The Central Control .Station was completed in as a state-of-the-art facility designed to permit the operation of the electrically-powered St. Lucie lock. This utilitarian building with Art Moderne details contained the lockmaster's office. It is significant for its role in the operation of the dam and for its style. Report Prepared by: David E. Port and Dena E. Hodes, New South Associates Date: December ) ST. LUCIE CANAL, LOCK NO.l, CONTROL STATION HAER No. FL-20-A-1 (page 2) Part I. Historical Information A. Physical History: 1. Date of construction: 2. Architect/Engineer: U.S. Engineer Office, Jacksonville, Florida 3. Original and subsequent owners: State of Florida, U.S. Corps of Engineers 4. Original Builder: Cleary Brothers Construction Company, West Palm Beach, Florida 5.
Alterations and Additions: Original windows have been replaced. B. Historical Context As part of the modernization plan for St Lucie Lock No. 2 authorized by Congress, plans were completed for a new lock and central control station, which included a hydroelectric power plant and a spillway dam. The central control station, also known as the lockmaster's office, was designed in to complement the upgraded lock and dam facility and to service the St. Lucie Canal as part of the Corps for the maintenance of South Florida's Drainage District responsibilities. The existing structure was finished in as a state-of-the-art facility designed to permit the operation of the electrically powered St. Lucie lock.
Unlike Moore Haven and Ortona facilities where the Lock Master houses also double as the control station, St. Lucie's control building was designed solely for lock operations and administrative responsibilities. ST. LUCIE CANAL, LOC~NO.l, CONTROL STATION HAER No. FL-20-A-1 (page 3) PART II. DESCRIPTION A. General Statement The rectangular one-story concrete block utilitarian building is currently known as Main Lock Control Building, Corps Structure No. SF The operation of the lock gates is controlled from the remotes in the control panel, which is housed in a rectangular projecting bay facing the lock chamber. Electrical instrument gauges line the southern interior wall.
The structure contains an office, two restrooms, equipment room, storage room, emergency generator room, a large garage, and the opened lock control room. The emergency generator room also contains a storage battery pit in a covered floor well. This room also features incoming well water lines, and the south end of this room serves as the staff breakroom. Unlike Ortona, the lock tenders at St. Lucie can open and close one set of lock sector gates at a time from this centralized position. Of the three lock and dam facilities, both Moore Haven and St. Lucie have incorporated this central control station concept. B. Physical Description 1. Exterior: a.
General: The control station is a one-story reinforced concrete block structure with Art Moderne details such as a frieze with horizontal grooves, stucco walls, flat roof, and a an overall horizontal emphasis. The rectangular structure measures x x The north, lock-facing, side contains a projecting rectangular bay that houses the control panels and permits lock personnel an unrestricted view of oncoming boat traffic. The bay has a concrete canopy. All electrical service to power the lock gates and lighting has been run underground and through conduits located on the northern and western exterior elevations of the structure. The overall appearance is simplistic yet well maintained with little evidence of architectural modifications ST. LUCIE CANAL, LOCK NO.I, CONTROL STATION HAER No.
FL-lO..A-1 (page4) over the years. The hurricane awnings are original, and the six awnings are positioned over the windows on each cardinal elevation. Exterior treatment includes two steel service doors on the canal side to permit access to the lock mooring quay and a steel double door servicing the main entranceway, located on the southern elevation. All three of these doors have double paneled (one-over-one) windows and transoms. The exterior wall finish is painted stucco with slightly rounded sills at window and door openings. The stucco finish has been embellished immediately below the roofline with a cast concrete frieze with multiple horizontal grooves, which is also found on the exterior of the powerhouse and the four machinery houses.
