BlockBefore

New York State Barge Canal, Lock E12, Main Street, Tribes Hill

New York State Barge Canal, Lock E12, Main Street, Tribes Hill, Montgomery County, NY. Surveyed as HAER NY-389, with a 2,549-word written history.

From the record

“Lock E12, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal.”

Written record, HAER NY-389 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-389 · the record runs 2549 words · one of 48 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1898 words

Source document Quoted word for word from HAER NY-389. Not written, edited or summarised by this site.

Lock E12, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is also significant for the movable dam at this site, which is one of two on the system that carry vehicular traffic. Description: Lock E12 is located more than 4 miles west of Lock E11 on the north bank of the Mohawk River.1 The access road is an asphalt driveway extending from Main Street that extends to an asphalt parking area near the lock. There are two other gravel parking areas at the lock; one is at the upstream end of chamber and is accessed by an asphalt and gravel driveway, and another is at the downstream end and is accessed by a gravel driveway.

The site consists of the lock and associated structures, powerhouse, lockhouse, tool shed, garage, movable dam (Dam 8), and spillway. Lock E12 has an 11' lift with normal pool elevations of below and above. There are double-leaf, steel miter lock gates at each end of the chamber, operated by spars and gear trains powered by replacement AC driven hydraulic actuators. The flow of water through the culverts in the chamber walls is controlled by butterfly valves also operated by AC driven hydraulic actuators. As is typical of locks E8 through E15 where flooding was an issue, there are two- story concrete cabins at all four corners of the lock chamber to keep the electric motors and switchgear above normal flood waters.

The cabins have flat roofs and aluminum windows facing the lock chamber, while modern glass block windows comprise the rest of the fenestration. The cabins on the north side of the chamber wall have sloped metal awnings over the lock control machinery, which consists of a modern control panel. The cabins and chamber have modern light fixtures. The lock and associated structures are in good condition. The buildings associated with the lock are located in a cluster on the downstream end of the north chamber wall. These include the single-story concrete powerhouse that sits on a small hill to protect the generating equipment from flooding. It has a hipped roof clad in asphalt shingles. The entrance is a wood door with plywood infill and a four-light transom.

The entrance to the basement is made through a small addition sided with vertical boards. The fenestration consists of three-light steel windows on the upper story and steel multi-light windows elsewhere that are either pivot or fixed sash. At the locks next to movable dams, the powerhouses were equipped with gasoline-powered generators rather than hydroelectric plants to accommodate the lack of 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E12 HAER No. (Page 2) head in the off season. The powerhouse retains its two gasoline-powered DC generators and slate panel control boards in operating condition. The building is in good condition.

The single-story clapboard lockhouse dates to and sits on a slightly raised concrete foundation. The wood-frame building has a gable roof covered with asphalt shingles. The entrance is a wood door. One-over-one-light vinyl windows placed in partially filled bays and small two-light aluminum awning windows light the structure. The lockhouse is equipped with a concrete chimney and is in good condition.2 Also located near the lockhouse and powerhouse and off the main parking area is a garage. The frame building is clad in vinyl siding and has an asphalt-shingled gable roof. It sits on a concrete foundation. There are one-over-one-light vinyl windows and a hollow metal door. The garage is in good condition. The tool shed is located off the main parking area as well and is in good condition.

It is a single-story frame building clad in vertical board paneling. The gable roof is covered with asphalt shingles. The entrance is a sliding wood door. Adjacent to the tool shed is a riveted-steel machinery cabinet that sits on a concrete pad. It appears to be in good condition. The concrete guide walls are in various conditions. The northeast wall exhibits spalling in some areas and is equipped with concrete-filled cast-iron bollards and modern light fixtures. It is in fair condition. The northwest wall is spalling and cracking. There is a single concrete-filled cast-iron bollard and modern light fixture. This wall is in good condition. The southeast guide wall has severe spalling and is consequently in poor condition.

It is lined with concrete-filled cast-iron bollards and modern light fixtures. Finally, the southwest guide wall has minor spalling. There is a single concrete-filled cast-iron bollard and a modern guide light. This wall is in good condition. Dam 8, a Mohawk River movable dam, extends across the river. The dam has two riveted-steel Pratt trusses supported by concrete piers. The dam measures between abutments while each truss span is long. The movable dams have steel gate panels and fabricated steel uprights operated by chains hauled by mules (DC electric winches).

