BlockBefore

United Engineering Company Shipyard, Gate House, 2900 Main Street, Alameda

United Engineering Company Shipyard, Gate House, 2900 Main Street, Alameda, Alameda County, CA. Surveyed as HAER CAL,1-ALAM,4C-, with a 1,836-word written history.

From the record

“The Gate House is a contributing structure in the United Engineering Company Shipyard historic district that has been determined eligible for the National Register of Historic Places.”

Written record, HAER CAL,1-ALAM,4C- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,1-ALAM,4C- · the record runs 1836 words · one of 198 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1088 words

Source document Quoted word for word from HAER CAL,1-ALAM,4C-. Not written, edited or summarised by this site.

The Gate House is a contributing structure in the United Engineering Company Shipyard historic district that has been determined eligible for the National Register of Historic Places. The United Engineering Company Shipyard, established in to build and repair ships for the U.S. Navy, is the last surviving of several large World War II shipyards in Alameda. United Engineering built 21 tugboats and repaired hundreds of ships during the war. The facility was one of the largest employers in Alameda and played an important economic and social role in the city. As the check-in point for hundreds of round- the-clock workers, the Gate House represents both the contribution of labor to work at the shipyard and the management of labor by the United Engineering Company and its successors.

Description: The Gate House is located south of the large Inspection and Repair Shop and east of the Office Building in the Alameda Gateway complex. The complex is situated at the north end of Main Street in Alameda, Alameda County, California. The Gate House is a long, narrow, one-story building with an irregular-shaped plan. It measures 89 feet across the north and south facades, 19 feet 6 inches across the west, and 15 feet across the east facade. The structure has a total area of approximately square feet. The Gate House is utilitarian in appearance and has little ornamentation. The eastern half of the building rests on a foundation of wooden posts, and the western half sits on a reinforced concrete base.

The building has a wood frame covered with horizontal wood siding on the exterior. The roof has several levels. Most sections are gabled with a shallow pitch, and others, such as the porches and south addition, have shed roofs. AH areas are covered with asphalt rolled strip roofing. Gutters r UNITED ENGINEERING COMPANY SHIPYARD, GATE HOUSE (United Engineering Company Shipyard, Timekeeper's Office No. 67) (Building No. 3) t HAER No. CA-295-C (Page 2) provide drainage, and there is one vent on the roof. A flagpole that is attached to the south facade also projects above the roofline. Most windows are double-hung, three-over-three divided lights with wooden sashes. The addition on the east end of the building has aluminum sliding sash windows.

Several doorways have the original wooden half-glassed doors. On the west end of the building, most of the plank doors to the aisles have been removed, and the openings have been covered with plywood. The building is fully plumbed and wired for electricity. The interior is lit with hanging fluorescent lighting fixtures. The interior walls are primarily clad in painted particleboard. The building was constructed in several phases and has been remodeled. As a result the Gate House has a complicated plan. The original building was a rectangular structure built in This portion is the core of the current building. In three additions were made to the structure; a single room was added to the east end, a small addition was made on the south side, and a large addition was built on the west end.

The largest portion of this last section was a large room divided into nine aisles. The doorways to the aisles (which are now on the interior of the enclosed porch) are still labeled overhead with numbers indicating aisle numbers and what appear to be employee numbers. For example, a sign above the fifth aisle reads, "#5 200 to West of the aisles, two small offices and a porch were added at about the same time.2 This area is now a storage space. A few years later (sometime in the late another addition was built on the east end of the building. It matches the existing building's width, siding, roof pitch and general appearance but has sliding sash aluminum windows. The addition consists of two rooms and a small bathroom.

Sometime later, the wall that divided the two spaces of the original structure was partially removed. In addition, the railings between the aisles were removed, the north aisle doors were boarded over, the south doors replaced with a single large opening, and the porch on the south end of the aisles was enclosed with plywood. The separate sections of the Gate House have different floor and ceiling treatments. The original core of the building has linoleum-tiled floors, and the ceiling is covered with acoustical tiles. The eastern rl Alterations and Addition to the Gate Home ( Alameda, CA: United Engineering Co., Alameda Shipyard, 30 November UNITED ENGINEERING COMPANY SHIPYARD, GATE HOUSE (United Engineering Company Shipyard, Timekeeper's Office No. 67) (Building No. 3) t HAER No.

CA-295-C (Page 3) addition has linoleum-tiled floors and a dropped ceiling added years after the addition was built. The large western addition has a concrete floor and exposed truss work. The building has been altered on the interior and exterior and has a low degree of integrity. Historical Context: The original Gate House and primary additions were built in during a construction campaign by United Engineering. At that time the company quickly constructed numerous buildings to accommodate shipbuilding and repair necessitated by U.S. involvement in World War II. Alben Froberg created drawings for the Gate House in July of The building was composed of a guard room and an office with four pay alleys in between.

A little over a year later, in November of plans for the first major additions to the Gate House were drawn. The drawings for the additions were labeled with the uses of the rooms. The east end of the building housed two offices and a lavatory. The center of the building was a large room with built-in drafting cabinets (still extant). West of these there was a large addition with aisles (labeled "Storage" on the attached sketch plan). These nine aisles, or "alleys" as the original plan called them, were used by the thousands of workers checking in and out of the shipyard during the hectic war years. Galvanized steel rails divided each aisle, and wood shelves attached to the center of each row were probably used for marking time cards.

At the west end of the alleys there were two "Time Checkers" offices with windows that opened onto the alleys on the east and an exterior turnstile on the west. On the Sanborn map, this building was identified as the Timekeeper's Office and labeled no. 16. During the Todd Shipyard years, the building was called building 67. In still called building 67, the original portion of the building is occupied by a tenant who operates a fabric, upholstery, and design company.

