Hoover Dam, Promontory Water Tank, U.S. Highway 93, Boulder City, Clark County, NV. Surveyed as HAER NV-27-J, with a 1,296-word written history.

From the record

“The Promontory Point water tank was an element of the central fire protection system of the Hoover Dam switchyard complex.”

Written record, HAER NV-27-J survey. Machine-read text.

Surveyed by the federal HAER program as HAER NV-27-J · the record runs 1296 words · one of 66 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

56 words

Source document Quoted word for word from HAER NV-27-J. Not written, edited or summarised by this site.

U.S. Highway 93 Vicinity of Boulder City Clark County Nevada USGS Hoover Dam, Nevada-Arizona 7.5 Minute Provisional UTM Coordinates: 1 Date of Construction: Engineer: U.S. Bureau of Reclamation Builder: U.S. Bureau of Reclamation U.S. Highway 93 Vicinity of Boulder City Clark County Nevada USGS Hoover Dam, Nevada-Arizona 7.5 Minute Provisional UTM Coordinates: 1 I Statement of

Significance

421 words

Source document Quoted word for word from HAER NV-27-J. Not written, edited or summarised by this site.

The Promontory Point water tank was an element of the central fire protection system of the Hoover Dam switchyard complex. The tank was erected in in advance of completion of any of the federal switchyards. It remains functional for water supply to the switchyard complex and the Exhibit Building at the dam at the time of this documentation, in Report Prepared by: Associated Cultural Resource Experts (ACRE) Sangre de Cristo Road, STE 202 Littleton, CO Date: April HISTORIC AMERICAN ENGINEERNG RECORD HOOVER DAM, PROMONTORY WATER TANK HAER NO. (Page 2) The Promontory Point water tank was an element of the central fire protection system of the Hoover Dam switchyard complex. The tank was erected in in advance of completion of any of the federal switchyards.

It remains functional for water supply to the switchyard complex and the Exhibit Building at the dam at the time of this documentation, in Description: The water tank is located on a rock ridge topographically above and to the east of the switchyard complex. The 30,000-gallon tank is in diameter and high. The tank is set on a 6"- wide circular concrete foundation, and the interior of the foundation is filled with oiled sand to support the bottom of the tank. Walls of the tank are 4' x 12' and 4' x 16' steel panel riveted together with 2" rivets. The flat roof is comprised of pie-piece-shaped, 3/8"-thick steel plates riveted together and joined at a round plate at the center of the roof.

Water is pumped to the tank through a 6" buried pipeline from the Nevada wing of the power plant, and water is gravity-fed to the Exhibit Building near the Nevada spillway structure through a 3"-diameter pipe. History: The water tank is located on a rock ridge topographically above and to the east of the switchyard complex. The 30,000-gallon tank is in diameter and high. The tank is set on a 6"- wide circular concrete foundation, and the interior of the foundation is filled with oiled sand to support the bottom of the tank. Walls of the tank are 4' x 12' and 4' x 16' steel panel riveted together with 2" rivets. The flat roof is comprised of pie-piece-shaped, 3/8"-thick steel plates riveted together and joined at a round plate at the center of the roof.

Water is pumped to the tank through a 6" buried pipeline from the Nevada wing of the power plant, and water is gravity-fed to the Exhibit Building near the Nevada spillway structure through a 3"-diameter pipe.

Sources

310 words

Source document Quoted word for word from HAER NV-27-J. Not written, edited or summarised by this site.

This documentation of features of Hoover Dam and associated structures was accomplished by Associated Cultural Resource Experts (ACRE). ACRE completed documentation of21 features in October Documentation on four linear features was extended and an additional 3 features were newly documented in February Both phases of documentation were conducted as part of the historical/engineering recordation of Hoover Dam-prepared for the Department of Energy, Western Area Power Administration; Bureau of Reclamation; and Federal Highway Administration-that includes a narrative for the Addendum to Hoover Dam and individual documentation of 25 features located at the Hoover Dam facility, photo documentation, and documentation of existing historic photographs and site plans.

The recordation conforms to the standards of the Historic American Engineering Record, U.S. Department of the Interior.

Other reports in the HAER collection completed for these projects are a narrative for the Addendum to Hoover Dam and 24 short forms for individual structures: Hoover Dam, Los Angeles Switchyard (NV-27-A); Hoover Dam, Southern Sierras/CEP/Southern California Edison Switchyard Hoover Dam, Metropolitan Water District Switchyard Hoover Dam, State of Nevada Switchyard Hoover Dam, Southern California Edison Switchyard (NV-27-E); Hoover Dam, Arizona-Nevada Switchyard Hoover Dam, Static Towers and Lines Hoover Dam, Los Angeles Relay Control Building Hoover Dam, Switchyard Fire House Hoover Dam, Promontory Water Tank Hoover Dam, Control Cable Hoist House Hoover Dam, Transformer HOOVER DAM, PROMONTORY WATER TANK HAER NO.

