BlockBefore

Hegeman-Hill Street Bridge, Spanning Batten Kill, .65 mile West of Greenwich, Easton

Hegeman-Hill Street Bridge, Spanning Batten Kill, .65 mile West of Greenwich, Easton, Washington County, NY. Surveyed as HAER NY,58-EAS,1-, with a 3,326-word written history.

From the record

“The Hegeman-Hill Street Bridge, while a common design of its time (pin connected-type Baltimore truss), was constructed by the Owego Bridge Company, founded by Ellery Colby, a bridge builder in New York State history.”

Written record, HAER NY,58-EAS,1- survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY,58-EAS,1- · the record runs 3326 words · one of 25 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Written history

3146 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER NY,58-EAS,1-. Not written, edited or summarised by this site.

This documentation was undertaken in February in accordance with a Memorandum of Agreement by the New York State Department of Transportation as a mitigation measure prior to the removal of the bridge. Keith W. Smith Director Environmental Analysis Bureau New York State Department of Transportation Albany, New York Edited and Transmitted by: Jean P. Yearby, HAER, Hegeman-Hill Street Bridge HAER No. (Page 2) PACT HISTORIC^ INFORMATION A. Physical History: 1. Date of Erection: The bridge was erected in 2. Designer/Builder: The Owego Bridge Company, Owego, New York. 3.

Original and Subsequent Owners: The towns of Easton and Greenwich Washington County Highway Department (1932-present) The Hegeman-Hill Street Bridge was erected for the towns of Easton and Greenwich in by the Owego Bridge Company of Owego, New York, and named after Edgar R. Hegeman, a prominent local businessman and politician. Substantial discussion by the citizens and the highway commissioners of Greenwich and Easton preceded building of the bridge. A series of meetings were held during late and into on the selection of the site. In contention were the Hill Street and the Academy Street routes.

The Hill Street route was mile shorter and was general favored by the residents of Easton, since it would shorten the drive to Greenwich by about one and one-half miles.1 The bridge site was approved in February and the bridge was completed in October of the same year.2 Owego Bridge Company The Owego Bridge company was founded in by Ellery Colby, prior to establishing the company, Ellery Colby organized the Groton Bridge Company in Groton, Tompkins County, New York. Colby sold his interest in the Groton Bridge Company in and moved to Owego, New York. He is credited with the construction of an iron bridge across the Potomac in Washington, D. C. (the extension of Pennsylvania Avenue) and the first iron pier ever constructed for the United States Government (at Fortress Monroe).

In the Owego Bridge Company constructed a large bridge over the Susquehanna River at a total cost of and at one time erected the longest single span highway truss feet) at Mount Morris in New York State.3 The firm employed about 150 men.4 The fabricating capacity of the Owego Bridge Company plant was tons in and tons in It is believed that Ellery Colby was associated with the Owego Bridge company until the spring of when, according to his obituary, he sold his interest in the company to American Bridge Company. The Owego Bridge Company was controlled by the Conger interests of Groton, New York.6 (Groton Bridge and Manufacturing Company). Hegeman-Hill Street Bridge HAER NO.

(Page 3) However, Talbot's American Brid^^^^^^ does not indicate the acquisition of the Owego Bridge Company by American Bridge. It does note the acquisition of the Groton Bridge and Manufacturing Company. Frank Conger, an official of the Groton Bridge and Manufacturing Company, became an official of the American Bridge Company.7 Talbot notes further that the Groton plant was closed in September Personal communications with William Chamberlain, New York State Department of Transportation, Pamela Thurber, The National Trust, and Margaret Hobby, the Dewitt Historical Society, yielded no information that ties the Owego Bridge Company to either the American Bridge Company or the Groton Bridge and Manufacturing Company.

Records of incorporation filed in the New York State Department of State (file numbers and indicate that the O/ego Bridge Company was incorporated on June 12, and that in the organization under the same name changed voting members of the Board of Directors from five to seven. NO members of the Colby family are listed in the modification. The corporation was dismissed by process (for not paying incorporation fees) on April 3, As noted above, the April 2, obituary in the Owego Gazette is the only reference uncovered that links the Owego Bridge company to the American Bridge Company. The corporate records indicate that sometime between and Ellerby Colby divested his interest in the Owego Bridge Company.

