BlockBefore

Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield

Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA. Surveyed as HAER CAL,15-BAKF.V,1A-, with a 2,837-word written history.

From the record

“The Kern River No. 1 powerhouse is equipped with two exciters (small electric generators) to provide direct field current to the four kv generators.”

Written record, HAER CAL,15-BAKF.V,1A- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,15-BAKF.V,1A- · the record runs 2837 words · one of 136 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

54 words

Source document Quoted word for word from HAER CAL,15-BAKF.V,1A-. Not written, edited or summarised by this site.

The Kern River No. 1 powerhouse is located in Section 29, T. 28 S., R. 30 E. Mount Diablo meridian, at a narrow point in a bend of the Kern River Canyon (UTM Coordinates The powerhouse is about 20 miles east of Bakersfield on state Highway Date of Construction: ca. Builder: General Electric Company

Significance

2694 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,15-BAKF.V,1A-. Not written, edited or summarised by this site.

The Kern River No. 1 powerhouse is equipped with two exciters (small electric generators) to provide direct field current to the four kv generators. The No. 1 exciter is original equipment driven by a water wheel; the No. 2 exciter was modified about to operate on an electric motor. Kern River No. 1 Hydroelectric Project significance lies in the key role it played in the development of the Southern California Edison Company into the pre-eminent twentieth Century Southern California Electric Utility. It is also significant as a nearly intact example of a state-of-the-art hydroelectric power facility from the early twentieth Century. Report Prepared By: Thomas T. Taylor, Senior Archaeologist Southern California Edison Company Environmental Affairs Division P. O.

Box 800 Rosemead, CA Date: December 20, Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAER No. CA-165-A (Page 2)

Description

Fowler described the as-built Kern River No. 1 Powerhouse as follows: "The site for Kern River No. 1 power house is partly natural and partly blasted from the face of the hill. The long axis of the building.. .is at right angles to the general trend of the stream, and is parallel to the axis of the pressure main [penstock] which emerges from the tunnel in the center of the retaining wall to the right of the power house (Photo CA-165-A-1, SCE Drawing The building, which measures 168 by 70 feet outside and 164 long by 48 feet 3 inches inside, is of very heavy reinforced concrete, with steel roof frame covered with galvanized roofing. The entire generating, transforming, and switching equipment is [in] the one main building.

The generator room is in part separated from the switching apparatus, wiring ducts, and line cells by a wall running the length of the building. The transformers are set in alcoves cut through the partition wall and facing out into the generator room. The powerhouse building is virtually unchanged to the present. The switching equipment has been moved out of the powerhouse building to an outdoor switchyard adjacent to the powerhouse on the south side (SCE Drawing Photo CA-165-A- 1). Fowler (ibid.) continues: The four [generator] units are arranged in a line on the discharge side of the powerhouse, with their shafts parallel to and 12 feet from the wall. The shafts are therefore parallel to the long axis of the building.

The generators by their arrangement fall into two groups of two each of which is placed as close as possible to its own end of the building. In the space between the two groups and on a line with the machines are the exciters, each one beside its pair of generators (Photos CA-165-A-2 and CA-165-A-3); the door on the discharge side of the building is between the exciters (Photo CA-165-A-4)." The generators were supplied by General Electric Company, and are their ATB kilovolt-ampere 24 pole model, Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAER No.

CA-165-A (Page 3) " ...giving 1,260-ampere 2,300-volt 3-phase 50-cycle1 alternating current at 250 revolutions per minute....By the generators were entirely enclosed and ventilation was provided by forced circulation of precooled air." (Fowler Originally, the two exciter sets were identical in type and capacity. They were: "...General Electric 8-pole 225-kilowatt machines, designed to give amperes at 125 volts with 430 revolutions per minute (Photos CA-165-A-5 and CA-165-A-6).

