The Historic American Engineering Record (HAER) is a long-range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service United States Department of the Interior. The Powerhouse No.
2 recording project was undertaken by Galvin Preservation Associates (GPA) for the Southern California Edison Company (SCE) in cooperation with Justine Christianson, HAER Historian SCE initiated the project with the intention of making a donation to As recommended by Justine Christianson the report describes how water flows in and out of the powerhouse to produce electricity, and a vital component of the report documents changes in operating machinery that have occurred over time. Archaeologist Crystal West (SCE) oversaw the project and provided access to the site. Historian Andrea Galvin (GPA) served as project leader. Architectural Historian Matthew Weintraub (GPA) served as the project historian.
Jeff McCarthy, Supervisor of Operations (SCE), and Keith Inderbieten, Hydro System Operator (SCE), provided research assistance. Stephen Schafer produced the large format photographs. The field team consisted of Andrea Galvin (GPA), Matthew Weintraub (GPA), Crystal West (SCE), Neil Sliger (SCE), Stephen Schafer (photographer) and David Sanchez (photographer assistant). Researchers can be directed to also see: HAER No. CA-145-2, Bishop Creek Hydroelectric System, Plant 2; HAER No. CA-145-2-A, Bishop Creek Hydroelectric System, Plant 2, Lake Sabrina Dam; and HAER No. Ca-145-2-C, Bishop Creek Hydroelectric System, Plant 2, Transformer House. Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 3) PART I.
HISTORICAL INFORMATION A. Physical History of Building: The physical history of Powerhouse No. 2 was determined by reviewing original construction drawings including architectural elevations,1 a floor plan,2 a roof plan,3 and machine foundation plans.4 Also, drawings for alterations and additions to Powerhouse No. 2 which occurred after its original construction were reviewed.5 These plans were retained by the power companies that successively owned and operated the plant (currently SCE). In addition, articles describing construction and operation of the powerhouse which originally appeared in the trade journals Journal of Electricity Power and Gas6 and Electrical World7 and reprinted by SCE were reviewed. They included a series of articles written by Charles O.
Poole, who served as chief engineer of the Nevada-California Power Company. The building itself provided physical evidence of its history and development via field inspection,8 as did historical photographs and contemporary drawings in the possession of SCE. Further information was found in previously completed HAER documentation9 and evaluations of eligibility for listing in the National Register of Historic Places.10 These sources provided thorough and detailed information regarding the historic design, construction, improvement and operation of the building. Overview Powerhouse No. 2 was constructed in by the Nevada-California Power Company.
It was the third of five powerhouses to be established in the Bishop Creek system (preceded 1 Nevada-California Power Company East Elevation of Power House, Southeasterly End Elevation of Power House No. 2, Sheet 1 of 6, approved March South Side Elevation of Power House No.2, Sheet 2 of 6, approved March 2 Floor Plan of Power House No. 2, Sheet 3 of 6, approved March 3 Roof Details of Power House No. 2, Sheet 5 of 6, approved March 4 General Foundation Plan for Power House No. 2, approved May 12, 5 Floor & Foundation Plan, Operating & Bus Room Addition, approved February 11, redrawn on June 24, and revised on April 13, 6 Rudolph W. Van Norden, System of Nevada-California Power Company and the Southern Sierras Power Company.
Part 1 Power Plants, Properties and Power Developments of the Nevada-California Power Company and the Southern Sierras Power Company. Reprinted from the Journal of Electricity Power and Gas, Volume XXXI, Numbers July p. 7 C. O. Poole, Hydraulic and electric features of stations No. 2 and No. 3 of the Nevada-California Power Company Tailrace water of former discharges directly into intake of latter, Power Development and Transmission Systems of The Nevada-California Power Company and the Southern Sierras Power Company, p. Reprinted from Electrical World, New York, 8 Field inspections were conducted on October 19 and December 7, 9 Thomas T. Taylor, Bishop Creek Hydroelectric System, HAER No. CA-145, Historic American Engineering Record, National Park Service, U.S.
Department of the Interior, p. 10 Robert Clerico and Ana Beth Koval, An Architectural and Historical Evaluation of Structures Associated with the Bishop Creek Hydroelectric Power System, Inyo County, California, Southern California Edison Company, December p. Valerie Diamond, Stephan G. Helmich, and Robert A. Hicks, Evaluation of the Historic Resources of the Bishop Creek Hydroelectric System, Southern California Edison Company, July p. A-161- Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 4) by No. 4 and No. 5), and it is the highest powerhouse at an elevation of feet. Powerhouse No.
