BlockBefore

Rocketdyne Manufacturing Facility, Building 031, 6633 Canoga Avenue, Canoga Park

Rocketdyne Manufacturing Facility, Building 031, 6633 Canoga Avenue, Canoga Park, Los Angeles County, CA. Surveyed as HAER CA-2355-K, with a 570-word written history.

From the record

“Rocketdyne Manufacturing Facility, Building 031, 6633 Canoga Avenue, Canoga Park, Los Angeles County, CA”

Survey record header. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2355-K · the record runs 570 words · one of 386 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

63 words

Source document Quoted word for word from HAER CA-2355-K. Not written, edited or summarised by this site.

The Rocketdyne Manufacturing Facility is located in Canoga Park, California. The facility is situated on an approximately 47-acre site (portion of Lot 2 Tract No. and portion of Lot 1 Tract No. bounded by Victory Boulevard on the south, Canoga Avenue on the east, and Owensmouth on the west. Building 031 is located at latitude: longitude: Present Owner/ Occupant: United Technologies Corporation (UTC)/vacant

Written history

393 words

Source document Quoted word for word from HAER CA-2355-K. Not written, edited or summarised by this site.

See Building 001 Record ROCKETDYNE MANUFACTURING FACILITY, BUILDING 031 HAER No. CA-2355-K (Page 2) Part I. Historical Information A. Physical History: 1. Date(s) of construction: 2. Architect/Engineer: None 3. Builder, contractor, suppliers: Unknown 4. Original plans and construction: None 5. Alterations and additions: Earthquake Safety B. Historical Context: See Building 001 Record Part II. Architectural and Structural/Design/Equipment Information A. General Statement: 1. Character: The Metal Storage Shed (Building is located near the southwest corner of the complex, next to Shed 42 (Building Building 031 is a large rectangular shaped single-story utilitarian prefabricated metal warehouse-like structure with a low-pitched roof. The Building is a product of Soule Building Systems.

Building 031 s distinguishing features include its low sloping roof line and vertical metal siding. The interior consists of a large wide-open space with no partitions and a concrete- slab floor. The ceilings are made up of exposed corrugated steel supported by metal trusses, brackets, and rafters. Industrial lighting is provided by suspended light fixtures. The ceiling also features multiple skylights. 2. Condition of fabric: Building 031 appears to be in good condition with no major indications of deterioration. B. Description of Exterior: 1. Overall dimensions: Building 031 is a rectangular building with overall dimensions of approximately 160 long by 80 wide. The building is approximately square feet. 2. Foundations: Building 031 sits on a reinforced concrete foundation. 3.

Walls: The exterior walls consist of prefabricated vertical metal siding ROCKETDYNE MANUFACTURING FACILITY, BUILDING 031 HAER No. CA-2355-K (Page 3) 4. Structural system, framing: Building 031 s structural system consists of a prefabricated steel frame attached to vertical metal siding and steel girders and beams. 5. Porches, stoops, balconies, bulkheads: There is a small concrete stoop located along Building 031 s east elevation, in front of a single door near the structure s northeast corner. 6. Openings: a. Doorways and doors: Building 031 has a large garage door providing access for vehicles, which contains a steel roll-up door. The garage door is slightly off center on Building 031 s east elevation.

On the north side of the garage door are two pedestrian doorways containing single metal doors. b. Windows: None 7. Roof: a. Shape, covering: Building 031 has a low sloping pitched roof with a corrugated steel surface. b. Cornice, eaves: None c. Dormers, cupolas, towers, clerestories, monitors: None Part III. Sources of Information A. Primary

In context

Canoga Park, California The place record: every map, photograph and survey of this town.
Los Angeles County, California 1,078 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Canoga Park

15 records

The federal surveyors worked through Canoga Park building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Pacific FurnaceHAER CA-22804,909 words
Rocketdyne Manufacturing FacilityHAER CA-2355-O1,369 words
Rocketdyne Manufacturing FacilityHAER CA-2355-B1,187 words
Rocketdyne Manufacturing FacilityHAER CA-2355-L1,060 words
Rocketdyne Manufacturing FacilityHAER CA-2355-D899 words
Rocketdyne Manufacturing FacilityHAER CA-2355-C880 words
Rocketdyne Manufacturing FacilityHAER CA-2355-J722 words
Rocketdyne Manufacturing FacilityHAER CA-2355-I663 words
Rocketdyne Manufacturing FacilityHAER CA-2355-F655 words
Rocketdyne Manufacturing FacilityHAER CA-2355-N596 words
Rocketdyne Manufacturing FacilityHAER CA-2355-P556 words
Rocketdyne Manufacturing FacilityHAER CA-2355-E541 words
Rocketdyne Manufacturing FacilityHAER CA-2355-G519 words
Rocketdyne Manufacturing FacilityHAER CA-2355-M498 words
Rocketdyne Manufacturing FacilityHAER CA-2355-H490 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2355-K. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.