Florida Flood Control District by Florida Conservation Workshop, Center for Continuing Education, July Douglas, Marjory Stoneman. The Everglades: River of Grass. New York: Rinehart and Company, Inc., Ellis, Gary D. and John J. Ellis.
An Intensive Cultural Resources Survey: St. Lucie Lock and Dam Recreation Area, Martin County, Florida. Report submitted to U.S. Army Corps of Engineers, Jacksonville District, by Ellis Archaeology, Lecanto, Florida. Contract No. DACW-92-M- March Farson, Robert H. Cape Cod Canal. Yarmouth Port, Massachusetts: Cape Cod Historical Publications, Fritz, Florence. Unknown Florida. Coral Gables, Florida: University of Miami Press, Glades County Board of Commissioners. Glades County, Florida History. Moore Haven, Florida: Rainbow Books, Grismer, Karl H. The Story of Fort Myers. St. Petersburg, Florida: St. Petersburg Printing Company, Hallock, Charles (comp). Camplife in Florida. New York: Forest and Stream Publishing Company. Hanna, Alfred Jackson and Kathryn Abbey Hanna.
Lake Okeechobee: Wellspring of the Everglades. American Lake Series, New York: The Bobbs-Merrill Company, Harner, Charles E. Florida's Promoters: The Men Who Made It Big. Tampa, Florida: Trend House, Hartog, Jan De. Waters of the New World. New York: Atheneum, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 109 Heilprin, Angelo. Explorations on the West Coast of Florida and in the Okeechobee Wilderness. Philadelphia, Pennsylvania: The Wagner Free Institute of Science, Historic Architectural Survey of Martin County, Florida. St. Augustine, Florida: Submitted to Growth Management Department, Comprehensive Planning Division of Martin County, Stuart, Florida, by Historic Property Associates, Inc., June Historic Properties Survey of Moore Haven, Florida.
Sarasota, Florida: Submitted to City of Moore Haven by Historical and Architectural Research Services, January Hutchinson, Janet and Emeline Page. History of Martin County. Hutchinson Island, Florida: Martin County Historical Society, Kimes, C.A. and Crocker. "The Caloosahatchee River and Its Watershed: A Historical Overview." Fort Myers, Florida: Submitted to Florida Gulf Coast University Library Services and South Florida Water Management District under subcontract from Florida Center for Environmental Services, Agreement No. FAU DSR No. revised September available from w~J:er~_hed/ index. INTERNET. Kurtz, Daisy Smith. A Tapestry of Tales: Family Chronicles from Indiana Homestead to Florida Everglades Richmond, Virginia: Dietz Press, Lorant, Stefan, ed.
The New World: The First Pictures of America. New York: Duell, Sloan and Pearce, Milanich, Jerald T. Florida's Indians. Gainesville, Florida: University Press of Florida, "New Locks for Navigation Canals to Lake Okeechobee." Engineering News Record no. 14 (4 April Norton, Charles Ledyard. A Handbook of Florida. New York: Longmans, Green and Company, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 110 "Notes on Construction in Southern States." Engineering News Record no. 13 (28 March Our Native Land: Glances at American Scenery and Places with Sketches of Life and Adventure. New York: D. Appleton and Company, Protecting Everglades National Park. Distributed by the National Parks and Conservation Association, Sears, William H.
Fort Center: An Archaeological Site in the Lake Okeechobee Basin. Gainesville, Florida: University Press of Florida, U.S. Secretary of the Interior. Standards and Guidelines for Architectural and Engineering Documentation: HABS/HAER Standards. HABS/HAER Cultural Resources Program, National Park Service, U.S. Department of the Interior, Washington, Stirling, Smithsonian Archeological Projects Conducted under the Federal Emergency Relief Administration, Washington Smithsonian Institution, United States Government Printing Office, Publication No. Tebeau, Charlton w. A History of Florida. Coral Gables, Florida: University of Miami Press, True, David o., ed. Memoir of Do. d'Escalante Fontaneda Respecting Florida, Written in Spain, about the year Translated by Buckingham Smith.
