This project is part of the Historic American Engineering Record (HAER), a long-range program to document historically significant engineering and industrial works in the United States. The Heritage Documentation Programs of the National Park Service, U.S. Department of the Interior, administers the HAER program. The project was prepared under the direction of Todd Croteau (HAER Maritime Program Coordinator) for the Maritime Administration (MARAD) in Wesley Hale wrote the historical report under the supervision of Justine Christianson, HAER Historian. Jarob Ortiz produced the large-format photographs. Drawings were prepared by Cristina I. Montenegro-Torres and Onairis N. P rez. GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 3) Part I. Historical Information A. Physical History 1.
Date of Construction: The exact date of the keel laying is unclear, but the vessel was launched on October 17, and delivered to the U.S. Navy s Military Sea Transportation Service on December 19, 2. Designer/Naval Architect: The Military Sea Transportation Service was tasked with procuring a roll-on/roll-off vessel that could also serve as a test case for the use of gas turbine engines in Navy ships. developed a list of requirements for the vessel that included gas turbine propulsion with speeds greater than 23 knots. The request for proposals was released March 16, and six proposals had been received by June 22, After evaluation, awarded the project to Sunexport, a venture between Sun Shipbuilding and Dry Dock Company and the American Export-Isbrandtsen Line, on October 29, 3.
Builder: Sun Shipbuilding and Dry Dock Company of Chester, Pennsylvania, built the ship. Sunexport then chartered the ship to for use.3 4. Original plans and construction: GTS Admiral William Callaghan is an example of an early roll-on/roll-off freighter and has not been significantly altered from its original design. It had square feet of cargo space for vehicle storage arranged on six decks subdivided into six holds. Each hold was located forward of the superstructure and divided into four compartments. The elevation of each deck was approximately with ramps and watertight doors providing access to the lower decks. Vehicles were loaded through four side ports and the stern ramp with a throughput of 750 vehicles/day.
They were primarily stowed in the forward holds (although there was room in the No. 6 upper tween deck for vehicle storage). The ship was also outfitted with two Stulken-type ton capacity booms and twelve 5-ton and 10-ton capacity booms that served the cargo holds for more traditional lift-on/lift-off operations.4 The plans indicate the bosun s stores were in the forward-most part of the ship, above the fore peak and divided between the platform and second deck. The chain locker was also in this section, between the bosun s stores and the No. 1 upper tween deck. The machinery space was amidships in the bottom hold directly below the superstructure.
It contained the port and starboard turbine engines, while the port and starboard reduction 1 Sun Drawing Number Sun Shipbuilding and Dry Dock Company, General Arrangement: Roll- On/Roll-Off Freighter, Sunexport Holdings Corporation, March 1, 2 Donald L. Caldera, et. al., Gas Turbine Propulsion Machinery for the Roll-On/Roll-Off Ship, ASME available at accessed July 3 Caldera, et al. 4 Caldera, et al. However, Fluhart, New Jet-Propelled Roll-On/Roll-Off Greeted on Arrival at Bremerhaven, Sealift XVIII, no. 3 (March states the total deck space was square feet. GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 4) gear was in the forward end of the lower flat of the engine room.
Just aft of the engine room was the auxiliary machinery space, where three Caterpillar generators with AEG turbines produced the electricity for the ship. This space also housed the distilling plant and the fuel-oil purifiers. The engine controls, comprised of a switchboard and Westinghouse console, were aft of the auxiliary machinery space. The machine shop, which was fully equipped to meet any of the circumstances the ship could encounter while underway, was located here as well. The ship s wheelhouse was on top of the superstructure on the navigation bridge deck. The decks below the wheelhouse contained officers quarters in the lower navigation bridge and boat deck, while the rest of the crew was quartered in the cabin deck.
Callaghan was originally fitted with two Pratt and Whitney gas turbine engines of shaft horsepower each, which provided a speed of 20 knots. The engines were located as far aft and as low in the hull as possible, aft of the gears and above the main shaft. This reverse arrangement was not usually possible with a steam turbine installation because of the main-condenser interference. The engine exhaust vented vertically from the engine up through the top of the house. The fuel for the engines (initially specified as either jet fuel or light diesel fuel) was held in double-bottom tanks and discharged through strainers to reserve fuel tanks on the outboard side of the auxiliary machinery space.
