From the record
“The San Vicente Dam has played an important role in the San Diego water system for the last 60 years.”
Written record, HAER CA-2267 survey. Machine-read text.
Surveyed by the federal HAER program as HAER CA-2267 · the record runs 5787 words · one of 194 surveyed structures published for this county.
Source document
Quoted word for word from HAER CA-2267.
Not written, edited or summarised by this site.
At the north end of Moreno Avenue approximately ft. north of the intersection of Moreno Avenue and Vigilante Road. In the city of Lakeside, San Diego County, California. USGS San Vicente Reservoir Quadrangle, Universal Transverse Mercator Coordinates: 11 West 1/2 of Section 31, RlE Construction Date: Engineer: Fred D. Pyle, Hydraulic Engineer, City of San Diego Julian Hinds, Chief Engineer and General Manager, Metropolitan Water District of Southern California (consultant) Builder: Arundel Corporation, Baltimore, Maryland L.E. Dixon Company, San Gabriel, California
Significance
5604 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER CA-2267.
Not written, edited or summarised by this site.
The San Vicente Dam has played an important role in the San Diego water system for the last 60 years. Although it was not the first dam in San Diego County, it supports a system of dams and reservoirs and plays a crucial role in storing both local runoff and water brought to San Diego form the Colorado River. It also helps prevent future floods in San Diego. The period during which the dam was constructed represented the end of a significant era of dam building that attempted to meet San Diego's water needs through local sources and to control the threat of disastrous flooding. Report prepared Chris Dolan by: Historian EDAW, Inc.
Kettner Boulevard, Suite 620 San Diego, CA SAN VICENTE DAM HAER CA-2267 PAGE2 Date: September Edited and reprinted by Anne Mason, HABS/HAER/HALS staff in The San Vicente Dam is located on San Vicente Creek, approximately 3.5 miles north of Lakeside in San Diego County (Figures 1 and 2). The watershed area is approximately 75 square miles.
Historical Information
San Vicente Dam History San Diego's history has long been interlaced with that of water resources. From early settlement, water supply was a constant concern. Because most of San Diego's rain falls in winter onto nearly impermeable clay soils, flooding has also been an ever-present threat. Significant floods in and played a pivotal role in the decision to build several dams throughout the county. Many of these dams created reservoirs that were used to control the county water supply. From to seven dams including San Vicente Dam were constructed in San Diego County. 1 The history of the San Vicente Dam began more than a decade before its construction. In the City of San Diego (City) started leasing the San Dieguito Water Company's system, with an option to purchase.
The following year, the City electors voted to issue bonds in the amount of to acquire certain water rights and to build the Sutherland Dam, Sutherland Aqueduct, and San Vicente Dam.2 In after only one year of construction, work on the Sutherland Dam was halted due to political reasons. The remaining money from the bond measure was held in the El Capitan Dam fund by the City for future projects. The El Capitan Dam was completed within a few years in The Sutherland Dam was not completed until due to foundation problems that arose during its construction. At the same time, the City applied to the Division of Water Resources of the State of California for rights to a portion of the Colorado River water that was going to be diverted to California.
Studies relating to the proposed diversion were overseen by Hiram N. Savage, Hydraulic Engineer for the City. 3 Savage died in with his work unfinished. He was seceded by Fred D. Pyle, who made a systematic investigation of the water supply problem of San Diego. In addition to considering importation of water from the Colorado River, Pyle looked at possibly obtaining additional water from local sources. His report favored the development of local water before importation of Colorado River water. 4 But local water rights were of some debate in San Diego County.
There were several legal battles that culminated in a case before the Supreme Court in The ruling favored the City's 1 Hill 2 Fowler, 3 San Diego County Water Authority 4 ibid:49 SAN VICENTE DAM HAER CA-2267 PAGE3 position, stating that San Diego had prior and paramount rights to the water of the San Diego River through the rights of the pueblo of San Diego. This ruling left the City free to continue to look for ways to capitalize on local water sources to supply the county's burgeoning population. By the late City officials began stressing the need for a new reservoir to supplement the Sutherland and El Capitan Dams. They proposed the San Vicente Dam, which could be built just west of the El Capitan Dam.
