BlockBefore

Naval Supply Center, Broadway Complex, Warehouse, 911 West Broadway, San Diego

Naval Supply Center, Broadway Complex, Warehouse, 911 West Broadway, San Diego, San Diego County, CA. Surveyed as HABS CAL,37-SANDI,34B-, with a 3,080-word written history.

From the record

“As a contributing element of the Naval Supply Center, Broadway Complex Historic District, Building 12 is significant at the local level for its historical associations with the Navy in San Diego and for its architectural qualities as one of the earliest major structures in the harbor area.”

Written record, HABS CAL,37-SANDI,34B- survey. Machine-read text.

Surveyed by the federal HABS program as HABS CAL,37-SANDI,34B- · the record runs 3080 words · one of 194 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1955 words

Source document Quoted word for word from HABS CAL,37-SANDI,34B-. Not written, edited or summarised by this site.

As a contributing element of the Naval Supply Center, Broadway Complex Historic District, Building 12 is significant at the local level for its historical associations with the Navy in San Diego and for its architectural qualities as one of the earliest major structures in the harbor area. Constructed in the building supported Navy supply requirements in the Pacific through World War II. During the period from the through the end of World War II, the Navy established a major presence on San Diego Bay, with significance to the city and the Navy's military operations in the Pacific. Architecturally, the seven story building has been one of the most substantial structures on the waterfront for decades and reflects a significant part of San Diego's architectural history.

Description: The design of Building # 12 is utilitarian industrial architectural styling in a concrete warehouse. The main building mass is seven stories in height, and it is built in a rectangular plan. The machinery penthouses are nine stories high and a control tower penthouse in the southwest comer of the building is ten stories high. The building is structurally sound and generally in good condition. Overall, Building #12 is a square foot structure, 300 feet long by 200 feet wide, with a maximum height of 92 feet at the observation penthouse. Its construction is of reinforced concrete poured in board forms. The walls are primarily flat surfaces textured slightly by the board forms.

Fenestration is simple, with loading docks across much of the first story level and regularly spaced rectangular steel windows. The building is constructed on pilings and hydraulic fill soils with a structural concrete foundation. The level of fill ranges from seven to ten feet, with an average depth of eight feet. The structural system is reinforced concrete. Twelve different types of columns are used in the building, and each floor has 150 columns spaced at foot intervals.

Floor live loads for the first floor were listed at pounds per square foot, 400 pounds for the second and third floors, 300 pounds at the fourth and fifth floors, and floors six and seven were designed for live loads of 250 pounds per NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE (Naval Supply Center, Broadway Complex, No. 12) HABS No. CA-2313-B (Page 2) square foot. The machinery penthouses were constructed to support 75 pounds per square foot. Interestingly, the structural systems were designed to accommodate a ten story building, although the contract called for completion of only seven floors. The original main entrance was designed to front on Harbor Drive, the west side of the building. The entry consisted of a small undecorated centrally located doorway opening to a small lobby.

Later alterations resulted in the door being replaced with a modem design. The west elevation has also been modified by the addition of a covered pedestrian bridge, which extends west across Harbor Drive to Building # 11 at the second story level. The north elevation first story consists of an elevated loading dock or platform running approximately % the length of the building. A truck ramp extends downward at the western end, and a set of small stairs are located at the eastern end. A concrete portico shelters most of the length of the loading dock. Steel roll-up doors open to the dock from the first floor of the warehouse. Also, on the north elevation a covered pedestrian bridge connects to the south elevation of Building # 1 at the third story level.

The east elevation consists of a large elevated loading dock across the full length of the building at the first story level. A truck ramp leads downward at the southern end, and a set of stairs is located on the northern end. Steel roll-up doors open to the dock from the first floor of the warehouse. The upper stories have multi-light square and rectangular window openings regularly spaced across each floor. The south elevation also has a full-length concrete loading dock covered by a concrete portico over most of the dock. The dock is accessible by a truck ramp on the western end and a set of stairs on the eastern end. Steel roll-up doors open to the dock from the first floor of the warehouse.

The upper stories have multi-light square and rectangular window openings regularly spaced across each floor. The roof is flat reinforced concrete with built-up asphalt roofing. Accessible from the roof are six machinery penthouses, which rise two stories higher. The penthouse on the southwest comer is ten stories tall, with an additional floor designed to serve as a control point for the harbor. The control tower is operated by the Port District as the management location for the Captain of the Port. The original interior layout consisted of a first story level with offices and storage space, with a small centrally located lobby at the Harbor Drive (west) entrance.

