The St. Lucie Lock No. 2 built by operated until when it was superceded by the new lock. It was part of the first efforts by the Corps of Engineers to control drainage and create an interior passage across the peninsula. Report Prepared by: David E. Port and Dena E. Hodes, New South Associates Date: December ST. LUCIE CANAL, LOCK NO. 2 Lucie Canal, Lock No. 2, Auxiliary Lock) HAER NO. Page 2 Part I. Historical Information A. Physical History: 1. Date of construction: 2. Architect/Engineer: Everglades Drainage District and First-Clark Construction Company 3. Original and subsequent owners: State of Florida, U.S. Corps of Engineers 4. Original Builder, Contractor, Supplier: Furst Clark Construction Company 5. Alterations and Additions: St. Lucie Lock No.
2 became a passive element within the lock and dam complex. It was not used after and its electrical equipment was removed. The lock chamber was filled with concrete in raising the interior space to a grade equal to the lock elevation. B. Historical Context In Florida's State Drainage Commission authorized intensive canal construction, and the basic design and form of the Okeechobee Waterway as it is known today was finished later that year. Shallow drift navigation via the Caloosahatchee River, Lake Okeechobee, and the St. Lucie Canal was made available, but no locks or dams had been installed along the waterway. The St. Lucie Canal functioned as a floodway and irrigation channel in these early years.
After completing the North New River Canal in Furst-Clark Construction Company continued dredging operations along the West Palm Beach and then widened and enlarged the St. Lucie Canal from until Furst-Clark obtained an amendment to their contract in allowing them to construct permanent locks in the canals they were building. The firm built five locks that permitted access into the lake, and these locks were located at the lakeshore entrances of Moore Haven and the St. Lucie Canal and at the North New River, Miami and West Palm Beach Canals. Furst-Clark Construction Company built the last ST. LUCIE CANAL, LOCK NO. 2 Lucie Canal, Lock No. 2, Auxiliary Lock) HAER NO. Page 3 three locks in and and they were responsible for the dredging of these canals as well as the Hillsboro.
The Everglades Drainage District built two other locks near Ortona after as well. In total, three facilities were constructed along the Caloosahatchee River at Lake Flirt, Citrus Center and Moore Haven in addition to the four canal locks along the lake end at the North New River, Miami, and West Palm Beach Canals and the west St. Lucie Canal (No. 1), which was completed in near present day Port Mayaca. East St. Lucie Lock (No. 2), the lock studied here, was constructed between to and the St. Lucie Canal was partly operational in and then completed in The Everglades Drainage District Commission's Annual Report states that their original report envisioned the St Lucie Canal as a combined control drainage, navigation and power canal with a single combined lock, dam and powerhouse.
However, the lock when built did not have a power feature, and two control locks and dams were constructed on the waterway, No. 1 at Lake Okeechobee, and No. 2 at one and two-thirds miles from the outlet into the St. Lucie River. A dredge pass and dry dock were added as part of control lock and dam complex at No. 2. The original St. Lucie Lock No. 2 included an eight-gate spillway, dredge pass, and lock that was completed by A larger electrically operated lock chamber that was built into the expanded south bank of the canal replaced the original lock. After St. Lucie Lock No. 2 was referred to as the auxiliary lock or old lock. Changes in the spillway forced its abandonment and its lock chamber was filled in PART II. DESCRIPTION A. General Statement St. Lucie No.
2 was a concrete lock with concrete lock gates. It was associated with a dredge pass, a spillway, and an office and lockmaster's house and garage. On the upstream side, there was a concrete pier and fender pilings; fender pilings on the downstream side. Located approximately 96 feet west of the new ST. LUCIE CANAL, LOCK NO. 2 Lucie Canal, Lock No. 2, Auxiliary Lock) HAER NO. Page 4 lock, the lock chamber became a passive part of the new lock's configuration in but did not contribute functionally. B. Physical Description The original lock was a simple concrete vault (internal dimensions), with a depth of This chamber was a full 20' narrower than its replacement. The lock's design included two sets of concrete lock gates that sat flush with the lock walls in the closed position.
The electrical-mechanical operating system has since been removed, but it operated in much the same fashion as the replacement lock. Watering and dewatering the lock occurred through the selective and incremental opening and closing of the gates to attain the desired lock water level. Previous to lock designs incorporated a water ducting system consisting of pumps to raise and lower water levels. Therefore, the lock was a modernization that influenced the ones built in the and The original lock and dredge by-pass remained in operation through to permit the completion of the new facilities at St. Lucie.
However, changes in the dam structure and south end of the spillway necessitated closing off access to both structures to permit the construction of the new powerhouse in In plans were made to fill-in the old lock chamber. This operation effectively raised the interior space to the grade consistent with that of the lock. The encapsulated chamber's new elevation is AMSL. The in-filling operation resulted in the lock gates being shut in their closed flush position. The lock vault walls were cross-tied with sixteen diameter tie-rods set apart. The tie-rods were fixed to double channel metal wale mounted to the locks exterior walls and running the length of the lock. No attempt was made to eradicate the existing lock's structure since the intent was in-filling.
Although covered, the lock structure remains intact. In addition, the manually operated single structural steel miter gate, gears, and hardware are also visible and intact. ST. LUCIE CANAL, LOCK NO. 2 Lucie Canal, Lock No. 2, Auxiliary Lock) HAER NO. Page 5 C. General Siting and Orientation St. Lucie Lock No. 2 lies 96' west of the lock. The dredge by-pass is situated to the west of the older lock. The lock chamber, now filled in, is grassed over and shares the same elevation as the lock; its concrete walls are visible. PART III. Sources of Information A. Architectural Drawings Selected as built engineering drawings were photocopied for this documentation from the U.S. Corps of Engineers, Jacksonville District Collection.