It would be connected by pipes to the El Capitan and Sutherland Reservoirs and would store runoff from both the San Vicente watershed and these reservoirs. 5 This would allow for increased capacity during unseasonably rainy periods. The City argued that the San Vicente Dam was also a good choice because the area covered by the reservoir would be small compared to most other dams in the county. With less surface area, the water in the San Vicente Reservoir would be slow to evaporate. Although the main purpose of the San Vicente Dam was to provide water storage for San Diego, an important secondary purpose was flood control. From to San Diego had unusually high levels of rain. This caused flooding throughout San Diego County.
Even though El Capitan Dam held back much of the water in the San Diego River, the river still rose to a level just short of the top of a dike that had been constructed to divert water past Old Town San Diego and out to Mission Bay. Had the San Vicente Dam been built, some contend that it would have held back much of that overflow. 6 Heavy rains in early also caused extensive flooding in the San Vicente Creek area. Large parts of the area between Lakeside and the now-defunct town of Foster were covered in water that threatened to take away residences. During this time, preparations were being made to construct the All-American Canal.
The Boulder Canyon Project Act authorized the construction of the All-American Canal and the Imperial Dam in The All-American Canal was built by the United States Bureau of Reclamation during the 193 Os, and in the first water was delivered to Imperial Valley. The 82-mile gravity-flow All-American Canal beings at Imperial Dam on the Colorado River about 20 miles northeast of Yuma, Arizona. The All-American Canal drops 175 feet between Imperial Dam and Westside Main Canal. The All-American Canal extends south and west along the Mexican/American border. When the canal and the Imperial Dam were both more than 75 percent complete, a citizens' report was prepared by a committee regarding use of the water from the canal and construction of new water-retaining facilities in San Diego.
After seven months of study on the subject, the committee recommended to the City Council that the San Vicente Dam be built to safeguard San Diego's claim to water from the Colorado River. 7 The committee stated that: The near future needs of the city require the taking of immediate steps to provide additional water from local resources and to perfect [sic] our right to use Colorado River water by providing means of taking water at the point of delivery fixed by the U.S. government as Imperial Dam.
8 5 Mayrhofer San Diego Historical Society vertical file 6 ibid 7 San Diego Sun, 8 ibid SAN VICENTE DAM HAER CA-2267 PAGE4 The committee cited several reasons for choosing to advocate construction of the San Vicente Dam: It always has been an approved unit of all plans and proposal for local development. Its capital cost is low compared with other projects .. .the city already owns the dam and reservoir sites and holds a clear title to the water rights. The project can qualify for federal aid, both for water conservation and flood control. It would also be completion of another unit in the development of the San Diego river water resources.
9 In late March the City Council made a policy decision to ask the voting public to ratify the All-American Canal contract and approve a bond to construct the San Vicente Dam. 10 The Council planned to present both propositions to the San Diego voters simultaneously. At that time, the City expressed hopes that they could fund portions of the project with federal aid, but up to would most likely be funded by a bond issue. 11 The estimated cost for construction of the dam would change several times as the City completed preconstruction studies and altered the plans accordingly. In April it looked like the San Vicente Dam might become a reality.
President Roosevelt revived the Public Works Administration (PWA), a program that provided for federal funding of up to 55 percent on projects for which communities advanced the remainder. 12 The San Vicente Dam, a prime candidate for such a program, was approved by the City council and was to be placed on the ballot for the August primaries. Before long, the City appropriated for preparation of plans for the dam to be used either as the basis for a bond issue or for government funding. 13 San Diego had several smaller projects already under way using funding under the Works Progress Administration (WP A) program. The WP A was similar to the PWA but differed in its use of labor. Under the WP A, the government furnished the labor and $5 per month for each man employed.
That money was to be used to purchase materials. 14 This program apparently fulfilled its purpose of employing those who were out of work and some San Diego projects were cancelled because there was no available labor. Because of this, the PWA program seemed like a more promising program for the San Vicente Dam. In May the City asked the federal government for PWA aid for the projected dam construction project. At the time, a 275-foot dam was proposed so that floodwaters could more easily be held back. 15 Apparently, the bond issue was not placed on the August ballot and in September, the City stated that it was preparing to present it in a special election in January 16 By this time, the planned height for the dam had reverted back to 190 feet.
