St. Lucie Canal, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart
St. Lucie Canal, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL. Surveyed as HAER FL-20, with a 12,389-word written history.
From the record
“Army Corps of Engineers, Jacksonville Office in St.”
Written record, HAER FL-20 survey. Machine-read text.
Surveyed by the federal HAER program as HAER FL-20 · the record runs 12389 words · one of 10 surveyed structures published for this county.
Source document
Quoted word for word from HAER FL-20.
Not written, edited or summarised by this site.
Located at the confluence of the St. Lucie Canal and the South Fork of the St. Lucie River, Stuart vicinity, Martin County, Florida USGS Indiantown SE Quadrangle, Universal Mercator Coordinates: 17 E570925 Dates of Construction: Engineers: U.S. Engineer Office, Jacksonville, U.S. Army Corps of Engineers, War Department Fabricator: Cleary Brothers Construction Company, West Palm Beach, Florida
Significance
10875 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER FL-20.
Not written, edited or summarised by this site.
Engineered by the U.S. Army Corps of Engineers, Jacksonville Office in St. Lucie Lock and Dam was designed for preventive measures during hurricanes, floods, and droughts while allowing navigation on the Okeechobee Intracoastal Waterway, a 155-mile passage connecting the Gulf of Mexico with the Atlantic Coast via Lake Okeechobee. Report Prepared by: David E. Port and Dena E. Hodes, New South Associates Date: December
St. Lucie Canal
Lucie Lock and Dam) HAER NO. Page 2 PART I HISTORICAL INFORMATION A. Physical History: 1. Date of construction: 2. Architect/Engineer: The Corps' supervising construction engineers at St. Lucie included Colonel Lewis H. Watkins, Jacksonville District engineer, Caraway Nelson, senior engineer in charge of Lake Okeechobee work, and C. J. Smith, resident engineer of the St. Lucie Canal lock. George T. Augur, Leo L. Burnet, Caraway Nelson and Peyton signed the engineering drawings as engineers. 3. Original and subsequent owners: State of Florida, U.S. Corps of Engineers 4. Original Builder, Contractor, Supplier: Cleary Brothers Construction Company, West Palm Beach, Florida. Philip Gray was superintendent of the Cleary Bros. Construction Company work force at St.Lucie Lock No. 1. 5.
Alterations and Additions: The original main spillway was outfitted with temporary wooden flashboards. In these were replaced with seven steel taintor gates in the main spillway and a steel auxiliary lock gate was installed in the old lock. Construction of the hydro- electric power house on the southern end of the dredge by pass created the need for the closure of the upper opening which had a moveable dam. The old lock chamber was filled with concrete in It is capped with a grass lawn at the same elevation as the island. Approximately twenty old gas lampposts that used to line the spillway and facility have been removed and sold at auction. Modern replacement lighting has been installed. B.
Historical Context When Florida became a state in its population mostly resided in northern Florida, an area larger than many states, or in Key West. However pioneers and Floridians alike began plans to settle and explore the remote southern part of the state. Awareness of the swampy land and what was needed to make it ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 3 desirable for settlement as well as the presence of its Seminole residents, made many look westward instead. Real challenges in addition to bad publicity made Florida and particularly southern Florida a destination to be avoided. The southern Peninsula was regarded, as a swampy, humid, miserable land while the west was open and vast.
As a consequence, the interior of the state was forgotten and the challenge of the Okeechobee Basin's reclamation was left relatively untouched and ignored by settlers for many years. Scattered settlements appeared in the St. Lucie region in the early with the communities of Gomez, Hobe Sound, Jensen Beach, and Stuart. Waveland was the first community and postal center in the region, being established in By there were forty-one inhabitants of the St. Lucie Inlet region, and by the turn of the century, the number doubled. 1 From the onward, proposals were made for drainage and land reclamation projects in south central Florida.
The Board of Trustees of the Internal Improvement Fund (I.F.F.) was founded in to manage the swamplands and then to use the proceeds from land sales to fund internal improvements. Railroad and canal companies that defaulted on their land purchases threatened the solvency of the I.F.F. To reduce their debt, the state board sold 4 million acres to Hamilton Disston who really began the enormous job of reclaiming land and engendered the opening of the interior. While the St. Johns and Indian rivers had gained attention for water transportation during Hamilton Disston's drainage and reclamation project, the hazardous and unpredictable water inlets such as St. Lucie and Jupiter remained a deterrent to navigation.
In the several plans were made to link the waterways together, and by the late-1890s, the St. Lucie waterway was proposed as a flood control and navigation route coinciding with the completion of Disston's waterways. However, the lack of roads and the advent of the southward bound Florida East Coast Railway took precedence over an interior waterway connecting the Gulf to the Atlantic. Railroads were built and 1 Historic Architectural Survey of Martin County, Florida. Augustine, Florida: Submitted to Growth Management Department, Comprehensive Planning Division of Martin County, Stuart, Florida, by Historic Property Associates, Inc., June 5. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 4 land sales increased by almost 200 percent because of the Disston Purchase.
His undertaking was one of three largest in Florida. The other two ventures that attracted attention and coincided with Disston's drainage project were the railroads from Henry M. Flagler on the east coast and Henry B. Plant on the west. In spite of Disston's untimely death in his venture was received as the first large-scale and successful attempt to begin intracoastal transportation across Florida's peninsula. Between and Disston continued dredging operations that converted hundreds of thousands of acres of swampland into fertile soil. His operations lowered the Kissimmee lake levels from eight to 11 feet; opened up most of the farmland around Lake Okeechobee; dug the first eight miles of the Miami Canal; and made possible the cities that ring the Lake.
He was also the first to conceptualize the St. Lucie Canal as evident on an railroad map. Disston's idea was later authorized by the State Drainage Commission. With all of the new lands opening, Disston was acquiring increasing amounts of real property to borrow capital for additional developments. Similarly, the Board of Trustees of the Internal Improvement Fund (I.I.F.) was pursuing new railroad contracts with renewed interest, chartering 564 companies seeking land grants, and of these, 251 were wholly or partially built, while 154 of these rail lines actually operated.
2 In gubernatorial candidate Napoleon Bonaparte Broward wanted to reclaim all of the Everglades and not just sections or portions at a time, like what had been done around Lake Okeechobee or what was being proposed by opportunists and developers. Without adequate knowledge of how such a project could be realized, he used the catchphrase "water will run downhill" to counter opponents and win support for his ideas. Humorously, the inexperienced yet vocal candidate once said that all that had to be done for reclamation was to "knock a hole in the wall of coral and let a body of water obey a natural law and seek the level of the sea." 3 Fortunately, at the time of the 2 Charles E. Harner, Florida's Promoters: The Men Who Made It Big (Tampa, Florida: Trend House, 17.
3 George E Buker, Sun, Sand, and water: A History of the Jacksonville District U.S. Army Corps of Engineers (Washington United States Government Printing Office, ca. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 5 election, the Okeechobee interior was flooding giving Broward's platform more credibility. He won the election by a narrow margin. The U.S. Department of Agriculture also backed Broward knowing that rice, sugar, and tropical fruits that could not be grown elsewhere in the country could be harvested in the Everglades. Soon the governor's reclamation vision became policy. Broward inspected the region by boat and then advised the legislature in a special meeting that a canal was needed from Lake Okeechobee to the St.
Lucie River, a distance of 22-miles, to be followed by another canal that would meet up with the St. Johns River. This new waterway, together with the Caloosahatchee, would create the intracoastal passage that Disston had dreamed about. With 740 miles of inland waterway, some 6 million acres would be reclaimed for cultivation and transportation. 4 Broward expected that this operation would also prevent flooding around Lake Okeechobee because the lake level would be lowered four to six feet from dredging and reclamation operations. 5 The project was earmarked for and dredging was scheduled for 18 months. 6 The Board of Trustees of the I.I.F.
expected to start at once, but Broward was cautious, knowing the trustees had abused their responsibility in the past providing public lands to railroad companies. The Governor preferred to have a joint resolution for a constitutional amendment or a statue creating a drainage district empowered to oversee reclamation. To his surprise, Broward received both statue and amendment so that the drainage operation would proceed responsibly.
