BlockBefore

United Engineering Company Shipyard, Pier 4, 2900 Main Street, Alameda

United Engineering Company Shipyard, Pier 4, 2900 Main Street, Alameda, Alameda County, CA. Surveyed as HAER CAL,1-ALAM,4Q-, with a 1,656-word written history.

From the record

“Pier 4 is a contributing structure in the United Engineering Company Shipyard historic district that has been determined eligible for the National Register of Historic Places.”

Written record, HAER CAL,1-ALAM,4Q- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,1-ALAM,4Q- · the record runs 1656 words · one of 198 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

842 words

Source document Quoted word for word from HAER CAL,1-ALAM,4Q-. Not written, edited or summarised by this site.

Pier 4 is a contributing structure in the United Engineering Company Shipyard historic district that has been determined eligible for the National Register of Historic Places. The United Engineering Company Shipyard, established in to build and repair ships for the U.S. Navy, is the last surviving of several large World War II shipyards in Alameda. United Engineering built 21 tugboats and repaired hundreds of ships during the war. The facility was one of the largest employers in Alameda and played an important economic and social role in the city. Pier 4 represents the ship repair aspect of work at the shipyard. Description: Pier 4 is located in the wet basin (on the south side of the Oakland Inner Harbor) in the Alameda Gateway complex.

Although once much longer, the north end of Pier 4 has been demolished, and it currently measures approximately 40 feet across and is 345 feet long. The structure of the pier is made principally of large timbers. The piles are large wooden posts treated with creosote and are sunk between 58 and 80 feet.1 Running the width of the pier, rows of nine piles alternate with rows with five piles. The piles are capped with 12 by 12 inch posts. The deck structure consists of 12 by 12 inch timbers placed lengthwise along the pier on top of the pile caps. Then 4 by 12 inch planks are laid across the width of the pier. The surface planks are secured to the timbers beneath with large iron spikes and nails.

Steel plates are located in the surface of the pier ostensibly to provide access to pipes located beneath the deck. In addition, steel plates and pieces of plywood cover holes and rotting planks on the deck's surface. r I John Hudspeth, Architect, Bulkhead Wharf & Pier U4 Extension Plan & Details of Solid Deck for RR. ('Alameda, CA: United Engineering Co., Alameda Shipyard, Ship Repair Facilities, 26 August UNITED ENGINEERING COMPANY SHIPYARD, PIER 4 (East Pier, Structure No. 15) HAER No. CA-295-Q (Page 2) An iron rail runs the full length of the pier on each side of the deck. A Colby crane originally ran along these tracks but has since been removed. It now sits on the wharf at the west end of the shipyard.

Along the east and west edges of the pier there are the remains of electrical conduit boxes and pipe manifolds. In addition, along the east side of the pier there are remnants of five mooring bits and three fire hose boxes. AH utilities have been abandoned Historical Context: The piers at the United Engineering yard were built in the early during a massive construction campaign. The company quickly built numerous buildings and structures to accommodate shipbuilding and repair necessitated by U.S. involvement in World War II. Pier No. 4 first appeared on a site plan of the shipyard dated 22 October During construction of the pier, a decision was made to build a shorter structure than originally planned.

Later, in a memo dated 20 December United Engineering Company requested that it be completed as planned, at a cost of In the original plan for construction of Piers in this yard, Pier No. 4 was designed 544 feet in length and the bulkhead wharf at the head of Pier No. 4 was designed to extend to the easterly property line. As the work progressed, the dredging and pier construction costs far exceeded the estimated prices and, in an effort to keep the project funds within the amounts originally allocated, Pier No. 4 was cut in length from 544 feet to 424 feet and the easterly section of the bulkhead wharf was eliminated. On further consideration, we are convinced that in order to develop the full service value of Pier No.

4 and the ton drydock which will be moored to the west side of that pier, it should be restored to the 544 feet length as originally designed and the bulkhead wharf should be constructed to eighty feet to the east, as originally planned. By so restoring the original design length of the pier, the crane located thereon will be able to reach any point of a vessel located in the drydock or on the adjacent pier. Shortly after the pier was completed, a dry dock was added to the west side of Pier 4. This was a ton dry dock and was controlled from a building constructed on the bulkhead wharf at the base of Pier UNITED ENGINEERING COMPANY SHIPYARD, PIER 4 (East Pier, Structure No. 15) HAER No. CA-295-Q (Page 3) 4.

At this time, it was also proposed that an even larger ton) floating dry dock be built on Pier 5.2 After fifty years of use and exposure to elements, by many of the piles were broken, missing, or rotted. As a result the deck was twisting and collapsing not to mention deteriorating.3 The Army Corp of Engineers analyzed the problem and demolished the northern end of Pier 4. Pier 4 is seriously deteriorated and is currently not in use.

Sources

403 words

Source document Quoted word for word from HAER CAL,1-ALAM,4Q-. Not written, edited or summarised by this site.

Alameda County Recorder. Exhibit B: Description of Buildings, Waterfront Improvements, Shipyard Utilities, Machinery and Equipment. 18 February RE: IM Alameda Gateway. Existing Site Plan. 30 January Hudspeth, John, Architect. Bulkhead Wharf & Pier #4 Extension Plan & Details of Solid Deck for RR. Alameda, CA: United Engineering Co., Alameda Shipyard, Ship Repair Facilities, 26 August Kennedy, Clyde C, Engineering Office of. "Area Plan and Interceptor Profile: Improvements to Sewer System for Properties Occupied by Todd Shipyards Corp., Alameda, Calif." Prepared for Matson - United Properties, Inc. 9 August Map of Alameda Shipyard Proposed Additional Facilities. Alameda, CA: United Engineering Co., Alameda Shipyard, 24 February Ship Repair Facilities Piers Nos. & 4.