Dam 8 and Dam 5 at lock E9 are the only two movable dams on the system that carry vehicular traffic.3 At the upstream end of the lock is the concrete spillway, which was constructed in after damaging floods occurred in September The spillway is in good condition.4 History: The construction of the lock and dam were covered under Contract 17, originally awarded in to The United Construction Company. The dam construction was under the supervision of Anthony E. Steere, State Assistant Engineer. By the upper guide wall, the south span of the dam and abutment, and large cofferdams had been completed. The United Construction Company had installed its construction plant at Amsterdam since they were also 2 State of New York, Department of Public Works, Annual Report, (Albany: 78.

3 A description can be found at Construction of the Tribes Hill Lock and Dam, Barge Canal, Engineering Record 61, no. 14 (April 2, 4 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Lyon Company, Printers, 21. NEW YORK STATE BARGE CANAL, LOCK E12 HAER No. (Page 3) building Lock E11 and Dam 7, but it was washed out and the contractor abandoned the job. In March the contract was re-let to Alexander Murdoch of Baltimore, Maryland.5 Lock construction and the completion of the south span of the dam progressed rapidly in The following year, the lock and north span of the dam had been completed and the site was nearly done except for the bridge superstructure, which was finished by & Cornell Company, subcontractor.

Remaining work at the site in included placing the wooden contact strips on the dam gates, laying the plank walls on the lock gates and needle beams, removing cofferdams and material on the dam sills, and operating the dam gates.6 The power plant was built as part of Contract 92, awarded to MacArthur Brothers Co. & Lord Electric Co. in with oversight by State Assistant Engineer Kline. The work included the installation of five gasoline-electric stations at locks E11, E12, E13, E14, and E15, and one hydro-electric station at Lock E16. Work started on September 12, and by the cooling system was 80 percent complete, and the gasoline-electric sets had been installed. 7 Various repairs and alterations were made to the lock and dam after their initial construction.

Work at the lock included rebuilding the upper valves in The upper and lower guide walls were extended under Contract awarded to American Pipe and Construction Company of Amsterdam, New York. Contract US95 involved work on the lock sills and gates, which was done in This may have been related to a initiative of the Department of Public Works to lower approximately thirty-two lock sills in order to provide a minimum 13' depth and to alter the lock gates to fit. The lock was rehabilitated in as part of Contract (also referred to as Work at the dam included replacing the uprights and bottom gates, and installing open steel flooring and something called plating pier, along with other work as part of Contract in The dam was cleaned and painted by contractor Carruthers Sons, Inc.

of Greenwich, New York, in under contract 5 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 87; Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Printers, Construction of the Tribes Hill Lock and Dam, quote from 6 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Printers, 64; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 74; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, 59; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 94. 7 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 8 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Williams Press, Inc., Maintenance Contracts, March 1, Maintenance Contracts, 9 Maintenance Contracts, Contracts at Dams, June 23, NEW YORK STATE BARGE CANAL, LOCK E12 HAER No. (Page 4) Originally, fixed dams were planned for construction on the Mohawk River.

This was problematic as there was a great deal of development along the river and if flooding occurred due to the fixed dams, the state would be responsible for the damage. Movable dams, on the other hand, would allow ice to flow unimpeded down the river and would also achieve cost savings due to the reduced need for dredging and silt removal. David A. Watt traveled to Europe to study the various dam types and decided upon the bridge type with Boule gates, which he had observed in Mirowicz on the Moldau River (in what is now Czechoslovakia). In his history of the Barge Canal, Noble Whitford devotes a paragraph to describing these structures. These dams, as they now appear in the Mohawk, seem to be bridges with abutments and piers.