Coral Gables, Florida: Glade House, Wayne, Lucy and Martin F. Dickinson. Cultural Resource Survey of the St. Lucie Bank Stabilization Project, Martin County, Florida. Report submitted to U.S. Army Corps of Engineers, Jacksonville District, by Water and Air Research, Inc., Gainesville, Florida. Contract No. DACW17-87-C-0047, November CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 111 Will, Lawrence E. A Pioneer Boatman Tells of Okeechobee Boats and Skippers. St. Petersburg, Florida: Great Outdoors Publishing Company, Okeechobee Hurricane and the Hoover Dike. Belle Glade, Florida: Glades County Historical Society, CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 112 PART IV. PROJECT INFORMATION The U.S.
Army Corps of Engineers, Jacksonville District, proposed to make structural changes to Ortona and Moore Haven that would substantially alter the structures. The Corps' Lake Okeechobee and Okeechobee Waterway Historic Properties Management Plan had identified these two lock and dam facilities as National Register eligible properties. Level II HAER documentation was proposed to mitigate adverse effects of the construction activities. A Memorandum of Agreement was executed between the US Army Corps of Engineers, Jacksonville District and the Florida State Historic Preservation Office that stipulated that the St. Lucie listed in the National Register of Historic Places in and the Ortona and Moore Haven locks and dams would be the subject of Level II HAER documentation.
New South Associates was contracted by the U.S. Army Corps to undertake this project in May Work completed for this historic properties' investigation was conducted in compliance with the National Historic Preservation Act of as amended through (PL and PL Executive Order the Advisory Council on Historic Preservation revised 36 CFR Part 800 Regulations; and the Memorandum of Agreement between the U.S. Army Corps, the Florida State Historic Preservation Office, and the Advisory Council on Historic Preservation. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 113 DESOTO SARASOTA l-- JZ6AUQ.19'? Nsi:H IOek OM \tilt' sttu,}tute ii\ St. ,.?Mat,194-~ o~:~~~r;~o8tut tromf!ort ro ,J'3CJ..WflviHe:- Mio~!
wcH@t>.fi:IY ottor 2MOt.194.~ ta ~~ri, M$it'-Ot jiwt Myer, and <1 ti<1~ift at taott --- -- --- - - -- - l Ju1. Enl t trl$tin 8 b 9:0 toot Cross-State Canal, Western Half Source: U.S. Army Corps of Engineers, Jacksonville District CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 114 l I I OKEECHOBEE MOO!?t; />IAV!l:N a Na BEA CH y OKEECHOBEE WATERWAY, FL SO.AU tN MU...JES 3 Cross-State Canal, Eastern Half Source: U.S. Army Corps of Engineers, Jacksonville District CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page~ Photograph of Caloosahatchee Lock No. 1, looking west toward Three-Mile Canal, Source: Florida State Archives, Florida Photographic Collection CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page~ Photograph of the Culebra Dredge in the St. Lucie Canal, Source: Florida State Archives, Florida Photographic Collection CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page~\\ Photograph of dredging maintenance at Herbert Hoover Dike, Source: Central and Southern Florida Flood Control District Office (West Palm Beach, Florida). CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page \ \'o APPENDIX A - ORAL HISTORIES CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page ~ \ \ ' \ EARLY DREDGING IN THE LAKE OKEECHOBEE REGION: ORAL HISTORY OF CONRAD MENGE, Obtained from the Clewiston Museum, Clewiston, Florida In about the Hamilton Disston Company (also known as the Atlantic Gulf Coast Land Company) purchased four million acres of land located throughout the southern part of the State of Florida. The purchase price was approximately one million dollars. It was the plan of the Disston Company to reclaim the marsh lands surrounding Lake Okeechobee and some of the lake bottom itself so that this land could be used for general farming. In order to reclaim the land, it was necessary to lower the level of the lake by about 4-feet.
All of the dredging carried out during the decade between and was undertaken with the purpose of draining the marshes and lowering the water level in Lake Okeechobee. The first dredge used on this project was built in or by my two brothers, Joseph Menge and J. Fred Menge. This dredge was constructed at Cedar Keys. This dredge was 20-feet wide, 80-feet long, and was of the elevator type with 24 buckets. The mud was dumped in a hopper and from there [it was delivered] into a wooden chute into which was pumped a stream of water to keep the mud [from] sliding out on the bank. This dredge was able to cut an average of 250 lineal feet, 24-feet wide and 6-feet deep in ten hours in soft muck. This type of dredge was invented by my father, Anton Menge, and was known as the Menge Patented Dredge.