If the Owego Gazette obituary is correct, he left the Owego Bridge company in the spring of and may have been involved in the design and fabrication of the Hegeman-Hill Street Bridge, but probably not involved in its completion. Edga^R^Jiegeman Edgar R. Hegeman, for whom the bridge was named, was born in Sand Lake, Rensselaer County, New York, on May 24, and died in Easton, Washington County, New York, on April 18, He was a farmer and a businessman, having interests in milling cement, the Consolidated Electric Company and in lumber.

As a Republican active in the politics of Washington County, he was elected Supervisor of the Town of Easton in and served two terms.9 The following is from the History of Washington County : "The Hill Street truss bridge was built in at a cost of through the efforts of Edgar R. Hegeman, an influential resident of Easton living on the farm now A. H. Hand. Mr. Hegeman was a Republican boss of Easton and was called, not unkindly, the Tall Sycamore of Easton. This bridge carries relatively little traffic and is an example of poor, pinch-penny engineering." Hegeman-Hill Street Bridge HAER No. (Page 4) The bridge remained the property of the towns of Greenwich and Easton until when ownership was transferred to the Washington County Highway Department.

At this time, the county prepared a report on the structural condition of the bridge (see supplementary material) . The bridge is in poor condition, and the county considered condemning it and replacing it with a steel truss or concrete bridge (see Photo instead, the bridge was repaired and structural members were upgraded. PART II. ENGINEERING INFORMATION A. General Statement: The bridge connects the towns of Greenwich and Easton by providing a crossing over the Batten Kill. Hill Street is in the village of Greenwich was extended concurrent to or shortly after the construction of the existing bridge. B. Description of the Bridge: The bridge is a single-span Baltimore truss or half Pratt through truss set on quarried stone abutments.

This truss configuration is so named because the Baltimore and Ohio Railroad Company frequently used this design for railroad structures. The Baltimore truss achieves economy ana strength by subdividing the main panels with an auxiliary framework, usually half-weight verticals braced with diagonal struts. This modified configuration allows the proper relation between the slope of the diagonal web members and panel length for maximum economy of material for longer span simple trusses. The diagonal compression struts also add significant rigidity to the structure. The Hegeman-Hill Street Bridge spans a total of across the Batten Kill.

The bridge provides a clear roadway opening of and high, with a total height of structure of Nine floor beams, spaced at support the open steel grating, which replaced the original wood plank deck. The superstructure was fabricated with Carnegie iron, utilizing pin connections at all joints and riveted connections for all composite members. Bolts were used at the joints which were assembled in the field. C. Speci f ica tions: The specifications of the bridge were as follows: 160 feet long on pin centers, 16-foot roadway in the clear, with the guaranteed capacity of floor system of 100 pounds to the square foot. The Hegeman-Hill Street Bridge HAER NO. (Page 5) abutments were to be 24 feet long on the bottom, 7 feet wide on the bottom/ 3 feet wide on the top and 22 feet long on the top.

The wing walls were to be 20 feet long and 5 feet wide on the bottom and feet on the top. Wing walls and abutments to have one foot of concrete laid in the best iron clad cement. Walls were to be built on concrete 15 feet high above (the) concrete foundation. The walls were to be built of quarried stone and laid in Rosendale cement and sand in the proportion of one to three,^ D. Site: The location of the structure (see attached location map) is over the Batten Kill approximately miles west of the village of Greenwich westerly limit. The Hegeman-Hill Street Bridge is in a rural setting surrounded by wooded slopes along the south bank and woods and cornfields on the north.

A century farmhouse is visible from the bridge to the north.11 A modern dwelling constructed in overlooks the bridge on the south. E. Alterations and Additions: Sometime after acquisition of the structure by Washington County, the number of stringers supporting the deck was increased from seven to eleven, apparently to compensate for the serious deterioration found in the original stringers; the wood-planked deck was replaced by an open steel grating supported on transverse sills; three of the four truss support points have been reinforced with welded steel plates; the original bridge rail has been replaced with welded channel sections; and the south abutment was stabilized with a poured concrete facing extending from below water level to bridge seat elevation. III.