From the downstream side of the lower chord hang steel frames with heavy upright pieces 15 feet apart, upon which slide an upper and a lower tier of large rectangular steel plates, called gates. When serving as a dam the bottoms of the lower gates rest on a concrete sill in the river bed, the tops of the upper gates forming the crest of the dam. When m ore water is to be passed one or more of the upper gates are partly or wholly raised. When all the water is to be passed, in extreme flood or during the winter, all the gates are raised and both gates and frames, which have a pin joint connection with the chord, are swung to a horizontal position under the bridge floor.10 The movable dams on the Mohawk River are now one of the character-defining features of the New York State Barge Canal.

Sources

346 words

Source document Quoted word for word from HAER NY-389. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Printers, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1.

Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, 10 Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Printers, quote from Michelle McFee, A Long Haul: The Story of the New York Barge Canal (Fleischmanns, New York: Purple Mountain Press, NEW YORK STATE BARGE CANAL, LOCK E12 HAER No. (Page 5) Construction of the Tribes Hill Lock and Dam, Barge Canal. Engineering Record. 61, no. 14 (April 2, Contracts at Dams, June 23, Hay, Duncan. New York State Barge Canal. National Register of Historic Places Registration Form, Maintenance Contracts, March 1, Series New York State Archives, Albany, New York. Eastern Division, Erie Canal, Section 3, Sta.

to Sta. approved March 29, 69. State of New York, Department of Public Works. Annual Report of the Superintendent for the Year Albany: Lyon Company, Printers, State of New York, Department of Public Works. Annual Report of the Superintendent for the Year Albany: Williams Press, Inc., State of New York, Department of Public Works. Annual Report, Albany: Whitford, Noble. History of the Barge Canal of New York State. Albany: Lyon Company, Printers, Historians: Laura S. Black and Jami Babb, summer

Written history

206 words

Source document Quoted word for word from HAER NY-389. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. Craig Williams of the New York State Museum provided research materials and assistance.

The HAER field team consisted of Jami Babb and Laura Black. NEW YORK STATE BARGE CANAL, LOCK E12 HAER No. (Page 6) Appendix: Images of Current Conditions Image 1: Downstream end of lock with powerhouse at center, followed by lockhouse, garage, tool shed, and cabin. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK E12 HAER No. (Page 7) Image 2: Spillway with cabin behind. Field photograph taken by HAER recording team, summer Image 3: Perspective view of Dam 8. Field photograph taken by HAER recording team, summer

In context

Tribes Hill, New York The place record: every map, photograph and survey of this town.
Montgomery County, New York 74 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Montgomery County

24 of 47 records shown

The federal survey recorded these other structures elsewhere in Montgomery County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Inman Manufacturing CompanyHAER NY,29-AMST,4-6,648 words
Erie Canal (Enlarged)HAER NY,29-FORHU,2A-3,928 words
New York State Barge CanalHAER NY-3862,888 words
New York State Barge CanalHAER NY-3882,616 words
New York State Barge CanalHAER NY-3942,452 words
New York State Barge CanalHAER NY-3932,440 words
New York State Barge CanalHAER NY-3912,221 words
Palatine ChurchHABS NY,29-NEL.V,1-2,093 words
Sir William Johnson HouseHABS NY,29-FORJO,1-2,061 words
New York State Barge CanalHAER NY-3961,934 words
New York State Barge CanalHAER NY-3901,287 words
Sanford Carpet CompanyHABS NY,29-AMST,6A-1,256 words
New York State Barge CanalHAER NY-3871,224 words
Sanford Carpet CompanyHABS NY,29-AMST,6E-1,158 words
Sanford Carpet CompanyHABS NY,29-AMST,6B-1,059 words
Sanford Carpet CompanyHABS NY,29-AMST,6D- 977 words
Sanford Carpet CompanyHABS NY,29-AMST,6-889 words
Ehle HouseHABS NY,29-NEL,1-852 words
Sanford Carpet CompanyHABS NY,29-AMST,6C-839 words
New York State Barge CanalHAER NY-392737 words
New York State Barge CanalHAER NY-395733 words
Prospect Street BridgeHAER NY,29-AMST,5-680 words
Guy Park ManorHABS NY,29-AMST,1-375 words
Isaac Parris House & Trading PostHABS NY,29-FORPL,2-315 words

Provenance

  • Written history. Quoted verbatim from HAER NY-389. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.