BlockBefore

Hoover Dam, Nevada Downstream Waste Tailings, Near the Lower Portal Tunnel Access Road, Boulder City

Hoover Dam, Nevada Downstream Waste Tailings, Near the Lower Portal Tunnel Access Road, Boulder City, Clark County, NV. Surveyed as HAER NV-27-W, with a 1,538-word written history.

From the record

“The Nevada Downstream Waste Tailings were an important feature in the construction of Hoover Dam.”

Written record, HAER NV-27-W survey. Machine-read text.

Surveyed by the federal HAER program as HAER NV-27-W · the record runs 1538 words · one of 66 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

58 words

Source document Quoted word for word from HAER NV-27-W. Not written, edited or summarised by this site.

U.S. Highway 93 Vicinity of Boulder City Clark County Nevada USGS Hoover Dam, Nevada-Arizona 7.5 Minute Provisional UTM Coordinates: l l l l l Date of Construction: Engineer: Not applicable Builder: Six Companies, Inc. U.S. Highway 93 Vicinity of Boulder City Clark County Nevada USGS Hoover Dam, Nevada-Arizona 7.5 Minute Provisional UTM Coordinates: 1 1 l Statement of

Significance

652 words

Source document Quoted word for word from HAER NV-27-W. Not written, edited or summarised by this site.

The Nevada Downstream Waste Tailings were an important feature in the construction of Hoover Dam. The tailings resulted from excavation of tunnels for diversion of the Colorado River, for penstock and spillway facilities, for lower-level access to the Hoover Dam power plant, and for other dam-related facilities. Report Prepared by: Associated Cultural Resource Experts (ACRE) Sangre de Cristo Road, STE 202 Littleton, CO Date: April HISTORIC AMERICAN ENGINEERNG RECORD HOOVER DAM, NEV ADA DOWNSTREAM WASTE TAILINGS HAER NO. (Page 2) The Nevada Downstream Waste Tailings were an important feature in the construction of Hoover Dam.

The tailings resulted from excavation of tunnels for diversion of the Colorado River, for penstock and spillway facilities, for lower-level access to the Hoover Dam power plant, and for other dam-related facilities. Description: The site contains a massive deposit of waste rock from excavation of tunnels and other features of the Hoover Dam complex. The spoils deposit is reached from the Lower Portal Tunnel Access Road by means of a tunnel through a rock ridge. A switchback road provides access to the top of the deposit, which contains not only tailing but also varied industrial refuse. Refuse observed on the site in included metal barrels, plywood, sheet metal, concrete foundation pieces, lumber, cable, water pipe, rubber hose, and aluminum beverage cans.

The top of the spoils pile is a relatively level area, irregular in shape and an estimated 130 meters east-west and 85 meters north-south. A portion of the level area has been converted to use as a pistol range, and an earthen berm has been deposited on the southwestern periphery of the leveled area to serve as a backstop for bullets. A car body and four target holders are to the northeast of the berm. The car body has multiple bullet holes. On the east side of the pistol range is a mechanical target riser device. To the southwest of the target berm are four large poured concrete blocks that have grooves for pipes and imbedded steel plates. To the west of the concrete blocks are curved forms that have steel spines or sections.

Near the forms are steel barrels, 10" diameter steel pipe sections, and other metal beams. A small flat-roofed mobile metal radio repeater station is to the southeast of the pistol range features. The structure/unit is set on metal sills, has an exterior light on the northwest comer, but has no visible connection to a radio transmitter tower. Metal tags on the structure indicate that the unit was once at the Tobyhanna Army Depot, and that the unit was overhauled in October This unit was probably brought to this site to serve a helicopter landing pad, prior to the removal of the helicopter pad closer to the dam in about The structure may currently serve as storage for the pistol range, but the interior was not accessible at the time of site examination.

History: The Lower Portal Tunnel Access Road was one of the first features of the dam complex to be constructed. The road was built to allow vehicular access to the bottom of Black Canyon downstream from the dam site, where a coffer dam was constructed and diversion tunnels were bored northward on the Nevada and Arizona sides of the river. To dispose of the tailings from the diversion tunnels and other excavations, a tunnel was driven through a mountain ridge to the southwest of the Nevada diversion tunnels, and waste rock and earth were hauled through the tunnel and deposited in a natural bowl adjacent to the river. As the deposit grew in size, a switchback road was constructed to the top of the deposit.

This site was also used for disposal of HOOVER DAM, NEVADA DOWNSTREAM WASTE TAILINGS HAER NO. (Page 3) rock, earth, and various industrial refuse after the dam was completed, as is indicated by partially buried refuse of apparent different periods from the to probably the

Sources

302 words

Source document Quoted word for word from HAER NV-27-W. Not written, edited or summarised by this site.

This documentation of features of Hoover Dam and associated structures was accomplished by Associated Cultural Resource Experts (ACRE). ACRE completed documentation of21 features in October Documentation on four linear features was extended and an additional 3 features were newly documented in February Both phases of documentation were conducted as part of the historical/engineering recordation of Hoover Dam-prepared for the Department of Energy, Western Area Power Administration; Bureau of Reclamation; and Federal Highway Administration-that includes a narrative for the Addendum to Hoover Dam and individual documentation of 25 features located at the Hoover Dam facility, photo documentation, and documentation of existing historic photographs and site plans.

The recordation conforms to the standards of the Historic American Engineering Record, U.S. Department of the Interior.