2 was constructed as a single-story reinforced concrete industrial building in the Mission Revival architectural style. It contains a large rectangular room that houses three rotating generators driven by impulse water wheels, installed in and In the water wheel-driven generators operated with a combined capacity of kilowatts The power company constructed a complementary wing addition to the powerhouse in Currently, Powerhouse No. 2 continues to operate as a hydroelectric powerhouse in the Bishop Creek system. The power plant is situated on the northwest bank of Bishop Creek in the upper reaches of Bishop Creek Canyon. The plant originally consisted of the powerhouse (extant), a matching transformer house (extant), four residence cottages (not extant), and two outbuildings (extant).
In the Journal of Electricity Power and Gas provided this general description of Powerhouse No. 2, which was constructed five years previously: No. 2 powerhouse, in its design, represents a style of construction and finish characteristic of all of the plants [in the Bishop Creek system] with the exception of No. 5. The building is of reinforced concrete. There are four columns on each longitudinal side of this construction, these extend inside of the walls and support the crane rails, also of concrete, and extend without the walls to give a buttress effect. The end walls have two buttressed columns and the walls are carried to the gables, which are finished above the roof in a simple style of the Spanish renaissance.
The roof is supported on [four] Fink steel trusses, the purlins being I beams spaces rather closer than usual and carrying a steel Spanish tile roof. The powerhouse layout is very simple and consists of three main generating units placed with their shafts in a line lengthwise with the building The generators are mounted in pits and there are but two bearings [on each unit], the water wheels being overhung.
One of these machines installed at a later date than the others is of a slightly different type The two earlier units are driven by single runner Pelton water wheels, each equipped with needle deflecting nozzles controlled by hand operated worm-gear handles The third unit is driven by a Doble wheel, also equipped with needle main and auxiliary nozzles Placed in front of two of the main units and with their shafts in line are the two exciter units The switchboard is placed at the middle of one side of the building facing the main units The transformers are housed in a separate building of similar construction to that of the power house.11 11 Van Norden, System of Nevada-California Power Company, p. 8.
Whereas this source indicates that the roof was supported by three Fink steel trusses, original plans and field inspection indicates that the powerhouse was constructed with and retains four trusses. This discrepancy should be noted. Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 5) 1. Date of Construction: Construction of Powerhouse No. 2 occurred in based on architectural drawings dated March and foundation plans dated May As stated in by Charles O. Poole, chief engineer of the Nevada-California Power Company, The plant was constructed in and has been in continuous use ever since, excepting the twenty days when the steel Y failed.
12 A small addition (north wing) to the main building was constructed in as indicated by a floor and foundation plan for the addition dated February 2. Architect/Engineer: The engineers of the original construction of Powerhouse No. 2 were (R. G.) Manifold & (Charles O.) Poole of Los Angeles, as listed on construction drawings dated Poole served as chief engineer of the Nevada Power, Mining and Milling Company, later the Nevada-California Power Company. The top sheet of construction drawings included the notation by Paul H. Ehlers, who was probably the draftsman and possibly an architect. Other architects and/or engineers are not known. 3. Builder/Contractor/Supplier: The builder of Powerhouse No.
2 was the Engineering-Contracting Co., as listed on the top sheet of construction drawings dated According to the construction drawing for the addition dated all plumbing and fixtures in the north wing addition were installed by the power company. Other builders, contractors and material suppliers are not known. 4. Original Plans: The powerhouse was designed as rectangular in plan with exterior wall-to-wall dimensions of 36 8 x 80 8 and height of 29 0 . It was constructed of concrete reinforced with new style corrugated metal bars and finished in stucco. The powerhouse was built three bays wide and five bays long as defined by regularly spaced columns that extended to the interior.
The concrete columns, or pilasters , were spaced 12 0 center-to-center at the building ends (east and west walls) and 16 0 center-to-center at the long sides (north and south walls). Between the columns were suspended curtain walls 4 thick. Columns were squared and terminated in well-defined drainage slopes. Columns located at corners and long sides were buttressed and columns at ends were flat. The powerhouse roof was a moderately pitched gable supported on four Fink steel trusses and sheathed in interlocking, barrel-shaped pressed metal tiles that measured 21- long long at eaves). The gable roof measured 9 4 in height from eaves to ridge, and 39 6 in width between the eaves, which extended 8 beyond the side walls.