The generator of each exciter set is mounted in the center of the unit, the [Allis-Chalmers] impulse wheel furnishing motive power is at one end and a large flywheel is at the other end of the main shaft (SCE Drawing [originally Each exciter also is furnished with a [Lombard] governor, which acts on a deflector turning down over the jet instead of deflecting the nozzle" (Fowler (Photos CA-165-A-7, CA-165-A-8, CA-165-A-10, and CA-165-A-11; SCE Drawing E433). Of the original exciters, only exciter no. 1 remains in its original condition (Photos CA-165-A- 7 and CA-165-A-8). Exciter no. 2 was modified about by removal of the impulse wheel and installation of a General Electric 240 horsepower alternating current electric motor as motive power (Photo CA-165-A-9; SCE Drawings and A2701).

The basic generator workings of both are original and identical (Photos CA-165-A-12 and CA-165-A- The function of an exciter in the generation of alternating current electric power is to provide direct current for the generator rotor windings, or field windings. The exciter maintains generator voltage, controls kilovar flow, assists in maintaining power system stability, and provides important protective functions (Rustebakke The exciter directly affects generator unit reliability and availability by keeping the machine in synchronism with the rest of the electric power system. H.

Historical Context

The Kern River No. 1 Hydroelectric Project is significant as a well-preserved example of a state-of-the-art hydroelectric power plant from the first decade of the twentieth century. It also I In the entire Edison system was converted to 60-cycles for uniformity with adjacent utilities and to integrate portions of the Edison system that had operated at 60-cycles since early in the century (Myers . Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAER No. CA-165-A (Page 4) played a key role in the development of Southern California Edison Company into the pre- eminent electrical utility company in Southern California.

During the many of the power generation and transmission technologies that would drive the power industry during the twentieth century were developed and demonstrated. The first electrical power generation and distribution systems in the United States utilize direct current technology. As conceived then, direct current posed severe limitations on transmission distance. This limitation was resolved by about by the development of alternating current generators. The step-up-step-down transmission process, an indispensable ingredient of long-distance power transmission, was first used in Southern California Edison's San Antonio Creek project in although at relatively low voltage.

The use of three-phase generation, a major breakthrough in providing power in a manner useful to industrial operations, is attributed to Southern California Edison's Mill Creek No. 1 plant. Southern California Edison's Santa Ana River No. 1 plant was among the first to step up transmission to very high voltages for long distance transmission (83 miles to Los Angeles) (Myers Other than its pioneering the use of all steel towers for long distance power transmission, Kern River No. 1 did not demonstrate the kinds of fundamentally new technologies associated with the San Antonio and Mill Creek projects. The Kern River No. 1 plant is important because it was the first Southern California plant to use these new technologies in a very large-scale (for the time) application.

When complete and brought on line in Kern River No. 1 more than doubled the generation capacity of the Southern California Edison Company (Fowler and The Edison Electric Company (re-incorporated as Southern California Edison Company in emerged in from a series of amalgamations among numerous small power companies that operated in the Southern California area during the (Fowler These predecessor companies (and those acquired after were organized to serve small local markets. With the development of long-distance power transmission capability, the economic advantages of serving larger markets with large capacity base-load generation was recognized.

The West Side Lighting Company, incorporated in June 5, is considered the initial Edison Company component because, although not chronologically first, its owners finally obtained control of the system (Fowler The Edison name was obtained in when the Los Angeles Edison Electric Company nominally purchased and consolidated with Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAER No. CA-165-A (Page 5) West Side Lighting2. By the re-incorporation as Edison Electric Company, the absorbed power companies included Pasadena Electric Light and Power Company, Santa Ana Gas & Electric Company, Mountain Power Company, Redlands Electric Light & Power Company (owners of the Mill Creek power plants), Southern California Power Company (who initiated construction on Santa Ana No.

1), Lytle Creek Light & Power Company, in addition to West Side Lighting and Los Angeles Edison Electric (op. cit. These acquisitions left Edison Electric with the larger market sought by its managers, but saddled with numerous small and obsolete steam plants and a few pioneer hydroelectric plants from which to serve its burgeoning demand for power. In Santa Ana River No. 1 at a capacity of kilowatts was the largest plant on the system (Fowler Table Planning for Kern River No. 1 began in by California Power Company. This company was nominally organized in by the promoters of Redlands Electric Light & Power Company, but was from the outset under the control of the Edison Electric Company.

