The power house is an integral component of the lock and dam system created in Report Prepared by: David E. Port and Dena E. Hodes, New South Associates Date: December ST. LUCIE CANAL, LOCK NO. I, HYDROELECTRIC POWER HOUSE HAER No. FL-20-A-3 (page 2) Part I. Historical Information A. Physical History: 1. Date of construction: 2. Architect/Engineer: U.S. Engineer Office, Jacksonville, Florida 3. Original and subsequent owners: State of Florida, U.S. Corps of Engineers 4. Builder: Cleary Brothers Construction Company, West Palm Beach, Florida 5. Alterations and Additions: None. B. Historical Context In Congress authorized replacing St. Lucie Lock No. 1 with a weir at Port Mayaca and adding a larger lock and spillway to the existing lock on the eastern end of the canal or at Lock No. 2.
During this year, the St. Lucie Canal was also widened and deepened, and the cost for this pre-War last installment of the Cross-State Canal was earmarked at In May plans were completed for the new lock and central control station, which included a hydroelectric power plant and a spillway dam. The installation of the powerhouse involved the deepening and extension of the original dam structure, sealing off the uplake end of the original lock, and modifying the uplake end of the dredge pass to serve as the water intake of the generator's turbine. The concrete bulwark was deepened and extended southward to form the edge of the new lock structure. The powerhouse is a three level structure whose submerged floor serves as the water intake sluice.
The intermediate floor provides access to the turbine. The upper floor contains critical electrical-mechanical equipment necessary to operate the turbine, produce electricity, and regulate water flow. Water egress was directed into the former dredge by-pass vault. It is unknown how long the hydroelectric plant operated or ST. LUCIE CANAL, LOCK NO. l, HYDROELECTRIC POWER HOUSE HAER No. FL-20-A-3 (page 3) whether is served to supply electricity to the facility. Lock personnel believed that the powerhouse's use was abandoned in as part of growing environmental concerns over downstream discharges PART II. DESCRIPTION A. General Statement The rectangular multilevel concrete block utilitarian building is currently known as the Hydroelectric Powerhouse and Turbine Building, Corps Structure No.
SF The powerhouse is located adjacent to the spillway and it contains the hydroelectric turbine, auxiliary oil and water pumps, switchboard, and storage space for the bulkhead's hoist car. The extent of the powerhouse's use prior to its abandonment in is unknown. Nonetheless, this structure is in excellent condition inside and out, save for its present use as storage. The structure has considerable integrity of design, workmanship, and materials, contributing to the Art Moderne style of this facility. The exterior treatment of the powerhouse is of simple painted stucco concrete block walls incorporating two horizontal banks of block glass windows on the uplake intermediate floor and a horizontal band of molded decorative trim or spandrel immediately below the eave line.
It has steel frame windows. The two exterior doors are steel, but they have incorporated a transom above. The rails for the hoisting car, which services the bulkhead gates along the spillway, run into the north end of the powerhouse via a roll-up garage door. A large metal trash rack covers the turbine sluice intake, serving the same purpose as the submerged spillway screen, to prevent foreign objects from damaging the turbine during operation. One internally mounted exhaust fan provides ventilation. The powerhouse is marked "ST LUCIE LOCK" on the upstream and downstream elevations. ST. LUCIE CANAL, LOCK NO. I, HYDROELECTRIC POWER HOUSE HAER No. FL-20-A-3 (page 4) B. Physical Description 1. Exterior: a.
Overall dimensions: The powerhouse measures x and has a clearance from the upper first floor line to ceiling. The basement or intermediate floor and the submerged floor add an additional 20' onto this structure's total height. On the upstream side, the length of the building expands into the spillway's bulwark, increasing its size by so that the intermediate floor measures X b. Foundation: From the powerhouse's first floor at an elevation of AMSL to the submerged basement's foundation, the structure extends The basement or intake for the turbine's sluice is actually The foundation is poured reinforced concrete set on a grid of steel shit piling spaced apart under the turbine housing. Reinforced poured concrete forms the base of this housing and is 4' thick.