After passing through the strainer, the fuel was stored in a head tank in the main engine room and discharged by gravity to the engines. There was a lubricating system for the main gears and shafting.5 The starting power for the engines came from hydraulic motors, chosen because of the availability of two generator diesels which can be used to drive the two hydraulic pumps of the starter system. Engine enclosures helped minimize the noise produced, and silencers were placed in the ductwork, which was of double-wall construction. In addition, storage and utility compartments were placed around the ductwork to create a buffer.6 The ship s design was found lacking by the crew. Chief Engineer Frederick W.
Hirst, as quoted in Sealift magazine, stated that the designers were only interested in the amount of cargo space they could achieve when they built this ship. While he praised the power plant, he deemed the subcontracted gear poor. 7 Relief skipper George R. Miller concurred with Hirst s assessment in another interview with Sealift, pointing out what he viewed as the ridiculous arrangement of the pilot house: whoever designed this bridge, didn t know the first thing about ships. Imagine putting the mate s working table at one end of the bridge and his radar set and the other gear on the other side. 8 5.
Modifications: Shortly after the completion of Callaghan, General Electric made a proposal to the Naval Sea Systems Command (NAVSEA) to replace one of the Pratt and Whitney gas turbine engines with one of their gas turbine engines. General Electric had been working on the engine and the for the U.S. Air 5 Caldera, et al., quote from p. 10; Shutdowns Hardly Deter Callaghan, Sealift XX, no. 6 (June 10. 6 Caldera, et al., 11, quote from p. 12. 7 Shutdowns, 8 Callaghan Is Extremely Productive; Moving All Types of Cargo. Sealift XX, no. 6 (June 4. GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 5) Force and had decided to try adapting the for maritime use, so the resulting needed to be tested.
General Electric agreed to pay the expense of changing over one of the engines on Callaghan and replacing it if it proved problematic. The modification took place in In the other Pratt and Whitney engine was removed and replaced with a second General Electric The have since become the standard propulsion plant in the U.S. Navy, with hundreds of examples in combatant craft and auxiliary vessels.9 6. Name: GTS Admiral William M. Callaghan bears the name of the first commander of the Military Sea Transport Service and the first captain of the battleship USS Missouri. A graduate of the Naval Academy, William Callaghan first served on destroyers escorting convoys across the Atlantic during the last six months of World War I.
He continued to serve on destroyers after the war, but eventually went back to school to earn his Masters of Science in electrical engineering from Columbia University in After assignments to cruiser and aircraft carrier duty during the interwar period, he returned to the Naval Academy as an instructor of marine engineering. Prior to the United States entry to World War II, Callaghan was stationed at the American Embassy in London where he helped plan deliveries of petroleum to Britain. His experience with logistics led him to a position as the war plans officer for logistics on the staff of the Commander in Chief of the Pacific Fleet during the Second World War. He served as the first commander of the battleship USS Missouri, which he led in engagements at Iwo Jima, Okinawa, and Tokyo.
At the close of the war, Admiral Callaghan was the first commander of the newly established Military Sea Transport Service, where he proved influential in developing the logistical structure necessary to move material and personnel across great distances. Callaghan served as commander of the from to overseeing the transport of U.S. troops and equipment to Korea at the start of the war.10 B. Historical Context During World War II, four separate government agencies controlled the transport and supply of military goods and personnel.
In the Military Sea Transportation Service was established as the sole transportation agency for the Department of Defense s ocean transport needs and assumed responsibility for providing sealift and ocean transportation for all military services as well as for other government agencies. 9 Richard Carleton and Eugene Weinert, Historical Review of the Development and Use of Marine Gas Turbines by the U.S. Navy, ASME available online at accessed July Caldera, et al., C.O. Brady and Luck, The Increased Use of Gas Turbines as Commercial Marine Engines, ASME available online at accessed July 10 Glenn Fowler, William M. Callaghan Dies at 93; Headed Logistics Service for Navy, The New York Times, July 9, GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No.
CA-2331 (Page 6) The Korean War provided an opportunity for to demonstrate its ability in mobilizing troops and personnel for deployment to foreign stations. On July 6, just eleven days after the initial invasion of North Korean troops into South Korea, the transported the Infantry Division and its equipment from Japan to Pusan (now Busan), South Korea, for deployment. The initial complement of six vessels was inadequate to meet the urgent need for military support and supply, so the activated several vessels in the reserve fleet and chartered commercial shipping vessels to transport troops and supplies from Fort Lewis, Washington, to Pusan in only twenty-nine days.11 also served as naval auxiliaries, participating in military operations like the U.S. invasion of Inchon.