It was 9 San Diego Tribune, 10 San Diego Union, 11 San Diego Tribune, 12 San Diego Sun, 13 San Diego Sun, 14 San Diego Sun, 15 San Diego Union, 16 San Diego Union, SAN VICENTE DAM HAER CA-2267 PAGES expected the City would pay and the federal government would provide the remaining 45 percent of the cost. 17 However, the bond issue was again moved, this time to April It was announced that the dam would take two years to build, provide work for 400 men, and eventually supply water to people.
18 The virtues of the dam were heavily promoted, and it was said to serve several functions, including holding runoff from San Vicente Creek; holding the flood waters of El Capitan and Sutherland Dams; performing some of the functions of Lake Hodges Dam and removing the necessity to raise it; and providing a reservoir that would hold nearly as much as all of the current reservoirs put together. 19 In San Diego experienced another heavy rainy season, which quickly filled area reservoirs to capacity. Despite the best efforts to extol the virtues of the dam, the San Vicente Dam bond in the election of April fell just short of the two-thirds vote needed to pass it.
Because the rains had been so generous the last few years, residents saw no urgent need for the dam, reservoir, and expanded facilities. This mindset would prove to be folly, as the area was experiencing rapid growth and the water supply would soon be inadequate. The City was encouraged, however, by the ratification of the All-American Canal contract during the same election. This protected San Diego's rights to gallons of Colorado River water daily and provided insurance against future drought. 20 The following year, the City tried a different approach to get the dam construction underway, this time at a cost of The City planned to use of the remaining from the construction of the Sutherland Dam and to obtain the rest from federal funding.
The local construction community protested this plan, stating that there was little room in dam construction for the unskilled labor that the federal programs would bring. 21 Nevertheless, the City submitted their application for funds. An additional problem arose during this time, however, when the State of California noted that the creation of the San Vicente Reservoir would impact one of its roads, Highway 198 (also called the Lakeside-Ramona Highway). A State Highway since portions of this road would be covered by the San Vicente Reservoir once the dam was completed. Consequently, the City was tasked with relocating the Shady Dell to Foster portion of the highway. Federal funding would be withheld until the City could find a new location for the road.
22 The problem was finally resolved when the City agreed to leave the road open during dam construction, allowing ample time to relocate the road. In August the cost for the dam was reassessed and projected at 23 This new cost would accommodate the relocation of the State Highway and construction of a pipeline 17 San Diego Union, 18 San Diego Tribune, 19 ibid 20 San Diego Union, 21 San Diego Union, 22 San Diego Union, 23 San Diego Union, SAN VICENTE DAM HAER CA-2267 PAGE6 connecting the San Vicente Darn with the El Capitan Darn. It was projected that the bond could be repaid in 30 years, using profits from the sale of water. 24 By this time, there were new reasons for building the dam, mainly the increased population due to the influx of people during the early years of World War II.
Fred Pyle, City Engineer, pointed out that is normal growth occurred for the next five years, the City would grow by people. With the increased war-related population, that number was expected to top Pyle maintained that city water was only barely sufficient at its current level. 25 Unfortunately, it was the war effort that also put a halt to potential federal funding because the labor could not be spared for nondefense-related projects. 26 Nevertheless, plans continued for the new dam and on November 5, Propositions 1 and 2 were put up for election to provide a total for construction of San Vicente Dam and for improvements to the water distribution system.
This bond was endorsed by several organizations, including the Realty Board, Consolidated Aircraft Corporation, and the Native Sons of the Golden West. 27 Members of the Realty Board stated: In the last 25 years our water development has managed to keep just a step ahead of the city's needs. This was because citizen groups worked side by side with city officials in making the public conscious of the problem ... we must now take the next logical step, which is San Vicente, and take it without delay in view of the pace at which San Diego is growing. 28 Major Edgar Gott, Vice President of Consolidated Aircraft Corporation state "Our firm is not inclined to add to our facilities except in San Diego, provided this community can lend the facilities demanded by an expansion program.