In the state legislature passed the first comprehensive drainage law that created the Board of Drainage Commissioners, which was counseled by former Governor Jennings and began dredging operations in 7 The Board also had the power to build canals, establish additional drainage districts, and accommodated the need to move water out of the Everglades into Lake Okeechobee and discharge through the Caloosahatchee River. By the Caloosahatchee 4 Alfred Jackson Hanna and Kathyrn Abbey Hanna, Lake Okeechobee: Wellspring of the Everglades (New York: The Bobbs-Merrill Company, 5 Charlton w. Tebeau, A History of Florida (Coral Gables, Florida: University of Miami Press, 6 Hanna and Hanna, 7 Tebeau, ST. LUCIE CANAL Lucie Lock and Darn) HAER NO.
Page 6 River region's population exceeded inhabitants and all freight and passenger traffic was still moved through Fort Myers. 8 Coupled with continued flooding the river, dredging activities continued by the Corps and the newly established Everglades Drainage District. Broward then changed his plans. He moved the location of the drainage canal to the New River instead of the St. Lucie River where there were large quantities of state owned unsurveyed land on the south shore of Lake Okeechobee. Many protested this move, including railroads and timber companies who were competing for the dredging contracts and subsequent reclaimed land. The North New River Canal began in and moved slowly from the North New River, through the Everglades, and into Lake Okeechobee.
Two dipper dredges, the Okeechobee and the Everglades, were the first to commence work on this project. 9 In all of the excitement to watch water run down hill, neither Broward nor the State Drainage Commission ever had a qualified drainage engineer or hydrologic study examine the reclamation project. It wasn't until after Broward's reelection defeat that the District employed the first qualified engineer. When engineers arrived to the Okeechobee Basin to inspect the work, they were confronted with the most basic, yet complex of problems that persist to this day. The only way to control the level of water in the Everglades is to control Lake Okeechobee because overflow from the lake runs south.
Inversely, only so much overflow can run south, so east and west discharge routes are needed to regulate the lake's water level, which in turn affects the underground aquifers and the Everglades water reserves. Understanding the precise combination of these factors has been an ongoing lesson in the Okeechobee Basin's watershed and hydrologic dynamics. Reclamation consumed more money than anticipated. During the Democratic National Convention in Broward solicited Richard J. Bolles to purchase acres of state-owned swamp 8 C.A.
Kimes and Crocker, "The Caloosahatchee River and Its Watershed: A Historical Overview," (Fort Myers, Florida: submitted to Florida Gulf Coast University Library Services and South Florida Water Management District under subcontract from Florida Center for Environmental Services, Agreement No. FAU DSR No. revised September available from www._ces__ .__ INTERNET. 9 Buker, ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 7 and overflowed lands in the Okeechobee Basin at $1 million. A few days before Broward relinquished his governorship, the I.I.F. and Bolles signed the contract for overflowed state land "solely and exclusively for drainage and reclamation purposes.
" 10 Bolles was interested in land speculation and exploitation and "was destined to exert a new and unwelcome influence on the history of Lake Okeechobee." 11 Broward ultimately had been too optimistic in a state-controlled reclamation project, and by the North New River Canal had progressed only fifteen miles at a cost of well above the predicted budget. 12 Albert Gilchrist followed Broward as governor in In politicians critical of the drainage idea and citing that a great scandal was occurring gained enough support to launch an investigation into the reclamation project and Wright's report.
It was believed but never proven that the Department of Agriculture, the Florida East Coast Railway, the Board of Trustees of the I.I.F., and other Florida land companies were conspiring for lucrative reasons. Even Congressman Frank Clark from the Lake Okeechobee area wanted to show that he did not obstruct the inquiry. Excerpts from Wright's survey were originally manipulated by Governor Gilchrist, but Wright's report later went through three revisions (Report Nos. 1, 2, and 3) within the Department of Agriculture. The last report had drifted far from the original survey. Critics thought that Wright's Report No. 3 made recommendations favorable for drainage because Wright had become the chief drainage engineer of the Everglades District.
The Department of Agriculture had printed a different version of his report later because it said the first one was incomplete and too favorable. Hearings were held to examine whether there was any collusion between federal agencies or between companies that misrepresented the Everglades drainage project. In reclamation no longer remained a state-controlled policy. Private companies with proven records and competent engineers were solicited and awarded contracts for dredging operations by the State Drainage Commission. In the Furst-Clark Construction Company of Baltimore, Maryland, and 10 Hanna and Hanna, 11 Ibid., 12 Tebeau, ST. LUCIE CANAL Lucie Lock and Dam) HAER NO.
Page 8 Galveston, Texas, was awarded the contract to resume work and bought four dredges from the state (the Everglades, Okeechobee, Caloosahatchee, and Miami) to continue construction on the North New River Canal. The Furst-Clark Construction Company had a reputation for dredging operations having been awarded the Cape Cod Canal project in Massachusetts the year before. 13 The Company was equipped with a fleet of hydraulic suction dredges, vessels like the Suwanee in design but altogether sturdier and larger. In addition, Furst-Clark had a host of steam-powered land excavators or draglines that were transported by rail as well as towing craft for the dredges. Fuel oil was also transported by rail from Galveston, Texas.
While little information is known of the specific North New River dredging operation, the Cape Cod Canal experience provides an account of Furst-Clark's excavation procedures. The four dipper dredges were much like the ones used initially in Disston's reclamation project, and they provided steady, reliable results. Hydraulic suction dredges were also probably used since they were prevalent at the time and in the area. The dredging technology that the company had in and that they could have used includes the following equipment and descriptions. In the State Drainage Commission authorized intensive canal construction, and the basic design and form of the Okeechobee Waterway as it is known today was finished later that year.
Shallow drift navigation via the Caloosahatchee River, Lake Okeechobee, and the St. Lucie Canal was made available, and no locks or dams had been installed along the waterway. The St. Lucie Canal functioned as a floodway and irrigation channel in these early years. 14 The North New River Canal was known to be rocky and therefore shallower, which was one of the main reasons why dredging operations continued on the St. Lucie Canal during the time.
Based upon Cape Cod Canal's procedures and corroborated through the Stuart newspaper, Furst-Clark operated two dredges in tandem with the sturdier and larger dipper dredge excavating a deep initial depth which was then followed by the suction dredge that leveled the canal to an even below sea level elevation, widening and deepening the twenty-five mile cut. 15 13 Robert H. Farson, Cape Cod Canal (Yarmouth Port, Massachusetts: Cape Cod Historical Publications, 35. 14 Kimes and Crocker. 15 Farson, 40. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 9 According to statements collected from the Stuart News from November 5, The work of digging the huge St. Lucie-Okeechobee drainage and shipping canal is progressing nicely and is being hurried along with night and day shifts.
Two dredges are employed in the work, each operating from the Okeechobee end. The small dredge, which precedes the larger, [has done more or less preliminary work for almost the total distance and] is now about two and one-half miles from the lake and is advancing at the rate of about 600 feet a day. [The smaller dredge does the work of pulling stumps and blocking-out work in addition to piling up rock and earth to a height of 10 or 12 feet along the dredge spoil lining the canal's banks]. The larger dredge Clark], which completes the actual work of digging the huge ditch [and has the advantage of its suction pumps], has reached a point of about one and one -half miles from the Okeechobee end and is excavating dirt at about cubic yards daily.
[This indicates that there will be a wall of earth and rock 20 to 30 feet high along both sides when the canal is completed through the pine lands]. If this rate could be maintained constantly, work would be finished in a year. Actual digging operations on the canal have been in progress for about five weeks. It is probable that the Furst- Clark Construction Company, the contractors, will also put a dredge at the St. Lucie end of the canal so as to expedite the work, although no definite announcement to this effect has been made. 16 In June the Stuart News noted that the dredge San Diego had begun cutting through the St. Lucie Inlet while on the lake side, the canal had been completed to a point about five miles eastward of Lake Okeechobee.