The structural concrete shell that surrounds the turbine is thick, tapering off to 17" in thickness on the intermediate level. c. Walls: The concrete block walls on the first level are 8" thick and covered with painted stucco on the exterior and on the interior. The four corners of the structure's first level however are poured concrete columns featuring a rounded beveled edge on the exterior of the corners. Two sets of spandrels decorate the exterior below the eave line. The first architectural feature is the horizontal cast concrete frieze with a hand rubbed finish. This spandrel consists of four 1- 3/ 4" stacked weathered joints.
On the spillway side and lock side elevations above the doors, there are vertical spandrels that are also spaced apart and appear as a mirrored set of weathered joints. These vertical spandrels descend from the roof line. There is one exhaust fan equipped with automatic shutters located on the first floor and on the downstream elevation side. d. Structural system: The powerhouse is structurally separated with two distinct floors. The submerged basement is only accessed via two manholes that are located on the intermediate ST. LUCIE CANAL, LOCK HYDROELECTRIC POWER HOUSE HAER No. FL-20-A-3 (page 5) level. This second level contains three rooms divided by two walls, which are made of 12" of poured concrete. The three rooms house the turbine, the stairs, and storage space under the stairs.
The first floor is an open room that houses a switchboard, the upper part of the turbine, stairs, the rails and hoist car, a hatch to the second level, and an overhead crane. e. Openings: 1. Doorways and doors: The three exterior doors of the powerhouse consist of the roll-up garage door, one set of double doors on the lock side elevation, and a single door on the spillway side. The two entrance doors had accompanying screen doors at one time that have since been removed. The lock side double door features two tubular steel, two-paneled, half-glazed doors each measuring x The spillway door is also a tubular steel, two-paneled, half-glazed door measuring x Both of these doors feature a transom directly above them with a single glass pane measuring in height.
The widths of the transoms correspond to the widths of the doors. The roll steel, manually operated, garage door measures x and this door is also located on the spillway side, next to the smaller entrance door. A fourth exterior door can be added to this list, and this one includes the trash rack or the vertical steel grating that covers the turbine sluice. The grating is approximately x Grating sections are grouped in four vertical units with each section measuring which are then connected to thicker bars measuring in diameter. 2. Windows: There are a total of nine windows providing illumination to the first and second floors of the powerhouse. All of the windows are original.
Window arrangements are single (one on the spillway elevation and one on either side of the double doors on the lock side elevation) and double (along the other two exteriors). The measurements conform to a standard height of with each window's width measuring The exceptions are the two clear glass block, seventy-eight-light windows. These windows each measure x 3' 0" and are located on the downstream elevation of the intermediate floor. ST. LUCIE CANAL, LOCK HYDROELECTRIC POWER HOUSE HAER No. FL-20-A-3 (page 6) The two window groupings on the upstream elevation feature two sets of fixed one-over-three single hung windows units separated by a 2" mullion.
Two other sets of one-over-three single hung windows mirror the downstream elevation; however, each of the three panes that constitute each window unit can be opened. The upper and lower panes can be pulled inward and upward while the middle pane can be pushed outward and downward. A similar ventilating design is found on the two single one-over-three windows that occupy either side of the double doors as well as the one one-over-three window that is located on the spillway elevation. 3. Roof: The roof consists of 8" of poured, reinforced concrete slab resembling a lid to a box without an overhang. There is 16 oz. of copper flashing that lines the interior well of the rooftop.
In addition to the cast horizontal concrete frieze that joins the roof to the block walls, the roof also extends upward, flush with the wall, for another This vertical flange, or more accurately a parapet, may have functioned as a cooling device due to the heat produced from the powerhouse's equipment. On top of the concrete slab, the following materials are layered on the exterior surface: built- up tar, felt, and gravel. There are four roof drains located in each corner. 2. Interior a. Plan: Open plan on uppermost level floor; three rooms on second level, lower level has open plan. 1. Walls: The interior of the powerhouse includes internal hatch- and stairways, control switchboard, turbine assembly, and hatchways for the turbine sluice.