After the dredge was delivered to Fort Myers, J. Fred Menge stayed to take charge of the dredging operations for the Disston Company. He took the dredge to Fort Thompson Falls under its own power, using a stern paddle wheel operated by a chain belt from the main engine. Beginning at Fort Thompson, a few spots were dredged out in the river from there to Lake Flirt. A channel was then cut through Lake Flirt and following the narrow stream bed on to the north end of Bonnet Lake. It was necessary to cut a channel in both of these lakes since in some places water was not deep enough to float the dredge. The main idea in this preliminary CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page dredging was to get the dredge to the point where it could begin digging a canal from Bonnet Lake to Lake Hicpochee. The first real canal was the one that connected Bonnet Lake and Lake Hicpochee. This work was begun sometime in the canal was cut in two widths, that is, 48-feet wide. After the cut into Lake Hicpochee was completed, the dredge was moved over to the east side of the lake and the second canal was started which would connect Lake Hicpochee and Lake Okeechobee. This second canal became known as the Three-Mile Canal. A lone cypress tree on the edge of the canal near Lake Okeechobee was named the Flat Top Cypress and soon became famous as a landmark. It carried a flag on top of it as a beacon so that anyone in the region could easily locate Three-Mile Canal.
This canal was completed in late or early After the Three-Mile Canal was finished, the dredge was taken back to Fort Thompson to cut off some of the short bends in the river. All of these first phrases of dredging were completed by the latter part of As it turned out, the canals from Okeechobee to Hicpochee, from Hicpochee to Bonnet Lake, and the channels throughout Bonnet Lake, Lake Flirt, and on to the Caloosahatchee Valley, did not succeed in lowering the lake level by the desired amounts. The project then continued with the building of a wood canal. As soon as the wood canal was finished, we moved the dredge to the east side of Hicpochee and begun cutting a canal from there toward Sand Point.
This canal called Nine-Mile Canal was started in about March The only purpose of this canal was to provide a waterway for hauling wood from Wood Canal to the new location at Ritta River where the next drainage canal was to be dug. Otherwise it would have been necessary to haul all of the wood up and across Hicpochee and through Three-Mile Canal, then down and across Okeechobee to Ritta River. By the time we finished digging Nine-Mile Canal, the dredge was worn out. We took it to the south side of Lake Hicpochee and abandoned it there. Perhaps today you would still see some of the old hull resting on the bottom. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page The Disston Company then built a new dredge at Kissimmee.
It was similar to the Menge Dredge, using a hopper and chute for depositing mud on the bank. It was equipped with tumbling wheels, however, instead of sprockets, and it had two pontoons, one bolted on each side to make it more stable. The new dredge was dismantled and shipped on barges from Kissimmee down the Kissimmee River to Lake Hicpochee where it was again set up. The first work done with the new dredge was to dig two cross canals a short distance from where the canal west of Lake Hicpochee entered the lake, that is, between Coffee Mill Hammock and Lake Hicpochee. These were experimental canals, their purpose being to drain the marshes on either side of the main canal to find out whether the soil would grow rice.
Some rice was sown and it grew so tall on account of the rich soil that the stalks fell over of their own weight before the heads matures. These rice stalks grew up over 5-feet tall. After this experience we gave up the idea of growing rice. After digging the two cross canals, the dredge was dismantled again and towed down to Ritta River by a little stern wheel steamboat called The Rosalie. Before beginning on the new canal, which was to go from Ritta River south toward Shark River, it was decided to take sounding for rock in order to determine the exact course the canal should take. We sent out two different parties to make this sounding and they both returned to the dredge at the end of a couple of days, reporting that they could not get through the swamp and saw grass.
My brother and I and our cook, John Weatherford, then decided that we would make the sounding ourselves. We took one canoe and a sneak boat. Our equipment consisted of three woolen blankets, three rubber blankets, and three 16-inch boards, each 7-feet long. These boards were placed along the canoe and sneak boat at night as a bed. This was during the dry season and there was practically no water in the marshes in the Everglades. We had to drag our boats practically all the way. In spite of the dry weather, the mosquitoes were so bad that we had to go to bed as soon as the sun went down to have the protection of the mosquito bar, which was suspended over our board bed. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page For 17 days we traveled making soundings as we went along. By this time our provisions were getting so low that we had to turn toward the pine timber and back toward the dredge to get more supplies. Our food supply gave out completely two days and a night before we reached the dredge, and I ate buds to stave off hunger. (They tasted pretty good). We finally reached the dredge and secured an additional supply of provisions and were ready to start out again and complete the sounding. Fortunately heavy rains set in and we were able to finish the soundings by beat. We started digging the canal from Ritta River south during the latter part of After dredging about 12 or 13 miles, we ran into a rock ledge and the canal was abandoned. This canal became known as the Thirteen-Mile Canal.