Apparently, optimism fueled exaggeration and expectation as noted in the following statement: The St. Lucie Canal will be the main control canal of the immense Everglades drainage system, the largest 16 Lucie Canal, Approved in Is Boon to Agriculture Here," The Stuart News, 9 January Anniversary Edition. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 10 drainage project in the world. The huge ditch will be twenty-five miles in length, 200 feet wide at the top, 160 feet at the bottom, with a minimum depth of twelve feet ... Indications are that digging operations will now go steadily forward until the completion of the canal and that no further hitch-up will result, as the Internal Improvement Board of Florida and the United States War Department have come to a thorough understanding.
17 Another common operating procedure was the purchasing and selling of equipment as Furst-Clark had done by acquiring the four dipper dredges from the State Drainage Commission to begin the North New River operation. The Suwanee was in use in various general purpose tasks such as dredging, freight, and passenger service for forty-four years before her demise in the hurricane of September and most vessels in a dredging area were worth more because of their location and accessibility. Similarly, when Furst-Clark abandoned the Cape Cod Canal project in October they turned over their dredges and other equipment to the Massachusetts-based Canal Construction Company to recoup their losses.
18 After completing the North New River Canal in Furst-Clark continued dredging operations along the West Palm Beach and then widened and enlarged the St. Lucie Canal from until By this time however, three new dredges, the Clark, the San Diego, and the Caloosahatchee, were utilized for the second phase of St. Lucie's canal excavation. In Congress appropriated for the initial dredging of the St. Lucie Inlet, and the contract was awarded to the Standard American Dredging Company. Undetected coquina formations, rocks in the channel, and limited State funds hampered progress. In the Bowers-Southern Dredging Company was also used along the St. Lucie Canal, and it is uncertain if they replaced Furst-Clark or if they were subcontracted to do the excavation of the canal.
As World War One began and oil became scarce because of the war effort, the dredges were converted to wood burners and logging crews nearly deforested central Martin County finding fuel for the machines. Bowers-Southern went bankrupt and the canal's construction again 17 Ibid. 18 Farson, 52. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 11 lurched onward, dependent upon funding supplied by the Board of the Everglades Drainage District and their business of land speculation. In times of land booms and fervid speculation, the State had the funds to proceed with drainage and reclamation, opening more land to developers and investors.
During construction of the North New River Canal in Wright was made Chief Engineer for the remainder of this project as well as for all drainage operations in the Everglades District. The District allowed him to ufix his own salary." 19 In addition, Furst-Clark obtained an amendment to their contract in for the placing of upermanent locks in said canals" that they were constructing. 20 The Furst-Clark Company built five locks that permitted access into the lake, and these locks were located at the lakeshore entrances of Moore Haven and the St. Lucie Canal and at the North New River, Miami and West Palm Beach Canals. Furst-Clark Construction Company built the last three locks in and and they were responsible for the dredging of these canals as well as the Hillsboro.
The Everglades Drainage District built two other locks near Ortona after presumably, although little information is known about their exact location and who constructed the locks or their attendant's houses. 21 In preparation for the new town site of Moore Haven, the U.S. suction dredge, Sarasota, cleared the Caloosahatchee River in from LaBelle to Citrus Center, and the Everglades Drainage District constructed new locks. One was located at Citrus Center (Caloosahatchee Lock No. 2) and the other was built (Caloosahatchee Lock No. 3) on the west end of Lake Flirt. Both were constructed after The new locks assisted in the navigation over the Lake Flirt basin, which was known to be shallow during seasons of droughts and swollen during floods. Caloosahatchee Lock No.
1 was planned to be located near Moore Haven, and the actual construction of the lock began in The firm also excavated and constructed the South New River 19 Hanna and Hanna, 13 2 . 20 National Register of Historic Places Inventory - Nomination Form, uLock No. 1, North New River canal," Florida Master Site File, 3, Located in R.A. Gray Building, Tallahassee. 21 Clausen et al., Cultural Resource Survey of Portions of the Port La Belle Development Tract, Glades and Hendry Counties, Florida, Report submitted to General Development Corporation, Miami, Florida, Survey Project No. July 62. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 12 Canal and Lock, which thereby connected Lake Okeechobee via the North and South New Rivers to Fort Lauderdale and the Atlantic Ocean.
The North New River Lock No. 1 became operational in March The opening of the lock led to an increased agricultural exploitation of the newly drained land along the New River Canal. Produce grown in the Okeechobee Basin was brought down the canal to the railroad at Fort Lauderdale. Similarly, settlements were established around the lake end of the North New River, Miami, and West Palm Beach Canals. Boats traversed the distance between Lake Okeechobee and Ft. Lauderdale in flotillas. This action made the trip go faster because more than one boat could use the lock concurrently, making its use more efficient. Lining the channel's length near the uplake entrance, rows of fish houses were constructed overhanging the North New River Canal.
Catfish was an equally important cargo, and flat, shallow, small launches transported the fish in box- like cabins constructed on these vessels to awaiting railroad freight cars. 22 The locks along the North and South New River, Miami and West Palm Beach Canals were similar in design to the locks built at both of the St. Lucie facilities in the They were located at or near the head of tidewaters, usually from the lake's shoreline, and the three structures replaced the existing muck, earth, and stone dams which had been constructed by Disston to release overflow. While the dimensions vary between lock chambers, the earlier structures consisted of a single lock approximately in length and 25' in width with a wing-dam extending uplake and connected to a large movable sluice gate.
Earthen cofferdams were constructed in front of the lock facilities to protect them from upstream water pressure and high water damage. The locks were constructed of parallel poured concrete walls with a depth in the chamber of 14' from top to foundation, measuring six feet thick at the foundation of the wall and tapering to three feet at the top. On the outside the chamber was located a small wing-dam of poured concrete. This auxiliary dam functioned as a reservoir to retain the water between the unfilled areas between the lock chambers' walls and 22 National Register of Historic Places Inventory, 4. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 13 the canals' banks.
Essentially, these early locks appeared as floating locks or island-like structures in the midst of the canals that connected to Lake Okeechobee because they emerged as wide inlets approximately south of Lake Okeechobee's shoreline. The upstream main wing-dam facade extended approximately 40' across and was also constructed from poured concrete. A wooden catwalk and a metal handrail extended across the top of this structure providing access along the wing-dam to the lock gates. Paired wooden gates at either end regulated the water level while also controlling the entrance to the lock chambers. The gates closed to form an interior angle of 142 and pointed upstream.
Horizontal 1' x 1' timbers, spaced at each end with 1' x 1' blocks, were spiked together using x iron straps to form the main gate structures. The gates were sheathed on the upstream side with vertical 2" x 8" boards nailed in a butt joint forming a watertight seal. At the base of each gate was a hand-operated butterfly valve that was used to control the water level in the lock when a boat was raised or lowered. The gates were operated through a miter-geared rack and pinion mechanism. Adjacent to these locks, there were auxiliary structures that influenced how future lock facilities were to be designed and operated. At the North New River Lock, a small poured concrete radio and U.S.G.S.
recording station was built in October and remained in use until Another common feature found at the majority of the lock facilities was the lock tender's quarters. These residences also functioned as office space, and their floor plan typically consisted of a three-room wood frame bungalow with a simple low gable roof supported by eave brackets. Built in July the bungalow at North New River Lock had its shed roof porch extending to the west of the house. The original plans for the house still exist today at the Land Records Section - Bureau of State Lands in Tallahassee, Florida. The three post-1930s lock and dam facilities at Ortona, Moore Haven, and St. Lucie were all designed with Lock Masters' Houses and Lock Assistants' Quarters. St.
