Thomson Terminal, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal. It is one of several terminals constructed along the Barge Canal to provide points for freight transfer. Description: The terminal is located on the east bank of the Champlain Canal.1 Remnants of the terminal include a loading dock, which is banked so the dock extends outward over the water from a higher elevation than the surrounding landscape. The dock has a timber deck set on a steel I-beam substructure. The approximately long concrete terminal wall sits on timber piles and features cast-iron coping, cast-iron cleats, and bollards on concrete pads. A concrete slab with a steel equipment remnant is adjacent to the terminal wall.
At the north end of the wall is a set of concrete stairs that lead directly down to the water. The concrete foundation of a building (probably the former winch building) is also located at the north end of the wall. The foundation is approximately 1' to 3' high and very overgrown with vegetation. The terminal is in poor condition. At the south end of the terminal is a remnant of a concrete abutment for a bridge that carried a rail spur past the terminal and onto a small island. A fixed crest dam is located south of the terminal, extending south from the Hudson River s west bank across the river to an island. This dam was constructed prior to the Barge Canal.
Along the west bank of the Hudson River near the dam are remnants of a reinforced concrete wall and concrete piers from guide cribs that are in poor condition. History: Chapter 746 of the Laws of authorized the issuing of bonds in the amount of for the purpose of constructing terminals for the Barge canal system throughout the state. The State Engineer, State Surveyor, and Superintendent of Public Works were tasked with choosing terminal locations, which would ultimately be approved by the Canal Board.
By the board had approved terminals for various locations, but Thomson does not appear on that list nor another list of proposed sites that required petitions by local citizens and officials be 1 Description of current conditions is based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 1, Sta. 20 to 0 + 00 to Sta. 14 + 00, approved April 2, 49. NEW YORK STATE BARGE CANAL, THOMSON TERMINAL HAER No. (Page 2) filed before the Canal Board would approve construction.
In though, the Canal Board let the contract for construction of the Thomson Terminal.2 Champlain Engineering & Construction Company, who submitted the winning bid of built the Thomson Terminal under Contract Hale, Assistant Engineer, oversaw the work. The contract comprised the building of a timber crib, with a concrete dock-wall on top of same. The crib was built on top of rock, except at the south end where concrete dead-man and steel cables were used to anchor the timber to the bank since a submerged crib was found in that location.
The dock walls had been completed by fall and the entire contract was completed on November 5, and approved by the Canal Board the following month.3 The retaining and cut-off walls on the west bank of the Hudson River in this vicinity were built as part of Contract 73, which encompassed dredging from Lock C4 to Northumberland. The contract had been awarded to E.M. Graves on May 26, The guide cribs in this area were built separately as part of Contract awarded to Bronk & Kimmey on July 29, The contract involved building concrete guide piers near Champlain Canal locks 3, 5, and 6.4 Holler of Ft. Edward, New York, rehabilitated the fixed crest dam at the site that predates the Barge Canal.
The work was done in under Contract which called for removal of the old stone-filled timber crib apron and building a new concrete one.5