This was the last canal dug by the Menge brothers in this region. The dredge was dismantled and put on barges for shipment to Kissimmee. During the trip across Lake Okeechobee, a storm came up suddenly and the dredge broke loose from the tow boat. It sank in Lake Okeechobee and was never located again. This ended the early dredging done in the region. My brother and I dug all the canals in the vicinity of Lake Okeechobee. We did not work on any of the canal projects that went to the east coast from the Everglades region and we were not connected with the St. Cloud operations on the Kissimmee River. It was quite a problem to move the dredge across the lake to a new location. The dredge wasn't very seaworthy and couldn't be handled by the tow boat at all in even a moderate breeze.
Towing was always done at night because there was very little wind on the lake between sundown and sunrise. The dredges were towed to location by small steamboats. We used three of these during the course of our work as tenders for towing wood barges and for hauling supplies as well as for towing the dredge. The names of all the boats and dredges used on the original job were: CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page~\? (a) Menge Patented Dredge. This was the first dredge used. It was worn out on the job and abandoned in Lake Hicpochee in (b) The Gopher. This small stern wheel steamer about 25-feet long was used to haul wood to get supplies for the dredge. It was the first tender used on the job and was out of commission in (c) Mamie.
This was a small steamboat (propeller drive) about 25-feet long. It was the second of three tenders used on the job. (d) New Dredge Built in Kissimmee. This dredge was built by the Disston Company in It did not have a name. It sank in Lake Okeechobee in (e) Rosalie. This was a small stern wheel steamboat about 45- feet long, the largest of three tenders we had on the job. The boat, named after Captain Rose's daughter, was brought down from Kissimmee. Captain Rose was the general manager for the Disston Company. It was the boat we used to tow the dredge to Ritta Island after two small side canals were dug across the main canal of Lake Hicpochee. (f) Hamilton Disston. This was a two-deck stern wheel steamer about 75-feet long.
Its home port was Kissimmee and it was used to bring officials of the company down to look over the progress of the work. Kreamer Island in Lake Okeechobee was named after James M. Kreamer, engineer for the Disston Company. I do not know how Observation, Ritta, and Terry Islands got their names. I do not know how Fort Thompson got its name originally. I remember someone telling me that a person found an old rusty coffee mill on the high ground of the hammock east of Fort Thompson and that this is the way Coffee Mill Hammock got its name. This place was known as Coffee Mill Hammock long before I came to Florida in I first met Captain Clay Johnson in Fort Myers some years after we had abandoned the dredging operations.
Captain Johnson and I became great friends when we were both in the steamboat CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page ia-T'\~ business. His home was in Kissimmee. He owned and operates three boats which I knew well: the Roseada, the Lilly, and the Osceola. These were passenger and freight steamers which operated on the Kissimmee River during the summer. During the winter season Captain Johnson often made trips down through the lake to Fort Myers carrying tourists on sightseeing and fishing trips. The Lilly was the largest of the three boats and was the one most frequently used in making these trips. The Suwanee was purchased from Captain Myers by the Menge Brothers Steamboat Line in about This was a two-deck stern steamer about 75-feet long.
It was designed for carrying passengers and freight. The boat had quite a history having once belonged to the newspaper Times Democrat of New Orleans, Louisiana. At that times it was named the Susie B. I am not sure where Captain Price bought the boat but at any rate he brought it to Fort Myers from the Withlacoochee River. He used the boat mainly to take parties fishing. After purchasing the Suwanee from Captain Prince, we also used it quite frequently for that purpose. Winter visitors from the north would charter the boat for several days or perhaps for a week or two to make trips up to Lake Okeechobee or out into the Gulf on fishing trips. Mr. Edison took more trips on the Suwanee than on any other boat between and Mr.
and Edison, usually accompanied by a party of friends, would charter the Suwanee for two or three days or a week. They made these trips every season for a number of years. Sometimes they would make several trips during the season. Mr. Edison was very fond of fishing and liked to go both up the river and down the river to the Gulf. The Suwanee was also chartered each season to parties from New York and other large cities in the east. These people often came to Punta Gorda in their private railroad cars. Since there was no railroad to Fort Myers at that time, the Suwanee would pick them up at Punta Gorda for trips up the river and along the Gulf Coast. I am sorry that I can not remember the names of any of these parties now.