The bond finally received sufficient support to pass in the fall of The start of the project, however, was delayed for several months due to a shortage of engineering specialists. Construction began almost a year later. The first cement was poured in April and the darn was finished in March 30 The construction of the San Vicente Dam helped alleviate a water crisis that the residents of San Diego were suffering from due to a rapid rise in population and water demand, as well as a period of drought in which left the then current water reservoirs at levels too low to support the ever increasing population. 31 Soon after construction, the San Vicente Darn also fulfilled its duty as a reservoir for Colorado River water.
San Vicente Dam was one of the last structures to complete the system of reservoirs, aqueducts, and dams that brought and/or held water for San Diego County. While 24 San Diego Union, 25 San Diego Union, 26 San Diego Union, 27 San Diego Union, 28 San Diego Union, 29 San Diego Union, Fowler Southwest Builder and Contractor 17 3 31 Pryde SAN VICENTE DAM HAER CA-2267 PAGE7 some of San Diego's dams and reservoirs contain water that comes from natural runoff, San Vicente is one of 11 reservoirs that also gets water from the Colorado River. 32 This was all made possible through partnerships with the City and the water districts. In the San Diego County Water Authority (Water Authority) was formed, and the City of San Diego became a member agency.
The Water Authority joined the Metropolitan Water District of south California which was formed in to transport water from the Colorado River to Southern California. The first objective of the Water Authority was to construct a pipeline system that would connect the county's water system to the MWD water supply system. In the first waters from the Colorado River flowed through the MWD system to the San Vicente Reservoir. From this point on, San Diego was no longer dependent on small, local sources for water. 33 Dam and Construction History Since the more than 55 dams have been constructed in San Diego County. San Vicente Dam was the last of the gravity dams to be built and is one of only five in the county.
The other gravity dams in San Diego County were built much earlier and include Sweetwater Savage Barrett and Fairbanks There are 110 gravity dams in California, making them the second most numerous type of dam. The highest numbers of gravity dams, in descending order, are in the counties of Tuolumne, El Dorado, Los Angeles, Shasta, San Diego, and Fresno. More than half of the California gravity dams were built in either the l or the Only nine were built in the and San Vicente Dam was the only one built in that decade in southern California. Despite being the only gravity dam in that decade, San Vicente was one of 70 dams built in the United States between and but it was by no means the largest.
34 In terms of mass, the Grand Coulee, Shasta, and Boulder dams were the largest concrete dams in the world in 35 Gravity-type dams were built as long ago as but they were constructed with uncemented masonry. 36 The San Vicente Dam is a concrete gravity section dam with a straight axis. A gravity dam is designed to resist the horizontal thrust of water solely based on its own weight. Therefore, they are most commonly made with large volumes of concrete, especially in areas where they need to span wide valleys. Gravity dams are triangular in cross-section, a design that complements the distribution of water pressure. Deeper water puts more pressure on the horizontal plane.
Thus, the maximum amount of pressure is located at the base of the dam, while at the surface of the reservoir, there is little pressure. 37 If the structure is proportioned well, has an adequate foundation, and is well constructed, it requires little maintenance. 38 The ideal location for this type of dam is one constricted in a valley with sound bedrock that is close to the surface on both the floor and the abutments of the dam. 39 32 San Diego County Water Authority website: 33 Pryde 34 Popular Mechanics, 35 Popular Mechanics, Wahlstrom 36 Portland Cement Association 37 http://www/simscience.org 38 U.S. Bureau of Reclamation, 39 Wahlstrom, SAN VICENTE DAM HAER CA-2267 PAGES A gravity dam is typically composed of cement or masonry, but it can be composed of earth or rock fill.
A concrete gravity dam is more expensive than gravity dams built of other materials. It is also more expensive than dams of other designs. For instance, a buttress dam uses 30 to 40 percent less concrete. 40 Until recently, the properties of concrete dictated that the dams were poured in monoliths to prevent cracking. 41 This was how the San Vicente Dam was built. Construction design was generally the same from one gravity dam to the next. Variations in construction design was generally the same from one gravity dam to the nest. Variations in construction were usually in response to the amount of water each dam had to retain. Sometimes, as in the case of the Grand Coulee Dam in Washington, new innovations were used during construction.
