Bishop Creek Hydroelectric System, Control Station, Operations Building No. 1, Bishop Creek, Bishop

Bishop Creek Hydroelectric System, Control Station, Operations Building No. 1, Bishop Creek, Bishop, Inyo County, CA. Surveyed as HAER CAL,14-BISH.V,2A-, with a 2,598-word written history.

From the record

“Building 102 Control Station (formerly Operations Building #1, Control Station) was constructed as the first operations building at the control station for the Bishop Creek Hydroelectric System in the eastern Sierra Nevada.”

Written record, HAER CAL,14-BISH.V,2A- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,14-BISH.V,2A- · the record runs 2598 words · one of 71 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

45 words

Source document Quoted word for word from HAER CAL,14-BISH.V,2A-. Not written, edited or summarised by this site.

Near Bishop Creek in Southeast 1/4 of Section 17, Township 7 South, Range 32 East, Inyo County, California. Eastern Sierra Nevada approximately 2.5 miles southwest of the town of Bishop, California, and 225 air miles due north of Los Angeles. Date of Construction: Builder: Unknown

Significance

2461 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,14-BISH.V,2A-. Not written, edited or summarised by this site.

Building 102 Control Station (formerly Operations Building #1, Control Station) was constructed as the first operations building at the control station for the Bishop Creek Hydroelectric System in the eastern Sierra Nevada. The building is significant both for its role in the early history of the Bishop Creek System, and as an example of the Mission Revival style building in a hydroelectric complex. The Bishop Creek System is considered significant for its role: (1) in the expansion of hydroelectric generation technology. (2) in the development of eastern California, and (3) in the develop-ment of long-distance power transmission and distribution. Report Prepared By: Ward Hill Architectural Historian BioSystems Analysis. Inc. 303 Potrero Street.

Suite Santa Cruz, CA ate: January 19, BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 (BUILDING NO. HAERNO. CA-145-1-A (PAGE 2)

Description

Building 102 Control Station was the original operations building at the Control Station for the Bishop Creek Hydroelectric System. The Control Station is where the power from the various generating plants is collected for distribution. Apparently this building originally housed some of the equipment for controlling the distribution of power from the Bishop Creek System, in addition to the operator's office and residence. Operation Building No. 1 at the Control Station is about 500 feet north of Plant No. 5. The Control Station and Plant No. 5 are southwest of Plant No. 6 and northeast of Plant Nos. 2, 3 and 4. The Bishop Creek System is about five miles southwest of the town of Bishop, Inyo County, California.

The five power plants in the system, located primarily along the south, middle, and north forks of Bishop Creek, are at varying elevations on the steep eastern slopes of the southern Sierra Nevada Range. Building 102 Control Station is on a flat site of low bushes and weeds, i.e., without any landscaping or yard. A low, deteriorated stone retaining wall is in front of the building, and one mature tree is to the south. Behind the building are various power lines and distribution equipment. The building is a single-story, rectangular plan (42 x 20 feet) structure characterized by the tall, stepped parapet gables at its front and rear elevations (Photos A-l, 145-1-A-2 and.l45-l-A-3).

The building's distinctive stepped gables, each with a top curvilinear gable, is a typical feature of the Mission Revival style, as is the building's rough textured stucco surface (Photo 145-1-A-4 and I45-1-A-5). Structurally, the building is stud- wall, wood-frame construction on a perimeter concrete foundation. The medium-pitched gable roof is covered with asphalt shingles, and under the roof eaves are exposed rafters. The front entrance porch along the width of the east elevation has a hipped roof (also covered with asphalt shingles) supported by massive corner posts. The segmental arches of the front porch were originally open, but in recent years they have been filled in with diagonal exterior siding and paired, vertical windows.

