Lock located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal and is typical of the lock sites built along the canal system. Description: Lock C11 is located 9 miles north of Lock C9 on the Champlain Canal and consists of the lock and associated structures and operating machinery, lockhouse, powerhouse, and fixed crest dam.1 The asphalt access road is the old alignment of Route 4 and is in poor condition. Parking is available at scattered locations alongside the lock. The lockhouse, which is original, is located at the southeast corner of the lock chamber. The banked two-story frame building is clad in shiplap siding and sits on a concrete foundation. Asphalt shingles cover the gable-front roof.
Two-over-two wood windows and a modern vinyl awning window light the building. A gabled, partially enclosed, porch shelters a pane-and-panel wood door. It is in fair to poor condition. The powerhouse, located near the lockhouse, is a one-story concrete building. Asphalt shingles cover the hipped roof, which is in fair to poor condition. The building is lit by one-over-one wood windows with decorative diamond-pattern transoms. Multiple thirty-pane wood storm windows are extant, either attached to the exterior or stored inside the building. Diamond-pane wood windows are located under the eaves. Entrance to the structure is via wood double doors with a diamond-pane transom. The equipment has been removed from the building, but the crane is intact. The building is in fair condition.
The lock has a 12' lift with normal pool elevations of below and above. The concrete chamber walls feature vertical cut-outs for pipe mooring aides. The walls exhibit areas of spalling and are in fair to poor condition. There are double-leaf steel miter gates at each end of the chamber. The original DC operating machinery was replaced with AC operators and EIM butterfly valve mechanisms in the The electrical equipment is housed in modern cabinets. Modern light boards indicate valve positions. The lock also features steel plate machinery 1 Description of current conditions is based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 2, Sta. 831 + 50 to Sta.
779 + 00, approved April 2, NEW YORK STATE BARGE CANAL, LOCK C11 HAER No. (Page 2) covers, open-grate catwalks and concrete stairs in fair condition. A modern utility bridge is located at the north end of the lock, and a modern steel railing has been installed on the west side of the lock. The controls for the lock gates and valves are housed in two control stand shelters at the northeast and southeast corners of the chamber. The structures are frame with vinyl siding, asphalt-shingle hipped roofs, wood pop-out windows, and modern wood doors. The lock is in good to fair condition. The northwest, southwest, northeast, and southeast concrete approach walls exhibit areas of spalling and are in fair condition.
A section of cobblestone retaining wall is visible above the northwest approach wall. Steel buffer beams are located in the northwest and southwest approach walls. Visible elements of a fixed crest dam (noted as Dam No. 4 on the Residency Map) southeast of the lock include a concrete northwest abutment exhibiting cracking and severe spalling. Exposed bedrock is visible at the southeast end of the dam. History: Atlantic, Gulf & Pacific Company built Lock C11 as part of Contract 15, which covered 6.8 miles between Lake Champlain at Whitehall and Wood Creek.
It included excavating the channel and building Lock C11 and dam and Lock C12 and Dam, as well as a spillway, two masonry culverts, and five bridges with piers and abutments.2 The dredge Champlain excavated both the upper and lower approaches to Lock C11 and removed material from the prism and bypass from to The excavated material was used to form the embankments behind the lock and its approach walls. Construction in included placing and hanging the needle-beams until January when work stopped for the winter. At that point, the concrete work had almost been finished, the upper and lower gates were in position, and the approach walls were in various stages of completion. By the approach walls had been finished, and work was progressing on the dam and power plant.
In the embankments and grading for the highway west of the lock were completed.3 The operating equipment and lighting for Lock along with locks C9 and was part of Contract 90, let on April 12, to D Olier Engineering Company of Philadelphia, Pennsylvania. State Assistant Engineer A.R. Morse oversaw the work. The contractor set up the plant at Lock The powerhouse had been nearly completed by with the exception of the roof. The turbines and generators were in place, the single and double conduit work had been completed, the cable for the main feeders and splices had been drawn, and the gate and 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Noble E.
Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 93; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 91. NEW YORK STATE BARGE CANAL, LOCK C11 HAER No. (Page 3) valve-operating machinery had been installed along with the control panels and cabinets.
The interior of the powerhouse was finished the following year.4 Lock C11 was rehabilitated under Contract in Work included installing new lock gates, valve and gate operating machinery, and doing electrical and miscellaneous work at the site.5