The Historic American Engineering Record (HAER) is a long-range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service United States Department of the Interior. The Powerhouse No.
6 recording project was undertaken by Galvin Preservation Associates (GPA) for the Southern California Edison Company (SCE) in cooperation with Justine Christianson, HAER Historian SCE initiated the project with the intention of making a donation to As recommended by Justine Christianson the report describes how water flows in and out of the powerhouse to produce electricity, and a vital component of the report documents changes in operating machinery that have occurred over time. Archaeologist Crystal West (SCE) oversaw the project and provided access to the site. Historian Andrea Galvin (GPA) served as project leader. Architectural Historian Matthew Weintraub (GPA) served as the project historian.
Jeff McCarthy, Supervisor of Operations (SCE), and Keith Inderbieten, Hydro System Operator (SCE), provided research assistance. James Sanderson produced the large format photographs. The field team consisted of Andrea Galvin (GPA), Matthew Weintraub (GPA), Crystal West (SCE), Neil Sliger (SCE), James Sanderson (photographer) and Matthew Pegler (photographer assistant). Researchers can be directed to also see: HAER No. CA-145-6-Bishop Creek Hydroelectric System, Plant 6. Bishop Creek Hydroelectric System, Plant 6, Powerhouse No. 6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 3) PART I. HISTORICAL INFORMATION A. Physical History of Building: The physical history of Powerhouse No.
6 was determined by reviewing available original construction drawings which were limited to a general plan of the plant,1 a powerhouse foundation plan,2 and a generator foundation plan.3 Also, drawings for the reconstruction of Powerhouse No. 6 following a fire and later expansion/ alterations which occurred after its original construction were reviewed.4 These plans were retained by the power companies that successively owned and operated the plant (currently SCE). In addition, articles describing construction and operation of the powerhouse which originally appeared in the trade journals Journal of Electricity Power and Gas5 and Electrical World6 and reprinted by SCE were reviewed. They included a series of articles written by Charles O.
Poole, who served as chief engineer of the Nevada-California Power Company. The building itself provided physical evidence of its history and development via field inspection,7 as did historical photographs and contemporary drawings in the possession of SCE. Further information was found in previously completed HAER documentation8 and evaluations of eligibility for listing in the National Register of Historic Places.9 These sources provided thorough and detailed information regarding the historic design, construction, improvement and operation of the building. 1 SCE, General Plan Bishop Creek Plant No. 6, October 15, first revised September 1, most recent revision April 14, 2 SCE, Foundation Plan Power House No.
6, September 6, revised October 31, 3 SCE, Generator Foundation Plan Power Plant No. 6, September 16, revised September 2, and November 28, 4 Nevada-California Electric Corporation (NCEC), Plans for Reconstruction of Bishop Creek Plant 6 Building After Fire of March Sheet 1 of 7, March 25, revised November 27, NCEC, Plans for Reconstruction of Bishop Creek Plant 6 Building After Fire of March Sheet 2 of 7, March 28, revised December 15, SCE, General Details Control Room Addition. Bishop Creek Plant No. 6, September 12, revised April 14, 5 Rudolph W. Van Norden, System of Nevada-California Power Company and the Southern Sierras Power Company. Part 1 Power Plants, Properties and Power Developments of the Nevada-California Power Company and the Southern Sierras Power Company.
Reprinted from the Journal of Electricity Power and Gas, Volume XXXI, Numbers July p. 6 C. O. Poole, Power house and equipment of station No. 6 of the Nevada-California Power Company All water leaving station used for irrigation purposes, Power Development and Transmission Systems of The Nevada- California Power Company and the Southern Sierras Power Company, p. Reprinted from Electrical World, New York, 7 Field inspections were conducted on October 20 and December 7, 8 Thomas T. Taylor, Bishop Creek Hydroelectric System, HAER No. CA-145, Historic American Engineering Record, National Park Service, U.S. Department of the Interior, p.