The rescued troops from the ports of Hungnam and Wonsan following the entry of the People s Republic of China into the Korean conflict. During the evacuation, U.N. troops, refugees, metric tons of equipment, and vehicles were rescued and delivered to Pusan.12 The Korean War demonstrated the need for a unified sealift service, although the continued to provide service as needed. The transported cargo to Europe for the Marshall Plan, the Economic Cooperation Administration, and the newly-organized North Atlantic Treaty Organization (NATO). As the United States set up bases in the far reaches of the globe, the provided the sealift service to carry cargo to those regions. In the became involved in the Vietnam conflict by delivering weapons to the French government.
The agency eventually became the Military Sealift Command in September worked with private industry to develop new types of vessels to facilitate the growing demands of international shipping and military mobilization during the mid-twentieth century. Post-World War II saw increasing containerization, which facilitated the movement of cargo from the producer to the consumer in a single container that never had to be opened. Containers could be loaded onto semi-truck trailers, then lifted onto a cargo vessel by a crane or driven on board a roll-on/roll-off vessel, and transported to their final destination. This obviated the need for stevedores to handle the cargo inside the containers.
Containerization necessitated the conversion of traditional breakbulk vessels and the construction of new types of freighters but resulted in reductions of crew and shipping costs by streamlining the cargo-handling process. To acquire the new types of freighters, the Maritime Administration (MARAD) engaged with private shipping companies. In MARAD approved the applications for several roll-on/roll- off vessels from multiple shipping companies (although many of the construction proposals were abandoned in favor of converting existing cargo ships into container ships).14 The first roll- 11 Salvatore Mercogliano, Korea: The First Shot (Military Sea Transportation Service in Korean War), available online at accessed July 12 Mercogliano, Korea.
13 Edward Marolda, Military Sealift Command, available online at command.html, accessed June 14 U.S. Department of Commerce, Annual Report of the Federal Maritime Board and Maritime Administration, (Washington, Government Printing Office, GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 7) on/roll-off vessel was delivered to the U.S. Navy in USNS Comet (see HAER CA-348) was inspired by the World War II-era tank landing ships that ferried track and wheeled vehicles to the field in such deployments as Operation Overlord the combined Allied landings at Normandy.
The Navy immediately recognized the usefulness of the design in transporting military wheeled cargo and support equipment, but private shipping industries resisted the design out of fear that it would draw government shipping contracts away from the civilian sector. With U.S. involvement in Vietnam, the need for roll-on/roll-off vessels outweighed the concerns of private industry and lost contracts. Callaghan was one of the first purpose-built roll-on/roll-off (Ro/Ro) vessels constructed to meet the growing need to mobilize military wheeled vehicles and equipment. The Sun Shipbuilding and Drydock Company built the ship and delivered it to Sunexport Holdings Corporation in The then chartered the ship for use.
Callaghan is the only ship in its class, though its basic functionality stern loading ramp and conventional cargo gear for lift-on/lift-off operations are common design features in early Ro/Ro vessels. Between and the transported 54-million tons of combat equipment and supplies and nearly 8-million tons of fuel to Vietnam. Over U.S. and allied combat personnel were also transported by and MSC ships from to The Vietnam conflict represented one of the largest deployments of and MSC vessels, and, initially, vessels were used solely to transport personnel and materiel from U.S. ports to South Vietnamese ports. However, in Adm. Elmo Zumwalt expanded the role of the as the newly reorganized was called, to utilize civilian sailors and vessels in direct support of military operations.
Zumwalt believed the MSC ships and union-crewed vessels could accomplish the same objectives as Navy ships with the same level of efficiency but at a drastically reduced cost. The use of merchant sailors who could execute the same tasks and continue to provide service as floating munitions warehouses and supply transports eliminated the costs of training new U.S. Navy sailors. 15 C.