The first story also housed a transformer and battery charging areas and made provision for a small inspector's office in the northeast comer. Floors two through seven had identical floor plans and were designed to provide open storage areas. Small inspector's offices were located on each floor. The building contains six freight elevators and one passenger elevator. Three stairways are constructed of reinforced concrete. The building retains most of its original trim and finish. The interior was NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE (Naval Supply Center, Broadway Complex, No. 12) HABS No. CA-2313-B (Page 3) largely undecorated industrial surfaces originally, and very little alteration has been made.

Historical Context: This facility was built in on the site of the original Peoples Fish Market. Drawings were approved on March 30, and construction began in the spring of Government cost for construction was The design was prepared by the Navy Bureau of Yards and Docks, whose place within the general naval establishment is to design and construct all public works and utilities of the shore facilities for the U.S. Navy. Various naval projects historically originated either at the request of the officer in charge of each facility, or by request of a regional bureau chief. The Bureau of Yards and Docks then estimated costs and prepared plans for review by the Shore Station Development Board.

The board was established in for the purpose of coordinating long-range development planning and directing public works programs. Reorganized several times during World War II, the board ultimately incorporated more direct participation by the Bureau of Yards and Docks. Although the bureau essentially remained a service agency, its technical expertise and capabilities exerted considerable influence in the development of the naval shore establishment. The U.S. Navy was the building's original owner, and it remains so today. The site was constructed as part of dredge and fill operations along San Diego Bay. Originally, the area consisted of tidal flats and open shore. In a survey party that included William Heath Davis and Andrew B.

Gray chose for a camp the upland area near the present site of the Broadway Complex. Gray thought the site would make a fine site for a town. Along with Lieutenant Johns, Gray drew up plans for a new town site, which encompassed the present project area. Dubbed ''New Town," the concept was presented to a group of San Diego citizens, who on March 16, formed a partnership to acquire and develop 160 acres there. At the time, about half of the land laid below the level of mean high tide. Construction of buildings in New Town began in the summer of A deep-water wharf was built just south of the modem Broadway Complex. After the wharf was completed in ships could unload cargo and passengers directly at the pier, rather than using lighters to ferry them to the shore.

In October a second wharf 150 feet long was constructed at New Town by Stephen S. Culverwell at the foot ofF Street. In the mid-1880s, the city experienced the most significant in a series ofland booms associated with new railroad connections. During the the city gained substantial institutional stability and added significantly to its infrastructure. City crews paved streets, gas and electricity were introduced, street car lines were laid, and a system of pipelines and storm drains removed sewage and surface water to the deeper bay. Along the waterfront, wharves were a focus of activity in the importation of goods and supplies to San Diego. NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE (Naval Supply Center, Broadway Complex, No. 12) HABS No.

CA-2313-B (Page 4) Two major wharves constructed within the current boundaries of the Broadway Complex were Culverwell's (described above) and the Spreckels Brothers'. The Spreckels wharf, also known as the coal bunkers wharf, was approximately feet long. It was built in a zig-z.ag configuration with rail cars and steam driven cable lines and winches to unload cargoes of coal, cement, and ,umber. The wharf was located at the foot of G Street and extended through the southern portion of the present-day Broadway Complex. Culverwell's wharf was later acquired by William Jorres and bore his name; the wharf was extended to several hundred feet, to reach beyond the tidal area to deep water. These wharves were part of continuing waterfront development.

Prior to the area along Pacific Highway paralleling the high tide line included a concentration of shanties, wharves, and small businesses. The area was unique to San Diego and played an important role in the flourishing development of New Town. Within the present boundaries of the Navy Broadway Complex were miscellaneous structures. In the cities of San Diego, Los Angeles, and Oakland petitioned the State of California to grant tidelands within their respective harbors for city development. A bill authorizing the transfer passed the legislature with a provision that harbor improvements be made by the cities.

Accordingly, the City of San Diego began an improvement program that included construction of a new concrete bulkhead and the dredging of a channel along Broadway In the City of San Diego deeded approximately acres to the Navy at the comer of Broadway and Harbor Drive. Additional property was granted by the city to the Navy in several subsequent land exchange transactions. As part of the Eleventh Naval District established in February the first component of the modem Broadway Complex was begun later that year. The first construction on the site began in when the north wing of Building #1 was begun. For seventy five years since the Broadway Complex as it was later known, served essential roles in the Navy's activity in the Pacific.

Originally known as the Naval Supply Depot, the center began with about 400 employees. After major changes during World War II, the command employed more than persons and was redesignated the Naval Supply Center in In in conjunction with a Defense Department-wide shift to utilize the Defense Logistics Agency for physical distribution, the center was redesignated the Fleet Industrial Supply Center and now serves primarily as a management organization. Today approximately employees at FISC San Diego conduct operations across fifteen separate locations throughout the Southwest. NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE (Naval Supply Center, Broadway Complex, No. 12) HABS No.