9 Robert Clerico and Ana Beth Koval, An Architectural and Historical Evaluation of Structures Associated with the Bishop Creek Hydroelectric Power System, Inyo County, California, Southern California Edison Company, December p. Valerie Diamond, Stephan G. Helmich, and Robert A. Hicks, Evaluation of the Historic Resources of the Bishop Creek Hydroelectric System, Southern California Edison Company, July p. A-10- 14. Bishop Creek Hydroelectric System, Plant 6, Powerhouse No. 6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 4) Overview Powerhouse No. 6 was originally constructed in by the Southern Sierras Power Company, a subsidiary of the Nevada-California Power Company.
It was one of the last two powerhouses to be constructed in the Bishop Creek system, along with Powerhouse No. 3 which was built at the same time. Powerhouse No. 6 is the lowest plant in the system at an elevation of feet. The powerhouse is a single-story, reinforced concrete industrial building altered from its original Mission Revival architectural style. It contains a large rectangular room that houses a single rotating generator driven by a pair of impulse water wheels. In the water wheel-driven generator operated with a capacity of kilowatts The building was reconstructed in after it was partially destroyed by fire. Currently, Powerhouse No. 6 continues to operate as a hydroelectric powerhouse in the Bishop Creek system.
The powerhouse plant is situated on the northwest bank of the lower stretch of Bishop Creek, below Bishop Creek Canyon. The plant originally consisted of the powerhouse (extant), a small utility building (not extant), a residential building (not extant), and a garage (not extant). In the Journal of Electricity Power and Gas provided this general description of Powerhouse No. 6, which was completed that same year: It has already been stated that No. 6 and No. 3 were plants operated by the Southern Sierras Company and were the newest plants, both having been built at the same time The powerhouse building of No. 6 measures 30 x 42 ft. inside and is a replica of Nos. 2 and 3, although smaller than either one. The operating hydraulic head is 258 ft. and like No.
5 there is but one generating unit. This plant is very simple in design and in operation and particularly suitable to a system of the sort to which it is connected. The main generating unit is placed at the center of the building, its shaft parallel to its greatest length.10 1. Date of Construction: Construction of Powerhouse No. 3 commenced in based on foundation plan drawings dated September and a general plan drawing of the plant dated October Construction was completed and the powerhouse was operational in The building was reconstructed in after it was substantially destroyed by fire, as indicated by reconstruction plans dated March 2. Architect/Engineer: The engineer of the original construction of Powerhouse No. 6 was probably R. G. Manifold of Manifold & Poole, Los Angeles.
Manifold apparently served as engineer for the construction of Powerhouse No. 3 which was constructed that same year. Manifold s business partner, Charles O. Poole served as chief engineer of the Nevada-California Power Company. In addition, the Sierras Construction 10 Van Norden, System of Nevada-California Power Company, p. 16. Bishop Creek Hydroelectric System, Plant 6, Powerhouse No. 6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 5) Co. was listed in construction plans and may have employed architects. Other architects and/or engineers are not known. 3. Builder/Contractor/Supplier: The original builder of Powerhouse No.
6 was the Sierras Construction Co., which is listed on construction drawings, dated The powerhouse was reconstructed after a fire by The Nevada-California Electric Corporation of Riverside, California (which succeeded the Nevada-California Power Company) as indicated by reconstruction plans dated Other builders, contractors and material suppliers are not known. 4. Original Plans: The powerhouse was designed as rectangular in plan with exterior wall-to-wall dimensions of 34 6 x 46 6 . It was constructed of reinforced concrete and finished in stucco on the exterior. The powerhouse was built three bays wide and three bays long as defined by regularly spaced columns that extended to the interior.
At long side walls, columns were spaced 12 6 apart; at end walls, they were separated by a distance of 8 6 . Concrete walls between columns were 6 thick. Columns, or pilasters , were four-cornered and shouldered with flat slopes. Pilasters at the sides were integrated with concrete cornices, while pilasters at the ends terminated in well-defined drainage slopes. The powerhouse roof was a moderately pitched gable supported by a Fink steel truss system and sheathed in corrugated sheet metal. End walls terminated in two-level curvilinear stepped parapets with square-profile coping that obscured the gable ends.