BIBLIOGRAHY Darnell, Victor C. Directory of American Bridge Building Companies Society for industrial Archeology. Kingman, Leroy W. Our County and Its People^- _A Memorial History ca. of Tioga County, New York. W. A. Ferguson, Elmira, New York. Kingman, L. W. Owego Sketches by Qwego Authors. Ladies Aides of the Baptist Church. Talbot, R. A. American Bridge Division - History and Organiza- J-iPJl' (Probably published by American Bridge Division of United States Steel.) Hegeman-Hill Street Bridge HAER NO. (Page 6) Cultural Resources Survey Report, P.I.M. Hegeman-Hill Street Bridge Replacement Greenwich, Washington County and prepared by the Division of Historical and Anthropological Services Office of the State Historian, Office of the State Archaeologist, New York State Museum.

H s t or _^_ _ : y_ ?A Jtfa.sMq9.ton_ Counfcy' Washington County Historical Society. The Greenwich Journal - various issues. April 2, Owego Gazette. Hegeman-Hill Street Bridge HAER NO. (Page 7) Footnotes The Greenwich Journal, October to August Cultural Resources Survey Repor t, p. 21. Qur County and Its people - A frfemor i al H i s tory _ of Tioga County_, New York, pp. Owego Sketches by Qwego Authors, p. 73. Directory of American Bridge Buildingi Companies p. 79. Qwego Gazette, April 2, American Bridge Division - History and Organization, p. 15. Ibid., p. 20. 9 The Greenwich Journal, April 22, p. 1. 10 The Greenwich Journal, February 27, p. 1. il Cultural Resources Survey Report, p. 22. H A R NO.

NY- 153 (PAGE 7A} HEGEMAN - HILL STREET BRIDGE LOCATION BY NEW YORK TRANSVERSE MERCATOR COORDINATES . N. 120 000 NEW YORK STATE DEPARTMENT OF TRANSPORTATION SCHUYLERViLLE QUADRANGLE SECOND EDITION - SCALE I:24000 HEGEMAN - HILL STREET BRIDGE HAER No. (Page 8) REPORT ON THE STRUCTURAL

Condition of the Hill Street Bridge'

Source: Washington County Department of Highways This report also describes the members and types of connection comprising the structure and a recommendation as to the disposition of the structure. HEGEMAN-HIL-L-STREE3-BRIDGE- SuP'.T. of HIGHWAYS HAER No. (Page 9 ) HILL STREET BRIDGE ACROSS the BATTENKILL RIVER-BETEEEN . THE TOriiS of GREENWICH and EASTON. ..;*In;~.my//opihibn''this, bridge, is a liability- and should be 'The'eost-'of ^i^Replacing'stringe rs. In Panel #1 and two :-Btrin ing: the stringers to the" : pasel- beams:,^new .rollers," pain ting-up of. abutm eats and fixing bearing surface on. the. Easton:.ejtd-i;-v brushing and; painti ng of..metal,- r.ith angles vtov tighten,-up.'upper; structure^..fould bo"'prohib itiye to the value it .;.

"Would, be., worths Asy ere* "if/these things, were done/, it; would have to-' be.^posted'-'for^ fiW/'taas-a d should be for: leas t ha*. that-due to ; ' elemeats^aad.. etreagth gone .from, the ;metal, uaab 1 to be figured* " "-. R.B.Nearer , J__ 'KEGS-MAN - KILL STREET BRIDGE ' ' - . -., "= - , ." "." ".: , ' , .:. MER DIMENSIONS: . . -, N (Pag^ :^^^^:^'tA 10 Panels @ lG'-O" give ' total of l$o;-0"-End..pin to ead pia.:'-:-^5> f & Truss to i Truss . ,- .' ;- "*5 -ll " Pi* at .top of col. to pin at' lower end^of ."col. -:> ' --v^ol"];^ . 1 Pin 'to 1 Pi* on end Posts -'::^^^^^vi ^-A'V^-fe Clear road width. '-. -\C l-i;,/.; */ ^^' ^&^/feP^^i 14 Road clearance (O.K.) '-' -:^Si lfiS'-O" Clear water spa*, Edge of abutment to .edge ;of abutment.!^; Avg.

