Duke, Donald and Stan Kistler, Santa Fe. Steel Rails Through California, (San Marino, This book gives illustrations of the San Diego and other depots. Ferris, Helen, M. "Santa Fe Depot: Report for Historical Site Board," San Diego, (xeroxed copy in the files of the Historic Sites Board, Planning Department, City of San Diego.) Carrico, Richard, "Historical Survey" Appendix to the "Environmental Impact Analysis of Santa Fe Towers," (xeroxed copy in files of the Historic Sites Board in the San Diego City Planning Department.) San Diego Union, various dates, especially: March 15, p. 1: Final plans approved for station and illustration of planned station. May 24, p. 1: Contract let for building. May 26, p. 5: Ground breaking. SANTA FE RAILROAD STATION HABS No. CA-1965 (Page 5) June 30, p.
3: Photographs show construction progress. January 1, p. 5: Station largely finished but not open yet, detailed description. March 8, p. 12: New station opened. Santa Fe Magazine, August This article, quoted by several later writers, was unavailable in San Diego libraries to the HABS summer team. See also additional material in the field records accompanying this report. Prepared by: Robert Bruegmann Historian HABS San Diego Team Summer PART II. ARCHITECTURAL INFORMATION A. Description of the Exterior: 1. Number of stories: The depot consists of a large main waiting room with a two-story wing running along the east elevation. There is also a one-story building to the north of the main waiting room and a partial basement. The concourse along the west side is one story high.
2- Layout, shape: The depot consists basically of two buildings separated by a 20' passageway which runs east and west between them. Both buildings are adjoined on the west side by a long covered concourse running the entire length of the depot. 3. Overall dimensions: x 4. Foundations: concrete foundations with 14" square piers transferring the interior loads. 5. Wall Construction: a. South building: The walls have a steel skeletal system with unreinforced brick used for the lower 16' of the main waiting room walls, and hollow clay tile used above. Both the two-story section and the area north of the main waiting room have steel skeletons with unreinforced brick and clay tile walls. All exterior walls are covered with plaster cement. SANTA FE RAILROAD STATION HABS No. CA-1965 (Page 6) b.
North building: The north building consists of two separate structures of totally different construction. The most southerly of the two structures was constructed with the South building as part of the depot shown on the original drawings of Bakewell and Brown Architects. The exterior walls have steel columns and unreinforced brick for their full height (except for their door and window openings). The northernmost building is of bearing wall construction with thick wall panels between 18" x 24" vertical pilasters located at intervals of approximately However, the east wall appears to be a uniform 14" thickness except for two columns approximately 18" square on each side of the main entry doors. 6. Structural Framing System: a.
South building: The construction of the main waiting room consists of a series of double transverse steel trusses or frames, at spacing covered with metal lath and plaster. These trusses have an arched bottom chord and a gabled top chord. Spanning between the trusses are double steel roof purlins supporting two inch tongue-and-groove redwood parallel roof sheathing over 4" x 4" redwood rafters spaced 24" on center. The steel purlins have been encased in redwood boards. Located directly north of the main waiting room is a low roofed area. This area's split level roofs are constructed of reinforced concrete slabs supported on steel beams.
The second floor of the two story section consists of a thick reinforced concrete slab supported on closely spaced steel beams spanning between steel girders located in the east and west walls. At the west wall, which is shared with the main waiting room, the floor girders span between and are connected to the columns of the typical transverse trusses. The roof framing consists of steel trusses. Spanning between these trusses are steel purlins which support a roof similar to that over the main waiting room. The framing of the first floor over the basement consists of a reinforced concrete slab and beam system supported on the basement walls and on interior 14" square concrete columns. b.
North building: The most southerly section of the north building has exposed steel roof trusses spanning between steel columns at the exterior walls. Spanning between the trusses are exposed steel purlins supporting a two inch tongue-and-groove redwood roof deck. The northernmost building is of open warehouse type construction. It has a series of wood trusses spanning between bearing walls and carrying a composite roofing over l" x 8" parallel sheathing boards. SANTA FE RAILROAD STATION HABS No. CA-1965 (Page 7) Concourse: The roof of the concourse is the same 2" deck and 4" x 4" rafters used in the main waiting room, supported on 6" x 10" redwood purlins which span between trusses.
The concourse trusses are of heavy construction with steel rods used for vertical web membranes, subjected only to tensile stresses. 7. Openings: a. Doors and Doorways: 1. South building: The south (main facade has four double doors affording access to the main waiting room. The wooden doors each have a single pane of glass. Each pair of doors is set in an arched opening with the remaining area glazed. The east elevation has two sets of double doors. An arched opening provides a recessed entry to a side vestibule. Each door has two molded panels. The remaining area within the arch is glazed. 2. North building: The north building has a series of arched openings containing window and door assemblies.