The right half of the front of the porch has been filled in with a solid wood front door flanked by pairs of windows (Photo 145-1-A-6). The building has 1-over-l, wood-sash double-hung and wooden casement windows. There is an louvered semi-circular vent under the central gable on the front elevation, and circular vent on the rear elevation. The ca.-1960 addition to the north elevation, covered with asbestos shingles, has sliding aluminum frame windows. A concrete stair with a metal handrail leads into a basement area on the south elevation (Photo 145-1-A-7). The interior of Building 102 Control Station retains much of its original plan.

The interior was originally divided so that about 30% was an office/operations area on the west side, while the BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 (BUILDING NO. HAERNO. CA-145-1-A (PAGE 3) remaining 70% on the east side of the building was a single family residence. The building has been residential since the present control station was built in The office area, which has its own entrance at the center of the west elevation, is a single space about 20 x 12 feet. The residential part of the building includes a living room, a dining room, a kitchen, two bedrooms and a bathroom. The residence has a compact plan with no halls or corridors joining the rooms which open directly one to another.

The doors and windows in these rooms are framed with simple, plain boards. The smooth plaster walls have simple baseboards and no cornice moldings. The residence's original doors (with inset panels) and hardware are intact. From the enclosed front entrance porch (Photo 145-1-A-8), one enters the living/dining room area (Photo 145-1-A-9). The living areas are arranged along one side, and the two bedrooms and bath on the opposite side of the building. A door on the south side of the living room opens into one of the bedrooms (Photo 145-1-A-10). A bathroom (recently remodeled) joins this bedroom to the second bedroom to the west (Photos 145-1-A-10. 145-1-A-ll, and A-12).

The second bedroom has an unusually large window consisting of two casements flanked by narrow double-hung windows (Photo 145-1-A-14). A door opens from the second bedroom into the dining room (Photo 145-1-A-13). One enters the recently remodeled kitchen from the dining room (Photo 145-1-A-15). Another door from the second bedroom opens into the office/operations -area at the back of the building. The cabinets in the office area are a recent addition (Photo 145-1-A-16). H.

Historical Context

The Bishop Creek Hydroelectric System is significant in the history of hydroelectric power generation technology, the development of eastern California, and the development of long- distance power transmission and distribution. The Bishop Creek system is an early example of a high-head, impulse water wheel, high-voltage electric generation system. The system exhibits a high level of innovative planning, maximizing the production of energy by combining use of the steep slope of the eastern Sierra Nevada with specialized generation technology. The first hydroelectric power generation along Bishop Creek was a small plant operated by the Bishop Light and Power Company. The plant, a Stanley polyphase generator horsepower) driven by a 48-inch Pelton wheel, generated power for local use.

The impetus for the development of the Bishop Creek system was the discovery of economic minerals in the Tonopah and Goldfield areas of Nevada. The local power companies in these areas generated BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 {BUILDING NO. HAERNO. CA-145-1-A (PAGE 4) electricity by burning fuels, an expensive and unreliable source of power for an industrial operation like mining. Loren B. Curtis and Charles M. Hobbs arrived in the Tonopah and Goldfield areas in because of their interest in mining. Curtis and Hobbs recognized that the economic potential of mining in this area could not be tapped unless a reliable and inexpensive power source could be developed.

Curtis, an engineer, decided that Bishop Creek in the eastern Sierra would be the best location for the production of hydroelectric power for the nearby Nevada mining areas. Hobbs, a banker and financier, obtained financial backing for the project, and then incorporated with his partner as the Nevada Power, Mining and Milling Company in December 24. Construction commenced in January on the first generating plant (Power Plant No. 4); nine months later, in September electricity was delivered to the Goldfield substation. Since Nevada Power, Mining and Milling had secured contracts for power delivery to the mining companies in Goldfield and Tonopah, there was a ready market for Bishop Creek electricity.