A second concrete band with vertical grooves was laid perpendicular to the frieze band on the lock side elevation. An oversize lantern was hung in this vertical band and a horn attached below. Wall mounted cylindrical glass and metal lanterns are placed by all of the building's entries. b. Foundations: Reinforced concrete. The control station rests on the southern exterior of the lock chamber. The elevation of the control house is AMSL. c. Walls: All of the walls are reinforced concrete block covered with stucco. Concrete corners are chamfered. d. Structural system, framing: The station is a reinforced concrete and steel structure. e. Openings: 1. Doorways and doors: The lock control station is accessed either the north or south sets of steel doors.
The steel doors, which face the lock chamber and measure x affords personnel quick and convenient access to the lock chamber and catwalks. Each door on the northern elevation is adjacent to the control room. These contain a centered one-over-one square window located on the upper half. The double steel doors, located on the southern elevation, measure x and also feature a one-over-one square window located on their upper halves. ST. LUCIE CANAL, LOCK CONTROL STATION HAER No. FL-20-A-1 II (page 5) 2. Windows and awnings: The sash-type steel-railed windows are of the two-over-two style and are replacements. Two pairs of windows are positioned on the northern and western elevation while only one set of windows appears on the eastern and southern sides of the structure.
All exterior windows except for those in the control room are equipped with adjustable storm awnings. The bay has a stucco finished, flattened head which projects 12" out over the three flat single-pane windows that forms this projection. The flattened head over the windows provides shading and serves as a drip-board. f. Roof: The lock control station has a flat roof, and the reinforced concrete finish has a beveled trim under the open eaves' line and soffit. The original roof was gypsum plank on open truss steel joists overlaid with tar, paper and grit gravel. The current roof is 4" concrete slab with no overhang. The concrete frieze and spandrel technique that joins the roof to the concrete block wall is flush with the wall.
The wall extends above the roof for another This parapet may have functioned as a cooling device due to the heat produced from the electrical gauges, back-up generator, and the control and distribution panels housed inside. The roof contains the heating and air-conditioning equipment and support ductwork. The facilities' radio antennas are also located on the roof. 2. Interior a. Floor plan: The control station contains several rooms including the office, two restrooms, equipment room that house the lock control panels and instrument gauges, garage, storage room, and the emergency generator room. As originally designed the area now known, as the generator room may have been open to the equipment room (control room).
A non-load-bearing wall that also serves to create a hallway from the main entrance to the control room now separates it. Hallway ceiling light fixtures are all off-center to avoid proximity with ceiling mounted conduits. However, they appear to have once served a larger contiguous area. Interior electrical conduits and water pipes run across the interior ceiling of every room despite efforts in to modernize the facility. ST. LUCIE CANAL, LOCK NO.I, CONTROL STATION HAER No. FL-20-A-1 (page 6) The garage is L-shaped with two bays. The larger bay is x and the smaller bay is x A single one-over-one paned steel-framed window provides light on the garage's east side. The garage floor is poured concrete and graded for drainage.
The emergency generator room contains a large 4-cylinder Kohler engine linked to an emergency generator. This generator provides serves as a critical backup to insure the safe operation of the lock under adverse conditions. Two 12-volt batteries connected in parallel start the generator. These large batteries are stored in a covered well adjacent to the generator. The starting sequence begins with the interruption of power to a control solenoid that releases 12-volts to the engine starter. b. Flooring: The flooring throughout the control house is reinforced poured concrete, which is set on top of the lock's chamber southern exterior foundation. c. Walls and ceiling finish: Interior treatment includes tile covered or painted poured concrete floors and gypsum board covered stud walls. d.