The Grand Coulee Dam used a system of pipes within the concrete of the dam to help cool the concrete as it dried. This variation allowed for quicker construction of the large dam because the concrete cured much faster than it would have otherwise. There are numerous gravity dams throughout the world. Two of the more notable ones include the Itaipu Dam (on the border of Brazil and Paraguay), and the Three Gorges Dam in China. The Three Gorges Dam is expected to be completed in and will overtake the Itaipu Dam as the largest concrete dam in the world. Many of the large gravity dams were constructed to hold large volumes of water for conversion to energy through hydroelectric means.
The San Vicente Dam is not used for this purpose; rather it contributes to San Diego's water storage for general consumption. It creates a reservoir with the second highest storage capacity of any dam in San Diego County, behind El Capitan Dam. 42 The maximum storage capacity of the San Vicente Dam is acre-feet, while the El Capitan Dam can store acre-feet. The San Vicente Dam cost to build in 43 The Arundel Corporation of Baltimore, Maryland, and the L.E. Dixon Company (Dixon Co.) of San Gabriel, California, were contracted by the City of San Diego to build the dam. 44 The Dixon Co., which also had the contract for the Sutherland Dam, was chosen to build the San Vicente Dam because they submitted the lowest cost proposal 45 The Dixon Co.
is also noted for building the Los Angeles Sports Arena in and the Upper Narrows Debris Dam on the Yuba River near Marysville, California. In fact, the Upper Narrows Debris Dam was so similar to the San Vicente Dam in width and depth, that the Dixon Co. was able to use much of the same equipment for both dams. 46 Other materials, including cast-iron and steel pipes, small gate valves, and grout, were provided by the City. Plans for the San Vicente Dam were prepared by City hydraulic engineer Fred D. Pyle and consultant Julian Hinds. Hinds was chief engineer and general manager of the 47 40 Portland Cement Association, 41 U.S.
Army Corps of Engineers, 42 San Diego County Water Authority website: 43 City of San Diego, 44 Mermel, 45 Southwest Builder and Contractor, :22 46 ibid:22 47 ibid:22 SAN VICENTE DAM HAER CA-2267 PAGE9 Before work could start on the dam, the water in the San Vicente River needed to be diverted. This was done by constructing a flume made of timber. Cofferdams of reinforced concrete were also built on the upstream and downstream sides of the dam. 48 Cement for the dam was furnished by the Southwestern Portland Cement Company under contract to the City. 49 It was delivered in bulk and the contractor built two large steel storage barrels in which to keep it. The dam was built in 40- to sections, with contraction joints and copper water seals in between.
50 The forms for the concrete were lined with metal or plywood and made smooth. The concrete was poured in lifts and given a minimum of 90 hours to cure. 51 A 20-ton cableway, spanning more than brought the mixed concrete to the storage barrels. Aggregate for the construction was derived from natural deposits in nearby Slaughterhouse Canyon and brought by dump truck to the screening and crushing plant located immediately downstream from the dam. 52 Water for the construction was pumped from downstream to a 50,000-gallon storage tank on the left abutment of the dam. There, it was cooled to 42 degrees by an automatic ammonia refrigerating plant so that it could be used for mixing concrete.
53 Although the equipment has long since been hauled away to be used on another job, the footings for the concrete storage area are still visible on the hillside above the dam. During the construction of the dam, it was necessary to relocate a paved State Highway (Highway that went through the dam site on the east side of the stream. While the City was grading a new path for the highway, a temporary tunnel was built into the base of the dam to allow cars to pass along the old route. The tunnel was 22 ft. wide and ft. tall with a reinforced arch section in the mass concrete. 54 The City finished relocating the highway before the dam was filled with water and the contractors designed a concrete plug to fill the tunnel. 55 The entrances to the tunnel were grouted after the plug was installed.
Traces of the tunnel can still be observed on the downstream face of the dam near the base. Portions of another road were also flooded by the creation for hauling wood, cattle driving, and by the forest service as a fire patrol road. 56 II. ARCHITECTURAL
Description
The height of the San Vicente Dam is 199 ft. above the streambed, with foundations that sit 20 ft. below the ground. 57 The board-form concrete dam was designed so that it could eventually be 48 Southwest Builder and Contractor, 49 Southwest Builder and Contractor, 50 Southwest Builder and Contractor, and 36 51 Southwest Builder and Contractor, 52 Southwest Builder and Contractor, 53 ibid 54 Southwest Builder and Contractor, 55 City of San Diego, Fowler, 56 San Diego Union, 57 City of San Diego, SAN VICENTE DAM HAER CA-2267 PAGE 10 raised to a height of 310 ft. 58 The following information is based on the article in Southwest Builder and Contractor and the as-built drawings housed at the City of San Diego Water Department. the crest of the dam is 960 ft. long and 14 ft.
