The section of railroad through Cajon Pass provided a vital link between the greater Los Angeles area and distant markets. In the California State His- toric Preservation Office determined the historic route of the AT &SF (now railroad alignment through Cajon Pass to be eligible for listing in the National Register of Historic Places under Criteria a and c. By connecting Los Angeles and San Bernardino to markets throughout the United States, the railroad dramatically affected demographic, commercial, and cultural trends in Southern California. Furthermore, construction of the long, winding alignment through rugged and often steep terrain represents a significant engineering feat for its time. Structure No.
contributes to the function and significance of the railroad line by affording a passage for rail traffic over a drainage channel. Report Prepared by: Scott Thompson, Senior Historian John Goodman, Archaeologist Statistical Research, Inc. Tucson, Arizona Date: March Burlington Northern Santa Fe Railroad, Cajon Subdivision, Structure No. HAER No. CA-2259-M (page 2) Architectural and Engineering Information Structure No. is a T-rail-on-concrete bridge that carries Main Tracks 1 and 2 over a minor drainage near the Blue Cut area of Cajon Pass (Figure 1). Constructed in the bridge has a length of and an approximate width of The distance from the bottom of the span to the channel surface is about 4' on the downstream (south) side.
This structure is a T-rail-on-concrete bridge with eighteen T-rails for each track. In this type of construction, a running rail (the rail part of the railroad track) is used as a sup- porting girder. The running rails, which weigh 85 pounds per yard, are placed contiguously to provide support for the bridge span (Bridge List, First District, Los Angeles Division, p. 48, Structures Depart- ment, Railway Company, Kansas City, Kansas). Two reinforced-concrete abutments comprise the substructure. The distance between the east and west abutments is An angled wing wall adjoins the south side of the west abutment. This wing acts as a retaining wall to hold back the roadbed fill.
On the upstream (north) side of the bridge, a large cast-iron pipe with a diameter of 7" lies parallel to the bridge and level with the bottom of the deck. Resting lengthwise on top of each abutment is a 6" x 1O" treated timber beam that supports the span's structural elements. Two 6" x 16" x timber beams, one on each side of the span, are secured to the tops of the abutment beams and set parallel to the track. Set inside these timber beams are thirty-six 0"-long T-rails. The T-rails have a web height of 4" and a flange width of 3". Anchored to the tops of the rails are 3" x 1O" lengths of treated timber that form the bridge deck. The timber deck supports the ballast, ties, and rails. Ballast curbs, for holding the roadbed ballast in place, run along the outer edges of the span.
The ballast curb on the upstream side measures 16" x 16" x the other measures 8" X 16" X Adjoining the bridge on the upstream (north) side is a reinforced-concrete spillway for channeling water downhill and under the bridge. The U-shaped spillway extends in a generally southwest direction. The structure is wide with side walls high and 10" thick. Although the concrete walls of the spillway join the bridge abutments, the structures were likely constructed at different times. Burlington Northern Santa Fe Railroad, Cajon Subdivision, Structure No. HAER No.
CA-2259-M (page 3) 0 8 ~ Structure Scale: (inset 1: Universal Transverse Mercator coordinate system Projection: Transverse Mercator Datum: North American Datum Zone 11 N Ellipsoid: Geodetic Reference System Unit:meter Archaeological data: SRI field data Grid . Base data: Cajon and Devore, California 7.5-minute USGS topographic quadrangles Statistical Research, Inc., December Figure 1. Project location Cajon, California, 7.5-minute U.S. Geological Survey quadrangle [photorevised