Openings: 1. Doorways and doors: All interior doors are ste_el with steel frames. 2. Windows: The structure contains two restrooms labeled "Mens" and "Womens," however, lock personnel thought that they were originally segregated facilities. These restrooms each contain comparable toilets, sinks, and mirrors that likely date to the period of their construction. Access to the men's facility is through the operator's office and an outer door. The women's restroom may only be accessed from an exterior doorway. Lighting for both facilities is provided by a single bulb light fixtures and small one-over-one paned steel framed windows. These windows like the others for the control station structure appear to be replacements, but the steel frames are likely originals. ST. LUCIE CANAL, LOCK NO.
l, CONTROL STATION HAER No. FL-20-A-l (page 7) e. Hardware: Most of the hardware, nails, hinges, door locks, and the window and door frames are original items, and few modifications and repairs have been done to the interior of the structure. The exception is the addition of the separating interior wall that divides the main entrance and the control room. f. Mechanical system: Locking procedures are run entirely by the electrical control panel that faces the south wall of the lock chamber. The control panel is best described as a totally enclosed, dead-front type with sloping asbestos board panel mounted on a steel cabinet.
The control board is located in the central control room's oriel, and the panel contains all of the remote control and drum type control switches, indicator lights, differential water level indicators, gate position indicators, emergency stop switch, and water level by-pass switches. The control board is used to activate the sector gate motors. The oriel has three large single-pane glass panels that allow and unrestricted review of the canal's approaches and waiting basins. The control panel permits both manual and automatic operations, but contains separate controls for each lock gate, bar graph readouts for gate position and lock, and sea and lake water levels.
The existing control panel was installed in as part of the facilities electrical system rehabilitation to provide for more comprehensive control of the lock operation. The original control panel relied mostly on manual switching and was installed by Miller Electric Company. The control panel is installed with the self-synchronous devices consisting of the four selsyn receivers that operate the differential water level and gate position indicators. The lock personnel also may control the lock approach and traffic control lights as well as the catwalk gate operation. Behind the control panel, the switchboard is aligned along the separating interior wall of this room.
The switchboard is a totally steel enclosed unit, free standing, dead front, front and rear door cubicle type, with five cubicles. It contains all of the electrical equipment and gauges necessary for the distribution of electric power from the emergency gas engine ST. LUCIE CANAL, LOCK NO.l, CONTROL STATION HAER No. FL-20-A-1 (page 8) generator, hydroelectric turbine, and outside service furnished by Florida Power and Light Company. Equipment located in the switchboard includes the following: An Auto Transformer is used to start the motor generator set, and this unit is rated 50 208-volt, 3 phase, 60- cycles, medium duty. A battery charger accompanies this unit and is furnished to charge the starting batteries for the emergency gas generator.
In addition, magnetic contactors, control relays, air circuit breakers, and voltage regulators are also housed in the switchboard assembly. The 4-cylinder Kohler gas engine generator unit is directly connected to a 94 K.V.A. generator with direct-connected exciter. The generator is rated 3 phase, 4 wire, 60 cycles, 120/208-volt at The motor generator set consists of an alternating current driving motor rated 40 208-volt, 3 phase, 60 cycle, rpm synchronous speed, direct-connected to two variable voltage generators and one constant voltage generator. The variable voltage generators are rated 15 volt at rpm and is used to supply the power for the sector gate motors.
The constant voltage generator is rated 3 125-volt at rpm and is used to supply the power to the variable voltage generators and motor operated thruster brakes. C. General Siting and Orientation The St. Lucie control house or control station is centrally located on the south side of the lock chamber's midpoint. The area between the control station and lock wall and balustrade is paved. A 4' wide concrete sidewalk surrounds the building. A parking area is located on the south side of the building abutting the sidewalk and space for single car parking is located on the west side. There are no planting areas in proximity to the building although the area beyond the walkway on the west is a grass lawn. ST. LUCIE CANAL, LOCKNO.l, CONTROL STATION HAER No. FL-20-A-l (page 9) PART III.
SOURCES OF INFORMATION A. DRAWINGS Selected as built engineering drawings were photocopied for this documentation from the U.S. Corps of Engineers, Jacksonville District Collection. A full collection of high-resolution images of engineering drawings for St. Lucie Lock No. 1 will be donated to the Florida State Archives, located in Tallahassee, Florida.