Central Pacific Transcontinental Railroad, Tunnel No. 1, Milepost 164.34, Blue Canyon
Central Pacific Transcontinental Railroad, Tunnel No. 1, Milepost 164.34, Blue Canyon, Placer County, CA. Surveyed as HAER CAL,31-BLUCA,1-, with a 1,188-word written history.
From the record
“The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha.”
Written record, HAER CAL,31-BLUCA,1- survey. Machine-read text.
Surveyed by the federal HAER program as HAER CAL,31-BLUCA,1- · the record runs 1188 words · one of 28 surveyed structures published for this county.
Source document
Quoted word for word from HAER CAL,31-BLUCA,1-.
Not written, edited or summarised by this site.
Southern Pacific Donner Pass Route Tunnels Milepost southwest (railroad west) of Blue Canon, Placer County, California. UTM: Quad: Westville, Calif. (photorevised (west portal) UTM: Quad: Westville, Calif. (photorevised (east portal) Date of Construction: Engineer: Theodore Judah and Central Pacific Railroad Engineering Department Southern Pacific Railroad Engineering Department
Significance
1065 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER CAL,31-BLUCA,1-.
Not written, edited or summarised by this site.
The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha. For the purpose of the current project, the first transcontinental railroad was found likely to be eligible for the National Register of Historic Places at the national level of significance under Criterion A for its significance in transportation history, in uniting the East and the West, and in the development of the West.
The railroad's period of significance is to from the line's completion in through the years of its role in the settlement and development of the West, to the conclusion of the railroad's achievements in World War n. Tunnel 1 is a contributive element of this historic property. Report Prepared By: John W. Snyder Co-Principal Preservation Services P.O. Box Sacramento CA CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 1 HAER No. CA-207 Page 2
Description
Tunnel 1 is a 518-foot, double track railroad tunnel, with reinforced concrete portal faces and granite ashlar voussoirs, belt courses and coping, and wingwalls. As-built in by the Central Pacific, the tunnel was a single track structure, with timbered approaches. The tunnel is on a right-hand curved alignment varying from eight degrees, thirty-four minutes to eight degrees, fifty minutes, and carries the tracks of the Union Pacific Railroad's (formerly Southern Pacific) Donner Pass line. H.
Historical Information
When the Central Pacific built the first transcontinental rail line over the Sierra Nevada in expediency stemming from time considerations and from the hand labor used to build the line forced a circuitous route that, wherever possible, hugged the outside slopes of hills to maintain reasonable grades in the climb over the mountain rampart. The builders were able to avoid tunneling until they had nearly reached Blue Canon, more than seventy miles from Sacramento. There they built Tunnel 1, and sequentially numbered the tunnels following to the east as they pushed the tracks toward Promontory Summit and the May meeting with the Union Pacific.
The Southern Pacific enlarged Tunnel 1 to its present dimensions as an element of the reconstruction and double-tracking of the original Central Pacific line between Colfax and Blue Canon. [For a full history of this line and of this undertaking, see the documentation set for the Central Pacific Transcontinental Railroad (Southern Pacific Overland Route) (Southern Pacific Donner Pass Route), Southern Pacific Donner Pass Route Tunnels, HAER No. CA-196.] After assuming control of the Southern Pacific/Central Pacific and merging them with the Union Pacific in Edward H. Harriman had embarked on a series of huge reconstruction projects system-wide.
One of these was the double-tracking of the original Central Pacific line over Donner Pass, the first segment of which was from Rocklin to Colfax, with the second segment east from Colfax to Blue Canon. Whereas the first phase of the double-tracking often saw the construction of the second track a considerable distance from the old line in order to secure gentler grades, during the second phase of double-tracking the lines paralleled each other closely enough that the railroad designed the tunnels in this reach new Tunnels 33 and 34 (HAER CA-206), and the rebuilt Tunnel 1-as double-track structures. Ultimately only Tunnel 1 functioned in that manner.
At Tunnels 33 and 34, the grade of the new line proved too steep for eastbound trains, and in the railroad removed the second track from these tunnels, using them instead to carry a single track for westbound (downhill) trains, while the old Central Pacific alignment around the outside of Cape Horn continued to handle eastbound trains. At Tunnel 1 the old and new lines were on the same alignment, and the rebuilt tunnel functioned as designed. CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 1 HAER No. CA-207 Page 3 HI.
Sources
Beebe, Lucius. The Central Pacific & The Southern Pacific Railroads. Berkeley, CA: Howell- North, "Colfax Grade Revision; Southern Pacific," Railway Age Gazette, February 18, Daggett, Stuart. Chapters on the History of the Southern Pacific. New York: Augustus M. Kelley, Publishers, originally published Hofsommer, Don L. The Southern Pacific, College Station, TX: Texas A&M University Press, Howard, Robert West The Great Iron Trail: The Story of the First Transcontinental Railroad. New York: G. P. Putnam's Sons, Kraus, George. High Road to Promontory: Building the Central Pacific across the High Sierra.
Palo Alto: American West Publishing Company, "Millions To Be Expended: Southern Pacific Is to Be Putin Fine Shape," Tfie Sacramento Bee, June "Oil Burning Mallets; Southern Pacific," Railway Age Gazette, 50:24a, June 16, "Railroad Construction," The Railroad Gazette, Sabin, Edwin L. Building the Pacific Railway. Philadelphia and London: J. B. Lippincott Company, Signor, John R. to Richard Starzak, Memorandum, "Brief Chronological History of Sierra Tunnels," October "The Days When The Central Pacific Was Young," Southern Pacific Bulletin, May "The Harriman Influence," The Railroad Gazette, January United States Geological Survey. Topographic maps. Westville, Calif, quadrangle, scries, (photorevised IV.
PROJECT INFORMATION As a result of the merger of the Union Pacific and Southern Pacific Railroads, a federal undertaking under the jurisdiction of the Surface Transportation Board of the U.S. Department of Transportation, and in order to accommodate freight trains utilizing longer and taller cars and loads-lri-level auto rack cars and cars carrying double-stacked containers, the Union Pacific will need to increase tunnel clearances on the former Southern Pacific Donner Pass Route. The tunnels, built between and are contributing elements of the National Register-eligible Southern Pacific Donner Pass Route Tunnels Historic District.
All tunnels have been laser- CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 1 HAER No, CA-207 Page 4 measured and the railroad will determine clearance needs on a tunnel-by-tunnel basis. Some, because of curved alignment, will require interior work to allow for longer cars such as tri-level auto rack cars; others will require both interior and portal work to provide sufficient vertical clearance for "double-stack" container cars. The latter work may impact the character-defining tunnel portals if crown mining of the tunnels (as opposed to lowering the tunnel floors) is selected. Inasmuch as this would cause an adverse effect to the tunnels, Union Pacific has elected to record the tunnels for the Historic American Engineering Record.
Documentation was carried out by Preservation Services, John Snyder Field Director and Historian, and Ed Andersen, Photographer. Photos were made in August and research was carried out from August through March
The federal survey recorded these other structures elsewhere in Placer County. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER CAL,31-BLUCA,1-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.