The Suwanee was wrecked in a hurricane in the fall of The storm blew the boat ashore on the south side of Lake Okeechobee near Moore Haven. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page When Mr. Ford came to Fort Myers in he inquired about the Suwanee and stated that he wanted to build a replica of the boat to be placed in his museum in Dearborn, Michigan. He was interested in the Suwanee mainly because Mr. Edison had spent so many happy days on it. Mr. Ford, Fred Myers, and I drove to Moore Haven in the winter of to see if we could find some parts of the old boat which could be used in the Suwanee which was to be rebuilt. We easily located the boiler on the south shore of the lake where the boat was wrecked.
We could not find any of the original hull or super structure. One of the engines was sticking out of the ground near the boiler and after digging around in the sand and mud, Mr. Ford found the second engine. I was employed by Mr. Ford to build a replica of the old boat. The hull was constructed on the old Menge brothers' ways on the Orange River and was shipped to Dearborn on flat cars along with the boiler and engines and two engines which had been salvaged from the lake shore near Moore Haven. I went to Dearborn shortly after the hull was shipped there in to finish building the boat and to install the boiler and the engines which had been reconditioned and put in perfect running order.
The "new" Suwanee powered by the original boiler and engines is now in Greenfield Village, Dearborn, Michigan. During the summer months the boat carries passengers on a small river in the Village. It is hard to name any particular place in the Lake Okeechobee region where the black bass fishing was especially good. It was good everywhere! When I was working on the dredge, one of my favorite pastimes on Sunday was to sit with a cane pole, using a piece of bacon rind for bait and catch bass as fast as I could pull them in. I used to catch them on one side of the barge, unhook them, and throw them in on the other side.
I recall that I used to catch many fish in Bonnet Lake, in Nine-Mile Canal, quite near Lake Hicpochee, between Lake Flirt and Bonnet Lake, and in Lake Hicpochee near the south shore. A friend of mine told me that he caught a 16 pound bass in Fish Eating Creek (this was in I didn't actually see the fish so I don't know whether it was that large or not. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page~ There is one experience with black bass that I do remember very well. We were digging Nine-Mile Canal and had cut through a small pond. After the canal had been cut through this place, the water was still 8 or 10 inches deep on each side of the cut. One of the men on the dredge told me one day that he wanted to show me where he had found a great many bass.
We got in a small skiff and rowed back to the pond, paddling the boat over the side of the canal and up near the edge of the saw grass, a few feet away where the water was only 8 inches deep. At this point, the pond narrowed down so that turning the boat sideways we could block the opening into the canal. Both of us then sat on the same side of the boat so that it touched the bottom and at the same time, we hit the surface of the water with our oars. As soon as our first oar hit the water, the bass started coming out of the saw grass where they had apparently been feeding and tried to get into the canal. They couldn't get by the boat and began jumping. About 25 or 30 fair sized bass, weighing from a pound and a half to four pounds, jumped into the boat.
Bass were hitting me in the chest, legs, and arms. I remember yelling to my companion that we had better get out of that place fast or they would sink us! I do not remember ever doing any bass fishing in Lake Okeechobee so I cannot say whether there were many fish in the big lake in those days or not. I do not know where the Disston Company secured funds to buy the land and start the dredging. It may have been a stock company or it might have been a private fortune that was used. The Disston Company had general offices in Jacksonville. The two officials who often visited the dredging locations were E.R. Rose, general manager, and James M. Kreamer, engineer. Date: Sept. 28, Signed: Conrad Menge Gregory Dearborn, Michigan CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO.
Page 1-3-if ORAL HISTORY OF RAY THIELEN, JUNE RAY THIELAN -
Retired Lockmaster
Introduction: Ray Thielan is the last living lockrnaster who remembers the early days of Moore Haven and Ortona's construction and who worked during the post-war years. Ray was born in December and started working at the lock facilities and for the Corps as a civilian lock assistant in Ray retired in The two interviews with Ray were conducted informally at his residence in Moore Haven. After consent was given to conduct the interview, Ray's conversation with us was recorded using a voice-activated tape recorder, microphone, and note pads. After the first interview, a follow-up meeting was made a week later.