The east side wall contained the original powerhouse s two entrances: a man-door located off-center in the northern bay; and a large square service opening in the southern bay which allowed for large machinery to be moved in and out of the building. The building was fenestrated in a regular pattern with wood sash: large square windows, 12-light-over-6-light, in side wall bays (three windows on the west side and one window at the center of the east side); and tall rectangular windows, 16-light-over-4-light, in the end bays. Gable ends contained large circular windows divided into 9-light grids. The powerhouse was built with a complex concrete substructure 10 0 feet deep that was designed to house an impulse wheel-driven generator.
At the interior, the generator room that occupied the structure was open in plan. The generator room housed a single generator driven by a pair of flanking water wheels situated at the center of the room and related equipment such as valves, pumps, governors, exciters, and switchboard panels. The interior long walls contained recessed bays formed by the post-and-beam construction and filled by curtain-wall panels. The building was open vertically through the trusses. A 20-ton overhead traveling crane furnished by the Cyclops Iron Works of San Francisco spanned the width of Bishop Creek Hydroelectric System, Plant 6, Powerhouse No. 6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 6) the room.
The rolling crane ran on rails mounted on concrete beams that formed parallel ledges along the long side walls below the level of the trusses. 5. Alterations and Additions: The powerhouse structure was extensively rebuilt after a fire in March The fire affected the roof, upper walls, and interior electrical machinery. Following the fire, the damaged upper portion of the building (from just below the eaves to the roof) was wrecked and rebuilt. The intact concrete foundation, lower walls and pilasters were retained and provided a structural base for the newer construction. The newer upper portion was constructed of matching reinforced concrete and tied securely to the intact lower portion. The rebuilt structure was capped by a new gable roof supported by two Fink steel trusses.
The reconstructed powerhouse included several alterations and additions to its original design. The most visible change involved the elimination of the original curvilinear parapets and termination of the end walls as gable ends with galvanized sheet metal cornices, which was more expedient than restoring the parapets. The corner pilasters were finished with squared tops rather than the original sloped profile. The original circular window openings in the gable ends were filled and replaced with blank stucco wall. A new roof with 2 solid redwood sheathing covered with a layer of Johns-Manville Rigid Asbestos Shingle and Ridge Roll was built.
(The original corrugated metal roof was previously replaced with asbestos shingles on wood sheathing in Asbestos shingles were salvaged from the existing roof and used in the construction of the newer roof). The formerly straight ridgeline was altered by installation of a centrally located, gable-roofed, sheet metal monitor with chain-operated, center-pivot factory sash, 8-light panels flanking 6- light panels on both sides.
Factory steel sash glazed with double-sided obscure glass and operable central panels were installed in existing window openings, 6- light x 5-light at side walls, 4-light x 5-light at the ends.11 At the northwest corner of the building, where more extensive fire damage had occurred, the reconstruction involved wrecking and repouring all or most of three 6 concrete curtain walls (two bays at the north end and one bay at the west side) and addition of a steel I-beam for structural reinforcement beneath a damaged concrete crane beam. Also, a new switch cell addition was constructed adjacent to the central and west bays at the north end of the powerhouse. The small shed- roofed wing extended out 7 0 from the original powerhouse and measured 21 6 along its long side.
It was built with reinforced concrete walls 6 thick and capped by a 4 slab covered by 20 yr. roofing. It varied in height from 12 6 at the top of north wall to 14 0 where it met the powerhouse wall. The shed roof projected 6 beyond the north wall. The addition was accessed by two Kalamein metal paneled doors, 3 0 x 6 8 with wire glass in the upper parts, symmetrically located at the corners of the east and west walls. 11 Original wood windows were previously replaced by steel sash in Bishop Creek Hydroelectric System, Plant 6, Powerhouse No. 6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 7) Since the powerhouse was reconstructed, altered, and expanded in few structural and/or material changes have occurred other than minor internal partitioning.
A small battery room and an adjacent water closet were constructed within the northeast corner of the powerhouse. In a windowed control office was enclosed along the north wall, measuring 11 10 wide and projecting 7 4 into the generator room. Recently, the control room window was removed and filled in by a matching wall. B. Historical Context: The following historical context was included in previously completed documentation which established the eligibility of the Bishop Creek Hydroelectric System for listing in the National Register of Historic Places.12 The turn of the twentieth century saw a dramatic change in technological history. The production of cheap, dependable hydroelectric power, and the ability to transport the power over great distances, was perfected at this time.
