BlockBefore

Burlington Northern Santa Fe Railroad, Cajon Subdivision, Tunnel No. 1, Between Cajon Summit and Keenbrook, Devore

Burlington Northern Santa Fe Railroad, Cajon Subdivision, Tunnel No. 1, Between Cajon Summit and Keenbrook, Devore, San Bernardino County, CA. Surveyed as HAER CA-2259-D, with a 855-word written history.

From the record

“The section of railroad through Cajon Pass provided a vital link between the greater Los Angeles area and distant markets.”

Written record, HAER CA-2259-D survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2259-D · the record runs 855 words · one of 145 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

104 words

Source document Quoted word for word from HAER CA-2259-D. Not written, edited or summarised by this site.

Railway Company Railroad Tunnel No. 1 is located on Main Track 1, Devore vicinity, San Bernardino County, California. The tunnel is bounded by the Union Pacific Railroad to the north and Main Track 2 to the south. The reinforced-concrete tunnel lies within the SW 1A of the SW 1A of the NW 1-4 of Section 24, Township 3 North, Range 6 West, on the Cajon, California (photorevised 7.5-minute U.S. Geological Survey quadrangle. Universal Transverse Mercator Coordinates: Zone 11, NAD83, Geodetic Reference System ellipsoid, mN mE (west portal); mN mE (east portal). Date of Construction: Architect/Engineer: unknown Builder: Atchison, Topeka and Santa Fe Railway (AT&SF)

Significance

670 words

Source document Quoted word for word from HAER CA-2259-D. Not written, edited or summarised by this site.

The section of railroad through Cajon Pass provided a vital link between the greater Los Angeles area and distant markets. In the California State His- toric Preservation Office determined the historic route of the AT&SF (now railroad alignment through Cajon Pass to be eligible for listing in the National Register of Historic Places under Criteria a and c. By connecting Los Angeles and San Bernardino to markets throughout the United States, the railroad dramatically affected demographic, commercial, and cultural trends in southern California. Furthermore, construction of the long, winding alignment through rugged and often steep terrain represents a significant engineering feat for its time. Tunnel No.

1 contributes to the function and significance of the railroad line by providing a passage under higher ground in the rugged pass. Report Prepared By: Scott Thompson, Senior Historian John Goodman, Archaeologist Statistical Research, Inc. Tucson, Arizona Date: March Burlington Northern Santa Fe Railroad, Cajon Subdivision, Tunnel No. 1 HAER No. CA-2259-D (page 2) I. ARCHITECTURAL AND ENGINEERING INFORMATION A railway tunnel carries the track through or under a natural obstruction. Tunnel No. 1 is located at Mile- post between the former stations of Summit (to the east) and Alray (to the west) (Figure 1). This area has been subjected to considerable geological activities and has many steep hills and ravines.

Instead of cutting down the tops of the hills to maintain the grade-as was done to the east and the west-the tunnel was built through one of the largest hills in this area. The hills are composed mostly of uplifted sand and rock layers, and, therefore, excavating through these hills was relatively easy for the railroad crews compared to excavating through solid rock. Tunnel No. 1 has a length of As originally constructed, the tunnel had a timber lining, framed as an arch, and reinforced-concrete headwalls at the portals. However, repeated fires caused by embers from passing locomotives prompted Atchison, Topeka and Santa Fe Railway to line the tunnel with concrete (Duke The date the tunnel was lined with concrete is not known.

The reinforced-concrete lining varies in thickness from l along the curve of the arch to at the base. The floor is poured concrete, reinforced by 61-pound standard rails spaced 30' center to center. Atop the concrete floor is the roadbed, which consists of ballast, ties, and rails. The height of the tunnel from the top of the rail to the arch centerline is and the width at the base is (Cajon Tunnel No. 1, Sheet 2 of 2 Sheets, C.E.C.L.-191-17243, drawing, Structures Department, Railway Company, Kansas City, Kansas). The east and west portals have reinforced-concrete headwalls that are part of the original construction. A date of is inscribed in the upper-central area of the headwall to the west portal.

The headwalls associated with the east and west portals are identical in terms of their design and dimensions. Each headwall is approximately 31' high with a top width of Lateral buttresses are bonded to either side of the headwalls to provide support. The lateral buttresses taper toward the top, have a bottom width of and project outward from the headwall for a distance of At the tunnel portals, simple walls constructed of large, dry-laid concrete blocks extend from the lateral buttresses on either side of the track. The walls, which are not part of the original construction, are three courses high and prevent soil from the hillsides from spilling onto the rails (David Miller, personal com- munication II. REFERENCES CITED Duke, Donald Chicago-Los Angeles-San Diego.

Santa Fe: The Railroad Gateway to the American West, vol. 1. Golden West Books, San Marino, California. Burlington Northern Santa Fe Railroad, Cajon Subdivision, Tunnel No. 1 HAER No. CA-2259-D (page 3) Scale: 1 {inset 1 Universal Transverse Mercator coordinate system Projection: Transverse Mercator Datum: North American Datum Zone 11 N Eliipsoid: Geodetic Reference System Unit: meter Archaeolog1caJ data: SRI field data Base data: Cajon, California 7.5-minute USGS topographic quadrangle Statistical Research, Inc,. December Figure 1. Project location Cajon, California, 7.5-minute U.S. Geological Survey quadrangle [photorevised

In context

Devore, California The place record: every map, photograph and survey of this town.
San Bernardino County, California 963 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Devore

22 records

The federal surveyors worked through Devore building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Burlington Northern Santa Fe RailroadHAER CA-22595,098 words
Burlington Northern Santa Fe RailroadHAER CA-2259-K1,153 words
Burlington Northern Santa Fe RailroadHAER CA-2259-O1,031 words
Burlington Northern Santa Fe RailroadHAER CA-2259-E937 words
Burlington Northern Santa Fe RailroadHAER CA-2259-C905 words
Burlington Northern Santa Fe RailroadHAER CA-2259-N904 words
Burlington Northern Santa Fe RailroadHAER CA-2259-H903 words
Burlington Northern Santa Fe RailroadHAER CA-2259-T888 words
Burlington Northern Santa Fe RailroadHAER CA-2259-R864 words
Burlington Northern Santa Fe RailroadHAER CA-2259-L862 words
Burlington Northern Santa Fe RailroadHAER CA-2259-S847 words
Burlington Northern Santa Fe RailroadHAER CA-2259-G835 words
Burlington Northern Santa Fe RailroadHAER CA-2259-M835 words
Burlington Northern Santa Fe RailroadHAER CA-2259-Q833 words
Burlington Northern Santa Fe RailroadHAER CA-2259-V817 words
Burlington Northern Santa Fe RailroadHAER CA-2259-B809 words
Burlington Northern Santa Fe RailroadHAER CA-2259-I809 words
Burlington Northern Santa Fe RailroadHAER CA-2259-J793 words
Burlington Northern Santa Fe RailroadHAER CA-2259-A792 words
Burlington Northern Santa Fe RailroadHAER CA-2259-U769 words
Burlington Northern Santa Fe RailroadHAER CA-2259-P748 words
Burlington Northern Santa Fe RailroadHAER CA-2259-F730 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2259-D. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.