Because of the informal nature of the interview process, the following transcript indexes and highlights pertinent information about Ray's life and the Moore Haven and Ortona lock facilities. Tape 1: Side 1: June 18, Machines (land excavators) ran on railroad track to build Ortona. Likewise, Moore Haven has an old railroad track on its north down lakeside, and that track was used to build this facility. It was a big deal for the men to sit on the old levee looking to the new Moore Haven facility. They knocked out the old spillway and added more gates (photos from Larry Lucky show old spillway at Moore Haven and explain why Moore Haven didn't have another spillway until the Ray worked 2 years at Ortona, 1 year at St.
Lucie and 4 years maintenance at Clewiston (worked here first) and Moore Haven lock master, retired at Ortona lock-Korean War was going on so he was a guard there. guards stared at Ortona and they had their own books (Both Lock Log Journals and Guard Journals at Ortona). 12 AM to 8AM his guard shift. Guards worked 24 hrs/day, and there were 3 to 4 guards sent by the Corps. Ray went back to Moore Haven because lockrnaster there liked his work. In he was in Kissimmee and before that Pine Castle. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page Ray worked Clewiston to Ortona to St. Lucie. At St.
Lucie, there was a reduction in force so then Pine Castle and last Moore Haven Ortona duties: mowed, painted, lock man and guard in disguise, if needed on lock wall then he was called in. Ray watched his 5 kids when outside working on the lock. The lock facilities had rifles for the guards who worried about sabotage and WW2 German subs off the coast of Fl. on the Atlantic side The guards ended in to when the Korean War ended . Ray is from Moore Haven and his family was there in the hurricane. The Thielans moved to Sebring after it and he was born there on His family had 10 kids total. Ray's parents are from Kansas and left with 5 kids and drove to Fl. in 3 cars with other relatives. His mom was from South Dakota and grandfather was a German timber man.
Ray's dad got to Moore Haven in and the whole family by Ray's photos are from the War Dept. The Dept burnt old documents by orders like old timesheets to make room for pertinent paperwork. Ray saved the photos we have because he recognized them and he knew the guy's name on the envelope. Fred Flanders was the former lockmaster of Ray's, and he was the first lockmaster at both the old and new Moore Haven lock facilities after it was built. In Flanders helped at St. Lucie too. Ray's dad helped build the levee on Moore Haven, and it was done by They didn't work full days (because of depression) . Lots of people worked on the locks and around 15 people helped to paint or landscape the grounds. Four people worked at Moore Haven when he was there and they may have had 5 before Ray left.
He had sick and annual leave for 2 weeks a year. The lock was open 7 days a week 6AM to and he had dedicated people there. There were lots of small boats at Moore Haven because of locals. There were more boats than at other locks because of the boat depot and city docks. They had short forms for boat owners to fill out then. They needed to know owner's name and know where he/she was from and where they were going if they weren't local. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page ~b Ray lived at Ortona, paid rent, and paid for lawn mowing or he did it himself. They went to half hr. shifts if the weather was severe at the locks (half hr. readings were recorded in logbooks and when they let the water out of gates).
They worked during the hurricanes, and people would come to watch the waves on the lake. Ray would haul them around with the trees blowing down around them. The hurricanes did minor damage to the locks, trees and shrubbery. Tape 1: Side 2 The boats would leave the coast to move inland during a storm for shelter. Shrimp boats came in when there should not be any shrimp boats because of the freshwater lake. During one year at St. Lucie, they had reduced the force there so Ray became the dispatcher at Pine Castle, and he also was a carpenter at St. Lucie. His maintenance work at Clewiston consisted of maintaining the levees, painting, pruning shrubberies, plumbing, and generally electrical work on the auxiliary structures surrounding the levees and around the locks.
