The Historic American Engineering Record (HAER) is a long-range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service United States Department of the Interior. The Powerhouse No.
4 recording project was undertaken by Galvin Preservation Associates (GPA) for the Southern California Edison Company (SCE) in cooperation with Justine Christianson, HAER Historian SCE initiated the project with the intention of making a donation to As recommended by Justine Christianson the report describes how water flows in and out of the powerhouse to produce electricity, and a vital component of the report documents changes in operating machinery that have occurred over time. Archaeologist Crystal West (SCE) oversaw the project and provided access to the site. Historian Andrea Galvin (GPA) served as project leader. Architectural Historian Matthew Weintraub (GPA) served as the project historian.
Jeff McCarthy, Supervisor of Operations (SCE), and Keith Inderbieten, Hydro System Operator (SCE), provided research assistance. Stephen Schafer produced the large format photographs. The field team consisted of Andrea Galvin (GPA), Matthew Weintraub (GPA), Crystal West (SCE), Neil Sliger (SCE), Stephen Schafer (photographer) and David Sanchez (photographer assistant). Researchers can be directed to also see: HAER No. CA-145-4, Bishop Creek Hydroelectric System, Plant 4; HAER No. CA-145-4-A, Bishop Creek Hydroelectric System, Plant 4, Cottage No. 1; HAER No. CA-145-4-B, Bishop Creek Hydroelectric System, Plant 4, Worker Cottage (Building HAER No. CA-145-4-C, Bishop Creek Hydroelectric System, Plant 4, Worker Cottage (Building HAER No.
CA-145-4-D, Bishop Creek Hydroelectric System, Plant 4, Worker Cottage (Building HAER No. CA-145-4-E, Bishop Creek Hydroelectric System, Plant 4, Worker Cottage (Building HAER No. CA-145-4-F, Bishop Creek Hydroelectric System, Plant 4, Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 3) Worker Cottage (Building HAER No. CA-145-4-G, Bishop Creek Hydroelectric System, Plant 4, Worker Cottage (Building HAER No. CA-145-4-H, Bishop Creek Hydroelectric System, Plant 4, Worker Cottage (Building and HAER No. CA-145-4-I, Bishop Creek Hydroelectric System, Plant 4, Lightning Arrester Vault. Bishop Creek Hydroelectric System, Plant 4, Powerhouse No.
4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 4) PART I. HISTORICAL INFORMATION A. Physical History of Building: The physical history of Powerhouse No. 4 was determined by reviewing available original construction drawings which were limited to a floor plan1 and a machine foundation plan.2 Also, drawings for alterations and additions to Powerhouse No. 4 which occurred after its original construction were reviewed.3 These plans were retained by the power companies that successively owned and operated the plant (currently SCE). In addition, articles describing construction and operation of the powerhouse which originally appeared in the trade journals Journal of Electricity Power and Gas4 and Electrical World5 and reprinted by SCE were reviewed.
They included a series of articles written by Charles O. Poole, who served as chief engineer of the Nevada-California Power Company. The building itself provided physical evidence of its history and development via field inspection,6 as did historical photographs and contemporary drawings in the possession of SCE. Further information was found in previously completed HAER documentation7 and evaluations of eligibility for listing in the National Register of Historic Places.8 These sources provided thorough and detailed information regarding the historic design, construction, improvement and operation of the building. Overview Powerhouse No. 4 was constructed in by the Nevada Power, Mining and Milling Company, and it was expanded in by its successor, the Nevada-California Power Company.
It was the first powerhouse to be constructed in the Bishop Creek system, and it is the third highest powerhouse at an elevation of feet. Situated on the northwest 1 Nevada Power Mining & Milling Company, Bishop Creek Power Plant Floor Plan Showing Arrangement of Machinery, December 22, 2 Nevada-California Power Company, Foundation Plan Unit No. 5 for Power Plant No. 4, April 22, 3 Southern Sierras Power Company Data for Roof of Power House No. 4 Area and Slopes, May 11, revised July 27, California Electric Power Company, Building Details Battery Room Plant No. 4 Bishop Creek, November 29, SCE, Building Roof & Wall Panel Details, Powerhouse No. 4, June 12, 4 Rudolph W. Van Norden, System of Nevada-California Power Company and the Southern Sierras Power Company.