End walls terminated in three-level stepped parapets with square-profile coping that obscured the gable ends. 12 Poole, Hydraulic and electric features of stations No. 2 and No. 3, p. 21. Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 6) The building contained two large entrances in the first bays of the long sides (counting from east to west) with side-hinged swinging double-leaf metal doors with central latches, which allowed for large machinery to be moved in and out of the building.
A third entrance with a similar, smaller single-leaf door was located in the fifth bay of the north side.13 The building was fenestrated in a regular pattern with a large rectangular window in each of the end bays (three windows total on each end wall) and paired windows in side wall bays that were not filled by doors. Windows were identical wood sash 16-light-over-4-light. Each gable end contained a large circular louvered vent. At the east end, the primary fa ade was distinguished by raised lettering that read: NEVADA-CALIFORNIA POWER COMPANY, located above the circular vent; and POWER HOUSE NO. 2 located below the circular vent. The individual block letters were approximately 9 tall, 6 wide, and cast of cement mortar and cemented into positions on the fa ade.
The powerhouse was built with a complex concrete substructure over aggregate rock base 10 0 feet deep that was designed to house impulse wheel-driven generators. The foundation was topped by a floor slab 16 thick. At the interior, the generator room that occupied the structure measured 36 0 x 80 0 . It was open in plan. The generator room housed three water-wheel/generator assemblies situated at the center of the room and related equipment such as valves, pumps, governors, exciters, and switchboard panels. The interior long walls contained recessed bays formed by the post-and-beam construction and filled by curtain- wall panels. The building was open vertically through the trusses.
A 20-ton overhead traveling crane furnished by the Cyclops Iron Works of San Francisco spanned the width of the room. The rolling crane ran on rails mounted on concrete beams that formed parallel ledges along the long side walls 4 6 below the level of the trusses. 5. Alterations and Additions: In July as part of an evaluation of the powerhouse s eligibility for nomination to the National Register of Historic Places, the following conclusion was reached regarding the condition of the powerhouse with respect to alterations and additions: The powerhouse, which has been modified, retains its architectural integrity.
The wing housing the operating and bus room was constructed in in the same style as the original building [I]t appears that numerous windows and doors have been replaced over the years; however, dimensions of the openings remained 13 The third entrance is not shown in original construction drawings or in available historical photographs. It is inferred to original and/or historic based on field inspection. Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 7) consistent.
One exception is the central door on the front fa ade; it appears originally to have been a window identical to those remaining on the front fa ade.14 The wing containing the operating (switchboard) room and bus room, built in was constructed adjacent to the third and fourth bays on the north side of the powerhouse. The rectangular-in-plan addition projected approximately 34 0 from the east side of the powerhouse and it was 19 6 wide. The addition included: a gabled roof clad in pressed metal Spanish tiles; a Mission-style three- level stepped parapet at the north end; squared concrete columns spaced 14 0 end-to-end at the longer north wall, 7 5 end-to-end at the short walls, and buttressed at corners; and concrete curtain walls 4 thick; which complemented the original powerhouse.
Construction of the addition involved removal of the original curtain wall and column from the fourth bay of the powerhouse, as well as removal of the switchboard from its location in front of the fourth bay. In the pair of windows located in the third bay of the north wall of the powerhouse, originally on the building s exterior and enclosed by the bus room addition, were removed and filled with concrete wall 4 thick concrete to match the existing wall. The addition was built to house a switchboard room that extended into the main generator room from the fourth bay of the north wall as a five-sided, two-door, steel-framed office bay.
At the back of the switchboard room, where the new switchboard was installed, a cable trench was installed, 16 wide, 11 deep, and running the length of the room. The remainder of the addition was partitioned into: a battery room located in the northwest corner; an internally partitioned U- shaped bus room located in the eastern part; and a small lavatory located behind the switchboard room between the battery and bus rooms. Other structural and/or material changes have occurred. Sometime before approximately center-pivot metal covers replaced louvered vents in the round windows at gable ends. In steel windows replaced original wood sashes in original openings.
Sometime after approximately a single-light metal door with transom replaced the central window on the front (east) wall; and later, the transom was removed and the opening was filled. At unknown times, the following changes also occurred: two gabled rooftop monitors with vented sides were constructed at the center of the ridge; corrugated metal roll-up doors replaced double-leaf metal doors in the large service openings; at the interior, a small rectangular, roofless concrete block partition was constructed in the southwest corner of the generating room, possibly originally to house batteries; and the original overhead traveling crane furnished by Cyclops Iron Works of San Francisco was replaced with a Northern Crane model.