-depth of .present water." ^- * ^U;-\ ^;':/i\'.^:^-^^H'^4 ^"i . Elev. of water to -top-of ^abutment.lif^^V;^^^^ ABUTMENTS: . " " -' .' Approx. above river bed. O'-S" Batter in total heigth.-.1 i;.::--:v"-J^^;:^ Wide at the top. la leagth it tapers do*a to act as a ^^i r retaining wall. . - '," . u , l, , 0* the side .at k for 3'fi"&18 0 a:16 0". V^- 'rv:5l^^U'-^-i--3^h^J :;- - k.' Z,Stta:24:,0M - V; :M: V r-V " ' "a '. '" : ' '': - " -:::.-V.:-i--;i- ;. '" a ! S'O^IS'O" -- Good *ork built of large stone but badly i* need of Fointing V ";, Up. Surface bearing of North abutment is in fair condition,-'*-"-1 -. (Stable e d of bridge) .. ,, Surface bearing of South abutment is in very poor condition, :'v (Free end of bridge). ROLLERS; In very poor condition if of any use.

Expansion has taken place : on the North (or fixed) end of bridge by pushing and bending ; the anchor bolts severely North. Dia. of rollers PANEL SEAMS: ... - . ": '.. 1 17 -*" IS- " - V-, 15" Depth -. : Flange " .. . : :. ^ Web Toe flange ' >^iI.V Nine of these paael beams lfi'-Cj" centers. Condition good." Two angles o* each end of'the beams tie them *to their hanging straps at b i,j , a d bfc'd'f'h1i*j'. ; While the beam at ee' and the one at gg' are held by rods bolted thru plates underneath the beams. - STRINGERS: ' *. - , 7". Deep Flange i" Web * '- :; ;- ^ " " t" Toe of Ilaage Seven of these I beams spaced 30" centers. The stringers are carried by the panel beams except aa' and kk'.they are carried by a angle on ed^e.

''' 0a the axgle at the.Easton (South)end of the bridge: SI is 30$ Shot it S2 40% it S3 40$ n S4 40$ t* S5 90$ Sfi n 60% tt S7 10% Gathe aagle at i the angle at the Greenwich (North) eAd of the bridge: SI is 20% Shot S2 M Fair S3 nit Fair 54 Fair S5 ifit Fair , ?fl Fair nmjJiriAD nj.ij j OXIXI^J. ui\fyuii HAER No. NY-lo3 (Page 4 . ... - STRINGERS: " " -.: .;. ..; '; v;" (Coat.) The strikers in the "other paaels" are"'fair.""' J> The angles are fair. :, ^ .' :\: About half of the bolts tieiag the stringers to _the panel ''. .' beams.are either gone or aeed replacing. . BOTTOM TATERAL BRACING: 'A'.:'::V-, ": v-!'^i- Tie angles in good conditioa. ;. ^./ " BED PLATES: n r ; : - - x20il!x5/8" ia fair condition. " ' ' %- <', ; : ; ; FA3H PLATES: ' - V V TS^ V Fair to good condition. :: --.

" Y-OOD PLANKING: "/ . ' '- : \ : _ 3" Thick la fair to good condition. . SHOES: . . - \\ .-. '': v^ : ;: : : Fixed shoes oa Korth' end 1A fair to good condition."-V - ;" One aachor. bolt"1A each. Eoth beat severely North- .; Roller shoes (South) end in fair to good conditioa. Except . ; for rollers which are no good. The beams in' aAPBXDYFZHRIk axd a'A'P'B'X'D'Y1 F'Z'H'R'I'k' are made up H of "two 10" channels (2-i" flange-i" too) back to baek . aad 10- apart. Held together by a I6"x5/IG" plate oi the upper aide (S" rivet spacing). Oa the lower aide by lattice straps Staggered rivet spacing). Fair to good. .; iI,Gi,Ac,Cc aad their primes are made up of Two 5" chaaaels (l^'flaage-i-" tab) back to back and 6" apart.