Part 1 Power Plants, Properties and Power Developments of the Nevada-California Power Company and the Southern Sierras Power Company. Reprinted from the Journal of Electricity Power and Gas, Volume XXXI, Numbers July p. 5 C. O. Poole, Hydraulic and electric features of stations Nos. 4 and 5 of the Nevada-California Power Company Static head at the former station, Power Development and Transmission Systems of The Nevada-California Power Company and the Southern Sierras Power Company, p. Reprinted from Electrical World, New York, 6 Field inspections were conducted on October 17 and December 7, 7 Thomas T. Taylor, Bishop Creek Hydroelectric System, HAER No. CA-145, Historic American Engineering Record, National Park Service, U.S. Department of the Interior, p.
8 Robert Clerico and Ana Beth Koval, An Architectural and Historical Evaluation of Structures Associated with the Bishop Creek Hydroelectric Power System, Inyo County, California, Southern California Edison Company, December p. Valerie Diamond, Stephan G. Helmich, and Robert A. Hicks, Evaluation of the Historic Resources of the Bishop Creek Hydroelectric System, Southern California Edison Company, July p. A-161- Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 5) bank of Bishop Creek, the powerhouse functioned as the main component of Power Plant 4, which included operational buildings, offices, residences, and accessory buildings. Powerhouse No.
4 was constructed as a single-story reinforced concrete industrial building in the Utilitarian early twentieth century industrial architectural style. As originally constructed, the building consisted of a large rectangular room that housed four impulse water wheel/generator units installed between and and a long wing that contained transformers. The power company expanded Powerhouse No. 4 in in order to accommodate a fifth water wheel/generator and additional transformers. By Powerhouse No. 4 operated with a combined capacity of horsepower in water wheels and kilowatts in generators. Transformers stepped up the voltage from to for long-distance transmission. Small additions to Powerhouse No.
4 were constructed between and and again more recently, and operations and machinery were incrementally improved over time. Currently, Powerhouse No. 4 operates as the oldest and largest powerhouse in the Bishop Creek system. In the Journal of Electricity Power and Gas provided this general description of Powerhouse No. 4, which was originally constructed eight years previously and expanded five years previously: The power house building, while it has been added to to accommodate increased capacity, is substantially in construction like those of Nos. 2 and 3 [which were constructed after Powerhouse No. 4 in and respectively], being of reinforced column and curtain wall type, with corrugated iron roof of Fink steel trusses.
There is a main bay for the generating units and a gable addition forming a bay almost as long as the main part, in which are placed the transformers. There are five main generating units placed with their shafts in line.9 In Charles O. Poole, chief engineer of the Nevada-California Power Company, described in Electrical World the economic factors that resulted in the expansion of the powerhouse and its facilities during and after its original construction: This station is the original station of the system, and the first units were installed in when the company was known as the Nevada Power, Mining & Milling Company. It was thought at that time that kw would be the maximum requirement, and the plant was designed accordingly.
The original installation consisted of two units, but the mining operations increased so rapidly that before the plant was put into operation a third unit of rating was ordered, and by the time 9 Van Norden, System of Nevada-California Power Company, p. 14. Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 6) that was installed a fourth unit was ordered, and so on until the development reached its present stage [with five units].10 1. Date of Construction: According to Charles O. Poole, chief engineer of the Nevada-California Power Company: Ground was broken on this plant in February, and on Sept. 20 electricity was delivered into Tonopah and Goldfield, a distance of 118 miles.
11 According to a history of the power company, Iron Men and Copper Wires, Powerhouse No. 4 was constructed during and: On September 19, the first hydroelectric energy was delivered to Goldfield, and two days later, power went on in Tonopah. 12 Apparently Powerhouse No. 4 was already built and operating when a floor plan was drawn up in December The powerhouse was expanded at its north end in as indicated by a machine foundation plan for the addition of a fifth power generation unit dated April 2. Architect/Engineer: The engineer of the original construction of Powerhouse No. 4 was John D. Galloway, who was listed as the civil engineer on a floor plan dated Galloway served as a consulting engineer for the Nevada Power, Mining and Milling Company.