(Page 3) Circuits Hoover Dam, Los Angeles BPL Lines 1-3 Hoover Dam, Southern California Edison North and South Lines Hoover Dam, Hoover-Basic Magnesium North and South Lines Hoover Dam, Metropolitan Water District Line 1 Hoover Dam, United States Construction Railroad Hoover Dam, U.S. Highway 93 Nevada Segment Hoover Dam, Lower Portal Access Road Hoover Dam, Kingman Switchyard Hoover Dam, U.S. Highway 93 Arizona Segment (NV-27-U); Hoover Dam, Explosives Magazines Hoover Dam, Nevada Downstream Waste Tailings and Hoover Dam, Nevada Spoils Tunnel Hoover Dam, Henderson-Mead Transmission Line 2

Written history

411 words

Source document Quoted word for word from HAER NV-27-J. Not written, edited or summarised by this site.

This documentation was prepared for three federal agencies: U.S. Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, Lakewood, CO; U.S. Department of Energy, Western Area Power Administration (Western), Desert Southwest Customer Support Region, Phoenix, AZ; and U.S. Department of Interior, Bureau of Reclamation (Reclamation), Lower Colorado Region, Boulder City, NV. This documentation records certain transportation and electrical features associated with Hoover Dam before planned removal or alteration of some structures. FHWA plans to construct a bridge over the Black Canyon of the Colorado River about downstream from Hoover Dam. The Hoover Dam Bypass Project would include realignment of U.S.

Highway 93 on the Nevada and Arizona sides of Black Canyon. The project would include demolition, relocation, or substantial visual impact to a segment of U.S. Highway 93 on the Nevada approach to Hoover Dam, a segment of a former alignment of U.S. Highway 93 in Arizona, electrical transformer circuits in Arizona and Nevada, two electrical switchyards, a segment of the grade of the U.S. Construction Railroad, a stone gate structure for a dam construction and operations road, and six historic transmission lines. This documentation also records certain structures not directly affected by FHWA's Hoover Dam Bypass Project. Electrical transmission facilities at Hoover Dam are administered by Western, but these facilities are within a federal reservation administered by Reclamation.

Documentation of electrical structures is intended to partially fulfill responsibilities of Western and Reclamation under Section 110 of the National Historic Preservation Act (As amended). Some electrical structures addressed by Western and Reclamation would be directly affected by FHWA's Hoover Dam Bypass Project, and all structures addressed by Western and Reclamation are functionally related and geographically near structures addressed by FHWA. Project Manager and historian for the recordation was Kurt P. Schweigert of Associated Cultural Resource Experts. The photographers were Deborah Dobson-Brown and Douglas M. Edwards of Associated Cultural Resource Experts.

This documentation was prepared on the basis of research conducted at Reclamation archives in Denver, CO, and Boulder City, NV; Western archives and files in Denver and Phoenix, AZ; the National Archives and Records Administration in Denver; libraries of the University of Nevada-Las Vegas; and the Western History Collection of the Denver Public Library. This documentation includes information contained in survey reports for the Hoover Dam Bypass Project Environmental Impact Statement, an evaluation of the Western switchyards at Hoover Dam, an evaluation of the Hoover Dam construction railroads, a National Register nomination for Hoover Dam, and other documents.

In context

Boulder City, Nevada The place record: every map, photograph and survey of this town.
Clark County, Nevada 264 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Boulder City

24 of 42 records shown

The federal surveyors worked through Boulder City building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1-17,316 words
Six Companies RailroadHAER NV-4414,857 words
Hoover Dam Aggregate Classification PlantHAER NV-4312,345 words
Bureau of Mines Metallurgical Research LaboratoryHABS NEV,2-BOUC,1B-7,892 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1D-6,399 words
Lake Mead LodgeHABS NV-605,936 words
Lakeshore RoadHAER NEV,2-BOUC.V,1-5,533 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1F-5,308 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1C-5,218 words
Bureau of Mines Boulder City Experimental StationHABS NEV,2-BOUC,1E-5,113 words
Arizona Gravel Pit RoadHAER NV-424,819 words
Hoover DamHAER NV-27-Q3,979 words
Hoover DamHAER NV-27-M3,425 words
Hoover DamHAER NV-27-O2,727 words
Hoover DamHAER NV-27-A2,334 words
Hoover DamHAER NV-27-D2,241 words
Hoover DamHAER NV-27-C2,123 words
Hoover DamHAER NV-27-L1,984 words
Hoover DamHAER NV-27-E1,861 words
Hoover DamHAER NV-27-F1,749 words
Hoover DamHAER NV-27-P1,685 words
Hoover DamHAER NV-27-N1,668 words
Hoover DamHAER NV-27-Y1,552 words
Hoover DamHAER NV-27-B1,539 words

Provenance

  • Written history. Quoted verbatim from HAER NV-27-J. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.