Lucie Canal Most observers, Okeechobee residents, engineers, and politicians considered the dredging of the St. Lucie Canal, to be the ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 14 panacea for controlling the lake's water level. The dredges utilized for the excavations were similar to hydraulic suction vessels like the Suwanee. The suction dredge discharged slurry upon the banks through pipes swung perpendicular to her sides, while the vessel's derrick provided lifting power to raise rocks and snags from the riverbed.
Violent accidents were not uncommon while working around dredges: workers were often sucked into the pipe after falling overboard; the protective dike that held the lake's water level back would break and 10- foot walls of water would engulf workers and equipment; and dynamite used to blow up stumps, rocks, and unwittingly, the people who lit the fuses. In the estuary region of the St. Lucie, shark attacks were common, as were alligator attacks further inland. Situated on the Atlantic end of the St. Lucie Canal, Stuart was like most places in south Florida, a booming frontier town of 700 residents. In nine million pounds of fish were sent by rail from Stuart.
But even with the advent of railroad and the decline of steamboat traffic that transported the fish to markets, shallow drift traffic allowed the passage of many small ships and vessels to get to the railroad hubs. The canals and waterways urepresented the most tangible sign that the frontier was being bent by the will of man. " 23 The Florida legislature passed acts modifying reclamation tax rates from a single rate to a gradual set of rates in terms of these proposed structures, maintenance, and anticipated benefits.
24 Of the promised locks along the waterway, three facilities were constructed along the Caloosahatchee River at Lake Flirt, Citrus Center and Moore Haven in addition to the four canal locks along the lake end at the North New River, Miami, and West Palm Beach Canals and the west St. Lucie Canal (No. 1), which was completed in near present day Port Mayaca. East St. Lucie Lock (No. 2) was constructed between and and the St. Lucie Canal was partly operational in and then completed in LaBelle remained an important intermediate town along the river and catered to the steamer and freight traffic with its deep harbor basins. 23 Thomas E. Weber, Jr. , ed. , "The Digging of the St. Lucie Canal," The Stuart News, Three part series, Copies obtained from St. Lucie's Visitor Center, U.S.
Army Corps of Engineers. 24 Kimes and Crocker. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 15 In with the end of World War I, work resumed methodically. On January 19, the St' Lucie Canal was officially dedicated. During dry seasons, the lake's level dropped by nearly six feet, which in turn made navigation difficult without continued maintenance and dredging of the waterways. During wet seasons, thousands of small farms would be inundated. The biggest impact of the St. Lucie Canal was that it did have the same effect of the opening of the West Palm Beach Canal, which provided accessibility, irrigation, and potential development to all of the fertile reclaimed land.
25 Citrus and agricultural companies came to the banks of the canal, especially in light of the frost that harmed all the citrus crops in north Florida, yet the orchards were spared in the Okeechobee Basin. In the new Florida Governor, Sidney J. Catts, wanted to sell all 1.5 million acres of state-owned swamp and overflowed lands at five to eight dollars an acre to pay off the reclamation debt, again privatize drainage. 26 Fortunately, Spitzer, Rorick, and Company from Ohio bought bonds worth million before this could happen. New canals were then started and old ones were improved with references to the Randolph report. Construction continued on the St. Lucie Canal from Port Mayaca to Stuart and also began on the Indian Prairie Canal on the west shore of Lake Okeechobee.
Within eight years, bond sales totaled million. While drainage taxes had increased, there was still a lack of funding, meaning that not all of the projects undertaken could be financed. Contracts were either honored intermittently or closed to save money. Undependable revenue sources and the inevitability of war were two reasons why the construction of the St. Lucie Canal took a decade to complete, three times longer than the time needed to complete the North New River. However, the decade between and gave witness to the most reclamation activity in the history of the Okeechobee Basin, with the exception of the Central and Southern Florida Flood Control District.
During this period, more than half the excavation of the Everglades occurred in addition to 453 miles of canals, fifty-four miles of levees, and fourteen canal locks. Construction began on the following locks during 25 Weber, Jr 26 Hanna and Hanna, 1 71 ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 16 this time, and in most cases, the facilities were finished within a year or two: the old Lake Flirt (ca. Citrus Center (ca. Moore Haven and St. Lucie No. 1 and St. Lucie No. 2 St. Lucie Lock No. 2 was completed in and took seven years to finish due to insufficient funding. All of these reclamation activities coincided with increased population, new rail lines and the first interior highway along the Lake's shore, land values quadrupling, and acreage under cultivation tripling.
27 The Everglades Drainage District Commission's Annual Report states that their original report recommended that "the St. Lucie Canal be constructed as a combined control drainage, navigation and power canal with a single combined lock, dam and powerhouse." However, their report notes that that recommendation was amended. "As finally planned and constructed, the power feature was abandoned, and two control locks and dams were provided, No. 1 at Lake Okeechobee and No. 2 at one and two-thirds miles from the outlet into the St. Lucie River. A dredge pass and dry dock were added as part of control lock and dam No. 2. " 28 The St. Lucie Canal was partly operational by following the completion of the west St. Lucie Lock No.
1 where Port Mayaca was developing as a potentially large citrus community engineered and termed as "scientific agriculture by water control." The canal from Lake Okeechobee eastward was utilized for drainage and irrigation purposes with increasing navigation, and construction continued through to repair damages following a hurricane of that year. The storm was the first of three that would substantially alter the interior of south Florida. Although construction continued intermittently through early the canal was estimated to be 70 percent operational by the year's end. East St. Lucie Lock No. 2 was finished a year before, and the facility included an eight gate spillway, dredge pass, and lock chamber. The gates of the lock chamber were operated manually.
27Buker, 28Everglades Drainage District Commission, Annual Report of Everglades Engineering Board of Review (Presented to the Board of Commissioners of the Everglades Drainage District, Tallahassee, Florida, 36. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 17 Little development has occurred at Port Mayaca and even today the region is relatively barren of buildings. Originally, the sons of Henry Phipps, former partner of Andrew Carnegie, acquired acres north and south of Port Mayaca and were promoting the land as the new Coral Gables. 29 As millions of dollars were set aside for this project, the land boom collapsed in and with it, the future city of Port Mayaca.
Yet a year before, large-scale agricultural companies such as Bessemer Properties and the Port Mayaca Company began planting sugar cane, oranges, and winter vegetables and were showing the profitability of agribusiness. Port Mayaca survived as a name place for the region and as the entrance to Lake Okeechobee from the St. Lucie Canal. Reclamation activities assisted with the construction of roads and irrigation ditches, and forty-acre farm tracts were made available to investors and potential farmers.
According to the Stuart News, January 9, First tangible result of the canal for large-scale agriculture was the pioneering efforts of the Port Mayaca development back around created by Bessemer Properties Inc., a Phipps company, which saw the opportunities for agriculture through scientific water control by tapping on to St. Lucie Canal with pumps to provide irrigation in dry spells. At the same time, a series of canals discharged excess water into the canal during wet spells. The Port Mayaca Valencia orange groves today represent the first big-scale successful planting of citrus in Martin County.
Port Mayaca could well be said to be the test plot on which millions were spent to prove, by trial and error, with the best possible scientific agricultural advice, what could be done by enlisting the aid of the man-made waterway. Port Mayaca was an outstanding ufirst" because it squarely faced up the fact that the problems of drainage and water control must be solved if agriculture was to be successful in Martin County. 30 Although the state had authorized and sold over ten million dollars in bonds by the collapse of the Florida land boom 29 Hanna and Hanna, 230 30 The Stuart News, 9 January ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 18 in brought an end to state-controlled waterway maintenance and reclamation projects.
The State Drainage Commission had exceeded its credit, and the state had exhausted its financial responsibility having been involved for the most part with reclamation since the Swamp and Overflowed Land Grant Act of Between to total expenditures for the District was approximately $18 million. 31 In maintenance on the North New River, Miami, and West Palm Beach Canals, which had provided extensive waterway traffic and toll revenue for over a decade, was abandoned. The droughts of the early and the lowered water tables in the Okeechobee Basin caused the decline of intracoastal traffic along the waterway. The canals had been shoaled from lack of dredging and navigation was no longer practical.