14 Clerico and Koval, An Architectural and Historical Evaluation, p. 27. Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 8) B. Historical Context: The following historical context was included in previously completed documentation which established the eligibility of the Bishop Creek Hydroelectric System for listing in the National Register of Historic Places.15 The turn of the twentieth century saw a dramatic change in technological history. The production of cheap, dependable hydroelectric power, and the ability to transport the power over great distances, was perfected at this time. In short order, drainages with sufficient flow for hydroelectric power generation began to be developed.
By the only suitable streams draining the east slope of the Sierra Nevada which were not being used for electricity production were the Carson and Walker river systems. The first hydroelectric power generation along Bishop Creek was a small plant operated by the Bishop Light and Power Company. The facility was reported to be a half mile west of the Standard Flouring Mills (present site of Plant 6) and two and a half miles from the town of Bishop. The plant consisted of a Stanley polyphase generator (capable of 150 horsepower) driven by a 48-inch Pelton wheel. The power was generated for local use. Through the efforts of Loren B. Curtis, an engineer, and Charles M.
Hobbs, a banker and financier, the Nevada Power, Mining and Milling Company was incorporated on December 24, The first facility built by the Nevada Power, Mining and Milling Company was put into operation in September, supplying hydroelectric power to the mining communities of Tonopah and Goldfield, Nevada. Executives of the power company had purchased controlling interest in the locally operated facilities in Tonopah and Goldfield, so that, when production began, there was a market ready for their product. The original transmission line extended east across Owens valley, the White Mountains, Fishlake Valley, and the Silver Peak Range to the town of Silver Peak in Clayton Valley. Here the line split, diverging northeast to Tonopah and due east to Goldfield.
The line distance from Bishop Creek to Goldfield was 95 miles, and that to Tonopah was 118 miles. This was a new record for long distance transmission. On January 5, the Nevada-California Power Company, successor to the Nevada power, Mining and Milling Company, was incorporated; most of the original corporate officers remained with the new company. Between and four more generating plants were placed on line, in tandem along Bishop Creek, and additional generators were placed in existing plants. As a result of this additional power generation, the Tower Line from Bishop to San Bernardino was completed in and put into operation, again creating a new record for long distance transmission miles).
The directors of the Nevada Power, Mining and Milling Company were well aware of the vicissitudes of the boom-bust mining industry and took steps to secure a more constant market for their product. In the Southern Sierra Power Company was incorporated with the main purpose of creating and servicing 15 Clerico and Koval, An Architectural and Historical Evaluation, p. Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 9) the power needs of southeast California. From then until several smaller power companies were purchased by the new company. The development of southern California's Imperial Valley corresponds directly with Bishop Creek's production of cheap, reliable electricity.
By the end of the Bishop Creek system was essentially complete with all five plants operating. In descending order down the drainage, the Bishop Creek facility then consisted of: Power Plant 2: Three Westinghouse generators, each capable of kw of power (total output of Units 1 and 2 were driven by Pelton wheels and unit 3 by a Doble wheel. Power Plant 3: Three Crocker-Wheeler generators, each capable of kw of power (total output of All three units were direct connected to Henry impulse wheels.
Power Plant 4: Five generating units consisting of: two National Electric Company, 750 kw, generators connected to Pelton wheels; one Bullock, kw, generator driven by a Pelton wheel; one Allis-Chalmers, kw, connected to a Pelton wheel; and one Allis-Chalmers, kw, machine driven by a Doble wheel (total output of Power Plant 5: Two generating units, one of which was a kw, Allis- Chalmers machine driven by a Doble wheel and the other a kw unit connected to a Pelton-Francis wheel (total output of Power Plant 6: A single generator capable of kw driven by a Pelton-Doble wheel. It is interesting to note that Power Plant 1 was to have been built at the present site of Intake No. 2, but the plant was never built due to the vulnerability of the site to avalanches.
The plant number designators were not adjusted accordingly, so that there is no Power Plant 1, nor has there ever been. In the Nevada-California Electric Corporation again was reorganized to become an operating company. The corporation became California Electric Power Co. and continued to operate under this name until when the company known as Calectric was subsumed by Southern California Edison Company. Since as a result of acquisition through merger consolidation, Southern California Edison (SCE) has owned and operated the Bishop Creek plants. Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-2-B (Page 10)