The engineers of the expansion of the powerhouse were (R. G.) Manifold & (Charles O.) Poole of Los Angeles, who were listed on a machine foundation plan dated Poole served as chief engineer of the Nevada- California Power Company. Other architects and/or engineers are not known. 3. Builder/Contractor/Supplier: Powerhouse No. 4 was likely built by contractors and/or day labor force hired by the power company in Ponderous generator parts were laboriously freighted up to the plant site, urged by long strings of mules. Pack trains and buckboard wagons carried material along an ever-lengthening road to where the power line was going up. 13 The powerhouse was probably expanded in by the Engineering-Contracting Co., which also constructed Powerhouse No.
3 in the Bishop Creek system that same year. Individual builders, contractors and material suppliers are not known. 4. Original Plans: The powerhouse was constructed with concrete-over-aggregate foundation 10 0 deep and concrete walls 12 thick. The original building plan resembled a wide T- shape. The primary mass at the top of the T-shaped building had exterior dimensions of 82 0 x 32 0 and contained the main generator room. Concrete 10 Poole, Hydraulic and electric features of stations Nos. 4 and 5, p. 27. 11 Poole, Hydraulic and electric features of stations Nos. 4 and 5, p. 27. 12 Myers, William A., Iron Men and Copper Wires: A Centennial History of the Southern California Edison Company, p. 73. 13 Myers, Iron Men and Copper Wires, p. 71.
Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 7) columns that extended to the interior divided the long axis into five bays, of which the end bays were 15 0 wide and the middle three bays were 17 4 wide. Paired windows pierced the long walls of the generator room in the first, third, and fifth bays on the west side and the first and fifth bays of the east side (counting from south to north). The south end of the generator room was accessed by a man-door opening and it also contained a single window. The north end contained a large service opening and a pair of windows. At the building s west side, a small west wing projected from the fourth bay 7 0 in depth and 16 4 in width.
The large east wing (the wide stem of the T-shaped building) projected from the center of the east elevation 23 3 in depth and 52 4 in width. The north wall of the east wing contained a large service door and a single window, the south wall contained two single windows, and the long east wall was blank.14 The powerhouse s generator room was originally designed and built with interior dimensions of 30 0 x 80 0 to house four water wheel/generator assemblies. Original specifications called for generators, of which two were initially installed (at Units No. 1 and No. 2 in the south end) and of which the remaining two were substituted for larger and more powerful generators during construction (at Units No. 3 and No. 4 in the north end), resulting in a total output capacity of kw.
The power generation units were installed in line with each other along the building s long axis, with the common centerline of the wheels, generators, and shafts located 11 8 from the interior west wall and 18 4 from the interior east wall of the generator room. The water wheels and direct- connected generators were mounted within pits that were cast into the poured concrete foundation. Units No. 1 and No. 2 were arranged with bilateral symmetry to each other so that the water wheels were located next to each other on the inside and the generators were located on the outside. Units No. 3 and No. 4 demonstrated the same bilateral arrangement.
In the southeast quadrant of the generator room, the foundation contained a pair of exciter units arranged similarly to the main power generation units, with pit-mounted water wheels and generators (smaller than those used in the main units) center-aligned 8 4 from the interior east wall. The exciters produced direct current that was used to energize electromagnets within the main generators. At the west side of the generator room, where the penstock feeder pipelines entered the concrete substructure, control pits housed the machinery that regulated the flow of water to the impulse water wheels. This regulating machinery, including gate valves, nozzles, power needles, and stream deflectors was operated primarily by hand-wheels.
One bilateral set of pipelines, machinery, and wheel controls was located in a shared control pit at Units No. 1 and No. 2 and another 14 Contemporary sources widely report that Powerhouse No. 4 originated as an L -shaped structure that was later expanded into a T -shaped building. However, evidence indicates that the powerhouse originated as a T -shaped building that was first expanded into an L -shaped building and then shortly after that expanded into a larger T - shaped building. Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 8) bilateral set was located in the shared control pit at Units No. 3 and No. 4, which extended into a small west wing with interior dimensions of 6 0 x 14 4 .