Ray worked under Jack O'Day at St. Lucie, and Jack was sent from Moore Haven when the turbines were put in at St. Lucie Jack was later made the lockmaster there, and it upset some people because Jack was considered an outsider. It was a big thing then. In the spillway was put in at Moore Haven. After that, most of the machinery that opened the spillway and lock gates were converted from electrical to hydraulics in the late or early thereby replacing some of the earlier machinery. The lockmaster/tender houses at Moore Haven were built in Ray lived in both houses when he later worked there. Ray's graduating class (elementary) at Moore Haven witnessed the lock's opening Ortona's equipment is fairly new. The facility had 2 big generators in warehouse building to operate the lock gates.
Ortona's swastika? Ray was unfamiliar with that story or the rumor of German made machinery. The early generators and machines that opened the locks were GE. The wires run from control house to control house to the generator and switchboard. Lock personnel pushed buttons and told him what to do. Ray's boss told you what to do with no questions. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page ~7 Ray hurt his back at Ortona. He was also working at Moore Haven at the time and had to drive his own car back and forth but he was not suppose to have to drive his vehicle. Ray went to the Clewiston office and Broadfoot (Chief Engineer of Clewiston District) put the Ortona lockmaster on the carpet for making Ray do that.
They took Ray to the Doctors and got the lockmaster in trouble because of his hurt back and using personal car. Bosses got away with more then. They used red lead under silver paint at locks and they moved nuclear material through Moore Haven to Cape Canaveral. The vessels were covered up on Army or Navy boats when building Cape Canaveral. A German guy died while pulling up anchor with a cigarette in his mouth. They found him in a ghost ship, so to speak, and had to pull him in while Ray was the lockmaster at Moore Haven. Ray had a photo of the German guy as well. The Corps are killing the trees surrounding the lake because the trees are taking it over.
The Australian Pines are interspersed with bamboo for erosion control and flood prevention/hurricane damage, but they also drain too much water. The pine however is good wood. The maintenance/groundskeepers kept the island (between the lock chamber and spillway) at Moore Haven mowed down, but they were made to stop doing it because of the birds that grazed, snakes and the environment. The island at Ortona is also left somewhat wild. Both facilities plan to make these islands into small wildlife and nature reserves. The water hyacinths, they had a time with them. Another problem was the algae blooms that turned the water bluish. With the great flood in and hurricanes after, the Army Corps came back to look at how the locks and levees survived. The Clewiston office opened in the .
The old Moore Haven lock was approximately 100 ft by 25 ft and stood by the Lone Cypress. The left part of its chamber wall was left for mooring and docking - it is still there today. Moore Haven used to discharge up to cubic feet per second and now it does maybe CFS or less, depends upon droughts and rainy seasons. One day of evaporation on the lake is equivalent to 30 days of normal evaporation elsewhere because of the large shallow surface area. There is more water discharge from the lake during drought because of the threat of muck fires. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page Moore Haven lock and the levee were built for personal reasons such as the loss of life and property, but now there are industries such as cows and sugar cane.
Sugar cane was the biggest industry, now maybe its cows and oranges. Moore Haven's houses were built before the streets so the streets in town are not straight; neither are the property lines. The waterway made a better life for Moore Haven. The private docks made money for people because they lured in nice yachts. Moore Haven's city had a dock but did not spend money on it. Ray lives in Moore Haven because there is no chance of quick development. The cattlemen, sugar men and US Sugar Corp. own everything. They own approximately 85% of the land, but the cattle make less money now. Family run businesses don't hire out much especially if it's associated with the waterway. There are no handouts too. The locks used to be close during lunch hours.
Buck Johnson, a lockrnaster at Ortona, was put on the carpet because he did not lock government officials through during his lunch hour. Tape 2: Side 1 Buck then joined the Navy and came back to get his old job because of his seniority. They tore down the fine boathouse at Moore Haven in the . They also threw out the full-length built-in cabinets in lockrnaster house. Ray has them now. They used to change the padlocks on the lock gates ever 10 years. They would lock and chain every gate into the facility, but people would cut them off and cut the chain too. Ray has his old oak desk that says U.S.E.D. on it. The original paint on the buildings at the lock had green trim. They were redone a lot. The new storm shutters are metal and are not as strong as the old wooden ones with metal awnings.
The old shutters lasted at Moore Haven until the They are still at Ortona. The shutters still worked then but they put on the new ones because they wanted to. The newer ones close faster in bad weather. At Moore Haven, they didn't put the shutters down when they said a hurricane was corning. When they hollered hurricane on TV or the radio, the wind was 35 to They needed people who could work in wind and rain when the storms came, and it could rain 2-3 days in hurricane seasons. The man who got the telegram about the hurricane told the women's club in Moore Haven and went home. By the next CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page \ '3~ morning, it was too late. There was lots of water and they had to haul people out in cars and trucks to trains.