Held together : v by li(lx-i" lattice straps on both aides (l*"rivet spading opp.} eD,g? aad their primes are made up of Two 6" channels flaage--5-"toe) back to back apart aad held together by l"i"x*" lattice straps on both aides rivet spacing opp.) Ab,Cd3Ef,Gh,11, aad their primes are single straps. . -V Be,Hi, aad their primes are straps -double. Fair to good.';" aad their primes are straps -double.' DEgjFEe, axd their primes are rods- double. Fair to good. '; : Double straps from pia to pin. From ato b,b to e,c to d,d to e, ' g to h,h to i,i to j, j to k, aad their primes are Good. Double straps from pia to pia. From e to f,f to g,aad their primes are Good condition.

Built up spctioiis as chords PP' ,are in good conditioa XX' ZZ' ,are made of two 3" angles back to back and are in fair to good condition. All members in upper structure in fair to good condition. Rivets in :- fair to good conditioa. One loose at H and one at H'-(Negligable). Two bolts loose at B in coyer plate. One bolt loose at B* in cover plate. Two bolts loose at H* in cover plate. Three bolts loose at II ia cover plate. Almost half of the bolts eoanectlag the stringers to the panel beams are either loose, goae or aeed replacing. Pins are ia fair to good condition except at a and a1,"' which are eroded to quite aa exteat- Upper tie rods allow considerable chucking and vibration. Could be replaced by iigid members.

Built by THE 0WEG0 BRIRGE Co., 0WEG0, Bridge bellies at center 1" dowastream. Usiag a six toa truck with a load of 2 tons on each rear whedl and 1 toa on each front wheel: Place a rear wheel oa a stringer half wa betwcea the panel beams. A 7"! beam,15 ft.loag has a distributed safe load of toas, a safe load at the center of tons. The six toa truck Is too heavy. Usiag a five ton truck giver a rear wheel load of toas, which is just uader the safe wheel load at the center of tons. HEGEMAN-HILL STREET BRIDGE HEGEMAN-HILL STREET BRIDGE HEGEMAN-HILL STREET BRIDGE HEGEMAN-HILL STREET BRIDGE MAER NO. NY- I5J PAGE 15 , r pec <LU OD OS r - - t ltd eit it o p 3 kg K. * ,0 - "T O LU. O ?I5 a: o - - aw J JJ ^J -J en en H n n^i T1 IT a o en.

o J a , 2 III t s < troacC 5* 5 oca as _iiU * to a ft # rf o _ r r 0 t-3 i g '8 S 2 Has rfi 3 C O a " r jt -3 ft -i i Mi 3? *- CJ. fo_ J* LU. CO EZZ2 to ZZ2 en o tr r^n u LU iL3 s < < Q u3 < t 3 ^ 5a ill u 8 > tr UiUJ S>- Ul|- B H

In context

Easton, New York The place record: every map, photograph and survey of this town.
Washington County, New York 259 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Washington County

24 records

The federal survey recorded these other structures elsewhere in Washington County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Glens Falls FeederHAER NY,58-HUFA,2-8,891 words
Sandy Hill BridgeHAER NY,58-HUFA,1-4,066 words
Campbell HotelHABS NY,58-HAMP,1-3,929 words
New York State Barge CanalHAER NY-3672,274 words
New York State Barge CanalHAER NY-3561,750 words
New York State Barge CanalHAER NY-3621,677 words
New York State Barge CanalHAER NY-3651,559 words
New York State Barge CanalHAER NY-3641,558 words
New York State Barge CanalHAER NY-3581,370 words
Cemetery Road BridgeHAER NY,58-SAL,1-1,256 words
New York State Barge CanalHAER NY-3551,240 words
New York State Barge CanalHAER NY-3661,200 words
New York State Barge CanalHAER NY-3571,118 words
New York State Barge CanalHAER NY-3601,023 words
Saunders Street BridgeHAER NY,58-WHIT,1-972 words
New York State Barge CanalHAER NY-363909 words
New York State Barge CanalHAER NY-359906 words
New York State Barge CanalHAER NY-361593 words
Odd Fellows TempleHABS NY,58-GRANV,1-554 words
New York State Barge CanalHAER NY-368410 words
Oldest HouseHABS NY,58-FORA,1-41 words
Stone HouseHABS NY,58-FORA,2-40 words
Old Stone House (Library)HABS NY,58-FORA,3-18 words
Stone SchoolhouseHABS NY,58-KING,1-10 words

Provenance

  • Written history. Quoted verbatim from HAER NY,58-EAS,1-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.