CA-2313-B (Page 5) The north wing of Building # 1 served as the original headquarters for naval supply in San Diego. In additional funds were appropriated for construction of the Navy Pier, and during the and buildings continued to be added to the complex. The present pier and pier warehouse (Building # 11) were built in and in the seven story concrete warehouse (Building was completed. In conjunction with pre-war expansion, Building # 1 was more than doubled in size in At that time, a central operations tower was added to the west front of the building to support coordination and control of harbor traffic.

Sources

148 words

Source document Quoted word for word from HABS CAL,37-SANDI,34B-. Not written, edited or summarised by this site.

Architectural drawings: Seven Story Storehouse South and West Elevations. Reduced copy on aperture card microform at Public Works Center, Naval Station San Diego. Available copy is marginally legible. Seven Story Storehouse North and East Elevations. Reduced copy on aperture card microform at Public Works Center, Naval Station San Diego. Available copy is marginally legible. Paint Exterior Building 12 Elevations "P" and Reduced copy on aperture card microform at Public Works Center, Naval Station San Diego. These later elevations appear based on the originals and are more legible. Paint Exterior Building 12 Elevations "M" and Reduced copy on aperture card microform at Public Works Ce~ter, Naval Station San Diego. These later elevations appear based on the originals and are more legible.

Historic views: Historic photographs of the complex are on file with, and subject to copyright by, the Photographic Archives of the San Diego Historical Society, San Diego, California.

Bibliography

204 words

Source document Quoted word for word from HABS CAL,37-SANDI,34B-. Not written, edited or summarised by this site.

City of San Diego Final Environmental Impact Report: Navy Broadway Complex. San Diego. Hatheway, Roger G. Draft Historic American Buildings Survey Documentation of Buildings # 1 and# 12, Navy Broadway Complex, San Diego. HABS No. CA- NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE (Naval Supply Center, Broadway Complex, No. 12) HABS No. CA-2313-B (Page 6) 2313A, CA-2313B. Hatheway & Associates, Crestline, CA. On file Cultural Resources Section, Southwest Division, Naval Facilities Engineering Command, San Diego. l\1arkovinovic,l\1ary Personal Communication with William R. Manley. Office of Public Affairs, Fleet Industrial Supply Center, San Diego. October 23. FISC San Diego. Internet URL: http://www.sd.fisc.navy.mil/ Smith, Brian F.

Navy Broadway Complex: Results ofan Historical Research and Survey Project. Brian F. Smith Associates, San Diego. Southwest Division, Naval Facilities Engineering Command (formerly West Division) Final Environmental Impact Statement: Navy Broadway Complex Project. San Diego. United States Navy Class I Property Records. Facilities Office, Naval Supply Center, San Diego. Likely sources not yet investigated: Additional historical information on the buildings' relationship to the city is likely available at the San Diego Historical Society Research Archives, the San Diego Public Library California Room. The Public Works Center, Naval Station San Diego has reduced copies of architectural and engineering drawings on aperture card microforms.

Written history

685 words

Source document Quoted word for word from HABS CAL,37-SANDI,34B-. Not written, edited or summarised by this site.

The documentation of Buildings #1, and #12 in the Navy Broadway Complex was prepared in compliance with a Memorandum of Agreement between the U.S. Navy, the Advisory Council on Historic Preservation, the California Office of Historic Preservation, and the National Park Service Division of National Register Programs. Draft HABS documentation of Buildings # 1 and# 12, prepared by Roger G. Hatheway in was submitted to the National Park Service Division of National Register Programs, and HABS numbers CA-2313-A and CA-2313-B were assigned. Instructions for preparing a final submission were sent from the NPS office on September 6, At that time, the project was suspended, because previously planned demolition of the Broadway Complex was dropped.

In October William l\fanley Consulting was retained by the Naval Facilities Engineering Command, Southwest Division to complete HABS documentation of Buildings #1, and The revival of the HABS project was necessary to support Navy management options for the buildings, including plans for re-painting, NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE (Naval Supply Center, Broadway Complex, No. 12) HABS No. CA-2313-B (Page 7) seismic retrofitting, and replacement of selected windows. Consultation with NPS resulted in identifying Building # 11 as HABS number CA-2313-C. This document was assembled using, in part, the documentation submitted in Written documentation for this updated version is based upon the text previously submitted.