The decision to specify gas turbines as the propulsion plant for Callaghan was the result of an agreement between the Naval Ship Engineering Center and the Testing gas turbines for extended periods of time had proved expensive, so the construction of the new roll-on/roll-off vessel was deemed a valuable opportunity to install gas turbines and have to hours of operational data to review. The ability to start the gas turbines in a minute with full power achieved in less than three minutes, the variety of fuels that could be used, and the fact they could run unattended were all cited as benefits to this propulsion system.
The smaller size of the gas turbine plant when compared with a steam propulsion plant, which resulted in more cargo space, was another advantage.16 15 Clyde-built ferry s maiden voyage, Glasgow Herald, September 4, 9; John Kerr, Roll-on/Roll-Off British Style, Marine Engineering/Log 63, no. 7 (July 76 77; Salvatore Mercogliano, Fourth Arm of Defense: Sealift and Maritime Logistics in the Vietnam War (Washington, Naval History and Heritage Command, 16 Carleton and Weinert; Fluhart, New Jet-Propelled Roll-On/Roll-Off Greeted on Arrival at Bremerhaven, Sealift XVIII, no. 3 (March GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 8) With the Pratt and Whitney engines installed, Callaghan left Philadelphia on December 24, on its maiden voyage to Bremerhaven.
The ship was loaded with measurement tons of cargo that included 369 vehicles, 186 2.5-ton trucks, and seventy-six 20-foot containers with wheeled chassis. Callaghan averaged knots, arriving in Bremerhaven on January 2, The cargo was removed from the ship within thirty-four hours, and it was reloaded with 443 vehicles, ten semi-trailers, and four truck tractors. For the first half of Callaghan transported cargo between the United States and Bremerhaven in support of the U.S. forces stationed there. Callaghan proved to be extremely productive.
The ship set a record in trans-Atlantic speed as it cruised an average of knots over nautical miles from Delaware to Bishop s Rock, England, over a five-day, eleven-hour, forty-five-minute period in February-March This broke the prior record held by a Moore-McCormack freighter that cruised an average of knots in During these transatlantic voyages, Callaghan moved hundreds of Army vehicles (at one time) along with other cargo like howitzers, 40-ton locomotives, and two 90' barges each weighing 175 tons.17 The trips between the United States and Europe provided an opportunity for the Navy and the engine manufacturers to observe the functions of the gas turbine engines and gave the necessary data the Navy needed to decide whether to install them in destroyers.
In December one of the Pratt and Whitney engines was removed and a General Electric gas turbine engine was installed in its place for comparison at the request of General Electric. By June the operation of the two engines had revealed that the General Electric engine required 20 percent less fuel than the Pratt and Whitney engine. The General Electric engine produced a black smoke while the Pratt and Whitney s exhaust was nearly colorless. As reported in Sealift, to passing ships, Callaghan gives the impression of having only one stack in operation instead of both, and this is the source of much kidding about the one-lunger ship.
In the other Pratt and Whitney engine was replaced with a General Electric one.18 From through Callaghan participated in NATO military exercises referred to as Reforger, whose purpose was to test and refine U.S. ability to move forces quickly and explore ways to improve transportation and supply systems between NATO nations. The Reforger '76 exercise was the first time MSC ships (including Callaghan, Meteor, Comet, and American Ranger) had participated since Callaghan transported helicopters and equipment to the Airborne Division in Ghent, Belgium, as part of that exercise. During Reforger Callaghan and Comet carried 292 tanks, armored personnel carriers, and 575 trucks, along with other wheeled vehicles.
The following year, Callaghan transported Army equipment from Beaumont, Texas, to Ghent, Belgium.19 17 Fluhart; New North Atlantic Speed Record Set By MSTS-Chartered GTS Callaghan, Sealift XVII, no. 5 (May 4, 21; Callaghan Is Extremely Productive; Moving All Types of Cargo, Sealift XX, no. 6 (June 3. 18 Shutdowns Hardly Deter, 8. 19 Callaghan, Comet Support Reforger Sealift XXVII, no. 9 (September 5; Four MSC Vessels in NATO Exercises, Sealift XXVIII, no. 9 (September GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 9) In the ship was transferred to the Ready Reserve Force.