The old dike held 9 ft of water back and then it was washed out. The water came in from the south end of the lake, and 2 miles away, you could hit dry high land. In the there were lots of tourists at the locks then and Ray would show them around. Ray would try to keep the public happy, and they would give you well wishes along the way as they locked through. The lake was a hidden body of water before fisherman found it. Ray was an avid fisherman and was interviewed by Life magazine in the as one of the leading sport fishermen who would take tourists and recreationalists out. Ray told no one about his fishing holes when he found them a hole. Ray used to guide the best fisherman around. The summer storms would come up and the water would chop really quick, short waves.
In the summer, there was bad weather every day. Hurricane Donna did the worst storm damage to the locks in It had winds up to The storm moved in from the coast so it tears down trees as it weakens inland. The highest lake has been when Ray was the lockrnaster was Some of the lake's level may have been high because of the wind action, but water sloshed over the top of the hurricane gate (at 32-feet high). The lake was down to one year in the early The lake was then when the rain was corning, so he discharged the water downstream. They dug a trench by the lake and dumped granite in it to form the riprap when the spillway was installed. Tape 2: Side 2: June 25, Corps could never get money appropriated, so if the Corps got it, then it was used.
In appropriations were made for more Kissimmee canals. In later years, there were too many nutrients in the Kissimmee River being drained into the lake because of Disneyworld, development in Orlando, etc. going into the lake. More canals were built on the Kissimmee to drain and reclaim lands around Orlando. The developers didn't plan for the river pollution. The river itself, which was self-cleaning in its natural state, needed more canals after it was modified in the to filter out the pollution before it got to Okeechobee. CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page .,1-tO" \ The County Commissioners would get their hands on the Corps money but used it differently. Sometimes they would buy off engineers with it. Some engineers tried to buy off Ray.
He saved contractors money by sandblasting at locks, a practice which started in the when the locks were repainted. At Ortona, they had to drain the locks with pumps because the seals were shot. The pumps had to always be on. Ray's maintenance crew used to do the sandblasting, and Ray was small enough to go under the float tanks at the gates to sandblast the interior surfaces. The float tanks of the gates keep the locks fairly weightless and easy to move, even by hand. At Moore Haven, they would build a little dike around the sheet piling when they drained the locks. Moore Haven locks have pipes with water running through the chamber to release pressure so the lock gates don't blow up under a closed chamber. The original lock tender's house was later used as machine shop at Moore Haven.
This was the house built in for the first lockmaster at Moore Haven, and it was also known as the State House where Fred Flanders lived. It made Ray sick because the people who lived in it earlier would keep it immaculate. They had pride in it and kept it well. Ray lived in the newer lockmaster's house (built in from Sland he also lived in the lock tender's house at Moore Haven before moving into the lockmaster's house (present day Office). Ray also wasn't happy with the renovations of both lock houses where they removed much of the original architectural features like the arches, cabinets, French doors, etc. The lockmaster had to be there to make decisions. Since he couldn't be there they built the lock tender's house as a second in charge.
But one of them had to be on at all times so they would schedule it like that. Now days, it is more lenient. Someone in Clewiston is over all the lock people, but back then, Ray was the boss man and he had his helpers. Back then, you could take off only if you called and made arrangements. He's glad it is different now and that the general maintenance like mowing and painting and sandblasting is done by others. The lock tender's house was privatized in later years and people did not want to pay rent, so it came out of their paychecks. The yard care too was also deducted when that service was privatized. The Moore Haven facility has a CROSS-STATE CANAL (Okeechobee Intracoastal Waterway) HAER NO. Page 14! generator to make its own power if the city power went out.
They don't pay electric if they used the generator, but they did have to go to City Hall to pay for electricity then. The Corps would pay 1/lOth of the lock power bill and the lock personnel paid the rest. Ray went to Clewiston to complain and was told that he was a troublemaker, and he always brought trouble. Ray then told his personnel to start paying for own power at City Hall and not to go through the Corps' deduction process.
The federal survey recorded these other structures elsewhere in Glades County. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER FL-21. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.