Large-format photographic documentation and reproduction of architectural plans from the earlier version had apparently been lost, and they were re-done for this final version, which was prepared by William R. Manley. NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE ( ... (Naval Supply Center, Broadway Complex, 1. 12) BABS No. CA-:,..,. 3-B (Page 9) -v p=w=JI 1 ""I ii i1ihiiAB a a ~- ' 1 a==w=t '-I:1:J IIDIII! n ~ . - - - - - - ' : ' - "C" . CC] II II - l!!!llll!I -. - ."' c::::i. I - - . cb ... .,_ _f ~ 1 ... -~ !. f NORTIL"1Ca..~ , . u-.;. .. _ .,_ " 1 :' -' -a e, E!IE!3 . CI::] II . . . . ' . . . ca a, ea 11 II CC] .. _, -w- r ... . . . f8 EJ1 EIE d II CCI CC] . . ca SD Ella . . R Ill . . . ci::J cb ;. CC) - - -- . . . ---i ... - - ,., -I... El cs aia ci:J cb ca et Ella - cs Ell. I I.

BUA~ .,, C\l....ug,c" 6NO .&COO\JNT'J ' M4A- s . M ' T - ~ i . ,. - ; ;, ' , ,_. ' , ' '., .'f I :! "' . , i. , ,. , ~ .. ,: ;, .1 :. . ./ . ; , ~ 1 I IU~)f') I , .4 : i::~\~\ ~-\ . '.i . / . .L: ,j. J. - \~' .\ L.::.i . .. . . . ~~ ,t, .t ""~ ; ! ~ , t i { ' } t.l "fr,,~Mi,M,,J,,, , 'J . .-- . ( ~ ~ \I .. 3 .. :.~i : ' ~ ~ ,. g. r:; - ")ii ., NAVAL SUPPLY CENTER, BROADWAY COMPLEX, WAREHOUSE (Naval Supply Center, Broadway Complex, - 12) HABS No. CA-:.U 1- _., (l'age I I ) -CD . . II CD l!l CD ,. .., ..I:' - IIIIBl!IIIB II CD l!l lllllEllll II . . . CD ID - l!!llilll!!I CD l!I . I 1.LNA,1011 M' ~La..a... u- I I f !If". l!B IID l:l o:::J lil lllllBlll!II I!] ci::J Iii ci::::i El ~ !" . e-,.-- .( BB l!l o:::J El CD CD !!l l!I . . . . . . . . ~~- BB BD ill lil CEJ CD l:l ll1 ~ ... - .. . . . .

~.. . . . -- -- Ell BB llllll!llll!I ill @ CD El El lll!IEllll Ell BD -Ill - .-. I I I t;UVATIOij ~ t _; SU~:. lUVAl 'iUPPcY ClUTEQ !>A" DoGO CAL. VTE:"210Q I 1, : , '.l I ~ : f : 7 1 f f':,:..O...i. 12 S'~lVl';!OtJ'i, Ult IM I pr

In context

San Diego, California The place record: every map, photograph and survey of this town.
San Diego County, California 602 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in San Diego

24 of 114 records shown

The federal surveyors worked through San Diego building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
U.S. Naval HospitalHABS CAL,37-SANDI,27-28,449 words
Chollas Heights Naval Radio Transmitting FacilityHAER CAL,37-SANDI,31-17,945 words
Torrey Pines LodgeHABS CA-286811,722 words
Naval Air Station North IslandHABS CAL,37-SANDI,33A-8,906 words
Hotel San DiegoHABS CA-27817,976 words
Perry D. and Olive B. Griswold Rental PropertyHABS CA-29637,639 words
Naval Supply CenterHABS CAL,37-SANDI,34A-7,163 words
Balboa ParkHABS CAL,37-SANDI,16D-6,909 words
The George White and Anna Gunn Marston HouseHALS CA-1316,416 words
Fort RosecransHABS CAL,37-SANDI,29-A-5,753 words
United States Custom House & Inspection StationHABS CA-28974,992 words
Savage Tire FactoryHAER CAL,37-SANDI,28-4,560 words
Mount Carmel RanchHABS CA-28944,165 words
Whaley HouseHABS CAL,37-OLTO,5-4,093 words
Naval Supply CenterHABS CAL,37-SANDI,34C-3,905 words
Point Loma Lighthouse No. 355HABS CAL,37-POLO,1-3,778 words
CALTRANS District 11 Maintenance StationHABS CAL,37-SANDI,32-3,389 words
George W. Marston HouseHABS CAL,37-SANDI,10-3,343 words
Melville Klauber HouseHABS CAL,37-SANDI,12-3,246 words
Santa Fe Railroad StationHABS CAL,37-SANDI,22-3,171 words
Stingaree BordelloHABS CAL,37-SANDI,25-2,999 words
U.S. Naval HospitalHABS CAL,37-SANDI,27-A-2,979 words
I. O. O. F. BuildingHABS CAL,37-SANDI,5-2,769 words
Mission San Diego de AlcalaHALS CA-812,750 words

Provenance

  • Written history. Quoted verbatim from HABS CAL,37-SANDI,34B-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.