The first, third and fifth arches have large sliding wood doors with glazing on the east elevation. The south elevation has three such infilled arches. The west elevation has three infilled arches with sliding wood doors and one with a pedestrian door and window assembly. b. Windows 1. South building: The south elevation and the north elevation of the main waiting room both have a very large arched opening that is glazed. This opening is about 17' from the floor and is nearly 55' in diameter. The east elevation has ten openings on the first floor level. Each opening has two double-hung, one-over-one windows with horizontal lights above. The second floor office area has twenty-two evenly spaced double-hung, one-over-one windows.
The clerestory of the main waiting room has nine sets of round headed windows on each side. Each of the eighteen windows has six lights in pivot sash. The north elevation has five double-hung, six-over-six windows on the ground floor, along with an arched opening infilled with door and window assembly. The second floor has two double-hung, one-over-one windows. The west elevation has identical clerestory SANTA FE RAILROAD STATION HABS No. CA-1965 (Page 8) windows as on the east. There are nine arched openings fitted with window and door assemblies on the concourse level. 2. North building: The east and west elevations of the north building each have arched openings fitted with window, door, and mill work panel assemblies. Each elevation also has strip clerestory windows.
The south elevation has three arched openings above the door height which are glazed with wooden sash. 8. Roof: a. Shape, covering: 1. South building: The main waiting room, two-story office area and concourse are all covered by gable roofs parallel to each other. They are all covered with red terra cotta tiles. The "restaurant and kitchen" area north of the main waiting room has reinforced concrete slabs covered with built up tar and gravel roofing. 2. North building: The southern part of the north building is covered by two parallel gables and finished with red terra cotta tiles. The northern part has a flat composition roof. b. Cornice: A fascia and gutter cover the ends of the rafters on the long elevations.
Wood beams (concourse) and steel beams encased in redwood (main waiting room) extend through the walls on the gable ends. c. Towers: Main towers: Located at the southerly end of the depot are two 90' high towers. They have ornate architectural finishes applied to an interior supporting framework of structural steel. At a height of about the corners become convex and are flanked by fluted pilasters. A cast concrete urn is located within each convex curve. Each face of the tower has an arched opening with cast concrete balusters and railing. Each tower is capped with a glazed terra cotta tile dome and lattern. Around each drum are eight concrete urns. SANTA FE RAILROAD STATION HABS No. CA-1965 (Page 9) B. Description of the Interior 1. Floor Plans: a.
First floor: The depot's main entry is through the double doors and porch on the south elevation. This entry leads into the main waiting room, which measures x with newsstands, a novelty shop, and access to the concourse and tracks to the west. The east elevation of the waiting room has a series of doors leading to auxiliary spaces. Resptively from south to north these are, general office with a private office and storage, women's lounge, women's toilets, stair hall, vestibule, (entry from east and lockers), smoking room, men's toilets. The main ticket counter is now located at the extreme north end of the main waiting room.
Beyond the counter area is (from east to west) electrical, pipe, lumber, and general storage, with access to basement, files and storage, restrooms, telegraph office and general office. Beyond this service area is the open passage between the main passenger terminal and the baggage/express building. From south to north these spaces are baggage room, railway express storage, passage and express room. b. Second floor: The second story of the east aisle is partially used now as Amtrax offices and partially vacant. The corridor runs adjacent to the main waiting room. The spaces south of north off this corridor were originally used as depot master, ladies aid, telegraph, and stairwell. Beyond were bedrooms. c. Basement: The basement area is only under a portion of the building.
Access to this area is only from the double doors on the east elevation. 2. Flooring: The main terminal floors are concrete with tile. The office and bedrooms have concrete floors. The baggage and express building has asphaltium on a concrete bed. 3. Wall and ceiling finish: The main waiting room has glazed terra cotta tile to the height of the door heads. Above this tile walls are plastered. Although the giant trusses are encased and plastered, the ceiling has exposed, wood-encased purlins, and wooden rafters. The men's smoking room has wood-paneled wainscoting to window-sill height, with plaster above. Both the smoking room and women's lounge have exposed wooden beams. The minor beams run north and south, and major beams run east and west. There is plaster ceiling.
The vestibule has onyx wainscoting to door height, with a plaster wall above. The ceiling is similar to those in the smoking room and lounge. SANTA FE RAILROAD STATION HABS No. CA-1965 (Page 10) The second-story rooms have plaster walls with picture moldings and lath and plaster ceilings. The telegraph and office spaces north of the ticket counter have glazed tile and plaster walls with plaster ceilings. The baggage/express building has brick and terra cotta walls with an exposed steel truss and purlin ceiling, supporting sheathing. 4. Doorways and doors: All doors off the main waiting room to the east wing are double doors with two molded panels, the top panel being glazed. These doors are set within arched openings, the remainder being glazed (except for wood panels) to a height of feet.
All the glazing has wood sash and mullions. All second story doors have two tiers of molded panels and molded door trim. Doors within storage and service area are five paneled with plain trim. C. Site: 1. General setting: The main facade of the depot faces south to Broadway. The concourse and tracks run along the west side, the tracks being on the same level as the concourse. The area between the main entry and Broadway has been asphalted for parking. Prepared by: Kim Spurgeon Project Supervisor HABS San Diego Project Summer