wide, with a crest elevation of ft. AMSL and a thickness of 20 ft. A spillway for uncontrolled overflow is located in the center of the dam and is able to contain cu. ft. per second. Its crest is 190 ft. The spillway measures 275 ft. long by 10 ft. deep and has guide walls that direct the overflow. Overflow spillways are practical provided the dam has sufficient crest length for the discharge. 59 Parapet walls 3 .5 ft. high are formed by 2-in. pipe railings along the crest on either side of the spillway. The base of the dam spans 169 ft. at the streambed. The dam has no complicated structures associated with it. A semicircular outlet tower is on the upstream side of the dam. It is nearly 20 ft. in diameter and has six 30-in. saucer valves for selective level draft control and three 36-in.
saucer valves at the bottom of the tower. 60 Screened vents are placed at different levels to be used for filling the tower, and operating valves are controlled from a platform on top of tower. An inspection gallery extends longitudinally through the base. An 8-in. gutter, which carries water seepage away, is located along one wall of the gallery. Concrete stairs follow the slopes on either side of the dam. The dam has 8-in. vertical drains (leak wells) and a 12-in. collection drain at the base. The vertical drains are carried through the galleries by cast-iron pipe. On the slopes above the dam, evidence can still be seen of the concrete mixing plant that was used to create the concrete with the correct consistency for use in the dam construction. The concrete was mixed in two 4-cu. yd.
mixers and brought to the structure in 8-cu. yd. buckets that dumped from the bottom. 61 While most of the dam is constructed of board-form concrete, the central section of the foundation and the left abutment are composed of metamorphosed schist. The right abutment is composed of granite. The foundation was grouted to approximately 50 percent of the total height. The San Vicente Reservoir formed by San Vicente Dam can hold acre-feet of water and has a safe yield of acre-feet per year of gallons per day.
62 58 Southwest Builder and Contractor Figures 3 and 4 in the field notes for this survey show the drawings for the dam as they were presented in Southwest Builder and Contractor in 59 Portland Cement Association, 60 Southwest Builder and Contractor, :22 61 Southwest Builder and Contractor, 62 City of San Diego, SAN VICENTE DAM HAER CA-2267 PAGE 11 III.
Sources
Published Sources City of San Diego Dams of San Diego: Facts and Figures. City of San Diego, Water Production Division. On file at San Diego Public Library. Hill, Joseph Dry Rivers, Dammed Rivers and Floods: An Early History of the Struggle between Droughts and Floods in San Diego. Journal of San Diego History, ). Fowler, Lloyd Charles A History of the Dams and Water Supply of Western San Diego County. Berkeley: University of California. Mermel, Register ofDams in the United States: Completed, Under Construction, and Proposed. New York: McGraw-Hill. Decade of the Dam Builders Popular Mechanics, August, p. Portland Cement Association Small Concrete Dams. Portland Cement Association, Skokie, Illinois. Pourade, Richard San Diego History, Chapter Two: Water the Real Key to a City's Survival.
Electric document, accessed January Pryde, Philip R. (editor) San Diego: An Introduction to the Region. Prepared by the Department of Geography , San Diego University, Dubuque: Kendall/Hunt Publishing Company. San Diego County Water Authority First Annual Report. SDCWA, San Diego, California Southwest Builder and Contractor "Angeles Construction Firm Will Build San Diego's San Vicente Dam." Southwest Builder and Contractor, p. September 5, "Highly Efficient Plant Speeds Progress on Construction of San Vicente Dam." Southwest Builder and Contractor, p. July 3, SAN VICENTE DAM HAER CA-2267 PAGE 12 U.S. Army Corps of Engineers Gravity Dam Design: Engineer Manual. National Technical Information Service, Springfield, VA. U.S. Bureau of Reclamation Design of Small Dams. U.S.