The purpose of the California Power Company was to complete certain preliminary work on Kern River including acquire water rights filed during the year In the properties of the California Power Company were formally taken over by the Edison Electric Company, which undertook construction the project in its own name (Fowler Between and the Edison Electric Company added kilowatts of hydroelectric generation (Mill Creek No. 3, Lytle Creek, and Santa Ana River No. 2) to an existing hydro capacity of kw, and kw of steam generation to an existing total of Total Edison generation capacity was kw in (Fowler Table 96, and When Kern River No. 1 was brought on line, it increase this capacity to kw (op. cit.:539). Kern River No.

1 remained the largest plant on the Edison system until completion of the kw Long Beach Steam Plant in (Myers Kern River No. 1 was the largest capacity hydroelectric plant until the purchase/merger with 2 In a group of San Francisco financiers organized the Los Angeles Edison Electric Company in order to obtain a license from Thomas Edison's General Electric Company to use the Edison name and Edison patents in the Los Angeles area. This Company never owned or operated a power system. In the consolidation with West Side Lighting, West Side Lighting provided the physical plant and franchises, and Los Angeles Edison supplied the Edison name and equipment licenses. (Myers The total steam generation capacity in was However, Los Angeles No.

1 steam plant with a capacity of was retired in as Los Angeles No. 3 steam plant went on line. (Fowler Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAER No. CA-165-A (Page 6) Henry E. Huntington's Pacific Power & Light Corporation, through which Edison acquired the massive Big Creek Project (Fowler Survey of the Kern River for power plant sites, and design of Kern River No. 1 was undertaken by F. C. Finckle, Chief Engineer for California Power Company, and Edison Electric when the latter acquired California Power. Finckle identified five potential hydroelectric power sites along the Kern River. The site on the main flow of the Kern River lowest in elevation and nearest the mouth of the Kern River Canyon was to be Kern River No. 1. Kern River No.

2 was to be located on the main flow of the river upstream from Pacific Power & Light's Borel Power Plant (built Kern River No. 3 was located on the North Fork Kern River above Kernville. Kern River Nos. 4 and 5 were to be located on the North fork upstream from Plant No. 3. Only Kern River No. 1 and No. 3 were built (Mikesell Finckle oversaw construction of Kern River No. 1, and unfortunately one of his design innovations was to prove his undoing. Finckle proposed construction of the pressure pipe or penstock by drilling a tunnel through rock and lining it with a thin coat of concrete. The pressure pipe failed and had to be reconstructed in Finckle resigned and was replaced as project engineer by William A. Blackenridge who designed and supervised construction of the new penstock.

Blackenridge was subsequently hired as vice-president and General Manager of Edison in charge of engineering and construction (Mikesell and Kern River No. 1 required five years to construct mainly because of its (then) remote location. The nearest railroad was in Bakersfield and a spur line was built to Edison, a town which took its name from the siding station. From the railhead, material was brought by mule-drawn teams over a new road constructed for the project which traversed a mile of the precipitous Kern River Canyon gorge to the plant site.

This road became State Highway The route of the access road for the Project transmission line to Los Angeles was followed by the state and federal highway that would become known as the Grapevine (Interstate 5) (Myers and With few modifications Kern River No. 1 has served the electrical generation needs of the Edison Electric/Southern California Edison Company from up to the present. As the electrical demand and generation capacity of the Edison service territory grew, Kern River No. 1 (and for that matter, hydroelectric generation in general) has contributed an increasingly smaller portion of the Company's total generation mix.

Because of its low capacity factor (by modern standards), high relative maintenance costs per kilowatt-hour generation, and comparatively burdensome regulatory operational environment, Kern River No. I and other hydroelectric plants of its era face difficult economic times. Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAER No. CA-165-A (Page 7) m.

Sources

Coleman, Charles M. P. G. and E. of California: The Centennial Story of Pacific Gas and Electric Company, McGraw-Hill Book Company, Inc., New York. Fowler, Frederick Hall Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada. Department of the Interior, United States Geological Survey, Water Supply Paper Washington, DC: Government Printing Office. Myers, William A. Iron Men and Copper Wires, A Centennial History of the Southern California Edison Company. Glendale: Trans-Anglo Books. Mikesell, Stephen D. National Register of Historic Places Nomination, Kern River No. 3 Relicensing Project. Report to the Southern California Edison Company. Walnut Creek: ENTRIX, Inc. Mikesell, Stephen D. Historic Resource Evaluation Report, Kern River No.