The inexpensive power from Bishop Creek made it possible to mine economically in these areas, producing a new mining boom and a period of posterity in Nevada (Elliott On January 5, the Nevada-California Power Company was incorporated as the successor to Nevada Power, Mining and Milling Company. In Nevada-California Power expanded Power Plant No. 4, and they purchased the capital stock of Hillside Water Company, thus permitting the construction of additional plants along Bishop Creek. In a fifth operating unit was installed at Power Plant No. 4 and construction was completed on Power Plant No. 2. Power Plant No. 5 was constructed in and South Lake was enlarged.

After this expansion, the Bishop Creek System produced significantly more power than was needed by its current market, still primarily mining operations in Nevada. In an attempt to expand the market for Bishop Creek power, the directors of Nevada- California Power Company incorporated the Southern Sierra Power Company as a subsidiary in with its main purpose being to service the power needs of southeast California.1 The total output of the Bishop Creek plants was k\V in when construction began on a transmission line to San Bernardino where a steam plant was built. Power Plant No.

3 was lp The creation of Southern Sierra Power Company consolidated several associated companies, including the Nevada-California Power Company, the Bishop Light and Power Company, the Corona Gas and Electric Company, the Lytle Creek Power Company and the Hillside Water Company. BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 (BUILDING NO. HAERNO. CA-145-1-A (PAGE 5) completed in adding kW to the system. During and the southern California system was expanded substantially, with the system's capacity increasing to kW, when Power Plant No.

6 was completed in The Bishop Creek System was essentially complete with the five plants existing today in operation by the end of Southern Sierra Power Company, which continued to expand by buying smaller power companies, grew to play a significant role in the development of southeastern California; particularly the Imperial Valley. In the longest power transmission line in the world (at the time) was completed, delivering power from Bishop Creek to the Imperial Valley. As a result of the electrical power now available, the population of the Imperial Valley grew from only 50 to over in the next 20 years. Nevada-California Power Company and Southern Sierra Power developed and operated the Bishop Creek plants as two separate, but associated, power companies.

As two branches of a larger power corporation, they initially produced power at slightly different voltages, which made it difficult to tie the two systems together. Plant Nos. 2, 3 and 4 were operated by Nevada-California Power Company and they serviced the Nevada mining districts; Southern Sierras Power Company operated Plant Nos. 5 and 6 for delivering power to southern California. Building 102 Control Station was built in as part of the Control Station for the Southern Sierras Power Company Plants Nos. 5 and 6. The Control Station regulated the distribution from this part of the system. Building 102 Control Station was designed in the Mission Revival style, a California regional style inspired by the state's old missions.

As a style derived from California's Hispanic past, the Mission Revival was a popular counterpart in the early century in California to the Colonial Revival on the East Coast. The Mission and Colonial Revival styles were both architectural idioms that borrowed imagery from historic buildings unique to their respective regions. In a new, larger Control Station, also in the Mission Revival style, was built near Plant No. 5 so the two systems developed at Bishop Creek could be permanently interconnected. After the new Control Station was built, Building 102 was used solely as a residence. During the the power-generating system was "fine-tuned" to extract as much power as possible from the existing plants.

Much of the company's resources at this time were used to market energy at the far reaches of the distribution network and to purchase other power companies. During the there was only limited development in Bishop Creek because of the worldwide depression. Increased competition from rival companies producing cheaper energy on the Colorado River forced the Bishop Creek company during the to withdraw BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 (BUILDING NO. HAERNO. CA-145-1-A (PAGE 6) from the Imperial and Coachella valley markets.

The Nevada-California Electric Corporation, formed as a holding company in for the companies associated with Southern Sierra Power Company, became an operating company in when the subsidiary companies were dissolved and the operating properties transferred to the parent company. In the company changed its name to California Electric Power Company (later known as Calectric). The properties of Calectric were acquired by Southern California Edison Company (SCE) in through a merger consolidation. SCE is the present operator of the Bishop Creek plants. Since SCE's consolidation of operations and automation of the power plant equipment has resulted in the elimination of many of the on-site employees. During the all the housing units at Plants Nos.

2, 3, and 5 were demolished, leaving structures only at Plant Nos. 4, 6 and the Control Station (near Plant No. 5). m.