Sources

246 words

Source document Quoted word for word from HAER CAL,1-ALAM,4C-. Not written, edited or summarised by this site.

Alameda Gateway. Existing Site Plan. 30 January Edward K. Hussey Engineering Corporation. Survey No. plan. Prepared for United Engineering Company 24 January Froberg, Alben. Gate Housefor United Engineering. United Engineering Co., Alameda Shipyard. 31 July Kennedy, Clyde C, Engineering Office of. "Area Plan and Interceptor Profile: Improvements to Sewer System for Properties Occupied by C UNITED ENGINEERING COMPANY SHIPYARD, GATE HOUSE (United Engineering Company Shipyard, Timekeeper's Office No. 67) (Building No. 3) t HAER No. CA-295-C (Page 4) Todd Shipyards Corp., Alameda, Calif." Prepared for Matson - United Properties, Inc. 9 August Sanborn Map Company. Insurance Maps of Alameda, California, p. 93. New York: United Engineering Company Alterations and Addition to the Gate House, plan.

30 November United Engineering Company Alameda Shipyard: Map Showing Existing Facilities and Those Under Construction. 22 October United Engineering Company Map of Alameda Shipyard Showing Existing and Proposed Additional Facilities, Plan no. UEC- A-l-7. 14 June United States. Army Corps of Engineers - San Francisco District and California. State Historic Preservation Officer. Memorandum of Agreement Regarding the Oakland Harbor Navigation Improvements Project, Alameda County, California. Signed 31 January and 22 January Widell, Cherilyn, State Historic Preservation Officer. Letter to Richard G.

Thompson, Lieutenant Colonel, San Francisco District, Corps of Engineers, Regarding Oakland Harbor Ship Channel Deepening and Improvements, Alameda County [Determination of Eligibility Concurrence]. 9 June Thompson, Richard G., Lieutenant Colonel, San Francisco District, Corps of Engineers. Letter to Cherilyn Widell, State Historic Preservation Officer, requesting Determination of Eligibility. 30 April

Written history

404 words

Source document Quoted word for word from HAER CAL,1-ALAM,4C-. Not written, edited or summarised by this site.

This report was prepared for the U.S. Army Corps of Engineers and the Port of Oakland in accordance with a Memorandum of Agreement (MOA) between the U.S. Army Corps of Engineers, San Francisco District and the California State Historic Preservation Officer concerning the former United Engineering Company shipyard. The Port of Oakland and the City of Alameda were concurring parties to the MOA. The MOA was created because of a proposal by the U.S. Army Corp of Engineers in partnership with the Port of Oakland to sponsor the Oakland Harbor Navigation Improvements Project. This project "would deepen Oakland Harbor channels and berth areas from -42 feet mean lower low water to -50 feet with 2 feet overdredge allowance" and widen some portions of the channels.

r These actions, which would constitute an Undertaking under Section UNITED ENGINEERING COMPANY SHIPYARD, GATE HOUSE (United Engineering Company Shipyard, Timekeeper's Office No. 67) (Building No. 3) f HAER No. CA-295-C (Page 5) would result in the demolition of several buildings and structures at the former United Engineering Company Shipyard. Because the shipyard had been determined eligible for the National Register of Historic Places, the Undertaking would have an adverse effect on the property. Under the MOA, the following HAER documentation has been prepared: a written historic and descriptive report on the shipyard as a whole, seventeen separate reports on individual buildings and structures in the shipyard, including this report, and photographic documentation.

This building will not be demolished by the federal undertaking. This report was prepared by Jody Stock, architectural designer, and Michael R. Corbett, architectural historian. Corbett was a subcontractor to Basin Research Associates of San Leandro. Basin Research was under contract to g. borchard & associates. C UNITED ENGINEERING COMPANY SHIPYARD f imUlUlLUL^y.. GATE HOUSE (United Engineering Company Shipyard, Timekeeper's Office No. 67) (Building No. 3) HAER No. CA-295-C (Page 6) /. BUILDING NO, 3: GATE HOUSE [N> Offices Of Fabric J Upholstery and Design ysrom NORTH ~D 16 24 feet Storage * - Prepared by Jody R. Stock Plan is based on scaled drawings, Alterations and Additions to the Gate House. Alameda, CA: United Engineering Co..

Alameda Shipyard, 30 November and Alben Froberg, Gate House for United Engineering. Alameda, CA: United Engineering Co., Alameda Shipyard, 31 July The plan has been altered to reflect current field conditions. The walls that have been added (after are indicated with hashmarks .....a... ESSL. and are not to scale.

In context

Alameda, California The place record: every map, photograph and survey of this town.
Alameda County, California 231 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Alameda

24 records

The federal surveyors worked through Alameda building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
United Engineering Company ShipyardHAER CAL,1-ALAM,4-22,920 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4A-8,911 words
Alameda City HallHABS CAL,1-ALAM,1-6,900 words
GTS Admiral William M. CallaghanHAER CA-23316,040 words
SS Keystone StateHAER CA-23345,179 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4D-4,308 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4B-4,177 words
Union Iron Works Turbine Machine ShopHAER CAL,1-ALAM,2-3,125 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4F-2,995 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4I-2,885 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4H-2,675 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4J-2,173 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4G-2,035 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4Q-1,656 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4M-1,600 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4K-1,451 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4L-1,432 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4R-1,326 words
U.S. Coast Guard Support Center AlamedaHABS CAL,1-ALAM,3-1,278 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4P-1,257 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4O-1,121 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4E-1,072 words
Henry H. Meyers GardenHALS CA-48831 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4N-49 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,1-ALAM,4C-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.