It was one of the first ships activated for service in Operations Desert Shield/Desert Storm in During the first Gulf War, the MSC delivered more than 12-million tons of wheeled and tracked vehicles, helicopters, ammunition, dry cargo, fuel, and other supplies and equipment. The Ro/Ro ships proved to be one of the most useful classes of vessels, delivering nearly 25 percent of the Central Command s material during the operation. However, while returning to the United States from its voyage to the Middle East, Callaghan struck an uncharted obstruction in the Red Sea, resulting in of hull damage. The ship remained in drydock well beyond the conclusion of the conflict.20 In the mid-1990s, Callaghan was once again activated to support U.S.
interests in Operation Uphold Democracy, the Clinton-Gore administration s attempt to reinstate the administration of Jean-Bertrand Aristide, the first popularly elected president in Haitian history, who had been removed from office by a military coup in The United States deployed an invasion force of nearly military personnel and two aircraft carriers to intimidate the military regime into abdicating power. The pressure proved successful, and the situation was resolved without bloodshed.21 From to MARAD activated 118 ships, including Callaghan, to support Operations Enduring Freedom and Iraqi Freedom. With a total of ship operating days and a reliability rate of 99 percent, the Ready Reserve Force moved 25 percent of the initial equipment needed to support the U.S.
Armed Forces deployed to Afghanistan and Iraq.22 Having proven its usefulness in multiple operations, Admiral Callaghan remains an active vessel in the Maritime Administration s Ready Reserve Force and is currently stationed in Alameda, California. PART II. STRUCTURAL/DESIGN INFORMATION A. General Description 1. Overall: GTS Admiral William M. Callaghan is the first gas-turbine engine propelled, double-screw, dry cargo roll-on/roll-off vessel constructed. It has a welded-steel hull with a double bottom that is longitudinally framed below the tank top. The ship s profile is defined by five pairs of kingposts rising from the forecastle, with two small winch platforms and a mast house amidships, a main superstructure, and a stern loading ramp.
The superstructure is standard in its design, with the engine funnels positioned abaft of the wheelhouse on either side of the radar tower. The ship s fore to aft arrangement is as follows: 20 MSC History, Military Sealift Command, available online at accessed June GTS Adm. Callaghan MARAD, available online at gallery/gts-callaghan/, accessed June 21 Milestones: Office of the Historian, Department of State, available online at accessed June 22 The Maritime Administration s Ready Reserve Force, available online at accessed July GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 10) Forepeak with boatswain s stores and chain locker above tank for salt water ballast No. 1 hold: three compartments for dry cargo Deep tank No. 1A: compartment for salt water ballast Deep tank No.
1B: compartment for fuel oil No. 2 hold: four compartments for dry storage No. 3 hold: four compartments for dry storage and vehicles; lower hold has fixed ballast tanks on the port and starboard sides No. 4 hold: four compartments for dry cargo and vehicles with three ballast tanks port and starboard Ship s stores and machinery space with fuel-oil settling tanks port and starboard, two driveway compartments and deckhouse above No. 5 hold: one compartment situated between a driveway and the No. 4 upper tween hold No.
6 hold: two compartments for goods and vehicles Auxiliary machine room with fuel-oil settling tanks and propeller shaft compartments Afterpeak, supporting the steering gear and stern driveway Stern loading ramp The double bottom is subdivided into additional tanks under the machinery spaces and holds. 2. Decks: GTS Admiral William M. Callaghan s navigation and crew spaces are in a five-deck superstructure with a tall mast located just abaft amidships. The radar and communications equipment stands on the house top deck, above the wheelhouse. The ship s two funnels protrude from the navigation bridge deck just behind the wheelhouse and are the primary feature of the uppermost deck. The purser s stateroom is found in the forward section of the lower navigation bridge deck.
The officers laundry and the third assistant engineer s stateroom are on the boat deck, forward of the turbine intake. The crew quarters and laundry are located on the cabin deck. The galley is positioned in the forward section of the upper deck, which also provides access to the crane platforms to operate the two stern and forward deck cranes. The main deck below the superstructure features port and starboard driveways that provide access from the stern to the bow, and a deck house amidships that provides ramp access to the No. 4 upper tween hold. GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No.
CA-2331 (Page 11) The forecastle and three winch platforms on the main deck contain the machinery for operating the forward six cranes designed and built by Sun Shipbuilding and Drydock Company, as well as the windlass mechanisms for raising and lowering the anchors. Information on the exact manufacturers of the anchor and chain system has not been located. The remaining decks below the main deck consist of cargo holds, machine shop and storage, machinery spaces, and fuel-oil and ballast-water tanks. 3. Cargo holds: Callaghan has six cargo holds comprised of sixteen compartments across four decks. In addition, the ship has four deep tanks for fuel-oil and salt water ballast, as well as a 125-ton potable water tank located between the No. 4 and No. 6 lower tween decks.
