The Arizona-Nevada Switchyard is one of six switchyards built between and to provide terminals for major transmission lines carrying electricity to markets in California, Nevada, and Arizona. All of these facilities were built by the Bureau of Reclamation as elements of the Boulder Canyon Project, and Reclamation documents referred to the entire complex of switchyards as "Boulder Switchyard." The Arizona- Nevada Switchyard is therefore a contributing element of the switchyard complex that was a major feature of the Hoover Dam development and contributed to the historical significance of the complex.
Report Prepared by: Associated Cultural Resource Experts (ACRE) Sangre de Cristo Road, STE 202 Littleton, CO Date: April HISTORIC AMERICAN ENGINEERNG RECORD HOOVER DAM, ARIZONA-NEVADA SWITCHYARD HAER NO. (Page 2) The Arizona-Nevada Switchyard is one of six switchyards built between and to provide terminals for major transmission lines carrying electricity to markets in California, Nevada, and Arizona.
All of these facilities were built by the Bureau of Reclamation as elements of the Boulder Canyon Project, and Reclamation documents referred to the entire complex of switchyards as "Boulder Switchyard." The Arizona-Nevada Switchyard is therefore a contributing element of the switchyard complex that was a major feature of the Hoover Dam development and contributed to the historical significance of the complex. Description: The Arizona-Nevada Switchyard is the southwestern-most of six electric power switchyards on the Nevada side of Hoover Dam. The fenced perimeter of the switchyard is x and the site for the facility was excavated into a northwest-facing slope.
The switchyard exists at two levels: a lower concrete service building 21' x that houses oil storage for circuit breakers and control equipment, and an upper graveled deck that contains bus structures, oil circuit breakers, disconnect switches, capacitors, and oil tanks on concrete foundations. The switchyard receives power from two transmission lines that cross the river from the Arizona powerhouse and a tie circuit to the Metropolitan Water District Switchyard. A single transmission line exits to the west of the Arizona-Nevada Switchyard. History: The Arizona-Nevada Switchyard was the last of six major federal switchyards to be constructed at Hoover Dam.
Installation of generating units A-3 and A-4 required the construction of a new switchyard to accommodate an incoming circuit from unit A-4 (Circuit No. an incoming circuit from unit A-3 (Circuit No. the outgoing Basic South (now Hoover-Boulder City Tap or Hoover-Mead) transmission line, and a tie line between the new switchyard and the existing Metropolitan Water District Switchyard to allow interchange and switching between circuits. The Arizona-Nevada Switchyard was constructed between and principally to provide power to users in Arizona and Nevada, and hence its name.
Principal items installed in the yard were four 1000-ampere, 3-phase oil circuit breakers; eight sets of motor-operated disconnecting switches for isolating oil circuit breakers; three single-pole, outdoor-type lightning arresters; about 100 tons of galvanized structural steel for supporting insulators, buses, and disconnecting switches; two 10,000-gallon oil storage tanks; a sewage disposal system; a 6- inch cast-iron water line for fire protection; and a 919'-long duct bank to an intersection with the control cable tunnel near the Metropolitan Water District Switchyard. The x switchyard was built into a northwest-facing slope on the south side of the highway, to the west of the Southern California Edison Switchyard and southwest of the Metropolitan Water District Switchyard.
The switchyard was built at two levels: a lower concrete service building for oil storage for circuit breakers and control equipment, and an upper graveled deck for installation of bus structures, oil circuit breakers, disconnect switches, capacitors, and oil tanks on concrete foundations. Excavation of rock for the switchyard proper began in late HOOVER DAM, ARIZONA-NEVADA SWITCHYARD HAER NO.
(Page 3) and was completed in February excavation for the access road and the service building began in March Concrete placement for the service building and footings began in May and was completed in June The steel bus structure was completed in September and installation of oil circuit breakers and disconnecting switches were completed in early In addition to oil storage and filtration, the 21' x service building contained carrier-current and telephone equipment, alternating-current distribution board DHA and direct-current distribution board BHA, service-station transformers, busses, fuses, and incidental equipment. A 60-cell, 125-volt battery and two battery chargers were also installed in the service building.
A 7- foot chain-link fence was built around the switchyard, and a similar fence and gate were installed to separate a part of the interior of the service building. Construction of the switchyard and the connecting transformer circuits was completed by the Howard P. Foley Company of Salt Lake City on May 14, Unit A-4 was released for commercial operation on April 30, and unit A-3 was released for commercial operation on September 18, The Arizona-Nevada Switchyard did not undergo extensive alterations in size or principal surface equipment until when a number of changes were made to the switchyard in preparation for transfer of operations to Mead Substation. One additional steel structure was constructed in the switchyard.
Potential and current transformers, control equipment, control cabinets, and associated equipment and wiring were installed or changed in the service building (Boyce Bureau of Reclamation The Arizona-Nevada Switchyard remained in use at the time of documentation in providing current to the Hoover-Boulder City Tap transmission line, also known as the Hoover-Mead transmission line.