Railroads and highways had replaced canals as the primary transportation artery to and from the lake. In the locks along these three canals were permanently closed and allowed to deteriorate. 32 Investors, pioneers, developers, businesses, and landowners, who in good faith had settled the Okeechobee Basin and resided around the Lake, were not to be ignored and silenced because the funding for reclamation stopped. Because of its history and the time invested, the need for continuing drainage projects and flood control management was loudly and dramatically heard with a series of natural disasters. Following the hurricane, the state called upon the Corps of Engineers to widen and deepen the St. Lucie and Caloosahatchee waterways in order to increase runoff during excessive lake levels.
Lieutenant Colonel Mark Brooke recommended that the channels should be straightened and dredges to a width of 80' and a depth of 6' as a preventive measure for future flooding. However, the Corps District Engineer qualified this by stressing that the state must construct and maintain similar channels from the western to the eastern boundaries of the Everglades Drainage District and must include additional locks and dams along the waterway. 33 31 G.E. Dail, Organization for Water Conservation in Florida Petersburg, Florida: University of South Florida Press, submitted to Central and Southern Florida Flood Control District by Florida Conservation Workshop, Center for Continuing Education, July 5. 32 National Register of Historic Places Inventory, 4. 33 Buker, ST.
LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 19 Soliciting a second opinion in the State Drainage Commission appointed three engineers, which constituted the Engineering Board of Review, to examine what was previously done in the Everglades Drainage District. Fred C. Elliot was Florida's Chief Drainage Engineer and supervised the review process. Based on the survey's findings, an engineering proposal recommended more east and west canals, pumping stations, a revision of the St. Lucie Canal, and a twenty-seven foot levee on the southern shore of the lake. All of which would be done by units or teams assigned to a specific task. 34 The survey also found the actual lands under cultivation following twenty-two years of reclamation and drainage was comparatively small.
35 Elliot was one of the first engineers to think in terms of units, or more precisely, a unit approach to a multifaceted problem that consisted of navigation, flood control, irrigation, construction of new facilities and maintenance of existing levees and locks along the waterway, and continued dredging and reclamation operations. In Congressional Representative Herbert J. Drane introduced a bill that authorized the Secretary of War to survey the Caloosahatchee River, Lake Okeechobee, and their drainage areas to determine what control works were necessary for navigation in association with flood control. The bill became law in February and Congress authorized Drane's report in April 36 Coinciding with Drane's report in the U.S.
House of Representatives assigned areas of jurisdiction and financial obligations to both the Corps of Engineers and the State Drainage Commission following the aftermath of the dissolved Caloosahatchee Improvement District and the hurricane of 37 Later that year in September the Palm Beach Hurricane moved inland to Lake Okeechobee, toppled an eight foot dike, and with destructive flooding, swept away an estimated lives and hundreds of homes and businesses in a single night. The Okeechobee Basin had been inundated with a month of heavy rains, and wind speeds reached 160 mile per hour. The barometer dropped to a point lower than any previously known and recorded 34 Tebeau, 35 Kimes and Crocker. 36 Ibid. 37 Ibid. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO.
Page 20 pressure-mark in the United States and only exceeded in a few instances in other parts of the world. 38 In addition to this loss of life and property, wildlife suffered immensely. Hundreds of alligators and thousands of fish were washed over the banks and left to die as the water receded. Livestock from many farms and ranches were completely destroyed. Most tragically, many families never knew what became of loved ones as "the curtain of oblivion dropped forever. " 39 With damage to the rail lines and with only two highways (the Conners and Palm Beach Road) leading to the southern shore of Lake Okeechobee, traffic into the interior was reduced to a crawl particularly in some areas where it took thirty to forty days for the lake's water to recede to permit passage.
40 The eeriest scenes and eyewitness accounts made the front pages, and horrific images were transmitted to the nation. These selected vignettes accompany the following descriptions. Hundreds of empty coffins were on public display because there was no dry land in the vicinity for immediate interment and little could be done to transport the volume of deceased. Mass burials were assembled in a common grave excavated by a dredging vessel's drag-line, which was working on the lake end of the St. Lucie Canal at the time. Finally, with the fear of cholera and other diseases encroaching, funeral pyres accounted for hundreds of unidentified bodies at several locations dotting the lake's shore.
The largest mass grave consisting of early settlers was excavated at Port Mayaca near the south bank of the St. Lucie Canal. The first major citrus grower in western Martin County, Bessemer Properties, donated five acres of land for this interment. Today, a slightly raised mound formed in an arc corresponds with the outline of the mass grave, and a marble plaque marks the burial ground of the victims. 41 The simple inscription on the stone reads: IN MEMORIAM 38 Ibid. 39 Hanna and Hanna, 2 6 2 . 40 Lawrence E. Will, Okeechobee Hurricane and the Hoover Dike (Belle Glade, Florida: Glades County Historical Society, 41 Weber, Jr. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO.
Page 21 TO THE PIONEERS IN THIS MASS BURIAL WHO GAVE THEIR LIVES IN THE HURRICANE SO THAT THE GLADES MIGHT BE AS WE KNOW IT TODAY For years afterwards, as the cultivation of the soil continued in the fertile lands, it was not uncommon to till over or come across a forgotten sun bleached skeleton. Engulfing the Okeechobee Basin for more than forty years and existing through fair-weathered and disappointing State-supported drainage works booming only in times of prosperity and newly issued bonds, land speculation fever was both stopped and extinguished by this hurricane's destruction of life and property. Knowing this tragedy could have been prevented, there were few words for this catastrophe; there were only images captured by photographs and recorded by gripping survivors' stories.
Fierce outcries demanded swift and immediate action. Once again, Federal participation was requested. Having been made a scapegoat for this disaster, Elliot, the Everglades Drainage District's Chief Engineer, was most vocal during this time. Elliot called attention to the fact that technically the State was not draining the Everglades from its coffers since, aside from land sales and drainage taxes on state-owned lands, Floridians had never paid for reclamation. The State was the largest landowner in Florida, and drainage operations were funded with revenues generated by land booms and newly issued bonds.
Elliot explained further that it was Florida's own financial contribution that needed to be reexamined as well as the inept State Drainage Commission and the Board of Trustees of the I.I.F. in Tallahassee. "No money has ever been appropriated by the State for drainage, no general State tax is imposed for such purpose, the bonds issued for carrying on the work are not an obligation of the State, and no law authorizes the State, itself, to take part or have in hand in this drainage enterprise-[yet the] highest public officials direct the work. In its broad, economic sense, the State views the drainage of the Everglades as the means of developing a tremendous potential as set within its domain" 42 42 Hanna and Hanna, 2 6 3 ST. LUCIE CANAL Lucie Lock and Dam) HAER NO.
Page 22 In December House and Senate Committees called for a review of Drane's report, which had been pending since its submission in April. At the end of the year, Congress allocated almost $18 million for expenditures of navigation, drainage, and flood control measures. Following the aftermath of the hurricane, President-Elect Herbert Hoover visited to view the destruction. As one of his first official acts of office, President Hoover instructed Congress to authorize the Corps of Engineers involvement and to come to the aid of the state. Up until this point, the Corps could only provide recommendations, and had been recommending the same proposals the Randolph Report addressed as well as what Elliot had planned.
During the proceedings of the House Flood Control Committee, Fred Davis, Florida's Attorney General, reverberated Elliot's sentiments but from the Tallahassee or north Florida perspective. In January Davis claimed that most of the Everglades residents were from other states and it was difficult to get people in other parts of Florida "interested in whether they perish or not." 43 When questioned, Davis again reiterated that people should be kept out of the Everglades altogether and that south Florida was essentially settled by seasonal Yankee tourists. Controversy over Davis and Elliot's statements reverberated throughout the country, and it was apparent the State of Florida was in the business of land reclamation, not flood control.