The total cargo capacity is square feet, with the ability to load containers and vehicles through port and starboard lateral cargo doors, located forward and amidships, as well as via the stern ramp. Each of the holds are also accessible via removable deck plates through which cargo can be loaded by one of the ship s ten cranes. The ship s holds are all spacious and designed to carry standard 20' cargo containers or vehicles for military support. The main deck can hold military vehicles such as LCUs and weighing up to 200 long tons each.23 The main and second decks can also store tanks equipped with machine guns. tanks could be placed on the main, second, and third decks.
These same three decks also had the capacity to hold125 heavy cargo trucks, and all decks, including the tank top, could accommodate 2.5-ton tactical trucks.24 Callaghan can store several semi-trailers of various sizes in its holds. The main, second, and third decks can hold and trailers, and 27' trailers can be stored on the top two decks. The ship was also designed to carry jeeps and ambulances on its third and fourth decks and on the tank top.25 While many of the vehicle types described in the original design plans have been phased out, they provide a general sense of the cargo capacity of this vessel in relation to modern equipment needs. 4. Crew accommodations: The ship was designed to host a complement of thirty-six crew members when fully staffed.
A full crew consists of sixteen deck hands ten of which would work in the engine room, seven stewards, and three military directors as needed. The officers offices and staterooms are located on the lower navigation bridge, and the officers lounge is one deck below on the boat deck, where the chief and assistant engineers offices and staterooms are found. When military directors accompany missions, they occupy staterooms on the boat deck as well. This deck is also host to laundry facilities and the radio room and provides access to the two motorized lifeboats. The rest of the crew, including the boatswain, cook, and mechanics, reside on the cabin deck, where their baggage and laundry facilities are located, as well as the ship s treatment room.
23 A Long Ton, or Imperial Ton, is equivalent to pounds. 24 Sun Drawing Number 25 Sun Drawing Number GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 12) The upper deck features two mess halls, one for officers and one for crew, each served by the same galley located between them. The steward s quarters are also located on the upper deck, where there is a refrigerator room and crew recreation room. 5. Safety: Callaghan has six inflatable life rafts capable of accommodating twenty persons each. Viking Life-Saving Equipment of Denmark supplied the rafts. The ship also features two motor propelled lifeboats, each certified to carry seventy persons. The boats are stored in davits on the boat deck, port and starboard. B. Mechanical Features 1.
Engine Plant: As previously described, the ship was originally fitted with two Pratt and Whitney engines providing a service speed of 20 knots. The had been replaced by with General Electric marine gas turbines. The were derived from the GE CF6 aircraft engine and have since become standard in U.S.
Navy vessels.26 The generates an output of shaft horsepower and a power turbine speed of General Electric s product description for the states, the has four major components: a 16-stage, pressure ratio compressor with seven stages of variable stators and inlet guide vanes; a fully annular combustor with externally mounted fuel nozzles; a two-stage, air-cooled high-pressure turbine which drives the compressor and the accessory-drive gearbox; and a six-stage, aerodynamically coupled, low-pressure power turbine which is driven by the gas generator s high-energy exhaust gas flow.27 Since the marine gas turbine is derived from GE Aviation s CF6 aircraft engine, it does not rely on steam from boilers. Instead, the system utilizes a gas compressor, combustion chamber, and expansion turbine.
The compressor draws air from the intakes located at the aft end of the superstructure into the turbine and pressurizes it, feeding it into the combustion chamber at speeds of hundreds of miles per hour. A steady stream of fuel is injected into the combustion chamber where it combines with the pressurized air, causing a reaction that burns the fuel at temperatures exceeding 1,051-degrees Fahrenheit. The combustion chamber produces a high-temperature, high-pressure gas stream that expands through the turbine section.
As the gas moves through the turbine blades, the turbine draws more air into the compressor to feed the system, generates thrust to the propeller shafts, and powers the generators to produce electricity for the vessel.28 The exhaust is expelled through engine uptakes to the funnels located behind the wheelhouse on the navigation deck. 26 GTS Adm. Callaghan MARAD. 27 Marine Gas Turbine, GE Aviation, available online at accessed June 28 Marine Gas Turbine ; How Gas Turbine Power Plants Work, United States Department of Energy, Office of Fossil Fuel Energy, available online at accessed June GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 13) 2.
