St. Lucie Canal, Lock No. 2, Control House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart

St. Lucie Canal, Lock No. 2, Control House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL. Surveyed as HAER FL-20-B-2, with a 788-word written history.

From the record

“Lucie Lock No. 2 was built by and operated until when it was superceded by the new lock (Lock No. 1).”

Written record, HAER FL-20-B-2 survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-20-B-2 · the record runs 788 words · one of 10 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

677 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER FL-20-B-2. Not written, edited or summarised by this site.

The St. Lucie Lock No. 2 was built by and operated until when it was superceded by the new lock (Lock No. 1). It was part of the first efforts by the Corps of Engineers to control drainage and create an interior passage across the peninsula. This control house was an integral component of the lock system. Report Prepared by: David E. Port and Dena Hodes, New South Associates Date: December ST. LUCIE CANAL, LOCK NO. 2,

Control House

Lucie Canal, Lock No. 2, Building No. SF HAER NO. Page 2 PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of construction: circa 2. Architect/Engineer: Everglades Drainage District and Furst-Clark Construction Company 3. Original and subsequent owners: State of Florida, U.S. Corps of Engineers 4. Original Builder, Contractor, Supplier: Furst-Clark Construction Company 5. Alterations and Additions: This building was altered in the The original gable roof was replaced with a mansard roof and Art Moderne details added to match the new building style of the architecture. Original window fenestration is no longer intact and the openings filled in with concrete and vents. B. Historical Context In Congress authorized replacing St. Lucie Lock No.

1 with a weir at Port Mayaca and adding a larger lock and spillway to the existing lock on the eastern end of the canal or at Lock No. 2. During this year, the St. Lucie Canal was also widened and deepened, and the cost for this pre-War last installment of the Cross-State Canal was earmarked at In May plans were completed for the new lock and central control station, which included a hydroelectric power plant and a spillway dam. The machinery houses were part of the design. No plans were found for the control house. It appears in historic views taken in the as a gable roof building. However it appears in a view taken in with a mansard roof and Art Moderne details which suggests it was remodeled to better fit within the new complex.

It is known as the "old" lock control building and is referred to in one source as a guardhouse. ST. LUCIE CANAL, LOCK NO. 2, CONTROL HOUSE Lucie Canal, Lock No. 2, Building No. SF HAER NO. Page 3 PART II. DESCRIPTION A. General Statement The lock's control house is a small rectangular building with a mansard roof situated on the island between the new and old lock on the south lock wall of the old lock chamber. It was used to station on-duty lock personnel needed to manually open and close the lock gates. B. Physical Description 1. Exterior: a. Foundation: Concrete foundation b. Walls: The structure is made entirely of concrete blocks that have been covered with stucco and painted.

The exterior walls are slightly recessed; the corner columns are cast in place and feature vertical grooving. c. Structural system: Masonry d. Openings: 1. Doorway and door: Single steel door that faced the old lock chamber. 2. Windows: There are three window openings located respectively on the other elevations while the fourth elevation features the steel door. The windows have been filled in with concrete and a vent panel. e. Roof: The mansard roof is concrete. 2. Interior: a. Floor plan: It has a single room with an open plan. b. Flooring: The floor is a poured and reinforced concrete slab. ST. LUCIE CANAL, LOCK NO. 2, CONTROL HOUSE Lucie Canal, Lock No. 2, Building No. SF HAER NO. Page 4 c. Wall and ceiling finish: The interior walls are concrete blocks covered by stucco and painted.

d. Equipment: No original equipment is in place. The building is used for storage. C. General Siting and Orientation This functional building that faced the old lock chamber was used as a workstation when the old lock gates needed to be manually operated. It currently sits on an island between the two lock chambers and is surrounded by grass with a small sidewalk connecting its entry to the old lock chamber wall. PART III. SOURCES OF INFORMATION A. Architectural Drawings No architectural plans were identified for this building.

In context

Stuart, Florida The place record: every map, photograph and survey of this town.
Martin County, Florida 78 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Stuart

9 records

The federal surveyors worked through Stuart building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
St. Lucie CanalHAER FL-2012,389 words
St. Lucie CanalHAER FL-20-A5,357 words
St. Lucie CanalHAER FL-20-A-32,406 words
St. Lucie CanalHAER FL-20-A-12,383 words
St. Lucie CanalHAER FL-20-A-51,255 words
St. Lucie CanalHAER FL-20-B1,222 words
St. Lucie CanalHAER FL-20-A-21,201 words
St. Lucie CanalHAER FL-20-A-41,144 words
St. Lucie CanalHAER FL-20-B-11,029 words

Provenance

  • Written history. Quoted verbatim from HAER FL-20-B-2. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.