Additional machinery located within the generator room included a switchboard located to the east of the exciters, an oil pump located in the southeast corner, and another oil pump located in an open area along the east side. Along the long axis of the generator room, the rails of an overhead traveling crane (used to move heavy machinery within the building) ran on top of a reinforced concrete post- and-beam system that projected 12 into the generator room. At the east side of the generator room where the side wall opened into the large east wing, steel post- and-beam substituted for reinforced concrete beneath the crane rail.
The large east wing, with interior dimensions of 21 9 x 50 4 , contained seven transformer units that stepped up the voltage of electricity for long-distance transmission. The transformers were installed close together in a row approximately 42 0 in length. Behind and above the transformers, an elevated concrete platform contained circuit breakers. Along the east side of the transformer wing, tracks for a transfer car (used to move transformers) ran the length of the room, aligned with the service opening at the north end. Within three years of original construction and commencement of operation, the power company saw fit to expand the size and increase the generating capacity of Powerhouse No. 4.
This expansion of the powerhouse may be considered a continuation of its construction because it occurred shortly after original construction and it was seamlessly integrated into the original building. According to photographic evidence, the powerhouse expansion of occurred in two separate phases. In the first phase, the north end of the transformer wing was extended by 14 10 the north, which filled in the recessed northeast corner of the original building, brought the north walls into the same plane, and resulted in an L-shaped building plan. However, a second phase of expansion which was completed in extended the generator room 19 0 to the north, which restored a T-shaped building plan to the powerhouse.
The two phases of expansion involved the removal of the original north walls, reconstruction of north walls in new locations with windows and service openings in original configurations, and lengthening of side walls. At the generator room, the expansion added a sixth bay that was pierced at the east and west sides by pairs of windows that matched those installed in the original construction. The expansion resulted in an overall building length of 101 0 and a transformer wing that was 67 2 long at the east side.
The original concrete post-and-beam wall section located in the fourth bay of the east wall of the generator room, which was enclosed by the expansion at the north end, was retained at the new interior as an open framed bay with an empty wall panel (which formerly contained a pair of windows) that allowed passage between the generator room and the transformer wing. The interior post-and-beam bay also supported the rails of the overhead traveling crane. Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 9) The expansion in accommodated additional facilities that increased power generation and transmission capabilities.
The expansion to the main generator room allowed for the installation of a fifth water wheel/1,500-kw generator assembly (Unit No. 5) located within the added bay and situated in line with the four previously existing units. A dedicated control pit with flow regulating machinery and controls was installed along the east wall next to the added power generation unit. It was arranged identically to the control machinery at Unit No. 4. Also, a third exciter unit was added near the center of the room in front of previously existing Unit No. 3. Also, three transformer units were added to the row of previously existing transformers within the east wing, which raised the total number of transformer units to ten (including one spare unit).
The additional equipment resulted in a total generator capacity of kw and transformers that stepped up the voltage from to for transmission on the Nevada-California and Southern Sierras systems. Although available original construction plans do not provide complete information, photographic and physical evidence provide additional details of construction and early development. The powerhouse building was originally capped by a hipped roof at the main generator room and an intersecting gable roof at the transformer wing, both roofs with overhanging eaves. The small wing at the west side was covered by a shed roof that was an extension of the west eave. The roofs were originally sheathed in galvanized iron.
At the primary hipped roof, a long gabled monitor straddled the length of the ridge with nine 3-light awning windows arranged in sets of three at each side. At the transformer wing, the upper wall of the east-facing gable end was pierced by a clerestory band comprised of six square windows regularly spaced. In the primary hipped roof was extended northward to cover the generator room addition and the rooftop monitor was lengthened to include a dozen awning windows on each side. Also in the transformer wing addition was capped by a second asymmetrical gable that was constructed next to the original gable and intersected with the primary hipped roof, resulting in a rather complex roof form. At the walls of the building, typical windows were double-hung wood sash, 6-light-over-1-light.