Alameda, CA: United Engineering Company, 7 March Thompson, Richard G., Lieutenant Colonel, San Francisco District, Corps of Engineers. Letter to Cherilyn Widell, State Historic Preservation Officer, requesting Determination of Eligibility. 30 April United Engineering Company Alameda Shipyard, San Francisco Area, Sketch No. 48. 10 February United Engineering Company Alameda Shipyard: Map Showing Existing Facilities and Those Under Construction. 22 October 2 Map of Alameda Shipyard Proposed Additional Facilities. (Alameda, CA: United Engineering Co., Alameda Shipyard, 24 February sheet 3. 3 Michael J. Walsh, Lt. Colonel, District Engineer, Partial Demolition of Alameda Gateway Piers (San Francisco, CA: U.S.

Army Engineer District, San Francisco Corp of Engineers, 27 March sheet 2, UNITED ENGINEERING COMPANY SHIPYARD, PIER 4 (East Pier, Structure No. 15) HAER No. CA-295-Q (Page 4) United Engineering Company Map ofAlameda Shipyard Showing Existing and Proposed Additional Facilities. Plan no. UEC- A-l-7. 14 June United Engineering Company Memo to Bureau of Ships, Washington DC. "Contract NObs-76 - Funds for completion of plant facilities". 20 December United Engineering Company Memo to Chief of the Bureau of Yards and Docks. "Reproduction Costs and Market Value to Third Parties of'Civil Works'", with Estimated Schedule of "Civil Works" Facilities. 8 February United States. Army Corps of Engineers - San Francisco District and California. State Historic Preservation Officer.

Memorandum of Agreement Regarding the Oakland Harbor Navigation Improvements Project, Alameda County, California. Signed 31 January and 22 January Walsh, Michael J., Lt. Colonel, District Engineer. Partial Demolition ofAlameda Gateway Piers. San Francisco, CA: U.S. Army Engineer District, San Francisco Corp of Engineers, 27 March Widell, Cherilyn, State Historic Preservation Officer. Letter to Richard G. Thompson, Lieutenant Colonel, San Francisco District, Corps of Engineers, Regarding Oakland Harbor Ship Channel Deepening and Improvements, Alameda County [Determination of Eligibility Concurrence]. 9 June

Written history

318 words

Source document Quoted word for word from HAER CAL,1-ALAM,4Q-. Not written, edited or summarised by this site.

This report was prepared for the U.S. Army Corps of Engineers and the Port of Oakland in accordance with a Memorandum of Agreement (MOA) between the U.S. Army Corps of Engineers, San Francisco District and the California State Historic Preservation Officer concerning the former United Engineering Company shipyard. The Port of Oakland and the City ofAlameda were concurring parties to the MOA. The MOA was created because of a proposal by the U.S. Army Corp of Engineers in partnership with the Port of Oakland to sponsor the Oakland Harbor Navigation Improvements Project. This project "would deepen Oakland Harbor channels and berth areas from -42 feet mean lower low water to -50 feet with 2 feet overdredge allowance" and widen some portions of the channels.

These actions, which would constitute an Undertaking under Section would result in the demolition of several buildings and structures at the former United Engineering Company Shipyard. Because the shipyard had been determined eligible for the National Register of Historic Places, the Undertaking would have an adverse effect on the property. Under the MOA, the following HAER documentation has UNITED ENGINEERING COMPANY SHIPYARD, PIER 4 (East Pier, Structure No. 15) HAER No. CA-295-Q (Page 5) been prepared: a written historic and descriptive report on the shipyard as a whole, seventeen separate reports on individual buildings and structures in the shipyard, including this report, and photographic documentation. This structure will be demolished by the federal undertaking.

This report was prepared by Jody Stock, architectural designer, and Michael R. Corbett, architectural historian. Corbett was a subcontractor to Basin Research Associates of San Leandro. Basin Research was under contract to g. borchard & associates. UNITED ENGINEERING COMPANY SHIPYARD, PIER 4 (United Engineering Company Shipyard, East Pier) (Structure No. 15) HAER No. CA-295-Q (Page 6) STRUCTURE NO. 15: PIER 4 NORTH 0 16 32 96 feet Measured by Stephen Hardy and Jody Stock Drawing prepared by Jody R. Stock

In context

Alameda, California The place record: every map, photograph and survey of this town.
Alameda County, California 231 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Alameda

24 records

The federal surveyors worked through Alameda building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
United Engineering Company ShipyardHAER CAL,1-ALAM,4-22,920 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4A-8,911 words
Alameda City HallHABS CAL,1-ALAM,1-6,900 words
GTS Admiral William M. CallaghanHAER CA-23316,040 words
SS Keystone StateHAER CA-23345,179 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4D-4,308 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4B-4,177 words
Union Iron Works Turbine Machine ShopHAER CAL,1-ALAM,2-3,125 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4F-2,995 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4I-2,885 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4H-2,675 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4J-2,173 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4G-2,035 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4C-1,836 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4M-1,600 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4K-1,451 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4L-1,432 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4R-1,326 words
U.S. Coast Guard Support Center AlamedaHABS CAL,1-ALAM,3-1,278 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4P-1,257 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4O-1,121 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4E-1,072 words
Henry H. Meyers GardenHALS CA-48831 words
United Engineering Company ShipyardHAER CAL,1-ALAM,4N-49 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,1-ALAM,4Q-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.