Sources

Coleman, Charles M. P. G. and E. of California: The Centennial Story of Pacific Gas and Electric Company, McGraw-Hill Book Company, Inc., New York. Elliott, Russell R. History of Nevada. University of Nebraska Press, Lincoln. Intermountain Research An Architectural and Historical Evaluation of Structures Associated with the Bishop Creek Hydroelectric Power System, Inyo County, California. December, Unpublished report prepared for Southern California Edison. Theodoratus Cultural Research, Inc. Evaluation of the Historic Resources of the Bishop Creek Hydroelectric System. July, Unpublished report prepared for Southern California Edison. Weitze, Karen J. California's Mission Revival. Hennessey and Ingalls, Inc.. Los Angeles, California.

BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 (BUILDING NO. HAERNO. CA-145-1-A (PAGE 7) Whiffen, Marcus American Architecture Since MIT Press, Cambridge. Massachusetts. IV. PROJECT INFORMATION This Historic American Engineering Record documentation of Building 102 Control Station, a structure at the Control Station of the Bishop Creek Hydroelectric System, was undertaken because the building represents excess housing. SCE is continuing to automate the Bishop Creek power plants. The automation of the power plants has made it unnecessary to have on- site crews, thus, residential units like this house have become obsolete. BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 (BUILDING NO. HAER NO.

CA-145-1-A (PAGE 8) Cottage 108 Operations Shed Lj ,^ Cottage Building 109 O "-O 111 101 Transformers Cottage ] Garage 105 Cottage r^V Cottage Rock Wall (Original Operations Building) NOTE: Buildings in dashed outline have been removed N 100 Feet N BiSWUF (JKEKK HYllKUEJUbiCTKHJ SYSTEM. CUINJLKUJL STATION, OPERATIONS BUILDING NO. 1 ;-. ;, '.- (BUILDING NO. HAER NO. CA-145-1-A (PAGE 9) M 1 ioj 2! o;' o Ju ( 1 r V.UJ ^.i o ro !-*!o ' HI >l CD Ujig ,H O m oO UJj t - O i < CO i ' U S!2 ^ 'i o!^ ir.p O - ""^ c < i t/i s i **/ ! - I ^ i &* - | IK-'- - n' LJ'--i V''i:':Mv\fti' - * c iVf^V''-' ! 1 - > J I " r: ?.l . i li^^i1' BISHOP CREEK HYDROELECTRIC SYSTEM, CONTROL STATION, OPERATIONS BUILDING NO. 1 (BUILDING NO. HAERNO. CA-145-1-A (PAGE 10)

In context

Bishop, California The place record: every map, photograph and survey of this town.
Inyo County, California 448 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Bishop

24 of 28 records shown

The federal surveyors worked through Bishop building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Bishop Creek Hydroelectric SystemHAER CA-145-4-J14,733 words
Bishop Creek Hydroelectric SystemHAER CA-145-3-A11,415 words
Bishop Creek Hydroelectric SystemHAER CA-145-5-A11,037 words
Bishop Creek Hydroelectric SystemHAER CA-145-2-B10,969 words
Bishop Creek Hydroelectric SystemHAER CA-145-710,717 words
Bishop Creek Hydroelectric SystemHAER CA-145-6-B10,035 words
Bishop Creek Hydroelectric SystemHAER CA-145-2-C9,519 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,1-6,792 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,2B-3,149 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,7A-2,764 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5A-2,619 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,2C-2,173 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5F-2,159 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5C-2,045 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5B-2,014 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5H-2,001 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5E-1,968 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5D-1,956 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,2D-1,794 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5G-1,765 words
Bishop Creek Hydroelectric SystemHAER CA-145-2-A1,630 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,5I-1,061 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,2-40 words
Bishop Creek Hydroelectric SystemHAER CAL,14-BISH.V,6-35 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,14-BISH.V,2A-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.