At the interior, the long side walls contained recessed bays formed by the post-and-beam/curtain wall construction. The building was open vertically through the trusses. 5. Alterations and Additions: Between approximately and three small exterior additions were constructed at Powerhouse No. 4 in order to accommodate improved operations and access. At the west side of the building, the existing small shed-roofed wing located in the fourth bay (counting south to north), which housed the control pit for Units No. 3 and No. 4 and valves for the penstock pressure line (No. 2), was extended 6 1 further from the west wall to 13 1 total. The extended wing contained a five-panel wood door in its south wall and a window in the north wall.
At the second bay, a smaller shed-roofed addition was constructed 7 3 in depth Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 10) and 10 0 in width, but it was not open to the interior of the powerhouse. This external addition housed valves for the penstock pressure lines (No. 1 and its by- pass connection to No. 2) and it was accessed by a two-panel wood door with diagonal boards in the panels and flat wood surround in its south wall. At the northeast recessed corner of the building, the construction of a small addition at the interior of the ell involved removal and covering of the large service opening at the north end of the east wing.
The corner addition extended 8 5 along the north-south axis and 22 9 along the east-west axis, and it was set back 6 behind the existing east wall of the main building. It was capped by a sloped corrugated metal roof with overhanging eaves and it contained a two-panel wood door at its north side and a pair of 16-light-over-4-light, double-hung wood windows at the east side. The corner addition housed personnel work spaces and facilities and it was accessed at the interior through the east wing. In steel sash replaced original wood sash in existing window openings. Also in the original metal roof was replaced with a new redwood roof covered by asbestos shingles.
Between approximately and a gabled dormer with louvered metal vent was added to the south side of the larger roof gable, and the sloped roof at the northeast corner addition was replaced by a lower flat roof. Reroofing occurred again in when all roof surfaces were covered by metal panels with metal ridge caps. After two small additions were attached at the west wall, neither of which involved piercing or removing the original exterior wall. One of these additions was constructed at the original valve wing in the fourth bay which was previously expanded between and This newer shed-roofed addition with metal panel cladding and solid metal double doors was built onto the existing south side, though it did not open into the valve wing or the generator room.
Adjacent to the small wing in the second bay that was added between and a similar, larger shed-roofed, metal-clad addition with double doors was constructed. These recent additions narrowed the open space between the small west wings but did not cover the windows located in the third bay. Over time, the original doors in the building were replaced, with the single exception of the wood door with diagonal boards located in the small west wing in the second bay which was constructed between and Other changes at the interior have occurred. A major facilities change that was planned in and that occurred at about the same time involved removal of the transformers from the interior of the building as a fire prevention measure.
This change allowed for repurposing of the internal volume of the east wing (the former transformer wing), including addition of equipment and partitioning over time. In the long east wall, which was previously blank except for clerestory windows in the original gable end, a window was added near the southeast corner. In a battery room measuring 8 0 x 12 0 was constructed in the southeast corner of the east wing. The battery room walls were 8 0 tall and constructed of 8 x 8 x 16 concrete-block. It was capped by a flat concrete slab roof 6 thick Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 11) that projected 2 beyond the plane of the walls.
The battery room was accessed from the interior of the powerhouse by a metal door with a louvered panel located in the west wall. The battery room was vented at the exterior by a metal louver that was installed in the south wall of the east wing. In a control room measuring approximately 24 0 x 23 6 was constructed within the north end of the east wing. The original concrete post-and-beam wall bay that was retained and enclosed when the north end was expanded in became part of the west wall of the control room. The bay, which originally contained a pair of windows that opened to the exterior, was filled with a metal-framed office window above a stucco panel.
The control room extended beyond the concrete post-and-beam and into the internal volume of the east wing as a rectangular framed enclosure with stuccoed walls and flat slab roof. Interior access to the control room was provided by doors located in the added west wall and in the southeast corner. The control room became the connection between the main volume of the powerhouse and the northeast corner addition, built between and which contained the north end entry vestibule, a communications room, and a lavatory (from east to west). B.