In short order, drainages with sufficient flow for hydroelectric power generation began to be developed. By the only suitable streams draining the east slope of the Sierra Nevada which were not being used for electricity production were the Carson and Walker river systems. The first hydroelectric power generation along Bishop Creek was a small plant operated by the Bishop Light and Power Company. The facility was reported to be a half mile west of the Standard Flouring Mills (present site of Plant 6) and two and a half miles from the town of Bishop. The plant consisted of a Stanley polyphase generator (capable of 150 horsepower) driven by a 48-inch Pelton wheel. The power was generated for local use. Through the efforts of Loren B. Curtis, an engineer, and Charles M.
Hobbs, a banker and financier, the Nevada Power, Mining and Milling Company was incorporated on December 24, The first facility built by the Nevada Power, Mining and Milling Company was put into operation in September, supplying hydroelectric power to the mining communities of Tonopah and Goldfield, Nevada. Executives of the power company had purchased controlling interest in the locally operated facilities in Tonopah and Goldfield, so that, when production began, there was a market ready for their product. The original transmission line extended east across Owens valley, the White Mountains, Fishlake Valley, and the Silver Peak Range to the town of Silver Peak in Clayton Valley. Here the line split, diverging northeast to Tonopah and due east to Goldfield.
The line distance from Bishop Creek to Goldfield was 95 miles, and that to Tonopah was 118 miles. This was a new record for long distance transmission. On January 5, the Nevada-California Power Company, successor to the Nevada power, Mining and Milling Company, was incorporated; most of the original corporate officers remained with the new company. 12 Clerico and Koval, An Architectural and Historical Evaluation, p. Bishop Creek Hydroelectric System, Plant 6, Powerhouse No. 6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 8) Between and four more generating plants were placed on line, in tandem along Bishop Creek, and additional generators were placed in existing plants.
As a result of this additional power generation, the Tower Line from Bishop to San Bernardino was completed in and put into operation, again creating a new record for long distance transmission miles). The directors of the Nevada Power, Mining and Milling Company were well aware of the vicissitudes of the boom-bust mining industry and took steps to secure a more constant market for their product. In the Southern Sierra Power Company was incorporated with the main purpose of creating and servicing the power needs of southeast California. From then until several smaller power companies were purchased by the new company. The development of southern California's Imperial Valley corresponds directly with Bishop Creek's production of cheap, reliable electricity.
By the end of the Bishop Creek system was essentially complete with all five plants operating. In descending order down the drainage, the Bishop Creek facility then consisted of: Power Plant 2: Three Westinghouse generators, each capable of kw of power (total output of Units 1 and 2 were driven by Pelton wheels and unit 3 by a Doble wheel. Power Plant 3: Three Crocker-Wheeler generators, each capable of kw of power (total output of All three units were direct connected to Henry impulse wheels.
Power Plant 4: Five generating units consisting of: two National Electric Company, 750 kw, generators connected to Pelton wheels; one Bullock, kw, generator driven by a Pelton wheel; one Allis-Chalmers, kw, connected to a Pelton wheel; and one Allis-Chalmers, kw, machine driven by a Doble wheel (total output of Power Plant 5: Two generating units, one of which was a kw, Allis- Chalmers machine driven by a Doble wheel and the other a kw unit connected to a Pelton-Francis wheel (total output of Power Plant 6: A single generator capable of kw driven by a Pelton-Doble wheel. It is interesting to note that Power Plant 1 was to have been built at the present site of Intake No.2, but the plant was never built due to the vulnerability of the site to avalanches.
The plant number designators were not adjusted accordingly, so that there is no Power Plant 1, nor has there ever been. Bishop Creek Hydroelectric System, Plant 6, Powerhouse No. 6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 9) In the Nevada-California Electric Corporation again was reorganized to become an operating company. The corporation became California Electric Power Co. and continued to operate under this name until when the company known as Calectric was subsumed by Southern California Edison Company. Since as a result of acquisition through merger consolidation, Southern California Edison (SCE) has owned and operated the Bishop Creek plants. Bishop Creek Hydroelectric System, Plant 6, Powerhouse No.
6 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-6-B (Page 10)