The latter includes rails for the hoist car and metal covers over the sluice bulkhead channel. An equalizer valve was operated from the dam and spillway hoist car to adjust the rate of water flow. The interior walls are painted stucco, and glazed ceramic tiles exist around the first floor foundations for the turbine and switchboard. b. Flooring: All floors are poured, reinforced concrete slabs supported by an interior grid of 12" I-beams. Both first and second floor's concrete slabs also measure 12" in thickness. ST. LUCIE CANAL, LOCK NO.I, HYDROELECTRIC POWER HOUSE HAER No. FL-20-A-3 (page 7) c. Wall and ceiling finish: Interior treatment includes painted stucco covering the concrete block walls. d. Openings: 1.
Manhole covers, hatch, and stairs: There are two manhole covers on the second intermediate floor that provide access to the submerged basement. These openings are located in the northeast corner of the turbine room and the northwest corner of the stair room. Floor drains in opposing corners are also located on this floor. The hatch is located in the southwest corner of the first floor and provides access to the second floor below. The hatch consist of two flat iron doors and measures approximately 5' x 4'. The stair well occupies the first floor and is housed in the southeast corner of this structure. 2. Windows: The mullions around the window units feature a 2" steel plate casing.
The casing around the glass block windows features a elastic compound around the head and sill of the casing that acts as an expansion cushion. Each glass block measures x x and is held together to other blocks by a mortar joint. e. Hardware: Most of the architectural hardware, hinges, nails, and door locks are original. Similarly, the glazed ceramic tile, flooring, and stairs are also in their original context. Outside lightning lamp fixtures mounted on the exterior walls are also original, however, no information has been found about their design. 3. Mechanical systems: a. Hydroelectric turbine unit: The turbine consists of a water wheel turbine direct connected to a 94 K.V.A. generator with direct-connect exciter.
The turbine is controlled with an automatic water wheel governor that is located on the first floor. The generator is rated 3-phase, 4-wire, 60 cycles, 120/208-volt, at 240 The water wheel turbine is rated 145 hp with 9' heads at 240 An automatic brake stops the unit in the event of a mechanical failure. The hydroturbine is operated whenever head differential will permit, and the energy derived is used in place or to supplement commercial power. The ST. LUCIE CANAL, LOCK HYDROELECTRIC POWER HOUSE HAER No. FL-20-A-3 (page 8) diameter of the hydroturbine housing on the first floor is and features an alternator and alternator terminal box. The turbine gate-operating shaft is connected to the oil pressure governor assembly.
Altogether, the turbine assembly measures approximately 32' in height and its operating equipment is distributed between the three floors. b. Switchboard: The switchboard is a totally enclosed, freestanding, dead front, front and rear doors cubicle type, with two cubicles, unit. It contains all of the electrical equipment necessary for the control of the hydroelectric generator unit. The air circuit breakers are automatic trip, manual return, and are used for the distribution of power from the hydroelectric unit as well as distribution of power to the spillway's taintor gate units.
The voltage regulator, magnetic contactors, and control relays are similar in design to those in the central control station switchboard and are used for the control of the auxiliary oil and water circulating pumps housed on this floor. c. Oil pump unit: This unit is a self-contained motor driven pump and storage tank. The motor is rated 3 208-volt, 3-phase, 60 cycle, and is used to supply oil pressure for the water wheel governor. Pump is rated 200 PSI discharge pressure. d. Water circulating pump: The pump's motor is direct connected to a 1" centrifugal pump. The motor is rated 3/4 volt, 3-phase, 60 cycle, and is used to circulate fresh water to the main guide bearing of the hydrogenerator unit. C.
General Siting and Orientation This building is situated southeast of the dam/spillway adjacent to the dredge by-pass. Part III. SOURCES OF INFORMATION A. Architectural Drawings No as built drawings were identified for this building in the engineering drawing collection at the U.S. Corps of Engineers Office, South Florida Operations Office, Clewiston District.