A full year was spent recovering from Davis' statements, repairing its harmful implications, and redirecting legislation back onto what was most important: that lives perished because of political, economic, and legal impediments. By December legislation was introduced calling for Federal cooperation, and the Okeechobee Flood Control District was created by the state legislation to cooperate with the Federal Government in a plan to provide flood protection to south Florida. Unfortunately, the Great Depression completely halted drainage activities until legislation authorized further action and funds were allocated.
The State of Florida was initially charged with the responsibility of straightening the Caloosahatchee River, maintaining the necessary locks and dams from the western to eastern boundary of the Everglades Drainage 43 Ibid. I ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 23 District, providing pertinent information to the Secretary of War, and ensuing that rights-of-way, free passage, and additional improvements were provided along the Caloosahatchee River. 44 These primary responsibilities were assumed under the Okeechobee Flood Control District.
The Navigation Act was passed in Congress and signed by President Hoover in July Originally, the bill had been sent to the House Flood Control Committee in where it had been withdrawn because of Davis' statements and congressional concerns fearing that it would extend the Corps of Engineers flood control programs beyond the Mississippi and Sacramento rivers. 45 The next reincarnation of the bill went before the House Rivers and Harbors Committee where it was then passed to the Senate Committee of Commerce. The bill proposed that the State should shoulder percent for the cost of improvements as well as for all land purchases.
46 The Senate called for further review of the plans to determine if modifications could be made to the bill which would allow for "a reasonable and necessary measure of safety within a practical limit of expenditure with a view arriving at an equitable and feasible proportion of cost" between the Federal government and the State. 47 The Rivers and Harbors Act also known as the Navigation Act authorized the Corps to provide deeper and wider channels on the Caloosahatchee and St. Lucie Rivers and to control and manage the Lake within the Everglades Drainage District. The discrepancy between the original bill's name reflects the division between the merits of navigation versus flood prevention as well as the life span of the bill's journey through House and Senate committees.
This act standardized the policy the Federal government would take regarding all flood control matters, which was to be under the jurisdiction of the Secretary of War, who in turn supervised the Corps. In the absence of a sound and successful drainage and reclamation history, special dispensation was made to Florida to allocate federal funding more expeditiously. 48 After a year of volleying 44 Kimes and Crocker. 45 Buker, 46 Kimes and Crocker. 47 Ibid. 48 Ibid. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 24 between the House and Senate, the bill made the provisions that the original height of the levee was to be reduced as well as the amount the State would have to invest and provide for this project.
A cost of $2 million was proposed for State land acquisitions and rights-of-way for the waterway. 49 Packaged within this navigation legislation, the act made provisions for a navigable channel 6' deep and 80' wide as well as for the construction of a levee that flanked three-quarters of the lake. Already in place, the Corps had proposals coinciding with previous surveys and recommendations for future work along the Okeechobee Basin. The project began at LaBelle on December 10, and the Corps proceeded to dredge and align the river to make the passage navigable and wider for the larger equipment needed. Born from the collection of proposals and studies in the Okeechobee Basin and watershed, many of these construction plans, which were awaiting development, were adapted.
Materials dredged from Lake Okeechobee's rim or belt-canal and the rivers were used to construct the Herbert Hoover Dike, a 140-mile long 34-foot high levee that surrounds the shoreline of Lake Okeechobee. The height of the levee varied, from 34 to 38-feet, which is 20' or more above normal lake level. In later years, additions to the height of the levee were made. The levee's height is also 5' above the highest known point the lake has ever reached. Within the protective series of levees, the southern half of the lake was bound like a swimming pool while the northern half contained a V-shaped levee protecting the town of Okeechobee and the entrance to Taylor Creek.
There were also four flood way channels (Indian Prairie and Harney Pond Canals, Kissimmee River and Fisheating Creek) which were maintained to regulate excess water in addition to 16 drainage spillways along the St. Lucie Canal. The levees were extended to completely circumference the lake's shore after these initial sections were constructed. Detached from the round bowl-like Dike that holds the lake's water, additional side levees function as flanges, paralleling the entrances at Fisheating Creek and the Kissimmee River. Finally, unlike previous construction plans that had recommended canals through the center of the lake, the Corps proposed using the rim or belt-canal. This route made construction and repair 49 Ibid. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO.
Page 25 of the Dike more efficient, and the perimeter canals would be advantageous to maintaining the lakeshore channels as well as repairing the levee in the future. 50 The hurricane and great flood demonstrated the levee's worth by its minimization of the loss of life. 51 On June 26, the Permanent Appropriation Repeal Act authorized the Corps to operate and manage the locks and dams along the Okeechobee Waterway. Funding for this endeavor was provided from the House Rivers and Harbors Committee. In the Corps was granted congressional authority for all of the national flood control projects.
The Federal Flood Control Act provided that the Federal Government should improve or participate in the improvement of navigable waters and their tributaries for flood control purposes if the benefit accrued might prevent the loss of lives and social security of the people. In Congress authorized replacing St. Lucie Lock No. 1 with a weir at Port Mayaca and adding a larger lock and spillway to the existing lock on the eastern end of the canal or at Lock No. 2. The St. Lucie Canal was also widened and deepened, and the cost for this pre-War last installment of the Cross-State Canal was earmarked at In May plans were completed for the new lock and central control station, which included a hydroelectric power plant and a spillway dam. The War Department plans compiled by the U.S.
Army Corps of Engineers for the lock are dated The plans contain drawings for the upper gate structure, lock chamber, lower gate structure, guide and connecting walls, sector gates for main spillway, machinery houses, water supply and sewage, and attendant's quarters. The statement of responsibility identifies George T. Augur as the Assistant Engineer, Caraway Nelson as the Senior Engineer and Col. Lewis Watkins as final reviewer. Cleary Brothers Construction Company of West Palm Beach, Florida, supervised the renovation and modernization of East St. Lucie No. 2 between and The phased project was completed in after a number of delays, due to the scarcity of materials resulting from World War Two. The Cross-State Canal had officially opened in 50 Buker, 51 Hanna and Hanna, ST.
LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 26 and as the new lock was not yet completed at St Lucie, the old lock carried the event. The new lock at St. Lucie completed in would subsume the older lock. St. Lucie Lock No. 2 became an auxiliary chamber to its counterpart and was known as the old lock. When built the lock was substantially larger, and the design of its facilities were influenced by those built originally at Ortona and Moore Haven. 52 In this year, the Corps officially assumed responsibility for the Okeechobee Waterway and its watershed. In August another hurricane pelted the lake with the eye of the storm passing directly over the Okeechobee Basin.
The Corps reported that the storm had uoperated against the $24 million levee for a period three times as long as any previous storm and with greater intensities." 53 Enduring winds ranging from 75 to 120 miles per hour for a period of seven hours, the Dike once again held with only minor damages estimated at to the locks and levee. Considering the expense of the locks and levees, the damage prevented had proven to officials that the Dike and locks were a worthy investment. Though discharge was regulated and damage was minimal to Lake Okeechobee, the detrimental effects of relieving excess water were seen downstream of the St. Lucie Canal as well as the Caloosahatchee River. The spillways at St. Lucie were thrown open for most of the year in to relieve the swelling.
Reportedly 5 million acres of agricultural lands and $60 million in property loss occurred due to flooding east of St. Lucie's spillway. Similarly, while the Caloosahatchee River has always been a conduit for carrying freshwater runoff to the estuary, the man-made alterations along the waterway has changed the freshwater and saltwater gradient in the lower reaches of the river valley. Before dredging activities, freshwater traveled slowly, remaining in the estuary for longer periods of time, and allowed for a gradual mixing thereby sustaining a balance between ecosystems. As the river's channel was made deeper and run-off was faster, the greater quantities of freshwater entering the estuary disturbed the natural balance.
54 Pollution was also a major source of concern as floodwaters permeated and stretched along the swollen St. Lucie River. Bank erosion and 52 Kimes and Crocker. 53 Will, Okeechobee Hurricane, 54 Kimes and Crocker. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 27 salinity levels were also impacted by the torrent of excess waters released from St. Lucie's lock and spillway. In light of the flood damage, a more efficient water management system was proposed. The difference between the and the hurricanes is that the lake level had not been maintained at a safe elevation and subsequent flooding occurred.
