The section of railroad through Cajon Pass provided a vital link between the greater Los Angeles area and distant markets. In the California State His- toric Preservation Office determined the historic route of the AT&SF (now railroad alignment through Cajon Pass to be eligible for listing in the National Register of Historic Places under Criteria a and c. By connecting Los Angeles and San Bernardino to markets throughout the United States, the railroad dramatically affected demographic, commercial, and cultural trends in Southern California. Furthermore, construction of the long, winding alignment through rugged and often steep terrain represents a significant engineering feat for its time. Structure No.
contributes to the function and significance of the railroad line by carrying rail traffic across Cajon Creek. Report Prepared by: Scott Thompson, Senior Historian John Goodman, Archaeologist Statistical Research, Inc. Tucson, Arizona Date: March Burlington Northern Santa Fe Railroad, Cajon Subdivision, Structure No. HAER No. CA-2259-I (page 2) Architectural and Engineering Information Structure No. is a four-span, steel-plate girder bridge (also known as a thru girder bridge) on a 6 curve that carries Main Track 1 over Cajon Creek (Figure 1).
Each span is and the bridge has a total length of approximately The width of the bridge is from the center of one plate girder to the other, and the center height of the bridge from the deck bottom to the creek bed is approximately The reinforced-concrete substructure bears the concentrated vertical load of the bridge and consists of two abutments, one on each side of Cajon Creek, and three piers for supporting the bridge deck spans. The east abutment has a length of and an approximate height of 1O' above the creek bed. Extending from both sides of this abutment are 15'-0"-long wing walls. The southeast wing of this abutment has an upper, more recent extension with a height of L-iron guardrails are attached to the top of the wing wall extension.
The western abutment has a length of 21 and an approximate height of 10' above the creek bed. The wing walls of this abutment have a length of Metal ladders for routine bridge inspections are anchored to the abutments. The three piers are identical in design and dimensions. Each pier is hexagonally shaped, with sides that slope upward. The aboveground sections of the piers have an average height of an average length of a top width of and an average bottom width of 8'. The piers are spaced at an average distance of Two metal inspection ladders are anchored to the opposing sides of each pier. There are two (left and right) steel-plate girders that appear as an I form in cross section and provide sup- port for each span.
The girders, which consist of large steel plates that are riveted together, have a web 4'- high. Cast-iron shoes anchor the girder ends to their respective vertical supports (either abutments or piers). Floor beams (steel I-beams) run perpendicular to the main girders and are riveted to the inside flanges of the girders. Three sets of metal bars, placed diagonally to the floor beams, provide lateral sup- port for each span. The bridge deck-on which rest the ballast, ties, and rails-is constructed of 4" x 10" creosoted timber. Burlington Northern Santa Fe Railroad, Cajon Subdivision, Structure No. HAER No.
CA-2259-1 (page 3) Structure Scale: (inset 1: Universal Transverse Mercator coordinate system Projection: Transverse Mercator , Datum: North American Datum Zone 11 N Ellipsoid: Geodetic Reference System , 980 Unit meter Archaeological data: SRI field data Base data: Cajon, California 7.5~minute USGS topographic quadrangle Statistical Research, Inc., December Figure 1. Project location Cajon, California, 7.5-minute U.S. Geological Survey quadrangle [photorevised