Government Printing Office, Washington, Wahlstrom, Ernest Eugene Dams, Dam Foundations, and Reservoir Sites. New York: Elsevier Scientific. Willey, Lorraine, and Christy Dolan Research Design for Archaeological Data Recovery at Sites CA-SDI-13, CA- SDI-13, CA-SDI-13, CA-SDJ-13, CA-SDJ-13, CA-SDI-13, and CA-SDI-l and San Vicente Reservoir and Historic American Engineering Record Documentation for San Vicente Dam Emergency Storage Project, San Diego County, California. Report prepared for San Diego County Water Authority by EDAW, Inc.
Newspaper Articles (in San Diego Historical Society vertical files: San Vicente Dam) San Diego Union: City to Vote on Canal, Dam City to Ask Aid in Building of San Vicente Dam San Vicente Dam Lines Painted on Mountain 60-Year Old Road Purchase May Affect San Vicente Dam Mayrhofer Cites Eventual Need for Vicente Dam City Seeks WP A Aid in Building San Vicente Dam Vicente Dam Project Hinges on Provision for New Record Bond Election Proposed for Vicente Dam San Vicente Dam Bond Election Favored: WPA Aid Refused because of Defense Needs Realty Board Backs Water Propositions; San Vicente Work Urged for Safe Supply Native Sons Back Water Proposals San Diego Sun San Diego Dam Urged as Step in Water Plan Hope for San Vicente Dam Held with Revival by of Government Fund Bureau Vicente Dam Project to Be Started Soon San Diego Tribune Dam on Vicente Creek Urged with All-American Canal Role Voters on Pass on Water Bond Issue for San Vicente, Canal Contract SAN VICENTE DAM HAER CA-2267 PAGE 13 San Vicente Dam; Proposed Huge Storage Reservoir to Catch Run-off of 2 Large Watersheds Internet Websites http://www.simscience.org http://www.sdcaw.org IV.
PROJECT INFORMATION San Vicente Dam was first recorded in during a survey by Ogden Environmental and Energy Services. At that time, it was given the designation lH and a Historic Resources Inventory Form was completed. Subsequently, it was assigned a primary number by the State Historic Preservation Office. The dam was given a National Register of Historic Places status code of This indicated that the surveyors thought that it might be eligible for the but more historical or architectural work needed to be performed. In EDAW, Inc. (then KEA Environmental, Inc.) was retained to assess the dam due to a proposed project to raise the existing dam by 54 feet to provide acre-feet of emergency water storage.
During these investigations, EDAW recommended the dam as eligible for the In a follow-up data recovery plan, it was recommended that prior to alterations to the dam an Historic American Engineering Record (HAER) be completed. 63 This study is a result of that recommendation. Fieldwork and historic research for this HAER was conducted between February and December Historical information was obtained from several places, including the San Diego Public Library, the San Diego Historical Society, and the Los Angeles Public Library. Among items reviewed were newspaper clippings, construction photographs, Water Authority Annual Reports, and back issues of Southwest Builder and Contractor. Original as-built drawings were also obtained from the City of San Diego, Water Department.
All documentation was completed for the Water Authority under the direction ofEDAW. Christy Dolan, M.A. (historical archaeologist/historian for EDAW) prepared the written documentation. Photographer Chris Wray photographed the structure and the photographs are part of the field notes that accompany this survey. 63 Willey and Dolan, / ORANGE ,, AN VICENTE DAM COUNTY,/ RIVERSIDE COUNTY ~O. CA- - -; '<'.AC\ 11 I "" j L _ -. .. . . . . _ ,I.. : Camp -\ .. , : .. - Pendleton I Fallbrook Palomar Mountain Valley Center SAN DIEGO COUNTY {YLake Wohlford Oceanside Carlsbad - Jt. . . Solana Beach (J El Capitan Reservo,r . . , ..-I] ~ Loveland Reservoir Figure 1 0 Regional Map San Vicente Dam HAER 3K31iW6 ESP (dhrady) SAN VICENTE DAM..., HAER NO.
CA- ;)a.~ r ~ ?a..(bC lS Figure 2 0 Feet Project Location Map San Vicente Dam HAER ESP /dbrady)
The federal survey recorded these other structures elsewhere in San Diego County. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER CA-2267. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.