In addition, the Corps was also concerned with rising toxins and salinity levels during severe droughts, which meant that the management system and flood control plan must account for more than draining excess water. Fresh water had to be kept in sufficient volume to provide a barrier in the underground aquifers from the intruding seawater. Florida's first comprehensive water management program was initiated in when the Federal Government authorized the South and Central Florida Flood Control Project. Designed to remove excess water rapidly throughout the drainage area, the project also stores excess water in large conservation pools. Water is also pumped in and out of Lake Okeechobee during the dry and wet seasons.
The following year, the state legislature created the Central and Southern Florida Flood Control District an agency responsible for monitoring and collaborating on all non-federal cooperative operations along the peninsula. The FCD was "the most far-reaching water program ever undertaken" in Florida until the Everglades Restoration projects were initiated. 55 The FCD is now in charge of the Dike as well as of water control in the Everglades and the Upper St. Johns and the Kissimmee River Basins, while the Corps maintains and operates the locks and dams along the Okeechobee Waterway. PART II.LOCK AND DAM DESCRIPTION A. General Statement: 1. Summary Description 55 Dail, 8. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 28 The St. Lucie Lock No. 1 facility is located within the St.
Lucie lock and Dam Recreation Area. The irregularly-shaped reservation consists of acres. The St. Lucie reservation is situated in the vicinity of the Hog Creek and Roebuck Creek drainage into the St. Lucie Canal, which is west of the lower South Fork of the St. Lucie Inlet. Located eight miles inland from Stuart, Florida, St. Lucie's lock enables navigation while the connecting spillway, located 120 feet north of the lock, is operated for flood control, irrigation, maintenance of water stages during low-flow periods and water conservation during droughts. St. Lucie Lock No. 1, the focus of this study, was added to an existing lock system built in The earlier facility consists of the original lock Lucie Lock No.
2), dredge pass, and small control house constructed circa The original lock had concrete lock walls and reinforced concrete miter gates. These elements were incorporated into the lock and spillway facility referred to as St. Lucie Lock No. 1 that was built into the expanded south bank of the canal. The lock facility includes a new larger electrically operated lock chamber and spillway, control house, four machinery houses, a hydro-electric power house, and five residences that accommodated the lock master and other lock personnel. The hydro-electric power house and lock personnel houses were integrated into the facility to create an independent and self-sustaining lock and dam complex.
The focus of the reservation is the lock and dam that extends across the river, incorporating the older lock and dam components into a unified concrete structure. The lock and dam structures are aligned respectively from the south to the north river bank in the following order: lock, island, old lock (now filled in), dredge bypass and dam. A diversion channel with a spillway and bridge is located just north of the lock and dam. The new lock is aligned with the older lock, approximately to the southeast. Paired machine houses, small box like buildings, were placed on opposite sides of the upper and lower gate structures. The hydro-electric power house was placed at the upper end of the dredge by-pass and a new office and control building was placed adjacent to the new lock.
The older control house is currently used for storage. The buildings associated ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 29 with the later lock and dam system are unified in their functional style with Art Moderne influences and the use of concrete as the primary building material. Lock tenders' quarters, constructed from standardized plans, are located southeast of the lock an elevated area. Four of the residences are placed in pairs, two facing the lock and two opposite one another on the access road. The fifth residence is set to the northeast of the others. This was considered the Lock Master's quarters and it was slightly larger than the other quarters. A paved access road lead from State Road 109 to the lock and dam facility. The St.
Lucie Lock and Dam Recreation Area also includes non- historic buildings such as a water treatment plant, a fire pump building as well as an additional residence constructed in known as the River residence, that has been adapted for use as a Visitor's Center. 2. Condition The historic buildings at the St. Lucie Lock and Dam Recreation Area are in good condition. The lock and dam is a functioning property, used for flood control and to enable navigation. Accordingly, its systems and structure have been well tended by the U.S. Army Corps of Engineers, Jacksonville District. The earlier dam has been filled in and the upper gate for the dredge bypass rendered non-operational when the hydro-electric power house was built on its northern end.
The historic residences are now privately owned and are inhabited. Some have been slightly modified but their layout and overall appearance possess integrity. B. Site 1. General Site Description The placement of the buildings and structures echoes the era lock system layout. The lock and dam complex has an east west orientation on the St Lucie River. The control house, ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 30 machinery house and hydro-electric power house are in direct association with the lock and dam. The access road dead ends at the parking area behind the control house. The residential cluster of buildings is laid out in a linear fashion along the south bank of the river. Three of the residences are situated to the left of the access road, two to the right.
The fairly level surrounding area is isolated and undeveloped. 2. Landscape The St. Lucie reservation consists of 159 acres in area, nine acres of which is maintained as a lawn and tended to by an outside landscape contractor. The area immediately adjacent to the lock and spillway structure is fenced with cyclone-type fencing. There are of asphalt-treated 10' width drives and of graded drives. The grounds are landscaped with Royal palm trees, Royal Poinciana, citrus fruit trees, and ornamental shrubs that were planted in the 3. Buildings/Structures The complex contains the lock and dam and its support structures as well as the residences. All of the buildings are painted cream-white with a reddish-brown trim, and the doors and awnings are also painted brown. The St.
Lucie reservation has an uniformed look yet with aesthetically pleasing qualities. PART III. SOURCES OF INFORMATION A. Architectural Drawings As-Built drawings of St. Lucie Lock and Dam were identified at the U.S. Corps of Engineers Office, South Florida Operations Office, Clewiston District. Current plans showing modifications ST. LUCIE CANAL Lucie Lock and Darn) HAER NO. Page 31 to the facility were also identified. Other drawings were gathered from the U.S. Army Corps of Engineers Okeechobee Waterway a compendium of maps illustrating various structures and facilities, current and proposed flood control projects, canals, and hyacinth removal plans.
This resource was likely compiled to coincide with the creation of the Central and Southern Florida Flood Control Projects and the later District between and As-built engineering drawings have been photocopied for this documentation. B. Historic views: Historic photographs were identified in Florida's State Archives in Tallahassee. The majority of the photographs document the construction of West St. Lucie No. 1 and East St. Lucie No. 2 prior to In addition, aerial photographs were obtained from the South Florida Water Management District's archives. C. Interviews: Ray Thielan, former lockrnaster of Moore Haven, was interviewed on two occasions in June at his home in the town of Moore Haven. Mr.
Thielan is the last lockmaster who not only remembers the actual construction of the Ortona and Moore Haven facilities, but who also worked on the construction of the Herbert Hoover Dike during the Depression. Mr. Thielan retired in from the Moore Haven facility Several individuals were consulted for advice and source information. They included Mr. Ed Miller of the Corps' South Florida Operations Office, Clewiston District, Mr. Larry Lucky, property tax assessor for the Glades County Courthouse, Mr. Charles Drawdry, Lockrnaster at Ortona, Mr. Mel Wills of the Kissimmee/Orlando Pioneer Museum, Mr. Mcclary of the Clewiston Museum, and Mr. Chris Hunter, archivist at Schenectady Museum, New York. D.
Bibliography
1372 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER FL-20.
Not written, edited or summarised by this site.
Primary and unpublished sources: Everglades Drainage District Commission. Annual Report of Everglades Engineering Board of Review. Presented to the
St. Lucie Canal
Lucie Lock and Dam) HAER NO. Page 32 Board of Commissioners of the Everglades Drainage District, Tallahassee, Florida, Copied obtained from Historic Museum of South Florida, Miami. Operation Manual: St. Lucie Lock and Dam. Department of the Army, Jacksonville District, Corps of Engineers. SAJP 18 October Copy obtained from the St. Lucie Lock and Dam Reservation. Operation and Maintenance Manual: Central and Southern Florida Flood Control Project As Maintained by the Corps of Engineers. Department of the Army, Jacksonville District, Corps of Engineers. SAJP 1 December Copy obtained from the Corps' South Florida Operations Office, Clewiston District. U.S. Army Corps of Engineers. Annual Report of the Chief of Engineers. Vol.