Historical Context: The following historical context was included in previously completed documentation which established the eligibility of the Bishop Creek Hydroelectric System for listing in the National Register of Historic Places.15 The turn of the twentieth century saw a dramatic change in technological history. The production of cheap, dependable hydroelectric power, and the ability to transport the power over great distances, was perfected at this time. In short order, drainages with sufficient flow for hydroelectric power generation began to be developed. By the only suitable streams draining the east slope of the Sierra Nevada which were not being used for electricity production were the Carson and Walker river systems.
The first hydroelectric power generation along Bishop Creek was a small plant operated by the Bishop Light and Power Company. The facility was reported to be a half mile west of the Standard Flouring Mills (present site of Plant 6) and two and a half miles from the town of Bishop. The plant consisted of a Stanley polyphase generator (capable of 150 horsepower) driven by a 48-inch Pelton wheel. The power was generated for local use. Through the efforts of Loren B. Curtis, an engineer, and Charles M.
Hobbs, a banker and financier, the Nevada Power, Mining and Milling Company was incorporated on December 24, The first facility built by the Nevada Power, Mining and Milling Company was put into operation in September, supplying hydroelectric power to the mining communities of Tonopah and Goldfield, Nevada. Executives of the power company had purchased controlling interest in the locally operated facilities in Tonopah and Goldfield, so that, when production began, there was a market ready for their 15 Clerico and Koval, An Architectural and Historical Evaluation, p. Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 12) product.
The original transmission line extended east across Owens valley, the White Mountains, Fishlake Valley, and the Silver Peak Range to the town of Silver Peak in Clayton Valley. Here the line split, diverging northeast to Tonopah and due east to Goldfield. The line distance from Bishop Creek to Goldfield was 95 miles, and that to Tonopah was 118 miles. This was a new record for long distance transmission. On January 5, the Nevada-California Power Company, successor to the Nevada power, Mining and Milling Company, was incorporated; most of the original corporate officers remained with the new company. Between and four more generating plants were placed on line, in tandem along Bishop Creek, and additional generators were placed in existing plants.
As a result of this additional power generation, the Tower Line from Bishop to San Bernardino was completed in and put into operation, again creating a new record for long distance transmission miles). The directors of the Nevada Power, Mining and Milling Company were well aware of the vicissitudes of the boom-bust mining industry and took steps to secure a more constant market for their product. In the Southern Sierra Power Company was incorporated with the main purpose of creating and servicing the power needs of southeast California. From then until several smaller power companies were purchased by the new company. The development of southern California's Imperial Valley corresponds directly with Bishop Creek's production of cheap, reliable electricity.
By the end of the Bishop Creek system was essentially complete with all five plants operating. In descending order down the drainage, the Bishop Creek facility then consisted of: Power Plant 2: Three Westinghouse generators, each capable of kw of power (total output of Units 1 and 2 were driven by Pelton wheels and unit 3 by a Doble wheel. Power Plant 3: Three Crocker-Wheeler generators, each capable of kw of power (total output of All three units were direct connected to Henry impulse wheels.
Power Plant 4: Five generating units consisting of: two National Electric Company, 750 kw, generators connected to Pelton wheels; one Bullock, kw, generator driven by a Pelton wheel; one Allis-Chalmers, kw, connected to a Pelton wheel; and one Allis-Chalmers, kw, machine driven by a Doble wheel (total output of Power Plant 5: Two generating units, one of which was a kw, Allis- Chalmers machine driven by a Doble wheel and the other a kw unit connected to a Pelton-Francis wheel (total output of Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 13) Power Plant 6: A single generator capable of kw driven by a Pelton-Doble wheel.
It is interesting to note that Power Plant 1 was to have been built at the present site of Intake No. 2, but the plant was never built due to the vulnerability of the site to avalanches. The plant number designators were not adjusted accordingly, so that there is no Power Plant 1, nor has there ever been. In the Nevada-California Electric Corporation again was reorganized to become an operating company. The corporation became California Electric Power Co. and continued to operate under this name until when the company known as Calectric was subsumed by Southern California Edison Company. Since as a result of acquisition through merger consolidation, Southern California Edison (SCE) has owned and operated the Bishop Creek plants. Bishop Creek Hydroelectric System, Plant 4, Powerhouse No.
4 Bishop Creek, Bishop vicinity, Inyo County, California HAER No. CA-145-4-J (Page 14)