Other reports in the HAER collection completed for these projects are a narrative for the Addendum to Hoover Dam and 24 short forms for individual structures: Hoover Dam, Los Angeles Switchyard (NV-27-A); Hoover Dam, Southern Sierras/CEP/Southern California Edison Switchyard Hoover Dam, Metropolitan Water District Switchyard Hoover Dam, State of Nevada Switchyard Hoover Dam, Southern California Edison Switchyard (NV-27-E); Hoover Dam, Arizona-Nevada Switchyard Hoover Dam, Static Towers and Lines Hoover Dam, Los Angeles Relay Control Building Hoover Dam, Switchyard Fire House (NV-27-I); Hoover Dam, Promontory Water Tank Hoover Dam, Control Cable Hoist House Hoover Dam, Transfonner Circuits Hoover Dam, Los Angeles BPL Lines 1-3 Hoover Dam, Southern California Edison North and South Lines Hoover Dam, Hoover-Basic Magnesium North and South Lines Hoover Dam, Metropolitan Water District Line 1 Hoover Dam, United States Construction Railroad Hoover Dam, U.S.

Highway 93 Nevada Segment Hoover Dam, Lower Portal Access Road Hoover Dam, Kingman Switchyard Hoover Dam, U.S. Highway 93 Arizona Segment (NV-27-U); Hoover Dam, Explosives Magazines Hoover Dam, Nevada Downstream Waste Tailings and Hoover Dam, Nevada Spoils Tunnel Hoover Dam, Henderson-Mead Transmission Line 2

Written history

421 words

Source document Quoted word for word from HAER NV-27-W. Not written, edited or summarised by this site.

This documentation was prepared for three federal agencies: U.S. Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, Lakewood, CO; U.S. Department of Energy, Western Area Power Administration (Western), Desert Southwest Customer Support Region, Phoenix, AZ; and U.S. Department of Interior, Bureau of Reclamation (Reclamation), Lower Colorado Region, Boulder City, NV. This documentation records certain transportation and electrical features associated with Hoover Dam before planned removal or alteration of some structures. FHWA plans to construct a bridge over the Black Canyon of the Colorado River about downstream from Hoover Dam. The Hoover Dam Bypass Project would include realignment of U.S.

Highway 93 on the Nevada and Arizona sides of Black Canyon. The project would include demolition, relocation, or substantial visual impact to a segment of U.S. Highway 93 on the Nevada approach to Hoover Dam, a segment of a former alignment of U.S. Highway 93 in Arizona, electrical transformer circuits in Arizona and Nevada, two electrical switchyards, a segment of the grade of the U.S. Construction Railroad, a stone gate structure for a dam construction and operations road, and six historic transmission lines. This documentation also records certain structures not directly affected by FHWA's Hoover Dam Bypass Project. Electrical transmission facilities at Hoover Dam are administered by Western, but these facilities are within a federal reservation administered by Reclamation.

Documentation of electrical structures is intended to partially fulfill responsibilities of Western and Reclamation under Section 110 of the National Historic Preservation Act (As HOOVER DAM, NEVADA DOWNSTREAM WASTE TAILINGS HAER NO. (Page 4) amended). Some electrical structures addressed by Western and Reclamation would be directly affected by FHWA's Hoover Dam Bypass Project, and all structures addressed by Western and Reclamation are functionally related and geographically near structures addressed by FHWA. Project Manager and historian for the recordation was Kurt P. Schweigert of Associated Cultural Resource Experts. The photographers were Deborah Dobson-Brown and Douglas M. Edwards of Associated Cultural Resource Experts.

This documentation was prepared on the basis of research conducted at Reclamation archives in Denver, CO, and Boulder City, NV; Western archives and files in Denver and Phoenix, AZ; the National Archives and Records Administration in Denver; libraries of the University of Nevada-Las Vegas; and the Western History Collection of the Denver Public Library. This documentation includes information contained in survey reports for the Hoover Dam Bypass Project Environmental Impact Statement, an evaluation of the Western switchyards at Hoover Dam, an evaluation of the Hoover Dam construction railroads, a National Register nomination for Hoover Dam, and other documents.

In context

Boulder City, Nevada The place record: every map, photograph and survey of this town.
Clark County, Nevada 264 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Boulder City

24 of 42 records shown

The federal surveyors worked through Boulder City building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1-17,316 words
Six Companies RailroadHAER NV-4414,857 words
Hoover Dam Aggregate Classification PlantHAER NV-4312,345 words
Bureau of Mines Metallurgical Research LaboratoryHABS NEV,2-BOUC,1B-7,892 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1D-6,399 words
Lake Mead LodgeHABS NV-605,936 words
Lakeshore RoadHAER NEV,2-BOUC.V,1-5,533 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1F-5,308 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1C-5,218 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1E-5,113 words
Arizona Gravel Pit RoadHAER NV-424,819 words
Hoover DamHAER NV-27-Q3,979 words
Hoover DamHAER NV-27-M3,425 words
Hoover DamHAER NV-27-O2,727 words
Hoover DamHAER NV-27-A2,334 words
Hoover DamHAER NV-27-D2,241 words
Hoover DamHAER NV-27-C2,123 words
Hoover DamHAER NV-27-L1,984 words
Hoover DamHAER NV-27-E1,861 words
Hoover DamHAER NV-27-F1,749 words
Hoover DamHAER NV-27-P1,685 words
Hoover DamHAER NV-27-N1,668 words
Hoover DamHAER NV-27-Y1,552 words
Hoover DamHAER NV-27-B1,539 words

Provenance

  • Written history. Quoted verbatim from HAER NV-27-W. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.