1, Lake Okeechobee and Okeechobee Waterway Historic Properties Management Plan. February Okeechobee Waterway. Map collection. Jacksonville Florida District. U.S. House. "Examination of Caloosahatchee River, Florida, from Mouth to Fort Myers." 65ili Congress, 2~ Session. Document No. Newspapers: Glades County Democrat, 26 April - 19 March Stuart Daily News, 22 March - 20 July Stuart News, 9 January - Secondary and published sources: Buker, George E. Sun, Sand, and Water: A History of the Jacksonville District U.S. Army Corps of Engineers Washington United States Government Printing Office, ca. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 33 Clausen, M. Almy, Clausen, M. Fryman, J. Milanich, J. Van Winkle, J. Wallace, and B. Wharton.
Cultural Resource Survey of Portions of the Port La Belle Development Tract, Glades and Hendry Counties, Florida. Report submitted to General Development Corporation, Miami, Florida, by CCC Enterprises, Inc., North Port, Florida. Survey Project No. July Dail, G.E. Organization for Water Conservation in Florida. St. Petersburg, Florida: University of South Florida Press. Submitted to Central and Southern Florida Flood Control District by Florida Conservation Workshop, Center for Continuing Education, July Farson, Robert H. Cape Cod Canal. Yarmouth Port, Massachusetts: Cape Cod Historical Publications, Grismer, Karl H. The Story of Fort Myers. St. Petersburg, Florida: St. Petersburg Printing Company, Hanna, Alfred Jackson and Kathryn Abbey Hanna.
Lake Okeechobee: Wellspring of the Everglades. American Lake Series, New York: The Bobbs-Merrill Company, Harner, Charles E. Florida's Promoters: The Men Who Made It Big. Tampa, Florida: Trend House, Historic Architectural Survey of Martin County, Florida. St. Augustine, Florida: Submitted to Growth Management Department, Comprehensive Planning Division of Martin County, Stuart, Florida, by Historic Property Associates, Inc., June Kimes, C.A. and Crocker. "The Caloosahatchee River and Its Watershed: A Historical Overview." Fort Myers, Florida: Submitted to Florida Gulf Coast University Library Services and South Florida Water Management District under subcontract from Florida Center for Environmental Services, Agreement No. FAU DSR No. revised September ST.
LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 34 available from watershed/index.html. INTERNET. Lorant, Stefan, ed. The New World: The First Pictures of America. New York: Duell, Sloan and Pearce, Milanich, Jerald T. Florida's Indians. Gainesville, Florida: University Press of Florida, Norton, Charles Ledyard. A Handbook of Florida. New York: Longmans, Green and Company, Our Native Land: Glances at American Scenery and Places with Sketches of Life and Adventure. New York: D. Appleton and Company, Sears, William H. Fort Center: An Archaeological Site in the Lake Okeechobee Basin. Gainesville, Florida: University Press of Florida, Tebeau, Charlton w. A History of Florida. Coral Gables, Florida: University of Miami Press, True, David o., ed. Memoir of Do.
d'Escalante Fontaneda respecting Florida, written in Spain, about the year Translated by Buckingham Smith. Coral Gables, Florida: Glade House, Wayne, Lucy and Martin F. Dickinson. Cultural Resource Survey of the St. Lucie Bank Stabilization Project, Martin County, Florida. Report submitted to U.S. Army Corps of Engineers, Jacksonville District, by Water and Air Research, Inc., Gainesville, Florida. Contract No. DACW17-87-C-0047, November Will, Lawrence E. A Pioneer Boatman Tells of Okeechobee Boats and Skippers. St. Petersburg, Florida: Great Outdoors Publishing Company, Okeechobee Hurricane and the Hoover Dike. Belle Glade, Florida: Glades County Historical Society, ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 35 E.
Likely sources not investigated: The University of South Florida in Miami has one of the largest collections of historical documentation and photographs of the Everglades' history. However, one must be a student to gain access to their archival materials. In addition, between June through April their archival repository was in the process of being curated and relocated to another facility within the university. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 36 IV. PROJECT INFORMATION In June the U.S. Corps of Engineers, Jacksonville District, proposed to make structural changes to the Okeechobee Intracoastal Waterway's historic lock facilities that would substantially alter the locks which were considered National Register of Historic Places eligible historic resources.
A Memorandum of Agreement was signed between the U.S. Army Corps of Engineers, Jacksonville District and the Florida State Historic Preservation Off ice stipulating that the St. Lucie, Moore Haven, and Ortona lock and dams would be documented to Level II Historic American Engineering Record standard. New South Associates was contracted by the U.S. Army Corps to undertake this project in May The project historian was David E. Port. Dena E. Hodes served as a research assistant. Mr. Richard T. Bryant produced the large format photographs contained in this report. Documentation was coordinated through Mr. Tommy Birchett of the Jacksonville District Corps of Engineers. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 37 USGS Topographic Quadrangle Location Map of Lock No. 1 - St. Lucie Canal.
ST. LUCIE CANAL Lucie Lock and Darn) HAER NO. Page 38 LAKE Cross-State Canal, Eastern Half 1 Map Showing lock and Dam locations Proposed Site of St. Lucie Lock No. 1 Using Earlier Lock No. 2 Site Source: "Coloosahatchee River and lake Okeechobee Drainage Areas, Florida. lock No. J St lvcie Dam,"1938, File No. U.S. Army Corps of Engineers, Jacksonville District. ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 39 l l Plan of Lock Number 1 - Cross State Canal, Western half Source: "Caloosohatchee River and Lake Okeechobee Drainage Areas, Florida. Lock No. l - St. Lucie Dam/1938, File No. l, U.S. Army Corps of Engineers, JacKsonville District. ST. LUCIE CANAL Lucie Lock and Darn) HAER NO. Page 40 LUCIE LOCK #J CdNSrRl/CTIOIY-" Original St. Lucie Lock under construction in view to southwest.
Source: Florida State Archives, Florida Photographic Collection ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 41 St. Lucie Lock No. 2 Construction, view to southeast. Source: Florida State Archives, Florida Photographic Collection St. Lucie Lock No. 2's spillway construction, circa view to east. Source: Florida State Archives, Florida Photographic Collection ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 42 ST. LUCIE. LOCK #2. SDi'IT LEhWNl!J 1.iCCK HMOeP PIIWN5T/ll4A'NI. Tug Captain John leaving St. Lucie Lock No. 2, dredge bypass and main spillway in background, circa view to northwest. Source: Florida State Archives, Florida Photographic Collection ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 43 Tug Captain John heading upstream at St. Lucie Lock No.
2 with original control house on right, circa view to northeast. Source: Florida State Archives, Florida Photographic Collection ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 44 View of main spillway and lock complex looking upstream, view to southwest. Source: Florida State Archives, Florida Photographic Collection ST. LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 45 View downstream showing the St. Lucie No. 1 lock and dam complex. From left to right, spillway, dredge bypass and hydro-electric power house, lock and island, and lock. The control house is adjacent to new lock and the attendants' quarters and the access road to the complex are to the right. View to east. Source: Central and Southern Florida Flood Control District Office (West Palm Beach, Florida) ST.
LUCIE CANAL Lucie Lock and Dam) HAER NO. Page 46 Aerial view of St. Lucie No. 1 lock and dam complex. From left to right, attendants' quarters, control house, lock with paired machinery houses at each set of gates, island and old lock (in-filled in dredge bypass, hydro-electric power house, and main spillway, circa view to northwest. Source: Central and Southern Florida Flood Control District Office (West Palm Beach, Florida)
The federal surveyors worked through Stuart building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER FL-20. United States federal work, no copyright under 17 U.S.C. 105.