Electrical System: There are three Caterpillar diesel engines with AEG turbine generators to provide auxiliary thrust and generate electricity for the vessel. 3. Cargo-Handling Arrangements: GTS Admiral William M. Callaghan is equipped with three pairs of king posts and sixteen cargo-handling booms. Four of the booms can lift 120-tons, eight are 15-ton capacity, and four are rated at 25 tons. Two 15-ton booms are located at the forward-most king posts to load cargo into the No. 1 upper tween hold, and two 15-ton booms also load the No. 2 hold. The No. 3 hold is serviced by two winch platforms, and the forward end is loaded by two 120-ton and two 25-ton booms while the rear is serviced by two 120-ton and two 15-ton booms.
There are two 25-ton booms located on a winch platform at the forward end of the superstructure for the No. 4 hold. The No. 6 hold is located aft of the superstructure and serviced by two 15-ton booms operated on a winch platform accessed through the aft end of the upper deck. The holds can also be accessed through the stern ramp or the ramp house located on the main deck amidships. Vehicles are driven onboard and loaded from the bottom-most to the upper-most holds through a series of articulated ramps located throughout the ship. Once below deck, the vehicles are secured with heavy-duty straps and chains to each other and to the bulkheads on each of the four deck levels. GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 14) Part III: Sources of Information A.
Primary Sources Admiral Callaghan Drawings, General Arrangement. Library of Congress, Drawer-A, Cabinet- 1, Tech Library, P/NO ALT 18, Brady, C.O. and Luck, The Increased Use of Gas Turbines as Commercial Marine Engines. ASME Available online at 2a001-93-gt-142.pdf, accessed July Caldera, Donald L., et. al. Gas Turbine Propulsion Machinery for the Roll-On/Roll-Off Ship. ASME Available online at 1T01A030-67-GT-31.pdf, accessed July Callaghan, Comet Support Reforger 77. Sealift XXVII, no. 9 (September Callaghan Is Extremely Productive; Moving All Types of Cargo. Sealift XX, no. 6 (June Fluhart, New Jet-Propelled Roll-On/Roll-Off Greeted on Arrival at Bremerhaven. Sealift XVIII, no. 3 (March Four Command Ships in NATO Exercises. Sealift XXVI, no.
9 (September Four MSC Vessels in NATO Exercises, Sealift XXVIII, no. 9 (September New North Atlantic Speed Record Set By MSTS-Chartered GTS Callaghan. Sealift XVIII, no. 5 (May 4, 21. Shutdowns Hardly Deter Callaghan. Sealift XX, no. 6 (June Sun Shipbuilding and Dry Dock Company. Cargo Handling-Heavy Lift Arrangement, Builders Plan No. Sun Shipbuilding and Dry Dock Company, General Arrangement, Builders Plan No. U.S. Department of Commerce, Annual Report of the Federal Maritime Board and Maritime Administration, Washington, Government Printing Office, GTS ADMIRAL WILLIAM M. CALLAGHAN HAER No. CA-2331 (Page 15) B. Secondary Sources Carleton, Richard S., and Eugene P. Weinert. Historical Review of the Development and Use of Marine Gas Turbines by the U.S. Navy.
ASME, Available online at accessed July Fowler, Glenn. William M. Callaghan Dies at 93; Headed Logistics Service for Navy. The New York Times, July 9, Available online at accessed July GTS Adm. Callaghan MARAD. Available online at accessed July Marolda, Edward. Military Sealift Command. Available online at accessed June Mercogliano, Salvatore. Fourth Arm of Defense: Sealift and Maritime Logistics in the Vietnam War. Washington, Naval History and Heritage Command, Korea: The First Shot (Military Sea Transportation Service in Korean War). Available online at accessed July One Hundred Years in the Making: The Birth of Military Sea Transportation Service Available online at accessed July Sealift 60 Years Strong. Available online at accessed June Milestones: Office of the Historian.
Available online at accessed June MSC History. Available online at accessed June United States Maritime Administration. Characteristics and Index of Maritime Administration Ship Designs. Washington, US Department of Transportation, Maritime Administration,