1 Power House, 6-Ker- Report to California Department of Transportation, District 06 - Fresno, Environmental Branch. Sacramento: California Department of Transportation, Division of Project Development, Office of Environmental Analysis. Rustebakke, Homer M. Electric Utility Systems and Practices, Fourth Edition. New York: John Wiley & Sons. IV. PROJECT INFORMATION This Historic American Engineering Record documentation of the Kern River No. 1 powerhouse exciters was undertaken because this equipment is obsolete and impedes the efficient synchronization of energy from Kern River No. 1 into the Southern California Edison electric grid. These mechanical exciters are being replaced with digital exciters mounted under the generator floor in the powerhouse building.

The project entails removal of the old exciters and covering the floor where they are mounted. Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAERNo.CA-165-A (Page 8) To Mojave Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAERNo.CA-165-A (Page 9) Cottage Layout of Kern River * Structure shown in dashed outlines has been removed T t i i t | I t i i | I i t I t | I 111 I i i i I i i j i i J t i i t 111 t I i i i t i I i i i r | i i t i i T i 1X.I I I I I I I 1 I I I 1 I 1 I I I Mil I i i i i i i 1 t tj^i_L-U (It i.l l.i i I I I I i i I I t i f ' ' Kern River No. 1 Hydroelectric System, Powerhouse Exciters HAER No. CA-165-A (Page 10) Ii & , t I t -J w fc t n 1_ J L -I - L. " ' * fi* Kern River Wo, 1 Hydroelectric s; System, Powerhouse Exciters HAER No.

CA-165-A (Page II) \ M &zz ) i i i i i t i i i i i i i i i in pr \ t i i i i i i i i i j i I \ i I r r i j i i i i ; i i i * t : t , T s 2 I.JL l l t I T.I I I T I I I I I I I ill l I I * I I i I I I I I I I I III I I l I l I l I I i I M I i i Lii,

In context

Bakersfield, California The place record: every map, photograph and survey of this town.
Kern County, California 752 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Kern County

24 of 135 records shown

The federal survey recorded these other structures elsewhere in Kern County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Jet Propulsion Laboratory Edwards FacilityHAER CAL,15-BORON.V,1-62,920 words
Edwards Air Force BaseHAER CAL,15-BORON.V,2-38,233 words
Forty AcresHABS CA-287830,862 words
Edwards Air Force BaseHAER CAL,15-BORON.V,4-14,838 words
Kern River 3 Hydroelectric SystemHAER CA-23098,622 words
Naval Ordnance Test Station InyokernHAER CA-3537,059 words
Edwards Air Force BaseHAER CA-308-A5,579 words
Edwards Air Force BaseHAER CAL,15-BORON.V,3-5,484 words
Edwards Air Force BaseHAER CA-308-B5,193 words
Kern River 3 Hydroelectric SystemHAER CA-2309-A4,128 words
Naval Ordnance Test Station InyokernHABS CA-27744,088 words
Forty AcresHABS CA-2878-D2,559 words
Forty AcresHABS CA-2878-C2,493 words
Forty AcresHABS CA-2878-B2,474 words
Naval Ordnance Test Station InyokernHABS CA-2774-D2,275 words
Naval Ordnance Test Station InyokernHABS CA-2774-A2,271 words
Naval Ordnance Test Station InyokernHABS CAL,15-RIDG.V,1A-2,263 words
Forty AcresHABS CA-2878-A2,182 words
Naval Ordnance Test Station InyokernHABS CA-2774-B2,108 words
Naval Ordnance Test Station InyokernHABS CA-2774-C1,991 words
Tule Elk State ReserveHALS CA-1091,408 words
Fort TejonHABS CAL,15-LEBEC.V,1-752 words
Edwards Air Force BaseHAER CAL,15-BORON.V,3B-57 words
Edwards Air Force BaseHAER CAL,15-BORON.V,4N-57 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,15-BAKF.V,1A-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.